Tag: waste

Tinian solid waste: Where to go?

In assessing these options, the U.S. military held the assumption that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese team of investors is planning to develop in an integrated resort — will be closed and that a transfer station has been considered.

MARFORPAC environmental specialist Sherri Eng said the dumpsite is not something that the military will have the ability to use.

Just by looking at the requirements and the benefits of the options researched, Eng said that the simplest are the off-island disposal.”

In choosing the off-island disposal alternative, the parties might need to check in the capacity of the Marpi landfill to adapt the waste coming from Tinian — both military and civilian waste.

Eng, at a meeting with the regional regulatory agencies and officials walked them through the three systems being considered.

Choice 1: Incineration

Eng said the system that calls for the use of incinerator or waste-to-energy system requires a”properly sized incinerator,” fenced site, ash landfill, wastewater disposal, trained operators and secondary disposal site for C&D or construction and demolition waste, green waste, recyclables and white goods.

She stated that this system could cause significant waste reduction and energy production.

However, there are challenges to be met: siting and permitting, maintaining consistent operations, the demand for waste and sorting monitoring, high first cost, high maintenance cost and deadline for building.

“Construction timeline is long. It’s not something that we can install tomorrow,” said Eng.

Department of Public Works Secretary Martin C. Sablan said about the CNMI getting an incinerator that it never used owing to the difficulty of permitting through the regulatory agencies.

Choice 2: Fukuoka Landfill

The Fukuoka landfill is a fresh approach to managing solid waste. It’s a semi-aerobic landfill with a leachate gathering pipe set up in the landfill floor that drains the leachate into a treatment facility.

This method does not expect a synthetic liner.

But if that were to be chased, Tinian will need an additional 15 hectares and the use of specific structure material.

The MARFORPAC agents said they have conducted research on this method.

It had been done in Palau, Yap and American Samoa but nowhere else in the continental United States due to permitting.

“We must find some kind of waiver,” said Eng mentioning that it is not a permitted system in the U.S.

But with Fukuoka method, there is a capability to convert the existing dumpsite on Tinian.

As for leachate, the military is contemplating to upsize its waste water treatment facility to adapt this if this were the option to think about.

As the Fukuoka landfill will need clay, Eng said their study showed the deficiency of the material on Tinian; nonetheless it was indicated there’s a source in Papago.

Choice 3: Off-island Entry

This alternative proposes to use the existing Marpi landfill.

With this option, Eng stated there will be no additional land requirements.

She explained that this centralizes waste management system on Saipan.

But Eng was quick to point out that among the challenges will be how to manage the perception that Saipan becomes a dumping ground.

The military also sees the necessity to upgrade shipping infrastructure.

“We are willing to accept military waste,” said DPW Secretary Martin C. Sablan.

He explained they had excavated the floor to construct the next cell of the landfill facility.

With this option, Eng assured that”whatever we do, we’re likely to take the Tinian waste .”

Asked by DPW if the military were to foot the bill for shipping and transport of this waste, Eng stated,”We consent to discover the solution and hope to obtain the solution.” She explained she could not commit to anything.

Sablan said it’ll charge less for the military to bring their waste to Saipan but the municipality will be needing assistance.

Eng remarked that the options has to be brought down to 2.

“I do not believe we’ve got the time and money to do all three,” she explained.

Transport channel is key

As they mulled the prospective solutions to Tinian’s solid waste problems, Eng stated it is supposed that there’ll be a transfer channel.

“Transport channel is important in all these sytems,” she explained.

Closure of this dumpsite

Tinian Mayor Ramon M. Dela Cruz pointed out It Is not the responsibility of the developer to close the Present dumpsite in Puntan Diablo.

He, however, stated that Alter City has dedicated to providing around $5 million in assistance.

Asked by CIP’s Elizabeth Balajadia if they might continue to utilize the dumpsite for five more years, Tinian Mayor’s Office chief of staff Don Farrell stated”five years is too long.”

Mayor Dela Cruz stated three years would be fair.

“That will permit the developer to work on the adjacent property,” he explained.

Alter City Group is proposing to build a golf course in the present site of the dumpsite.

Alter City dedicated to help

In a hearing prior to the CNMI legislature last week, Alter City’s legal counsel Rober Torres stated,”Investor is prompted to help in its elimination.”

Mayor Dela Cruz said three years would be reasonable.

“That will allow the developer to work on the adjacent property,” he said.

Alter City Group is proposing to build a golf course at the current site of the dumpsite.

