Waste Incinerator Model TS150 PLC, Overview
This model is small-scale waste incineration equipment for small waste output.
Construction is dual/double combustion chamber with 02 sets oil burner, batch loadincineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).Primary & Secondary combustion chambers and smoke filter chamber.Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation.Primary Combustion Chamber:※Main Feature:— Double Combustion Chamber— Double Italy Burner— Smoke Filter included–Burning Rate: 50-200kgs per hour optional–Primary Combustion Chamber: 1.57M3(1570Liters)— Incinerator Mainbody steel: 8mm thickness— Paint for outside face: 800°C Rate—Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate— Idea for campsite average or below 600 people— Chimney: 10 Meters, Stainless steelFeeding door primary chamber:
Items/Model
TS150(PLC)
Picture
Principle
Waste Incineration Treatment
Burn Rate
Average 150 kg/hour
*(50/100/200kgs/hour optional)
Feed Capacity
Average 750kg/feeding
Control Mode
PLC(Programmable Logic Controller Incinerator)
Main Body Steel
8mm thickness
Chamber Material
High Alumina Fire Brick Wall, 1750℃ Rate
Paint for outside face
800°C Rate
Combustion Chamber
1570L
Internal Dimensions
150x100x105cm
Secondary Chamber
750L
Smoke Filter Chamber
Yes
Feed Mode
Manual
Voltage
210/230V 50/60Hz
Power
0.9Kw
Oil Consumption (kg/hour)
Average 20.4-28.0(D.O)
Gas Consumption (m3/hour)
***
Temperature Monitor
Digital Display
Temperature Protection
Yes
Oil Tank
300L
Feed Door
80x60cm
Chimney
10Meter
Chimney Type
Stainless Steel
1st. Chamber Temperature
800℃–-1000℃
2nd. Chamber Temperature
1000℃-1200℃
Residency Time
2.0 Sec.
Gross Weight
8500kg
External Dimensions
300x160x280cm(without chimney)
Waste IncineratorsMedical Waste IncineratorPet Animal CremationSolid Waste Incinerator
Tel: +86-25-8461 0201Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com
Email: [email protected]
Email: [email protected]Nanjing Clover Medical Technology Co.,Ltd.
England’s Garbage Producing Danish heat
“They save on having to bury the waste and we save on the consumption of natural gas,” he explained.
READ MORE: Denmark pays for electricity
Environmental protection agency Miljøstyrelsen explained that last year up to 200,000 tonnes of non-hazardous waste from England was incinerated in Denmark — almost six percentage of the total volume of combustible material used.
by: http://cphpost.dk/news/englands-trash-generating-danish-heat.11398.html
Incinerators in Aalborg and Hjørring are also burning British trash.
“The heating we produce using the waste is cheaper than that which we could create with gas,” explained AVØ mind Tore Vedelsdal. “And the British are curious since they lack incinerators and pay heavy taxes on landfills.”
Good for the environment
Power in Denmark is increasingly being produced in plants burning waste imported from England. The custom is being called an economic and ecological blessing on either side of the equation.
The AVØ incinerator in Frederikshavn creates heating and electricity to the area by burning trash from England.
“It’s mainly construction waste like bits of wood, cardboard and plastic in Manchester,” AVØ operations manager Orla Frederiksen told DR Nyheder. “I guess we have 600 tonnes here which provide a fantastic combustible mixture we could then become district heating and electricity.”
Good for your bottom line



























































