Archive: February 14, 2024

burner maker in china


1. Is your house time greater than 2 secs?
2. Is the primary as well as additional air preheated?
3. Could it be given as a constant system?
4. Exists a monitoring system for functional criterion? (temperature).
5. Exists an info logging system?
6. Does it offer control treatments to change waste feed, grate rate, as well as quantity, distribution and temperature level

of primary as well as added air?
7. Does it contain complementary heaters?
8. Does it consist of system that quickly stops waste feeding when melting requirements are not proper?
9. Is it possible to have a computerized bottom ash discharging system?
1. Is the main as well as likewise additional air preheated?
2. Could it be offered as a continuous system?
3. Exists an information logging system?
4. Does it attend to control treatments to change waste feed, grate speed, in addition to volume, circulation and also temperature level

of major and also additional air?
5. Does it include supporting heating units?
6. Does it include system that promptly quits waste feeding when melting criteria are not ideal?
7. Is it possible to have an automated base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Dual Chambered.
Mode of Heating: Burner


оборудование крематория домашних животных

Наконец, пар в рубашку должен отключиться, разгрузочная дверца должна быть открыта.

Затем вал и смесительные лопасти меняются местами, чтобы действовать как механизм разгрузки и вычерпывать фрагменты отходов из

через разгрузочную дверцу, на конвейерную ленту или прямо в контейнер для отходов.

 Теперь сосуд должен быть готов к следующему циклу обработки, сохранив большую часть тепла для обработки

следующая партия.

(B) Характеристики и характеристики парового котла:

Особенности котла:

Это должен быть электрический котел

Брызгозащищенный электрический шкаф и переключатели

 Изолятор двери к главному электрическому шкафу

Аварийные огни и безопасность / защита от давления excel

 Регулировка уровня на резервуаре для воды с обратной связью

Техническая спецификация котла:

 Производительность: от: 90 до 110 кг / ч (F&A 100 ° C)

Рабочее давление: 7-10 бар

Объем воды в котле: от 80 до 100 литров

 Объем резервуара для питательной воды: от 60 до 80 литров.

Потребляемая мощность: от 60 до 75 кВт

Количество нагревательных элементов: 3-4 шт.

Электрические требования: 400 В переменного тока, 50 Гц, 3 фазы

(C) Технические характеристики моечной машины

Функции:

Полностью автоматический и ручной режимы.

 Металлическая конструкция, SA 240/304

Датчики для максимального повышения эффективности машины и безопасности оператора.

 Необходимо использовать рециркуляцию холодной воды для стирки, чтобы минимизировать потребление воды и эксплуатационные расходы.

 Дезинфицирует все поверхности бункера

Использует мощный фен для удаления излишков поверхностной воды

Должен соответствовать всем нормам Северной Америки и ЕС.

Характеристики:

Машина для мытья баков подходящего размера, норма 38 г

Минимальная емкость резервуара для воды должна составлять 225 л.

Идеально подходит для больниц и клиник, обрабатывая до 300 контейнеров в час.

Время мытья и сушки одного бункера после загрузки – примерно 12 шт.

Загрузка контейнеров на моечную станцию за один раз – примерно 12 шт.

Общая длина: около 30,0 футов

Общая длина: около 8,0 футов

Общая длина: около 3,0-3,5 футов

 Высота конвейера от земли: около 3 футов.

Привод ванны мойки

Моторный привод

Мощность двигателя: прибл. 4.0 л.с.

Питание: 220 В переменного тока, 1 фаза или 400 В переменного тока, 3 фазы или в соответствии с потребностями заказчика.

Бункеры должны быть включены

200 шт. с другим цветом (в зависимости от фактических требований больницы)

(D) Технические характеристики внешнего управления измельчителем

Предварительно запрограммированное управление ПЛК

Пароль активирован и индикация истории отмены

Пускатель двигателя с защитой от перегрузки

Автоматическая мгновенная остановка на твердом предмете в станине измельчителя

Автоматическое реверсирование и повторная попытка резания при большой нагрузке, до трех раз

Корпус управления Nema Type 12

Резка проводов

Размеры камеры (Ш x Д x В): прибл. 33 см x 38 см x 25 см

Количество ножей: около 18 или по желанию клиента

Толщина ножа: около 18 мм или по желанию заказчика

Диаметр ножа: около 16 см или по желанию заказчика

Зубы на нож: минимум 3

Количество валов: 2, т.е. двухвальный измельчитель

Привод измельчителя

 Должен быть с приводом от двигателя

Мощность двигателя: прибл. 10 л.с.