Alter City committed to assist

At a hearing before the CNMI legislature last week, Alter City’s legal counsel Rober Torres said, “Investor is motivated to assist in its removal.”
But he said the government too has to pitch in.
by: http://www.mvariety.com/special-features/business-edge/70491-tinian-solid-waste-where-to-go

incinerator china, call hiclover brand(www.hiclover.com).  Nanjing Clover Medical Technology Co.,Ltd. is top incinerator supplier in china and supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
7. Type of waste  : Bio-medical / Hazardous / Municipal / Trash  = ALL and Mixed
8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Quantity of waste generated per day in kg : 3 -5 tonnes per day
10. Duration C incinerator will be used per day : 1 C 8 hours / 1 C 16 hours / Continuous 
11. Approximate moisture content: Variable
12. Local incinerator operating and emission standards : India / EURO / US-EPA  Australia
13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process
14. Fuel proposed to be used :  LDO / HSD / FO / SKO/ Gas / Other  – No fuel required – Intended to free burn waste products
15. Availability of power and type : Electricity if required
16. Details of space available :  Not restricted
17. Do you require an automatic loading system? : [X ] Yes         [ ] No 
18. Do you require a gas scrubbing system? : [ ] Yes         [X ] No 
19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months
20. City and country of use :  Australia
21. Whether the location is a coastal area : [ ]Yes         [X ] No 
22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.
23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.

incinerators for sale



incinerators for sale

get HICLOVER new incinerators for sale, call us +86-25-8461 0201 and receive free quotation document from us. We supply single combustion chamber, dual glazing chambers, three combustion chambers and multi-combustion chambers waste incinerators for lab, hospital, clinic, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, toxic waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Hazardous solid chemical:

Different types of combustible solids, used textiles, grease, and toner cartridges, chemicals
for water purification and photographic consumables and plastic material, empty
plastic/metal cans that still contain remnant hazardous material, oil absorbent.

Hazardous liquid chemical:

Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-less
Solvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic and
Compressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, air
refresh spray and other similar chemicals.

Contaminated fuel:
Mainly diesel or gasoline contaminated by water or solvents.

Used and/or Contaminated oil:

Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motor
and gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%).

Contaminated water:

Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate.

Contaminated soil:

Soil polluted by oil, fuel or 11 chemicals.
Contaminated soil polluted by chemicals that has to be recycled in landfill.
Contaminated soil—treated and replaced on site.

Oil Contaminated Solids
Rags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials.

Electronic waste:

Waste electrical or electronic appliances or assemblies, including printed circuit boards,
containing toxic material and/or heavy metal and/or emitting low radiation.

Used battery cells:

Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containing
materials that are hazardouy.

Used lead-acid batteries:
Waste lead-acid batteries, rained/un-drained, and whole or crushed.

Hazardous medical waste:

Clinical and related waste, arising from medical, nursing or similar practices and waste
generated in clinics during the investigation or treatment of patients (bio hazard).

Expired drugs, solid:

Waste pharmaceuticals, drugs and medicines, including sensitive medicines.

Expired drugs Iiquid:

Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medical
grease, and paraffin based xpired medicines.

Expired and/or contaminated fod:

Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food)

Onsite Training and Assem Option for Industrial Incinerators

I. The bidders should includ 1a price in their offer for training in a central location ( Goma or
Bukavu) approximately 15 staff in the operation and maintenance of the
equipment.

Smart Ash Incinerators

1. Size requirement for the incinerators is that the unit works with a 55 gallon open ended
steel drum.
2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.
3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J
4. Each unit should come witH two steel drums, so that a spare drum is available.

Spare Parts Option
If there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

the china incinerators with reasonable price for customer and good quality for long time use. We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc.

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 5300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 300
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chmaber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

 

 

minimum technical requirements

 

Item 1

Incinerator model A

 

Burn Rate 65kg/h minimum

 

Weight (kg), please indicate:

 

Secondary Chamber

 

Gas Retention Time – 2 Seconds

 

Fuel – Diesel/LPG/LNG, please indicate

 

Power Supply for Control Box – 220V-240V 50Hz single phase

 

Minimum operating temperature 850 °C, please indicate

 

One year Spare Parts Package for complete maintainability

Item 2

10m Hose Pipe, indicate length

Item 3

I000 Litre Fuel Tank + Pipe System, indicate volume

Item 4

Additional chimney extension, indicate height

 

Warranty, indicate no of years

 

 

 

 

minimum technical requirements

Incinerator model B

Burn Rate 150kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Diesel/LPG/LNG, please indicate

Power Supply for Control Box- 220V-240V 50Hz single phase

Minimum operating temperature 920 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

I000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

 

 

 

minimum technical requirements

Incinerator model C

Burn Rate 250kg/h minimum

Weight (kg) please indicate:

Secondary Chamber

Gas Retention Time 2 Seconds

Fuel Diesel/LPG/LNG, please indicate

Power Supply for Control Box 220V-240V 50Hz single phase

Minimum operating temperature 920 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

I000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

 

 

minimum technical requirements

High Temperature Waste Incinerator

HTW Incinerator model D

Burn Rate – 150kg/hour minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time 2 Seconds

Fuel Diesel/LPG/LNG, please indicate

Power Supply for Control Box 220V-240V, single phase 50-60Hz

Minimum operating temperature 1200°C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

1000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

 

 

 

MOBILE INCINERATORS

 

minimum technical requirements

 Mobile Incinerator

Item 17

Mobile Incinerator model E

 

