Tag: incineration plant

Small Scale Incinerator 10kgs Per Hour



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, china incineration manufacturer, china incinerators, china manufacturer of refuse incineration plant, chinaveterinary, chinese animal crematories, chinese cremation incinerators, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Gas Cleaning Methods Maishima Incineration Plant



Basic Info.

Export Markets:Global

Product Description

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock. 

Application Scope: 
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste. 
3. Community & Sea Port & Station: Municipal Solid Waste, etc. 
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, waste incineration plant saudi arabiawaste incineration technologey manufacturer clover medical limited, waste incinerator capacity of 10 to 30 tons day, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel

Gas Cleaning Methods Maishima Incineration Plant



Basic Info.

Export Markets:Global

Product Description

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock. 

Application Scope: 
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste. 
3. Community & Sea Port & Station: Municipal Solid Waste, etc. 
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, waste incineration plant saudi arabiawaste incineration technologey manufacturer clover medical limited, waste incinerator capacity of 10 to 30 tons day, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel

Slaughter House Incinerators



Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator medical waste incineration, medical waste incineration in china, medical waste incineration moldova, medical waste incineration plant supplier italia, with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Poultry Incinerator



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, spittelau incineration plant caise acid rain, sterilizations incineration, sterling suffolk greenhouses, stoven to cremated pets, suppliers medical waste incinerator, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Clover Medical supply Incinerator for pet animal cremation. This equipment can burn family pet and animal, bird, cat, dog, pig, etc. The burn rate around 20-300kgs per hour.

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Incinerator Burner



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover
Origin:Nanjing

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Please fill in following items and send back to us. Advantage of diesel hospital incinerator, algeria incinerators, animail incenrator, animal by-products of the incineration plant scheme, animal carcas incineration, We will study following important information and proposal our product models, specification and so on.

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^..unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Incinerator



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, ways to use bt40lrf, westland incinerator company price, what flue gas cleaning methods does maishima incineration plant use, what is 150 kg per hour gas, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Livestock Incinerator



Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER
Packing:Wooden Carton
Origin:China Nanjing City
Production Capacity:1000 Sets Per Year

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one waste incineration compaines in china, waste incineration equipment, waste incineration factory data, waste incineration in ukraine, waste incineration plant ipswich jobs, incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Msw Incinerator



Basic Info.

Export Markets:Global

Additional Info.

Trademark:nanjing clover medical
Origin:Nanjing

Product Description

It is being recently issued an ordinance by the Ministry of Environment to build incineration plants in the metropolitans which generate more than 10.000kg of medical waste per day. And this implementation is going to start in the beginning of the year 2014. 
Our aim is to build a Medical Waste Incineration Plant in one of the metropolitan cities in Turkey. We have been preparing for the tenders which are going to be held soon by the Metropolitan Municipality. 
We would like to cooperate with a supplier/contractor for building an incineration plant. Would you be able to advise if you devise incineration plants, if yes kindly advise in which part of the world you had worked (built incineration plants). 

Could you also please inform us regarding the following issues: 
– Is it possible to reach an incineration temperature of 1.100° C within the systems which you have been devising? (This is one of the standards for the incineration plants according to the regulations in Turkey). 
– Is it possible to generate electricity and how? 
– If it is possible to generate electricity within the system, what would be the kwh amount of electricity per ton of waste incinerated? 
– What is the period for building the plant? How long would it portable medical incinerators, portable pet cremation, portable trash incinerator, posco krakow incineration plant, post-animal incinerator fuel, take for building a plant and would it depend on the plant capacity as for 1.000kg/hr or 2.000kg/hr? 
– What is the water consumption per incinerated ton? And if there is electricity generation within the system, what would be the amount of water consumption per ton for generating 1 kwh of electricity? 
– Do the plants which you devise have gas cleaning and filtering systems? If already included or can be added, would you be able to advise your prices including the gas cleaning and filtering systems? 
– Would there be a change in the prices if electricity generation can be added to the system? If yes, would you please advise your prices according to this? 
We look forward to your cooperation. 
Thank you in advance for your quickest possible response. (Turkey) 

Que valor tiene un incinerador PARA quemar droga. 

– Que consumo de energí A tiene? ? ? 
– Cuanta contaminació N genera a la ATMó Sfera. 

