Tag: English

Campaigners welcome Heathrow’s Intends to move incinerator

Heathrow Airport has announced plans to move an incinerator away from Stanwell and create a 15 mile ‘green ring’ around town.

A Labour county councillor nevertheless has stated it is like moving pieces around a chess board.

“But neighborhood resident Andrew McLuskey has done all of the hard work.

“But in saying that, we’re still fighting off to stop growth occurring at Heathrow at all.

“There are still serious reservations and I do not feel an expansion of the airport is right for the region or the whole country.

“We’re talking semantics here — it’s a big growth in a very cramped area. It’s like moving pieces around a chess board — whatever we do not like around Stanwell will be just as enormous someplace else.”

Changes to the programs include introducing a 15 mile’green corridor’ which will increase the quantity of recreational distance between town and a new car park south to the airport — which has also been reduced in size.

A brand new park and an all-weather sports pitch has been mooted for the region, as well as the potential construction of’reconciliation ponds’ to help control the release of floodwater.

Roberto Tambini, chief executive of Spelthorne Borough Council, stated:”We’re thrilled that Heathrow has listened to and acted upon our opinions in creating its upgraded expansion plans and the inhabitants of Spelthorne have been provided an improved deal for a result.

“I am certain that we are able to work together and Heathrow will continue to listen to Spelthorne residents and demonstrate a flexible way of future proposals.”

A number of those 16 billion of private money being spent will also be utilised to encourage the Environment Agency in developing flood prevention schemes to safeguard homes and land in the surrounding regions.

The airport has also announced plans to fund a new bypass to replace the present A3044 in Colnbrook and Poyle to ease congestion problems.

John Holland-Kaye, chief executive of Heathrow stated:”The growth of Heathrow can bring significant benefits for local people as well as the UK economy.

“As well as bringing 50,000 new jobs and 10,000 apprenticeships, we can also enhance the ecological landscape across the airport and also mitigate some of today’s problems including street congestion and flooding. We continue to enhance our strategies based on the feedback we get.”

The Airports Commission is currently assessing the case for growth of Heathrow or Gatwick.

“As well as bringing 50,000 new jobs and 10,000 apprenticeships, we can also improve the environmental landscape around the airport and mitigate some of today’s problems including road congestion and flooding. We continue to improve our plans based on the feedback we receive.”

The Airports Commission is currently assessing the case for expansion of either Heathrow or Gatwick.

Tinian solid waste: Where to go?

In assessing these options, the U.S. military held the assumption that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese team of investors is planning to develop in an integrated resort — will be closed and that a transfer station has been considered.

MARFORPAC environmental specialist Sherri Eng said the dumpsite is not something that the military will have the ability to use.

Just by looking at the requirements and the benefits of the options researched, Eng said that the simplest are the off-island disposal.”

In choosing the off-island disposal alternative, the parties might need to check in the capacity of the Marpi landfill to adapt the waste coming from Tinian — both military and civilian waste.

Eng, at a meeting with the regional regulatory agencies and officials walked them through the three systems being considered.

Choice 1: Incineration

Eng said the system that calls for the use of incinerator or waste-to-energy system requires a”properly sized incinerator,” fenced site, ash landfill, wastewater disposal, trained operators and secondary disposal site for C&D or construction and demolition waste, green waste, recyclables and white goods.

She stated that this system could cause significant waste reduction and energy production.

However, there are challenges to be met: siting and permitting, maintaining consistent operations, the demand for waste and sorting monitoring, high first cost, high maintenance cost and deadline for building.

“Construction timeline is long. It’s not something that we can install tomorrow,” said Eng.

Department of Public Works Secretary Martin C. Sablan said about the CNMI getting an incinerator that it never used owing to the difficulty of permitting through the regulatory agencies.

Choice 2: Fukuoka Landfill

The Fukuoka landfill is a fresh approach to managing solid waste. It’s a semi-aerobic landfill with a leachate gathering pipe set up in the landfill floor that drains the leachate into a treatment facility.

