INCINERATOR DIESEL FIRED

Incinerator 20 Kg
Incinerator electrically operated
including:
 A cage for receipt of biomedical waste;
 A combustion room with fireplace using a filter to retain ashes;
 A cover;
 An air supply;
A turbine  allowing supply air.
 ▪      The incinerator should be a modern waste disposal unit, designed
to buttocks medical waste in a clean and environmentally efficient
manner. It should use a temperature based logic control system
to provide optimum control of the working conditions and
incorporate a high capacity thermal oxidizing secondary room.
It should be designed to retain the exhaust gases, for at least two seconds to make sure the unit’s effective destruction of the combustion
products.
▪      All the incinerators to be provided and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and specifically 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
process for installing and operating incinerators.
▪      The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪      The incinerator shall be run on a three-phase power supply
(mains).
▪      For the technical analysis, not only the treatment plant but
the whole system will be considered. It will be the responsibility
of the Bidder to provide a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪      The machine offered shall be designed to function normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪      The Bidder must provide a guarantee for one year.
▪      All text, parameter etc. on all control working ports as
well as on information screens and on print-outs will be in
English language.
The Bidder shall provide all the essential documentation to be able to facilitate the legal requirements for the
installation and putting into use of their equipment.

▪      Period of Execution is 90 days from contract signature for
delivery to site and completion of verification operations
required for the issuance of provisional acceptance.
▪      Representatives of the Contracting Authority and the
Beneficiary, together with all the Bidder’s representative, shall
execute the controls, testing and initial approval for provisional
and final approval. The provisional and final acceptance shall
take place at the last destination.
▪     After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is approved by
the Manufacturer, and which is able to quickly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year guarantee period. In
fulfillment of the condition with their offer, bidders must
submit a statement signed by the manufacturer or representative
of this manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair facility is able to quickly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪      The Bidder will be responsible to deliver and install all
equipment provided to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time program within the whole construction and building period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall make certain that all areas of
the plant transported by sea will not be shipped as”deck
cargo”.
▪      It is anticipated that the Bidder cooperates closely with the
contractor to the new waste handling building/ housing and will
make available all necessary technical information, drawing, etc. to
the contractor.
.     Waste Calorific Value    4000 KCAL/Kg
iv.     Moisture content    10-25%
v.     Estimated ash  residue    5-10%
vi.     Nominal capacity     100Kg/hour batch load
vii.     Secondary room 2 minutes @ 1100°C
viii.     Environmental    Environmental Management Coordination Act, 1999 and specifically, Waste management regulations, 2006
2    Equipment
2.1    Primary Combustion Chamber
▪       The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
stainless steel sections. It’s carried from the floor level on a
significant steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face mixture of superb duty brickwork or high strength castable.
▪       The main combustion chamber must ensure minimum exit
temperature is less than 850°C.
One Manual Load Incinerator comprising:
▪       Manual Loading door (heavy duty steel door with proper refractory lining)
▪       Horizontal solid hearth, refractory lined main combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪       Full sized bulk load/ash removal door
▪       1 off diesel-fired ignition burner — temperature controlled
▪       1 off combustion air supply fan and distribution system, automatic
control
▪       High capacity secondary combustion chamber with home time
less than two seconds @ >1100°C
▪       1 off diesel-fired afterburner — temperature controlled
▪       Control panel — automatic operation
▪      Temperature indication primary and secondary chambers 0-
1200°C. Both chambers have to be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must be certain that the gas temperature as measured against the inner wall in the secondary room & not in the flame zone, isn’t less than 1100°C.
2.2     Throughput
100kg/hour in a minimal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for healthcare waste.
2.3    Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4    Quality/Environmental Standards
▪       Environment Management and Coordination Act, 1999
▪       BS3316
2.5    Operating Period
▪      Anticipated daily operating period 8 hours
▪      Maximum working period 12 hours
2.6    Chamber
▪      Should be refractory lined into the following standard; Hearth and
lower section of room walls
2.7    Hot face substance ▪      Super duty firebrick
▪      Limiting continuous service limit 1500°C
▪      Thickness 100mm
▪      Thermal conductivity 1.3 W/mk
2.8    Insulation
▪      Calcium silicate
▪      Limiting continuous service limit 1000°C
▪      Thickness 25mm
▪      Thermal conductivity 0.095 W/mk
2.9     Chimney / Stack
▪      Must be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪      Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪      Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as needed. ▪      The chimney shall be painted with heat resistant
paint after installation.
2.10     Ignition Burners
Fully packed oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and finish with all valves, fan and motor.
·         Maximum rating:            at least 450kW/hour
·         Burner:                            ordered for on/off operation
·         Maximum consumption: at least 6 litres/hour
·         Average consumption:    at least 3 litres/hour
2.11    Afterburner
Fully packed oil type, complete with electric ignition and flame failure controls wired with continuous running fan and finish with all valves, fan and motor.
A mechanical
particulate collector must be integrated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13    Diesel Tank
▪      To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪      The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank into the incinerator.
The connecting pipe must be a black pipe of accepted gauge
and diameter. Contain other accompanying accessories and
accessories ▪      Connect leftovers to fuel supply.
3    Documentation:
Operation manual    2 sets
Service/maintenance manual    2 sets
4    Certification
▪      National Environment Management Authority (NEMA)
certification
5    Capacity to support equipment
▪      The agent/supplier will have adequate facilities, spare parts,
consumables and qualified and skilled technical personnel.
Installation works
▪      Provide lifting gears like forklift, gantry, rollers, and lifting
jacks and position incinerator.
6    Commissioning and Training
▪      The Agent will test all set operating parameters

▪     The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7    Commissioning Maintenance Contract
▪     Before the expiry of the guarantee / signing off, the provider shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly regular maintenance price per quarter
for three (3) quarters.