Saludos y quedo atento. (Chile)

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chamber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

The other day in the waste incineration plant



Recently a dream came true for me. I had the opportunity to participate in a guided tour through the waste incineration plant in Cologne. That may seem strange. Sometimes I catch myself when I get stuck on documentary programs about recycling methods in the (rare) zapping through the TV channels. Obviously this topic fascinates me.

The BVMW (Federal Association of Medium-Sized Enterprises) invited to a lecture on the topic of generation Y. Host and the venue was the waste recycling company in Cologne, AVG, which offered additionally a guided tour through their waste incinerator. Since I am also very interested in the topic Generation Y, I could kill two birds with one stone.
In a small group, we were led by the spokesman of the AVG through the various sections of the waste incineration plant and the procedures were explained in detail. Initially skeptical, because in previous years there was so much negative about this facility (excessive construction costs, lack of capacity), the mood among the participants changed gradually into fascination.

To clarify: It’s just about waste. Not about recycle materials such as paper, plastics, recycled glass or compostable organic waste.

Precision and cleanliness

What I noticed during the tour: In the plant, each step is carefully considered, it is worked with great precision. And even if that sounds paradoxical: it is squeaky clean! Only in the hall where different wastes are mixed on conveyor belts, there is the typical smell of rubbish, but also not as bad as originally expected.

Amazing for me: I did not know that by using residual waste a really large amount of power is generated. And reassuring for me: resources are won even from the last drop: metal, material for road construction, plaster in good quality. The proportion of what is factually left and actually not recycled, seems negligible to low.

From waste to electricity – the process in detail

The residual waste incinerator in Cologne was put into operation in 1998 and is one of the most modern and best facilities in the world. It processes what has landed in the residual waste after the separate collection of private households, as well as the remains of sorting from mixed building and industrial waste.

Much of the waste is shipped by rail. The railway containers are loaded in two waste transfer stations in the city of Cologne and together have a capacity of approximately 250,000 tons per year. The remaining waste is brought by truck.
A special feature of the Cologne residual waste incinerator is the integrated treatment of the waste in a treatment room. Residues from sorting and residues from the domestic and bulky waste are first distributed to the daily waste bunker on separate chambers. The bulky waste is pre-sorted and crushed. Only the non-recoverable components are processed in the incinerator.

The household waste is sorted in a perforated drum to size and then passes on large conveyor belts so-called magnetic seperators. They remove ferrous scrap. A second ferrous metal deposition as well as an automatic non-ferrous deposition take place after combustion.

Even commercial waste residuals are delivered to the Cologne plant. They have been processed previously in external sorting, so they can be added directly to the domestic and bulky waste. The various waste streams are mixed thoroughly, because this homogenization ensures a high quality, a uniform as possible burnout and a good quality ash.
From the huge hall of the conveyor belts the waste enters the so-called residual waste bunker. Here it is stored a while until enough moisture has dissipated, so that it can burn well. By means of permanent temperature and humidity indicators it is controlled, in what condition the waste is. With large gripping cranes the waste is rearranged and finally placed in the kiln. The garbage gripper fill four huge funnels. The waste comes from here in four independently powered boilers that operate around the clock. The waste moves on roller grates through the boiler. And there it burns. At an unimaginable heat of 1,000 to 1,500 degrees Celsius. The respective “new” waste ignites from the already burning garbage. So no additional external energy is required for the combustion process. The combustion takes place after the DC principle: The burning of waste and the waste gases move in the same direction through the “hot flame” at the end of the grate. This procedure ensures that the destruction of pollutants such as dioxins and furans are already done in the combustion chamber.

From waste is made power for 250,000 people

And here is the highlight. The heat produced during combustion is used. On the one hand, to heat the nearby Ford plant. But this is just a nice side effect. The majority of the heat is converted into electricity by generators. And even that much that the power consumption of 250,000 people can be met. The waste incineration plant Cologne is thus basically a power plant and supplies a quarter of the city of Cologne with electricity. That sounds awesome. And since you could get the idea that it is not so bad when so much garbage is produced – as it is used so well …

After combustion bottom ash, hot exhaust gas and residues remain. These substances are largely used again useful: The ash is cooled with water and stored in an ash bunker before it is processed in a bottom ash treatment plant and then utilized in road, landfill and landscaping.
The hot exhaust gas is used for power generation. It heats preheated water to steam, which meets at a temperature of 400 degrees Celsius and a pressure of 40 bar to a turbine. This drives the downstream generator with which is produced electric power. For own use only a small part of the energy is needed. The greater part is given in external power supply networks. The amount of energy generated in the incinerator is enough to power more than 100,000 households.