Обороты двигателя: минимум 1750

Снижение скорости: 60: 1

 Создаваемый крутящий момент: мин. 40 Нм или 350 фунтов / дюйм.

КПП: должен быть параллельным валом

Защита от ударов: моментный рычаг с резиновым креплением

Питание: 220 В переменного тока, 1 фаза или 400 В переменного тока, фаза или в соответствии с потребностями заказчика.

Вспомогательные элементы должны быть включены

 Стойка измельчителя, изготовленная из стальной трубы квадратной формы 3 дюйма, стандартная высота 30 дюймов.

 Бункер измельчителя, изготовленный из стали 16 калибра, с опциональной переключаемой крышкой бункера

(E) Характеристики и технические характеристики конвейера

Перенести переработанные отходы с судна на измельчитель

Органы управления

Пускатель двигателя с защитой от перегрузки

Корпус управления Nema Type 12

Безопасные упоры по обеим сторонам конвейера

Вспомогательные

 Конвейерная стойка, изготовленная из стальной трубы 2 ”кв.

Поднятые боковины из стали 16 калибра

Габаритные размеры

Общая длина: от 20 до 25 футов или подходящей длины в зависимости от требований к установке.

Общая ширина: от 24 до 30 дюймов

Общая высота (без подставки): от 12 до 14 дюймов

Доступные уклоны: 0-40 градусов

Скорость ремня: 75 футов / мин.

 Расстояние между плотинами: прибл. 16 дюймов

Привод

Моторный привод

Лошадиная сила: прибл. 0,75 л.с.

Обороты двигателя: прибл. 60

Электрическая входная мощность: 220 В переменного тока, 1 фаза или 400 В переменного тока, 3 фазы или в соответствии с потребностями заказчика.

(F) Технические характеристики самосвала

Функции:

 Он должен быть спроектирован таким образом, чтобы можно было легко разместить контейнер под дверью для выгрузки переработанных отходов и облегчить

маневренность для подъема и опрокидывания отходов в бункер измельчителя.

Оснащен 2 креплениями для загрузки переработанных отходов в измельчитель и отходы измельчителя

вывозится в мусорный бак.

 Рама: прочная сверхпрочная рама, изготовленная из формованной и сварной стали для дополнительной прочности

Мачта: изготовлена из канальной стали для большей прочности и надежности. Открытая конструкция в комплекте с безопасностью

клетка для большей видимости.

TECHNOLOGICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications

           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
 

NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank need to be attached to the incinerator at a greater degree to enable free-flow of diesel from the storage tank to the incinerator. The connecting pipeline has to be a black pipe of accepted gauge as well as diameter. Include various other coming with accessories and installations

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Give lifting gears as forklift, gantry, rollers, as well as raising jacks and also setting burner.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a smokeshaft with scrubber (for purification)

Provide raising equipment to hoist, set up as well as mount chimney, and give assistances slings as needed. Enable cutting of tree branches to facilitate the exercise.

The chimney shall be repainted with approved warmth immune paint after installment.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

EXAMINATION CRITERIA

Analysis will be performed in 4 phases particularly preliminary examination of files for uniformity with compulsory demands, technical assessment, site check out and also commercial examination.

Stage One: Initial Assessment

– – Initial Evaluation under special condition of the tender. These are required requirements.

This shall include confirmation that a bidder has followed the unique problem of tender over.

Failing to satisfy any kind of among the above needs stated in the special conditions of the contract will cause automated incompetency.

Stage 2: TECHNICAL ASSESSMENT (70 MARKS)

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
 

The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The storage tank must be linked to the burner at a greater degree to make it possible for free-flow of diesel from the tank to the burner. The connecting pipe must be a black pipe of approved gauge and also diameter. Include other going along with accessories as well as installations

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Offer lifting gears as forklift, gantry, rollers, and also lifting jacks and placement burner.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Give lifting gear to lift, erect and also mount chimney, as well as provide assistances slings as essential. Enable cutting of tree branches to help with the exercise.