This method does not expect a synthetic liner.

But if that were to be chased, Tinian will need an additional 15 hectares and the use of specific structure material.

The MARFORPAC agents said they have conducted research on this method.

It had been done in Palau, Yap and American Samoa but nowhere else in the continental United States due to permitting.

“We must find some kind of waiver,” said Eng mentioning that it is not a permitted system in the U.S.

But with Fukuoka method, there is a capability to convert the existing dumpsite on Tinian.

As for leachate, the military is contemplating to upsize its waste water treatment facility to adapt this if this were the option to think about.

As the Fukuoka landfill will need clay, Eng said their study showed the deficiency of the material on Tinian; nonetheless it was indicated there’s a source in Papago.

Choice 3: Off-island Entry

This alternative proposes to use the existing Marpi landfill.

With this option, Eng stated there will be no additional land requirements.

She explained that this centralizes waste management system on Saipan.

But Eng was quick to point out that among the challenges will be how to manage the perception that Saipan becomes a dumping ground.

The military also sees the necessity to upgrade shipping infrastructure.

“We are willing to accept military waste,” said DPW Secretary Martin C. Sablan.

He explained they had excavated the floor to construct the next cell of the landfill facility.

With this option, Eng assured that”whatever we do, we’re likely to take the Tinian waste .”

Asked by DPW if the military were to foot the bill for shipping and transport of this waste, Eng stated,”We consent to discover the solution and hope to obtain the solution.” She explained she could not commit to anything.

Sablan said it’ll charge less for the military to bring their waste to Saipan but the municipality will be needing assistance.

Eng remarked that the options has to be brought down to 2.

“I do not believe we’ve got the time and money to do all three,” she explained.

Transport channel is key

As they mulled the prospective solutions to Tinian’s solid waste problems, Eng stated it is supposed that there’ll be a transfer channel.

“Transport channel is important in all these sytems,” she explained.

Closure of this dumpsite

Tinian Mayor Ramon M. Dela Cruz pointed out It Is not the responsibility of the developer to close the Present dumpsite in Puntan Diablo.

He, however, stated that Alter City has dedicated to providing around $5 million in assistance.

Asked by CIP’s Elizabeth Balajadia if they might continue to utilize the dumpsite for five more years, Tinian Mayor’s Office chief of staff Don Farrell stated”five years is too long.”

Mayor Dela Cruz stated three years would be fair.

“That will permit the developer to work on the adjacent property,” he explained.

Alter City Group is proposing to build a golf course in the present site of the dumpsite.

Alter City dedicated to help

In a hearing prior to the CNMI legislature last week, Alter City’s legal counsel Rober Torres stated,”Investor is prompted to help in its elimination.”

Mayor Dela Cruz said three years would be reasonable.

“That will allow the developer to work on the adjacent property,” he said.

Alter City Group is proposing to build a golf course at the current site of the dumpsite.

Alter City committed to assist

At a hearing before the CNMI legislature last week, Alter City’s legal counsel Rober Torres said, “Investor is motivated to assist in its removal.”
But he said the government too has to pitch in.
by: http://www.mvariety.com/special-features/business-edge/70491-tinian-solid-waste-where-to-go

New Metro incinerator Could cost $1.3 billion more than planned: study

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected.

The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the province’s rejection of its proposed Bylaw 280, which was integral to the solid waste management program since it could have ensured garbage generated in Metro was retained in the area.

Belkorp, which runs the Cache Creek dump, has been engaged in a high-profile lobbying effort against Bylaw 280 also as Metro Vancouver’s plans to burn the area’s waste rather than landfill it. Metro is slated to shut the Cache Creek dump in 2016.

“We are still battling for alternatives that are better than the incinerator,” said Russ Black, Belkorp’s vice-president of corporate growth. “Irrespective of Bylaw 280, we still wanted to show the true expenses of the incinerator.”

