Tag: incinerator

New Metro incinerator Could cost $1.3 billion more than planned: study

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected.

The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care of the province’s rejection of its proposed Bylaw 280, which was integral to the solid waste management program since it could have ensured garbage generated in Metro was retained in the area.

Belkorp, which runs the Cache Creek dump, has been engaged in a high-profile lobbying effort against Bylaw 280 also as Metro Vancouver’s plans to burn the area’s waste rather than landfill it. Metro is slated to shut the Cache Creek dump in 2016.

“We are still battling for alternatives that are better than the incinerator,” said Russ Black, Belkorp’s vice-president of corporate growth. “Irrespective of Bylaw 280, we still wanted to show the true expenses of the incinerator.”

The analysis, by ICF’s lead author Seth Hulkower, suggests Metro Vancouver significantly outperforming the earnings it would make by selling electricity from the new incinerator to BC Hydro within a span of 35 decades.

Metro had proposed it would seek to negotiate a price of $100 per kilowatt hour from BC Hydro, but Hulkower noted the waste-to-energy small business plan does not take into account the BC Hydro may correct the price it pays for electricity following Metro recovers it capital outlay on the undertaking.

Metro Vancouver chairman Greg Moore said he’s not surprised with the study’s findings, stating it’s a point that has long been argued by Belkorp.

But he said the analysis is premature thinking that Metro has at least 10 proponents offering distinct forms of waste-to-energy, including district heat and gasification, and there are several potential scenarios.

“They don’t understand anything about what we’re doing in our (request-for-proposals) procedure… all of them are not based on selling to Hydro,” Moore stated.

He added Metro has experience conducting a waste-to-energy plant, having done so in Burnaby since 1988, while Belkorp is considering establishing multi-material recovery centers and ensuring the dump continues to operate.

“They are persistent in pursuit of the schedule to continue to have garbage going for their landfill,” Moore stated. “Until this decision is made I don’t believe that they’ll stop.”

Belkorp already has a Coquitlam website where it suggests to build a facility to take a”last pass” at waste to remove recyclables such as organics, plastics, paper and alloys, a movement that would finally rob the area of sufficient substance to fuel another waste-to-energy facility.

Black acknowledged multi-material recovery centers directly compete with incinerators however say they make sense. “When you look at the selection of prices, there is some critical questions that have to be addressed,” he said.

by: http://www.vancouversun.com/technology/Metro+incinerator+would+cost+billion+more+than+planned+study/10329525/story.html

we have small incinerators with 10kgs per hour and the equipment weight 2200kgs for small waste out put unit department.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

معدات حرق الجثث

وصف المنتج

المحرقة عبارة عن معدات حرق ، نفايات حريق مباشر بواسطة وقود الغاز أو الوقود النفطي. كطوق مختلف ، يمكن تسمية المحرقة بالعديد من الكلمات على النحو التالي:

قدرة المعالجة: محرقة صغيرة الحجم ، محرقة واسعة النطاق وبانت حرق.
مواد النفايات: محرقة النفايات البلدية ، محرقة النفايات الطبية ، محرقة جثث الحيوانات ، محارق الجثث البشرية
وقود المحرقة: محرقة الغاز ، محرقة الزيت
تحويل النفايات إلى طاقة (WTE): محرقة WTE ، محرقة لا تستخدم WTE
الشركة المصنعة للمحرقة: الشركة المصنعة للمحرقة في الصين ، الشركة المصنعة للمحرقة في المملكة المتحدة ، الشركة المصنعة للمحرقة بالولايات المتحدة الأمريكية ، الشركة المصنعة للمحرقة في الهند.
الشركة المصنعة للمحرقة الشهيرة: Inciner8 (UK) ، Clover Incinerator (الصين) ، Pennram (الولايات المتحدة الأمريكية) ، Haat (الهند)
معدل الحرق: 5 كجم / ساعة ، 10 كجم / ساعة ، 15 كجم / ساعة ، 20 كجم / ساعة ، 30 كجم / ساعة ، 50 كجم / ساعة ، 100 كجم / ساعة ، 150 كجم / ساعة ، 300 كجم / ساعة ، 500 كجم / ساعة