The chimney will be painted with authorized warmth resistant paint after installment.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

Pass mark for technical analysis is 70/100 marks

Stage Three: Website Browse Through

The assessment committee will check out the properties of the prospective buyers who are receptive to technological evaluation phase to confirm the authenticity of legal file sent; establish the precision of the info given in the tender records, examine company’s ability, place, to name a few.

The Tenderer will be immediately disqualified where incorrect or deceptive Info is discovered to have been provided.

Stage 4 Business Analysis

Bids that pass the above 3 (3) stages will be contrasted on the basis of costs/ cost estimated and the most affordable valued will certainly be taken into consideration the lowest examined bid and also consequently advised for award. Prevailing market prices will be used to identify the price responsiveness of the prospective buyers.

AREA V– TIMETABLE OF CRITERIA

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

waste incinerator manufacturers china

Capacity    Not less than 500Kg/hr.
Operation    24hr-7days/week continuous operation.
Combustion chamber    2 combustion chamber.
Temp.    First combustion chamber 800-1000 C.
Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.
Combustion Efficiency    99.99%
Retention time    Of the flow gases not less than 2 Sec in the hot portion.
Excess Oxygen concentration    Of primary combustion chamber 3-6% max.
Refractory    The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C.
Doors    Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation.
Air Emission Control System    With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.
Wet System    If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.
Chemical dosing    It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors.
Chimney    It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies.
Sampling point    Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope.
Ash Removal    It should be auto ash removal system.
Fuel    It should be dual system, such as diesel and natural gas.
Feeding System    Should be auto feeding system into primary chamber.
Control Room    Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.
Cooling System    The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C.
Inter-lock system    The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C.
Flue treatment and cleaning    To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.
Quenching system/Heat exchanger    Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or equivalent.
Noise Level    Not more than 85 dBA during normal operation.
Inaddition    The desigh should insure that responsive fail-safe control systems are used.
The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage area…etc.
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.

waste burner supplier in china

  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration must be entirely free from noticeable smoke along with offending smells.

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” burning should have:

  1. A combustion chamber of waste:

* Completely tight door for the manual loading of waste.The loading need to be Handbook, Set Lots,

* A burner of lighting which the use is limited to the ignition of waste.

* Leading Loading loading with door seals gone up on joints, wheel of screw plug, flexible joint, and also packing shielding out of refractory.

* The insulation of the combustion chamber should be composed of refractory blocks, having a high material of aluminum and shields blocks in order to assure a minimum temperature level on the outside sheet steel.

* Make-up of the refractory;

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* Burner of illumination of waste, with gas, standard mono-bloc spreading directing plunging flame, illumination and safety of digital ignition, irreversible air flow, electromagnetic sluice gate of guideline and isolating valve.

* Plate of combustion in Carborundum, preventing the repairing of glass as well as slags.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :

Propuesta de quemador de desechos médicos

I.Medida del incinerador 4,410 W x 3,037 L x 4,836 H mm

II. Energía

El problema de la utilidad para los dispositivos de incineración en funcionamiento es el cumplimiento.

1) Gas: aceite ligero o queroseno

2) Energía eléctrica

Motor eléctrico

-0.1– – 110kW: Aire acondicionado 220V x 3PH x 50Hz

– – – – Por debajo de 0,1 kW: Aire acondicionado 220V x 1PH x 50Hz Circuito de control

– – – – Control MCC: A / C 220V x 1PH x 50Hz

– – – – Herramienta: Aire acondicionado 220V x 1PH x 50Hz

– – – – Cambio de equipo: Aire acondicionado 220V x 1PH x 50Hz

2.

– – Cambio de equipo: Aire acondicionado 220V x 1PH x 50Hz

2. Transporte, instalación, puesta en servicio y capacitación puerta a puerta

3. Cotización de precios

– – El costo debe indicarse en Birr etíope (IVA incluido)

– – El costo debe incluir elementos de costo adicional como productos, seguros, cuotas y capacitación para el personal esencial, hasta la obligación de aprobación cuando sea apropiado

небольшой мусоросжигательный завод на продажу

Время стерилизации: ок. 30 минут при 121 ° C / 1,1 бар или примерно 15 минут при 132 ° C / 2,5 бар для достижения 6log10

бесплодие

 Фрагментация внутри камеры: тяжелые условия с максимальным размером конечного продукта <20 см.