Burn Rate 50kg/h minimum

 

Weight (kg), please indicate:

 

Secondary Chamber

 

Gas Retention Time – 2 Seconds

 

Fuel – Diesel/LPG/LNG, please indicate

 

Power Supply for Control Box – 220V-240V 50Hz single phase

 

Minimum operating temperature 850 °C, please indicate

 

One year Spare Parts Package for complete maintainability

Item 18

10m Hose Pipe, indicate length

Item 19

1000 Litre Fuel Tank + Pipe System, indicate volume

Item 20

Additional chimney extension, indicate height

 

Warranty, indicate no of years

 

 

minimum technical requirements

 Mobile Incinerator

Mobile Incinerator model F

Burn Rate 100kg/h minimum

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – 2 Seconds

Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum operating temperature 850 °C, please indicate

One year Spare Parts Package for complete maintainability

10m Hose Pipe, indicate length

1000 Litre Fuel Tank + Pipe System, indicate volume

Additional chimney extension, indicate height

Warranty, indicate no of years

 

 

 

minimum technical requirements

High Temperature Waste Mobile Incinerator

Item 25

HTW Mobile Incinerator model G

 

Burn Rate 100kg/h minimum

 

Weight (kg), please indicate:

 

Secondary Chamber

 

Gas Retention Time – 2 Seconds

 

Fuel – Diesel/LPG/LNG, please indicate

 

Power Supply for Control Box – 220V-240V 50Hz single phase

 

Minimum operating temperature 1200 °C, please indicate

 

One year Spare Parts Package for complete maintainability

Item 26

10m Hose Pipe, indicate length

Item 27

1000 Litre Fuel Tank + Pipe System, indicate volume

Item 28

Additional chimney extension, indicate height

 

Warranty, indicate no of years

 

 

incinerator manufacturers china



incinerator manufacturers china

we are incinerator manufacturers china with hiclover manufacturer and TS version, YD version incinerators for medical waste, pet crematory, creature incineration and other solid waste treatment.

Currently we supply different series for local client requirements and layout updated incinerator with our leading technology. The updated design characteristic of our range of incinerators make them one of the most cost effective in the world. Key Features: * All models with Dual combustion chamber. * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 600kgs a hourto 10ton daily. * PLC Control Plane for Intelligent operation. * New Design for pet animal cremation enterprise. * One year warranty on incinerator and components in stock.

New Metro incinerator Could cost $1.3 billion more than planned: study

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected.

The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the province’s rejection of its proposed Bylaw 280, which was integral to the solid waste management program since it could have ensured garbage generated in Metro was retained in the area.

Belkorp, which runs the Cache Creek dump, has been engaged in a high-profile lobbying effort against Bylaw 280 also as Metro Vancouver’s plans to burn the area’s waste rather than landfill it. Metro is slated to shut the Cache Creek dump in 2016.

“We are still battling for alternatives that are better than the incinerator,” said Russ Black, Belkorp’s vice-president of corporate growth. “Irrespective of Bylaw 280, we still wanted to show the true expenses of the incinerator.”

The analysis, by ICF’s lead author Seth Hulkower, suggests Metro Vancouver significantly outperforming the earnings it would make by selling electricity from the new incinerator to BC Hydro within a span of 35 decades.

Metro had proposed it would seek to negotiate a price of $100 per kilowatt hour from BC Hydro, but Hulkower noted the waste-to-energy small business plan does not take into account the BC Hydro may correct the price it pays for electricity following Metro recovers it capital outlay on the undertaking.

Metro Vancouver chairman Greg Moore said he’s not surprised with the study’s findings, stating it’s a point that has long been argued by Belkorp.

But he said the analysis is premature thinking that Metro has at least 10 proponents offering distinct forms of waste-to-energy, including district heat and gasification, and there are several potential scenarios.

“They don’t understand anything about what we’re doing in our (request-for-proposals) procedure… all of them are not based on selling to Hydro,” Moore stated.

He added Metro has experience conducting a waste-to-energy plant, having done so in Burnaby since 1988, while Belkorp is considering establishing multi-material recovery centers and ensuring the dump continues to operate.

“They are persistent in pursuit of the schedule to continue to have garbage going for their landfill,” Moore stated. “Until this decision is made I don’t believe that they’ll stop.”

Belkorp already has a Coquitlam website where it suggests to build a facility to take a”last pass” at waste to remove recyclables such as organics, plastics, paper and alloys, a movement that would finally rob the area of sufficient substance to fuel another waste-to-energy facility.

Black acknowledged multi-material recovery centers directly compete with incinerators however say they make sense. “When you look at the selection of prices, there is some critical questions that have to be addressed,” he said.

by: http://www.vancouversun.com/technology/Metro+incinerator+would+cost+billion+more+than+planned+study/10329525/story.html

we have small incinerators with 10kgs per hour and the equipment weight 2200kgs for small waste out put unit department.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