تقنية الترميد بالتحلل الحراري هي طريقة تقليدية لمعالجة النفايات لسنوات عديدة. في جميع أنحاء العالم ، في العديد من البلدان ، يقوم الناس بمقاومة المحارق لأن المحرقة ستنتج ديوكسين كبير في الدخان. يشير مصطلح “الديوكسينات” إلى مجموعة من المركبات الكيميائية السامة التي تشترك في بعض التركيبات الكيميائية والخصائص البيولوجية. يمكن إطلاق الديوكسينات في البيئة من خلال حرائق الغابات ، وحرق النفايات في الفناء الخلفي ، وبعض الأنشطة الصناعية ، والمخلفات من الحرق التجاري السابق للنفايات. تتحلل الديوكسينات ببطء شديد ولا تزال الإطلاقات السابقة من الديوكسينات من مصادر طبيعية ومن صنع الإنسان موجودة في البيئة. على أي حال ، يجب أن نذكر أن هذا هو بانت حرق على نطاق واسع ، بشكل عام أكثر من 30 طنًا في اليوم. هذه مشكلة اجتماعية ، لتحليل واقتراح طرق في زوايا مختلفة من الجمهور ، والحكومة ، والتنمية الاقتصادية ، وحماية البيئة ، وتطوير التكنولوجيا ، إلخ.

إذن ، لماذا ما زلنا نستخدم المحرقة؟
أولاً ، بالنسبة للنفايات الطبية من المستشفى ، فإن المحارق الحرارية هي أفضل علاج حتى الآن. تكنولوجيا الانحلال الحراري يمكن أن تقتل الفيروس ، والسيطرة على التلوث.
ثانيًا ، بالنسبة لجسم الإنسان والحيوان الأليف ، في العديد من البلدان والمناطق ، نرغب في حرق الجثث. هذا هو الحفل في مسيرة تنمية المجتمع ، واحتفالات تخليد ذكرى اختفاء الحياة.

على النحو الوارد أعلاه ، وليس فقط أعلاه ، ما زلنا نستخدم المحارق.

كيف يمكنك العثور على محرقة معقولة لموقعك المحلي؟
المحرقة ليست من المعدات الرخيصة ، وعمومًا يكون سعر النموذج الصغير حوالي 5 آلاف دولار أمريكي لكل وحدة وسعر نموذج كبير الحجم يزيد عن 50 ألف دولار أمريكي لكل وحدة. لذلك ، قبل شراء وحدة حرق واحدة ، عليك توضيح العناصر التالية:
ا ، احرق ماذا؟ المحرقة عبارة عن معدات حرق ، وظيفتها هي نفايات الحريق. إذن ما نوع النفايات التي تريد معالجتها؟
B ، صغير أم كبير؟ هذا وفقًا لإخراج النفايات كل يوم أو حجم النفايات لكل وقت تغذية ، مثل حجم الحيوان.
ج ، الوقود؟ تستخدم المحرقة وقود الزيت أو الغاز ، بشكل عام ، وقود الغاز أرخص من الزيت ومنظف الدخان من طراز الوقود النفطي. لكن بعض المواقع المحلية ليس لديها نظام إمداد بالغاز. محرقة ، مواصفات محرقة نفايات طبية مزدوجة الغرفة ، مصنعي محارق نفايات بغرفة مزدوجة ، محرقة اقتصادية ،
وعناصر تقنية أخرى ، مثل الطاقة (220 فولت ، 380 فولت) ، نوع باب تغذية النفايات ، هيكل المحرقة ، إلخ.

بعد توضيح ذلك ، يمكنك الذهاب للعثور على مصنّعين محليين أو دوليين ، يطلبون الأسعار والمواصفات الفنية ثم شراء المنتجات المناسبة في النهاية.