 Снижение объема отходов после переработки: на 60-80% за счет полного обезвоживания отходов, в том числе жидких.

содержание отходов

 Все действия после загрузки для стерилизации, фрагментация продукта должны происходить в одной камере / сосуде.

 Предварительная или последующая эвакуация по воздуху не требуется или не используется.

 Качество отработанного воздуха: не требует вентиляции для контроля запаха.

 Операционная система: полностью автоматизированная с ручным управлением (встроенный ПЛК, способный генерировать письменный отчет с

время цикла, суммарное время при> 121 ° C

 Должна быть возможность подключения к Интернету по телефону, кабелю или

Бойлер: не требует предварительного подогрева воды.

 Электрические требования: 220 В переменного тока, 1 фаза или 400 В переменного тока, 3 фазы в соответствии с потребностями клиента.

 Уровень шума при полной работе: <80 дБ

Принцип работы процессора

 Обработчик должен использовать паровую технологию в сочетании с механическим фрагментом (измельчителем) для стерилизации

медицинские отходы, тем самым делая остаточные отходы безопасными для захоронения на свалках.

 Стерилизационный сосуд ДОЛЖЕН быть цилиндрическим сосудом с двойными стенками (с рубашкой).

 Запрещается предварительное измельчение инфекционных отходов, дробление должно происходить безопасно внутри масштабированного сосуда.

непрерывно.

 Сосуд / камера для стерилизации должны быть оснащены валом с приводом от двигателя, к которому может подключаться измельчитель для тяжелых условий эксплуатации (фрагментирующий

рука) прикреплен внутри сосуда, чтобы произвести неузнаваемый размер отходов

 Фрагментация должна постоянно вращаться и перемешиваться на протяжении всего цикла нагревания и стерилизации, чтобы гарантировать

что фрагментированные и перемешанные отходы (включая острые предметы и жидкости) равномерно подвергаются воздействию температуры стерилизации

и давление.

 Тепло пара следует подводить только к куртке, в то время как взбалтываемые отходы поглощают тепло от куртки и создают

собственный пар из-за содержания влаги.

 Не требуется специальных пакетов для автоклавов – простой пакет или коробка должны быть работоспособными.

 НЕОБХОДИМО не требовать предварительной обработки отходов.

 Жидкости и газы ДОЛЖНЫ оставаться заблокированными внутри сосуда до завершения стерилизации.

откачан в зараженном состоянии.

 Оберните паровой обогреватель для полного обезвоживания отходов независимо от исходного содержания воды.

 Весь горячий конденсат из рубашки перерабатывается, что делает работу процессора очень экономичной.

 Все частицы отходов должны достигать высокого уровня стерилизации, а не просто «дезинфекции» из-за

непрерывное перемешивание.

Описание цикла обработки процессора

i) Загрузка

 Отходы следует загружать, сбрасывая их в мешках или коробках в открытую загрузочную дверцу на судне.

 Загрузочная дверца должна быть установлена под углом на верхней стороне судна с размером, подходящим для размещения

инфекционные отходы, для которых он предназначен

Перегрузка или слишком сильная загрузка не должны быть проблемой для этого процесса, и, следовательно, нет необходимости в специальных

операторское мастерство.

ii) Нагрев и фрагментация

После загрузки дверь судна должна быть закрыта, а внешняя рубашка судна должна быть автоматически заполнена

с высокотемпературным паром, который должен выступать в качестве основного теплоносителя для нагрева отходов

 Во время этого цикла нагрева вал и смесительные лопасти должны постоянно вращаться, в результате чего отходы дробятся.

и непрерывно падал на горячие стенки сосуда.

 На этом этапе отходы разбиваются на мелкие фрагменты, и весь материал быстро нагревается, равномерно и равномерно нагреваясь.

полностью подвергается воздействию горячих внутренних поверхностей. Влагосодержание отходов превратится в пар, и сосуд

начнет повышать давление.

 Изначально пар не будет попадать в отходы. Если в отходах недостаточно влаги для создания давления

В сосуде должно автоматически добавляться небольшое количество пара до тех пор, пока не будет достигнуто желаемое давление.

В конце периода должна быть достигнута правильная температура стерилизации и период стерилизации.

должен начаться.

iii) Период стерилизации

 Количество пара, подаваемого во внешнюю рубашку, должно регулироваться для поддержания желаемой температуры и давления

внутренний сосуд.