The analysis, by ICF’s lead author Seth Hulkower, suggests Metro Vancouver significantly outperforming the earnings it would make by selling electricity from the new incinerator to BC Hydro within a span of 35 decades.

Metro had proposed it would seek to negotiate a price of $100 per kilowatt hour from BC Hydro, but Hulkower noted the waste-to-energy small business plan does not take into account the BC Hydro may correct the price it pays for electricity following Metro recovers it capital outlay on the undertaking.

Metro Vancouver chairman Greg Moore said he’s not surprised with the study’s findings, stating it’s a point that has long been argued by Belkorp.

But he said the analysis is premature thinking that Metro has at least 10 proponents offering distinct forms of waste-to-energy, including district heat and gasification, and there are several potential scenarios.

“They don’t understand anything about what we’re doing in our (request-for-proposals) procedure… all of them are not based on selling to Hydro,” Moore stated.

He added Metro has experience conducting a waste-to-energy plant, having done so in Burnaby since 1988, while Belkorp is considering establishing multi-material recovery centers and ensuring the dump continues to operate.

“They are persistent in pursuit of the schedule to continue to have garbage going for their landfill,” Moore stated. “Until this decision is made I don’t believe that they’ll stop.”

Belkorp already has a Coquitlam website where it suggests to build a facility to take a”last pass” at waste to remove recyclables such as organics, plastics, paper and alloys, a movement that would finally rob the area of sufficient substance to fuel another waste-to-energy facility.

Black acknowledged multi-material recovery centers directly compete with incinerators however say they make sense. “When you look at the selection of prices, there is some critical questions that have to be addressed,” he said.

by: http://www.vancouversun.com/technology/Metro+incinerator+would+cost+billion+more+than+planned+study/10329525/story.html

N.D. could get Ebola waste from Calif..

FARGO, N.D. — California health officials have given note that North Dakota is among six countries that may get Ebola medical waste in case the state has any material to incinerate.

In a note published last week, the California Department of Public Health listed North Dakota as one of six states where California pushes medical waste to be incinerated when onsite disposal isn’t available at health facilities.

Healthcare Environmental Services Inc., located at a nearby park in 1420 40th St. N. at Fargo, operates a medical waste incinerator which also accepts waste from other locations.

Calls for Healthcare Environmental Services on Tuesday afternoon Weren’t returned.

The company is owned by Sanford Health. A Sanford spokeswoman said it couldn’t immediately comment on the possible incineration of Ebola waste from California in the Fargo facility.

up to now, California has no known Ebola cases, according to the state health department, which spelled out its own interim guidelines for safe handling of medical waste in an alert to others and providers.

In another development, public health officials have been tracking two North Dakota residents who lately returned from countries in West Africa that are combating the Ebola epidemic.

Neither of the two inhabitants is running a temperature or showing any signs of an Ebola disease, which can include diarrhea, joint and muscle aches and abnormal bleeding.

“They’ve just recently traveled to the area,” said epidemiologist Michelle Feist of the North Dakota Health Department. “They pose no danger to the community.”

Health officials aren’t releasing information about where the two people live.

Public health officials in both Minnesota and South Dakota also are tracking residents in those countries who have recently visited Guinea, Liberia or Sierra Leone in West Africa, in which an epidemic of Ebola has killed about 5,000.

State health officials have been contacted by the Centers for Disease Control and Prevention when a person is entering the United States from those countries through five major international airports.

“We are doing tracking,” explained Sam Brungardt, a public information officer for the Minnesota Health Department.

On Monday, Minnesota health officials declared that they were tracking one resident who’d traveled to West Africa, but the record of individuals to monitor is growing.

“It’s grown, and it’ll continue to grow as we get reports by the CDC,” Brungardt said. “There’s people that are returning from these three West African countries every day.”

up to now, not one of those being monitored for signs of fever with twice-daily temperature checks show any sign of disease, he said.

As a precaution, howeverthey will continue to be checked during the 21-day monitoring period, generally regarded as the incubation period for the Ebola virus.

