Archive: September 19, 2024

Медицинские отходы газовой горелки

Недавно один из клиентов сообщил нам о своей цели приобрести 1 системную установку для сжигания газа. Горелка для медицинских отходов для сжигания отходов медицинских центров в Египте, требуемая способность составляет 5 партий в день. Горелка среднего размера, которая использует как энергию, так и масло. НЕБОЛЬШОЙ ЖИВОТНЫЙ КРЕМАТОР С ГАЗОМ

pet crematorium equipment

Finally, steam to  the jacket should shut off, the unloading door is to be opened

Then the shaft and mixing arms are reversed to act as unloading mechanism and should scoop the waste fragments out of

the unloading door, onto a conveyor belt or directly into a waste container.

The vessel should now be ready for another treatment cycle, having retained most of its heat for the treatment of the

next batch.

(B)Features and Specification of the Steam Boiler:

Features of the Boiler:

It must be an Electrical boiler

Splash proof electric enclosure and switches

Door Isolator to main electric enclosure

Alarm lights and Safety/protection against excel pressure

Level control on feedback water tank

Technical specification of the Boiler:

Output: between: 90-110 kg/h (F&A 100 deg C)

Working pressure: between 7-10 bar

Boiler water content: between 80-100 liter

Feed water tank content : between 60-80 liter

Power consumption: between 60-75 Kw

Number of Heating Elements: 3-4 nos.

Electrical requirements: 400Vac, 50 Hz, 3 ph

(C)Technical Specifications of Tub washer

Features:

Fully automatic and manual modes.

Metal construction, SA 240/304

Sensors to maximize both machine efficiency and operator safety.

Must use Re-circulating cold wash water to minimize water consumption and operating costs

Disinfects all bin surfaces

Uses Powerful blow dryer to remove excess surface water

Must be compliant with all North American and EU regulations

Specifications:

Tub washer able to wash bins of a suitable size , the norm being 38 g

Must have an water reservoir of capacity minimum : 225 liter

Perfectly suited for hospitals and clinics by processing up to min.300 bins per hour.

Time to wash and dry one bin after loading-approximately 12 nos.

Bins loading on wash station at a time -approximately 12 nos.

Overall length: approx 30.0 feet

Overall length: approx 8.0 feet

Overall length: approx 3.0-3.5 feet

Height to Conveyer from ground: approx 3 feet.

Drive of the Tub washer

Motor driven

Motor Horsepower : approx. 4.0 HP

Power : 220vac, 1 ph or 400 VAC , 3 ph or to suit customer needs

Bins to be included

200 nos. with different color (based on the actual requirement of the hospital)

(D)Technical Specification of External SHREDDER Controls

Pre-programmed PLC controlled

Password activated and reversal history indication

Motor starter with overload protection

Automatic instantaneous stop on hard object in shredder bed

Automatic heavy cutting load reversal and re-try , up to three times

Control housing Nema Type 12

Cutting Hardwires

Chamber Dimensions (W x L x H): approx. 33 cm x 38 cm x 25 cm

Number of Knives: approx 18 or to suit customer needs

Knife Thickness : approx 18 mm or to suit customer needs

Knife Diameter : approx 16 cm or to suit customer needs

Teeth per Knife: minimum 3

Number of Shafts : 2 ie double shaft shredder

Drive of the shredder

Must be motor driven

Motor Horsepower: approx. 10 HP

Motor RPM: minimum 1750

Speed Reduction : 60:1

Generated Torque : min 40 Nm or 350 Ibs/in.

Gearbox: should be Parallel shaft

Shock Protection: Rubber Mount Torque Arm

Power: 220vac, 1 ph  or 400 VAC , Ph or to suit customer needs

Ancillaries to be included

Shredder stand, fabricated from 3” sq. steel tube, standard height 30 inches

Shredder hopper , fabricated from 16 gauge steel, with optional switched hopper lid

(E)Features & Technical Specification of Conveyer

To carry processed waste from vessel to shredder

Controls

Motor starter with overload protection

Control housing Nema Type 12

Safety pull-stops along both sides of conveyer

Ancillaries

Conveyer stand, fabricated from 2” sq. steel  tube

Raised sidewalls fabricated from 16 gauge steel

Dimensions

Over-all length: between 20-25 feet or appropriate length depending on the installation requirement.