 Смесительные лопасти (измельчитель) ДОЛЖНЫ продолжать вращаться в течение этого цикла, чтобы обеспечить равномерное давление стерилизации и

температура для всех отходов.

Время обработки должно составлять 15 минут при 132 ° C ИЛИ 30 минут при 121 ° C для достижения уровня стерилизации 6log10.

 Интенсивное воздействие на отходы высокой температуры и влажности в динамической среде также должно

вызывают гидролиз отходов, то есть быстрое разложение органического материала.

iv) Сброс давления

По истечении времени обработки пар к рубашке должен оставаться включенным, а внутренний сосуд должен

быть сброшенным через конденсатор и разгерметизированным. Таким образом, отходы теряют содержание воды.

за счет сочетания поступления тепла от рубашки и мгновенного испарения воды из-за

разгерметизация.

v) обезвоживание

 Дальнейшее обезвоживание должно быть достигнуто за счет поддержания подводимого тепла и перемешивания – должна быть достигнута почти полная сухость.

incinerator maker in china

1. Is the house time more than 2 secs?
2. Is the main as well as additional air preheated?
3. Could it be provided as a continuous system?
4. Exists a surveillance system for functional parameter? (temperature).
5. Exists an information logging system?
6. Does it offer control interventions to change waste feed, grate rate, as well as temperature, volume and distribution

of main as well as additional air?
7. Does it consist of complementary heaters?
8. Does it consist of system that immediately stops waste feeding when burning specifications are not appropriate?
9. Is it feasible to have an automated bottom ash discharging system?
1. Is the main and also secondary air preheated?
2. Could it be offered as a continual system?
3. Exists a data logging system?
4. Does it provide for control treatments to adjust waste feed, grate speed, as well as temperature, volume and circulation

of main and secondary air?
5. Does it consist of auxiliary heaters?
6. Does it include system that instantly stops waste feeding when burning parameters are not suitable?
7. Is it feasible to have an automatic base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Double Chambered.
Mode of Heating: Burner

waste burner provider in china


  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

This burner with “PYROLYTIC” burning should have:

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

* Entirely limited door for the hand-operated loading of waste.The packing requirement to be Handbook, Set Lots,

  1. A combustion chamber of waste:

* A burner of lighting which the usage is limited to the ignition of waste.

* Make-up of the refractory;

* Burner of illumination of waste, with gas, conventional mono-bloc dispersing routing diving flame, lighting and safety of electronic ignition, permanent air flow, electromagnetic sluice entrance of standard and also isolating shutoff.

* A burner of burning of gases,

* A device of shot of air enabling a total recombustion of gases,

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* A gadget of air inlet of air conditioning of waste gases,

* A sheath of emptying of the gases blistered.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :


НАГРЕВАТЕЛЬ Для сжигания лабораторных отходов.

Установки для сжигания отходов должны подходить для экспертной утилизации клинических и медицинских отходов / мусора с лучшими возможностями для сбора примерно
1000-1500 кг. Прочные автономные горелки будут предлагать исключительно эффективную и надежную утилизацию в дополнение к тому, что они должны производиться в соответствии с соответствующими глобальными директивами, например CE, EU и т. Д.
. Сорт газа: дизельное топливо или топливо или газ. Температура регулируется.
Возможно, мощность сжигания составляет 200 кг / человеческий ресурс, а также теплотворная способность 7500 ккал / кг. Промышленные и бытовые отходы. ИНСИНЕРАТОР Для сжигания лабораторных отходов.

Функции.
I. Отсутствие дыма и запаха.
ii. Высокотемпературный, подвижная огнеупорная футеровка с отличным удержанием тепла.
iii. быстрое время нагрева.
iv. Должна быть вторая камера.
v. Последователь постоянного бега.
vi. Контроль температуры.
vii.Управление термостатом

Технические характеристики.
I. Вместимость: прибл. 0,20 м3.
ii. Потребление топлива: 5 литров / час дизельного топлива.
iii. Минимальная рабочая температура: 900 ° C.
iv. максимальная рабочая температура: 1350 oC.
v. Время пребывания: 2 сек.
vi. Скорость горения: минимум 35 кг / час.

Аксессуары.
Требуются обычные аксессуары

Расходники так же как и Сейвы.