South Dakota health officials also are tracking somebody who lately returned from West Africa, but isn’t showing symptoms.

by: http://bismarcktribune.com/news/state-and-regional/n-d-could-receive-ebola-waste-from-calif/article_10e0e242-5f2c-11e4-8ff8-8ba8bab48ce3.html

Smaller cremators incinerators

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require.
Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group).
● Able to burn 25-30kg per hour
● Consist of two chambers to ensure significant reduction in emission
● Be capable of temperature in range of 800c to 1000c
● Low maintenance design
● Must be Diesel fuelled
● Need more than 15amp 220- 250V power
● kW Consumption power consumption to be stated
● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste
● Solid waste reduction in range of 90-97% ( should be routinely achieved)
1. –  2 medical waste autoclaves 350ltr and 100ltr
2. – 1 medical waste shredder
3. –  3 medical macerators
4. – 27 Waste transfer trolleys.

One chamber incinerator

One (MAIN) chamber only, with two doors
Doors with hinges at the center
LPG combustible mainly
After burner and chimney don′t change
MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber
Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete
Burning Rate:47.5–50kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash post 100kg:Max 3.8kg
1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time
2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day??
3)      How many hertz do we need for this type of incinerator
4)      Where is the oil tank in the incinerator?
5)      Is it possible to build in not the standard accessories but the high proof accessories?
6)      What are the costs when shipment is to Surinam/South America
7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly? 
And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company.
So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.
 
Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country.
So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

One chamber incinerator

One (MAIN) chamber only, with two doors
Doors with hinges at the center
LPG combustible mainly
After burner and chimney don′t change
MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber
Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete
Burning Rate:47.5–50kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash post 100kg:Max 3.8kg
1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time
2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day??
3)      How many hertz do we need for this type of incinerator
4)      Where is the oil tank in the incinerator?
5)      Is it possible to build in not the standard accessories but the high proof accessories?
6)      What are the costs when shipment is to Surinam/South America
7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly? 
And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company.
So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.
 
Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country.
So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

islands incinerators

Application : four islands in Croatia

Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day
Burning temperature – over 12000C
Two chambers – minimum
Emissions – dioxin and heavy metaly – better then Kyoto protocol
Emission – monitoring system
Waste unloiding – directly from waste track to incinerator
Burn Rate(Average kgs/hr)
 25 kg
 
primary chamber
 800 degree
 
secondary chamber
 1000 degree
 
chimney
 standard
 
shredder
 separately
 
Autoclave or microwaves
 separately
 
temperature monitor
 attached outside of machine
operating
 Fuel and electric
 
–          Toxic and dangerous wastes,  
–          Medical pharmaceutical and hospitable liquids  Wastes
–          Domestic garbage  
–          Electric and electronic wastes
–          Industrial wastes
–          In General, all type of wastes and garbages
1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai
2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it
so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300
3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before
4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai
5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item
6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog
7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china)
8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers.
9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines
10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted
The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products, 
you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.   
If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.  

islands incinerators

Application : four islands in Croatia

Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day
Burning temperature – over 12000C
Two chambers – minimum
Emissions – dioxin and heavy metaly – better then Kyoto protocol
Emission – monitoring system
Waste unloiding – directly from waste track to incinerator
Burn Rate(Average kgs/hr)
 25 kg
 
primary chamber
 800 degree
 
secondary chamber
 1000 degree
 
chimney
 standard
 
shredder
 separately
 
Autoclave or microwaves
 separately
 
temperature monitor
 attached outside of machine
operating
 Fuel and electric
 
–          Toxic and dangerous wastes,  
–          Medical pharmaceutical and hospitable liquids  Wastes
–          Domestic garbage  
–          Electric and electronic wastes
–          Industrial wastes
–          In General, all type of wastes and garbages
1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai
2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it
so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300
3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before
4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai
5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item
6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog
7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china)
8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers.
9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines
10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted
The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products, 
you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.   
If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.