Over-all width: between 24-30 inch

Over-all height (without including stand): between 12-14 inch

Available inclines:    0-40 degrees

Belt Speed: 75 ft/min

Dam spacing: approx. 16 inch

Drive

Motor driven

Horsepower :approx. 0.75 HP

Motor RPM: approx. 60

Electrical Power input : 220vac, 1phj or 400 VAC , 3 Ph or to suit customer needs

(F)Technical Specification of Tipper

Features:

It is to be designed to allow for easy bin positioning under the door to unload processed waste and easy

maneuverability for lifting and tipping the waste into the shredder hopper.

Equipped with 2 binds to accommodate processed waste loads to be loaded into the shredder and shredder waste to be

transported to the disposal bin.

Frame: Rugged heavy duty frame constructed of formed and welded steel for extra strength

Mast: Fabricated with cannel steel for greater strength and dependability. Open structure design complete with safety

cage to offer greater visibility.

equipo de incineración de mascotas

Capacidad mínima: 500L

Provisto de estructura de soporte

valvulas

Tanque indicador de nivel

embudo

Filtra las impurezas en la boca del tanque.

Especificaciones técnicas

Incineradora a Diesel de 25Kg / h

Caixa

Dimens? Es da caixa do incinerador.

Largura aprox: 900 mm

Comprimento aprox: 1000 mm

Altura aprox: 1000 mm

Dimens? Es da chaminé

Altura min: 6000 mm

Diámetro: 300 mm

Provido de duas camaras primarias e secundaria.

Volumen de la cámara primaria: 0,25 m3

Volumen de la cámara secundaria: 0,25 m3

Construído em a? O com revestimento refractário

Porta de remo ?? o de cinzas

Visor de chama nas duas camaras

Sondas de temperatura do tipo PTC

Queimadores

Potencia Térmica Max: 5100 Kcal / h, 59 Kw

Mínimo 1700 Kcal / h, 20kw

Consumo aprox. 2,6 a 5,0 kg / h

Decenas? O -230V 50Hz

Ventilador 75W, Rotacao 2800 Rpm

Transformador de igni ?? o

Igni ?? o por meio eléctrodos

Controlador de queimador

Quadro controlador

Termómetro digital de camara primaria e secundaria

Regula ?? o de cabe? A de combust? O

Regula ?? o de ar

Combustível: Diesel

FFP2 Respirator machine

平面口罩机参数:

Semi-Automatic Mask Machine

Power supply: 3.3KW mono phase

Mask Size: 175mm*80-100mm (two or three layers)

Nonwoven (GMS): 10-50g

Capacity: 120 to 150pcs/min

Dimension(L*W*H):3800mm*500mm*1400mm

Net Weight: about 1000kg

 

焊接机参数:

Welding Machine

Capacity: 5 to 10pcs/min

Power supply: 8.5KW mono phase

Compressed Air connection: 0.5 to 0.7Mpa

Dimension(L*W*H): 900mm*650mm*1380mm

Net weight: approx. 50kg

 

KN95口罩机参数:

N95 Mask Machine

Capacity: 130 to 160pcs/min

Dimension(L*W*H): 1037*855*1780

Power Supply 15.3kw mono phase

Net Weight: approx.: 1500kg


Zhangjiagang Tengxiang Machinery Co., Ltd.
Mobile: 0086-13962221749(whatsapp)
Wechat: chncheumg

Face Mask Machine for Coronavirus Disease COVID-19

Breathing mask machine
Mask machine
Respirator machine
Face mask machine
Facial mask machine
2ply Breathing mask machine
2ply Mask machine
2ply Respirator machine
2ply Face mask machine
2ply Facial mask machine
3ply Breathing mask machine
3ply Mask machine
3ply Respirator machine
3ply Face mask machine
3ply Facial mask machine
2layer Breathing mask machine
2layer Mask machine
2layer Respirator machine
2layer Face mask machine
2layer Facial mask machine


HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-06

сжигание органических отходов в лаборатории

1- Объем шлама превышает 4000 кубических метров, он упакован в пластиковые пакеты и хранится более 10 лет.
2- Очистка и устранение 2500 кубических метров внутри резервуара для хранения масла.
– – отходы являются органическими и происходят из лаборатории, они могут быть крайне опасными в случае террористической атаки, всплесков активности или подобных событий.
– – ввод сокращенный, а также периодический, лаборатория используется при срабатывании системы тревожной сигнализации или эпидемии. Но иногда может потребоваться сжигание трупов людей или животных. Передвижная горелка должна работать вместе с мобильной биолабораторией для лиц, оказывающих самое быстрое реагирование. Это самая маленькая мусоросжигательная печь, доступная на рынке. инсинератор производительностью 10 кг / час и 20 кг / час для медицинских отходов.

waste incinerator

Burring Capacity     100 / 200 KG/ hr    Please write your offer here
Number of Burner     02 Nos    Please write your offer here
Incinerator Type     Dual Chamber
Primary Chamber
Secondy Chamber    Please write your offer here
Incinerator Design    Controlled Air     Please write your offer here
Fuel to be used     Natural Gas / Deisel     Please write your offer here
Loading System     Manual / Batch Type    Please write your offer here
Warmer Time     20 minutes     Please write your offer here
Type of Paint    Heat Resistance enamel paint     Please write your offer here.1.       Petrol: diesel

2.       Consumption: 8-10liter/hour

3.       Capacity: to cremate (carrion and spoils) 350-400kg/hour

4.       Temperature: 900-1350?C

5.       Operation temperature: -30~40?C

6.       Incinerator weight: 1800-2000 kg

7.       Volume: 0.70-0.80m/cube

8.       Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

small incinerator for sale

Sterilization time: approx. 30 minutes at 121◦C/1.1 Bar or approx  15 minutes at 132◦C/2.5 Bar to achieve 6log10

sterility

Fragmentation inside the chamber: Heavy duty with maximum size of final product <20 cm.

Volume reduction of the waste after processing : by 60-80% through complete waste dehydration including liquid

content of the waste

All actions after loading for sterilization, fragmentation of product is to be occurred in the same chamber/vessel

Pre or Post-air evacuation should not be necessary or used

Exhaust air quality : Does not require any venting for odor control

Operating System: Fully automated with manual over-ride .(On board PLC capable of generating written report with

cycle time , cumulated time at >121◦C

The option should be there for Internet connectivity by phone, cable or

Boiler : should not require pre-heated water

Electrical requirements: 220Vac, 1ph or 400vac 3ph to suit customer needs

Noise level at full operation: <80 dB

Working Principle of the processor

The processor should utilize steam technology in conjunction with a mechanical fragment (grinder) to sterilize

medical waste, thereby making the residual waste safe for disposal in landfills.

The sterilization vessel MUST be a double walled (jacketed) cylindrical vessel.

Pre-shredding of infectious waste must not be accepted, the fragmentation must occur safely inside the scaled vessel

continuously.

The sterilization vessel/chamber must be fitted with a motor driven shaft to which a heavy duty grinder (fragmenting

arm) is attached inside the vessel to produce an unrecognizable size of the waste product

The fragmenting are must rotate to agitated continuously throughout the heating and sterilization cycle to ensure

that the fragmented & agitated wastes (including sharps and liquids) are exposed evenly to sterilization temperature

and pressure.

Steam heat should be applied to the jacket only, while the agitated waste absorbs the heat from the jacket and makes

its own steam from its moisture content.

Should not need for special autoclave bags- simple bag or box should be workable

MUST not need for pre-treatment of the waste.

Liquids and gases MUST remain locked inside the vessel until sterilization is complete-nothing should be vacuumed or

pumped out in its infected state.

Jacket steam heat to dehydrate the waste completely regardless of its original water content.