In the combustion and the subsequent exhaust gas purification residual substances such as dust and salts remain as well as ashes from the boiler. These materials are collected and used as backfill material for the backfilling of salt mine tunnels. Gypsum is also a waste material, which is obtained as a reaction product in the exhaust gas purification and has building material quality.

Emission control: the exhaust gases are almost completely neutralized by the method used at the Cologne incinerator. There is no waste water, as well as the legal requirements are clearly undercut. As a neutral auditor, the county government gets the actual exhaust gas readings permanently by direct line.

Rethinking at waste management companies

After the guided tour, I had the opportunity to talk to the press officer of AVG. In this conversation it became clear how much the thinking has changed in the field of waste management in recent decades and years. While during the 1960s to the 1990s garbage was piled up completely unsorted in landfills and then forgotten, in the new millennium they have recognized the value of the waste. Climate change and CO2 emissions have long pushed as important issues in focus for the residual waste processing. The heat generated during combustion is converted into electricity. Resources are regained, as far as is technically possible. Especially metal, plastics and wood. The recovered plastic from residual waste is used for example as fuel for cement plants.

Waste incineration plant are nowadays equatable to power plants, even if the fuel value is not quite equivalent to the conventional fuels such as coal, oil and gas. As more and more municipalities have come to generate their own electricity by means of residual waste incineration, the major electricity providers get in significant difficulties.

At the end of the tour I was really impressed. That what is put in the residual waste in private households plus the commercial waste is, after all, still god to supply 100,000 households with electricity in Cologne.

And at the same time it’s scary, what incredible tonnes of waste we produce. Yellow and blue ton even come on top of that.

Consumer society provides garbage

Waste incineration plants generating electricity for us and making us less dependent on fossil fuels, are the logical consequence of our consumer society. But incinerators are not built primarily to generate electricity. But to become master of the mountains of waste that we produce continuously as a consumer society. Fortunately, with modern incinerators, a way has been found to make up the stinking problem a clean thing. But the cause, our consumption, is the real problem.

For the operators of the incineration plant, it is essential that enough waste is delivered. Garbage is their product. The more they can get, the better for the system’s capacity. For then it will work cost-effectively, which in turn has a positive impact on the urban garbage fees. Not all incinerators in Germany are so well utilized as in Cologne. Since waste is added from adjacent areas.

But the consumer society provides these masses of garbage. Goods are produced in large quantities, purchased, used or consumed and eventually discarded. The 2aste incineration plant gets food – in 2013 there were 707,000 tons in Cologne. And provides us even with power (282 million kWh in 2013 in Cologne). Actually a perfect cycle, so one might think. If not for this “but” would be. Because our conventional consumption goes at the expense of other countries, to the detriment of the environment, fair working conditions; Resources are wasted, the transport around the globe has impact on the climate, production facilities in the Far East poison the local environment and so on.

Well, I live in Cologne, a big city, where certainly only a small proportion of residents think about trash, disposal or even waste reduction and also practice this. That may be a negative point of view, but I think it is realistic. The average normal citizen does not necessarily ask the question what is actually happening to what he throws away in the course of a year. All the more it is interesting to follow the different paths. My next wish is to visit a recycling plant for plastics.

Waste incineration and waste seperation versus waste prevention

Waste separation was yesterday. The latest approach is waste prevention. In its most distinct version it is called Zero Waste. No waste. So far there are only a few pioneers, whose reports and videos I read and watch with interest. And at the same time I wonder how to implement this in a normal big-city life. It starts with the fact that – even if you use a togo box, which is compostable, then you do not know where to dispose of it along the way. So take it home and put it in the compost bin? Would everybody do that?

I think it’s great if it is possible, to be master of the situation (immense amounts of waste) through a well organized disposal system and beyond even to convert this residual waste to a large extent into energy, ie electricity and heating. There is at least a huge improvement as against the stinking landfill from earlier, in which everything was thrown into a pile and then covered with the cloak of silence. The next step must be, to reduce the amount of waste in total. And this will not be possible just by the civil society. Here politics and economy are asked to create the right framework and to set the practical implementation in motion.

by: http://blog.upcycling-markt.de/en/blog/muellverbrennungsanlange-waste-incineration-plant.html