العناصر / النموذج TS10 (PLC) TS20 (PLC) TS30 (PLC) TS50 (PLC) TS100 (PLC)
معدل الاحتراق 10 كجم / ساعة 20 كجم / ساعة 30 كجم / ساعة 50 كجم / ساعة 100 كجم / ساعة
سعة الأعلاف 20 كجم 40 كجم 60 كجم 100 كجم 200 كجم
وضع التحكم PLC PLC PLC PLC PLC
غرفة الاحتراق 100 لتر 210 لتر 330 لتر 560 لتر 1200 لتر
خفض الماوس لعرض الإجابة 50x50x40 سم 65x65x50 سم 75x75x60 سم 100x80x70 سم 120x100x100 سم
الغرفة الثانوية 50 لتر 110 لتر 180 لتر 280 لتر 600 لتر
غرفة مرشح الدخان نعم نعم نعم نعم نعم
وضع التغذية يدوي يدوي يدوي يدوي يدوي
الجهد االكهربى 220 فولت 220 فولت 220 فولت 220 فولت 220 فولت
قوة 0.5 كيلو واط 0.5 كيلو واط 0.5 كيلو واط 0.7 كيلو واط 0.7 كيلو واط
استهلاك الزيت (كجم / ساعة) 5.4 – 12.6 7.8 – 16.3 10.2 – 20 12.1 – 24 14 – 28
استهلاك الغاز (م 3 / ساعة) 6.2-11.4 8-15.7 9.8 – 20 9.9 – 26.1 10 – 32.2
مراقب درجة الحرارة نعم نعم نعم نعم نعم
حماية درجة الحرارة نعم نعم نعم نعم نعم
خزان النفط 100 لتر 100 لتر 100 لتر 100 لتر 200 لتر
باب التغذية 30×30 سم 45×40 سم 55×50 سم 70×55 سم 80×60 سم
مدخنة 3 متر 3 متر 5 متر 5 متر 10 أمتار
نوع المدخنة ستانلس ستيل ستانلس ستيل ستانلس ستيل ستانلس ستيل ستانلس ستيل
وقت الإقامة 2.0 ثانية. 2.0 ثانية. 2.0 ثانية. 2.0 ثانية. 2.0 ثانية.
الوزن الإجمالي 1500 كجم 2200 كجم 3000 كجم 4500 كجم 6000 كجم
الابعاد الخارجية 140x90x120 سم 160x110x130 سم 175x120x140 سم 230x130x155 سم 260x150x180 سم

اتصل الآن هاتف: + 86-25-8461 0201

we are mobile incinerator china manufacturer. HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce.

※Main Feature:
— Double Combustion Chamber
— Double Italy Burner
–Burning Rate: 10-100kgs per hour
–Combustion Chamber: 0.1M3-1.2M3
— Mobile Incinerator, Standard shipping containers, Easy to move/transport system
— Free Installation, Pre-installed incinerator, Ideal for camps

One chamber incinerator

One (MAIN) chamber only, with two doors
Doors with hinges at the center
LPG combustible mainly
After burner and chimney don′t change
MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber
Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete
Burning Rate:47.5–50kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash post 100kg:Max 3.8kg
1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time
2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day??
3)      How many hertz do we need for this type of incinerator
4)      Where is the oil tank in the incinerator?
5)      Is it possible to build in not the standard accessories but the high proof accessories?
6)      What are the costs when shipment is to Surinam/South America
7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly? 
And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company.
So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.
 
Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country.
So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

Hiclover supply medical waste incinerators with capacity 10kgs per hour to 500kgs per hour. 

The incinerator with dual/double combustion chamber and dry filter chamber, two fuel burner from 

Italy manufactured, hot sale model for small scale waste output, the capacity is 30kgs per hour 

and 50kgs per hour.

We are famous small scale incinerator manufacturer and brand, dispatch incinerator products 
and best services with lower price for customer all around the world.

 How you can find reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale model’s price around $5,000usd per unit 

and large scale model’s price more than $50,000usd per unit. So, before purchase one unit incinerator, 

 you have to make clear following items:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of 

waste you want to treatment?

B, small or large? This according to the waste output every day or the waste volume per 

feed time, like animal size.

C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke 

cleaner than oil fuel model. But some local site don’t have gas supply system.