All the hot condensate from the jacket is recycled, making the processor very economical to operate

All particles of the waste should achieve a high level of sterilization and not just “disinfection” due to the

continuous agitation.

Description of the Treatment Cycle of the processor

i)Loading

The waste has to be loaded by dropping bagged and or boxed waste into the open loading door on the vessel.

The loading door should be mounted at an angle on the top side of the vessel with suitably sized to accommodate the

infectious wastes for which it is intended

Over-loading or loading too tightly should not be an issue with this process, and hence no need of the special

operator skill.

ii)Heat –up and fragmentation

After loading , the vessel door is to be closed, and the outer jacket of the vessel is to be automatically filled

with high temperature steam, which should act as the main heating medium for heating the waste

During this heating cycle, the shaft and mixing arms should rotate continuously, causing the waste to be fragmented

and continuously tumbled against the hot vessel walls.

At this point, the waste is broken up into small fragments, and all material heats up rapidly, being evenly and

thoroughly exposed to the hot inner surfaces. The moisture content of the waste will turn in to steam, and the vessel

will start to pressurize.

Initially, no steam will be injected into the waste. If there not enough moisture in the waste to pressurize the

vessel, a small amount of steam is to be automatically added until the desired pressure is reached.

At the end of the period, the correct sterilization temperature and should be reached, and the sterilization period

should start.

iii)Sterilization period

The amount of steam fed to the outer jacket is to be regulated to maintain the desired temperature & pressure of the

inner vessel.

The mixing arms (grinder)  MUST continue to rotate throughout this cycle to ensure even sterilization pressure and

temperature for all wastes.

The treatment time should be either 15 minutes at 132◦C OR 30 minutes at 121◦C  to achieve level 6log10 sterilization

The intense subjugation of the waste to high temperature and pressure moisture in a dynamic environment should also

cause the waste to hydrolyze, that is a rapid decomposition of organic material.

iv)De-pressurization

After the treatment time , the steam to the jacket should remain on, and the internal vessel is to

be vented through a condenser, and de-pressurized. Thus, the waste loses its water content

through a combination of heat input from the jacket and flashing of water due to

depressurization.

v)De-hydration

Further dehydration is to be achieved by maintaining heat input and mixing-almost total dryness should be achieved.

HICLOVER Hospital Medical Waste Incinerator in Stock for 2019-nCoV SARS-CoV, sars, coronavirus, Novel coronavirus

Model Capacity/Burnning Rate For Hospital SickBed No. Fuel Type Qty. Ready for Shipping New Production  Shipping Volume Shipping Weight Delivery Location
TS30 average 30kgs per hour Average 150 SickBed Diesel Oil 1 set 5 days 20sets/2 weeks 5 m3 3000 kgs Shanghai Port
TS50 average 50kgs per hour Average 250 SickBed Diesel Oil 1 set 7 days 20sets/2 weeks 7m3 4500 kgs Shanghai Port
TS100 average 100kgs per hour Average 500 SickBed Diesel Oil 1 set 7 days 15sets/2 weeks 10m3 6000 kgs Shanghai Port
TS150 average 150kgs per hour Average 750 SickBed Diesel Oil 5 sets 7 days 15sets/2 weeks 13m3 7500 kgs Shanghai Port
YD10 average 10kgs per hour Average 50 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 3m3 1200 kgs Shanghai Port
YD20C average 20kgs per hour Average 100 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 6m3 2000 kgs Shanghai Port
YD50C average 50kgs per hour Average 250 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 7m3 2300 kgs Shanghai Port
YD30 average 30kgs per hour Average 150 SickBed Diesel Oil 1 set 5 days 20sets/2 weeks 5m3 2300 kgs Shanghai Port
YD30 Small average 30kgs per hour Average 150 SickBed Diesel Oil 2sets 5 days 20sets/2 weeks 3m3 1500 kgs Shanghai Port
YD50 average 50kgs per hour Average 250 SickBed Diesel Oil 2 sets 5 days 20sets/2 weeks 8m3 4500 kgs Shanghai Port
YD100 average 100kgs per hour Average 500 SickBed Diesel Oil 1 set 10 days 15sets/2 weeks 13m3 6000 kgs Shanghai Port
YD150 average 150kgs per hour Average 750 SickBed Diesel Oil 1 set 10 days 15sets/2 weeks 17m3 7500 kgs Shanghai Port
YD300 average 300kgs per hour Average 1500 SickBed Diesel Oil 10sets/2 weeks 20m3 9000 kgs Shanghai Port
YD500 average 500kgs per hour Average 2500 SickBed Diesel Oil 5sets/2 weeks 27m3 13000 kgs Shanghai Port
CA 50 Mobile Containerized average 50kgs per hour Average 250 SickBed Diesel Oil 2 sets 15 days 10sets/2 weeks 28m3 7000 kgs Shanghai Port


HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-03

proveedores de calentadores de residuos clínicos

repeticiones químicas que se utilizarán:
Solución acuosa al 10% de heptil (dimetilhidrazina asimétrica),
vapor de heptil (dimetilhidrazina asimétrica) con una concentración de 0,8 a 1,0 kg / m3,
Tratamiento de agua con ácido azótico (nítrico) al 10%,
vapor de ácido azótico (nítrico) con énfasis tanto como 1.1 kg / m3;
2. enfoque de neutralización: degeneración térmica;
C a +1200? C;
5. Entrada de estrés y ansiedad: hasta 2 barras;
6. sistema de control automatizado;
7. Las dimensiones totales permitirán colocar el dispositivo en una estructura de automóvil y camión.
productores de calentadores de residuos clínicos Especificaciones generales
Construcción de chapa de acero de placa de 6 mm
11cm 1400 o C L iner refractario
Calentadores de temperatura controlada
Sistemas de calefacción de combustión agregados
Interlock Turn On Load Doors
Puerta de fresno separada
Un segundo segundo a casa @ 1000 o C.
Pintura a base de silicona a 400 ° C llena.
Sistema de notificación de temperatura de aleación.
Instalación de fabricación cableada y revisada.
Capacidad-20 kg / recursos humanos.
Cámara primaria-1607 L.
Área de hogar -1: 36 metros cuadrados.
Segunda Cámara-694 L.
Calentador principal (aceite) -420.000 btu.
Segundo sistema de calefacción (aceite) -900,000 btu.
Combustión secundaria-1/6 hp.
Pila de escape-46cm x 6m.
Servicio Eléctrico-220/50.
Sistema de peso-5.700 kg.
Dimensión “D” -152 centímetros.
Toneladas de elevación del puerto: 60 x 60 centímetros.
Altitud del puerto de ceniza -36 x 36 cm

Bid to burn waste from out of town in Newhaven Incinerator



Veolia is seeking to source non-recyclable commercial and industrial waste for its Newhaven Incinerator from areas neighbouring East Sussex and Brighton and Hove.

It argues this will allow the incinerator to produce enough energy to power 25,000 homes continuously.

But cllr Rod Main from Newhaven said this would lead to more trucks and pollution.

Veolia applied for planning permission to East Sussex County Council to lift a planning condition to enable the scheme to go ahead.

General manager for Veolia in South Downs Allan Key said the company wanted to extend the catchment area outside East Sussex and Brighton and Hove.

He said it would not lead to physical changes at the incinerator or increase to the 242,000tpa capacity.

Mr Key said: “Energy demands are going to increase year on year. Facilities such as the one we have here in Newhaven recovers energy from waste that would otherwise be lost by going to out of county landfill.”

Cllr Main said: “They need more waste to help ESCC’s carbon footprint by pumping more carbon dioxide into the atmosphere (and it’s around 100,000 tonnes pa now) not to mention how many more trucks will be coming right across Sussex from who knows where adding to the pollution.

“It’s helping to power 25,000 homes. There’s a proposed wind farm just off the coast which might power 20 times that and it won’t be pumping 100,000 tonnes of CO2 into the atmosphere every year for the next 20 or more years.”

by: http://www.sussexexpress.co.uk/news/county-news/bid-to-burn-waste-from-out-of-town-in-newhaven-incinerator-1-6388465