And other technology items, like power(220v, 380v), waste feed door type, incinerator structure, etc.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Averag
e)
20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

One chamber incinerator

One (MAIN) chamber only, with two doors
Doors with hinges at the center
LPG combustible mainly
After burner and chimney don′t change
MAIN Chamber dimensions [LxWxH]: 2.2m x 4.5m x 2.8m, so we can put two containers within the MAIN chamber
Ok per your comment, refractory concrete and fire brick inside the chamber; feed door with refractory concrete
Burning Rate:47.5–50kg/hour
Minimum Operating Temperature:850o C(primary combustion)
Maximum Operating Temperature:1450 oC(Afterburner chamber)
Secondary Burning Capacity:Compulsory
Density Insulation:20mm High
Refractory Casting:Minimum 65mm
Heavy duty refracting lining to withstand:1500 oC
Average burn out time :maximum:3 hrs
Fuel type:Diesel
Fuel Consumption in L/hr:7.5 to 9
Residence time in secondary chamber:2sec
Residue ash post 100kg:Max 3.8kg
1)      This type is suitable for medical waste, but how many kilos can be put in the incinerator in one time
2)      Q: Operation and maintenance costs, these costs are based on?? What if we use it every day??
3)      How many hertz do we need for this type of incinerator
4)      Where is the oil tank in the incinerator?
5)      Is it possible to build in not the standard accessories but the high proof accessories?
6)      What are the costs when shipment is to Surinam/South America
7)      How will the inicinerator be delivered? Partly installated or do we have to install it completly? 
And in addition, the other models with less burn rate capacity as TS100(PLC); TS50(PLC); TS30(PLC); TS20(PLC) and TS10(PLC), interests also our company.
So, would you give also Proforma Invoices of these models in CIF Prices to Port of Abidjan.
 
Furthermore, as the Incinerators have to be installed at nationwide, there are always great power cuts in our country.
So, we would like to know if you can supply each Incinerator with a diesel engine (generator) which power is adapted to the power of the Incinerator unit?

islands incinerators

Application : four islands in Croatia

Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day
Burning temperature – over 12000C
Two chambers – minimum
Emissions – dioxin and heavy metaly – better then Kyoto protocol
Emission – monitoring system
Waste unloiding – directly from waste track to incinerator
Burn Rate(Average kgs/hr)
 25 kg
 
primary chamber
 800 degree
 
secondary chamber
 1000 degree
 
chimney
 standard
 
shredder
 separately
 
Autoclave or microwaves
 separately
 
temperature monitor
 attached outside of machine
operating
 Fuel and electric
 
–          Toxic and dangerous wastes,  
–          Medical pharmaceutical and hospitable liquids  Wastes
–          Domestic garbage  
–          Electric and electronic wastes
–          Industrial wastes
–          In General, all type of wastes and garbages
1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai
2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it
so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300
3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before
4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai
5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item
6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog
7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china)
8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers.
9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines
10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted
The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products, 
you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.   
If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.  

Waste incinerator producers from china



waste incinerator manufacturers from china

Nanjing Clover Medical Technology Co., Ltd. is waste incinerator producers out of china, a top waste incinerator manufacturer in China. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all around the world and also have good feedback from end-customer. The YD Model medical incinerator have multi-combustion room and fundamental dry scrubber (smoke filter chamber) with reasonable endeavor funding. For the cleaner require, we accept custom made wet scrubber to get incinerator and this will be also our next functioning by focusing on energy technical.

islands incinerators

Application : four islands in Croatia

Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day
Burning temperature – over 12000C
Two chambers – minimum
Emissions – dioxin and heavy metaly – better then Kyoto protocol
Emission – monitoring system
Waste unloiding – directly from waste track to incinerator
Burn Rate(Average kgs/hr)
 25 kg
 
primary chamber
 800 degree
 
secondary chamber
 1000 degree
 
chimney
 standard
 
shredder
 separately
 
Autoclave or microwaves
 separately
 
temperature monitor
 attached outside of machine
operating
 Fuel and electric
 
–          Toxic and dangerous wastes,  
–          Medical pharmaceutical and hospitable liquids  Wastes
–          Domestic garbage  
–          Electric and electronic wastes
–          Industrial wastes
–          In General, all type of wastes and garbages
1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai
2) the customer also want also to buy a fuel bulk storage tank  to be for 3 days continuous operation so we hope also you can manufacture it
so please give me the best price for fuel bulk storage tank  to be for 3 days continuous operation for YD-300
3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before
4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai
5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system.  please send me the price and catalog for this item
6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog
7) 2 units 1.5 tonne Fork Lift  ( if you know good price and quality  company in china)
8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers.
9) Spare Parts For 2 Years Operation & Maintenance  for YD-300 and for the above machines
10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted
The highest temperature that the filter bag can operate continuously is 260C.    In order to add a bag house using our filter products, 
you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C.   
If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.