Care control proposal.
▪      The maintenance contract price includes labour, transportation and
accommodation for the attending technicians.

Maintenance control proposal.
▪      The maintenance contract price includes labour, transport and
accommodation for the attending technicians.

ประกาศเกี่ยวกับพนักงานทุกคนของบริษัทที่เข้าร่วมโปรโมชั่นเว็บไซต์อย่างเป็นทางการของบริษัท

18 พฤษภาคม 2019 ข่าว บริษัท 347 ครั้ง3

เพื่อประชาสัมพันธ์เว็บไซต์ของบริษัทให้ดียิ่งขึ้นและส่งเสริมผลิตภัณฑ์หลักของบริษัท: โรงทำความสะอาด ตัวกรองไขลาน ฝักบัวลม และงานขายอื่น ๆ ที่เกี่ยวข้อง หลังจากการตัดสินใจของผู้นำของบริษัท พนักงานทุกคนของบริษัทมีส่วนร่วมในการส่งเสริมอย่างเป็นทางการของบริษัท เว็บไซต์ และงานเฉพาะ ดังนี้

เวลาโปรโมตเว็บไซต์: ทุกคนใช้เวลาครึ่งชั่วโมงในการโปรโมตเว็บไซต์ทุกวัน

การโปรโมตเว็บไซต์มีความสำคัญ:

①แผนกต้อนรับและพนักงานที่ปรึกษาของบริษัทช่วยเหลือพนักงานที่กรอกเนื้อหาของเว็บไซต์ของบริษัทและแก้ไข ส่วนข่าวของบริษัทได้เป็นอย่างดี

②ช่างเทคนิคและวิศวกรผลิตภัณฑ์ของบริษัท เพื่อช่วยเจ้าหน้าที่กรอกเนื้อหาเว็บไซต์ของบริษัท ทำงานแก้ไข เพิ่มและแก้ไข โซลูชัน และ คอลัมน์ความรู้เกี่ยวกับผลิตภัณฑ์ได้ดี

③ ผู้บริหารบริษัทและเพื่อนร่วมงานอื่นๆ ช่วยเจ้าหน้าที่ก่อสร้างสายโซ่ภายนอกของเว็บไซต์ของบริษัท ทำงานได้ดีในการก่อสร้างร้านค้าภายนอกบนเว็บไซต์อย่างเป็นทางการของบริษัท การเผยแพร่การจำแนกข้อมูล และการเผยแพร่ฟอรัม

ในอนาคตอันใกล้นี้ ถือเป็นช่วงเวลาที่สำคัญสำหรับการพัฒนาโรงทำความสะอาด ตัวกรองม้วน ฝักบัวลม และธุรกิจที่เกี่ยวข้องอื่น ๆ สำหรับการพัฒนาระยะยาวของบริษัท ผมหวังว่าเพื่อนร่วมงานทุกคนจะทำงานหนักและพิถีพิถัน ทำงานโปรโมทเว็บไซต์และทำเพื่อบริษัท ผลงาน. ผู้ที่มีผลงานโดดเด่นจะลงทะเบียนผู้มีส่วนร่วมดีเด่นให้กับหัวหน้าแผนกตามสถานการณ์จริง และผู้นำจะมอบรางวัลตามสถานการณ์จริงของแผนก

หนานจิง Yixiou เทคโนโลยีพัฒนา Co., Ltd.

เวลา: วันพฤหัสบดีที่ 20 ตุลาคม 2559

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

Animal Waste Incineration, Pet Cremation Equipment

Product Description

Waste Incinerator International Market Analytics 
Date. Jun. 10, 2012 
Download: Word format / PDF format 

Key Word: 
Small incinerators 
Medical waste incinerator 
Pet animal cremation incinerator 
Incinerator manufacturers 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant. 
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators 
Incinerator fuel: Gas incinerator, oil incinerator 
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer. 
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. "Dioxins" refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics. Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste. Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc. 

So, why we still use incinerator? 
First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control. 
Second, 100 kg incinerator, 100 kg/hr incinerator, 100 kg/hr incinerator for hospital waste, 100 kgs incinerator, 100 kgs/hr, 100 per hour, 100 ton incinerators uses natural gas, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life. 

As above two reason but not only above, we still use incinerators. 

How you can find reasonable incinerator for your local site? 
Incinerator is not a cheap equipment, generally the small scale model's price around $5, 000USD per unit and large scale model's price more than $50, 000USD per unit. So, before purchase one unit incinerator, you have to make clear following items:
A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment? 
B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size. 
C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don't have gas supply system. 
And other technology items, like power(220V, 380V), waste feed door type, incinerator structure, etc. 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products. 

Wrote by Nicky

Items/Model YD-30 YD-50 YD-100 YD-150 Items/Model YD-200 YD-300 YD-500 YD-600 Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr. Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr. Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 360 900 1200 1500 Primary Chamber (Liters) 2000 2400 4000 5500 Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 200 200 500 500 Secondary Chamber (Liters) 500 1200 1500 1500 Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380 External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475 External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96 Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125 Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 200 300 300 500 Oil Tank(Liters) 300 500 500 500 Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81 Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128 Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 5 5 10 10 Chimney (M) 10 10 14 14 Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES Secondary Chamber  YES YES YES YES Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES Mix-Combustion Chamber YES YES YES YES Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES Smoke Filter Chamber YES YES YES YES Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES Temperature Monitoring YES YES YES

MicroShine

2019年05月22日 業績與案例 372 views

項目名稱:MicroShine潔凈棚,風淋室,潔凈室改造

項目簡介:無塵室潔凈棚,風淋室等設計生產安裝

承接時間:2015.4-2015.10






 MicroShine公司於2007.12月註冊成立,外商投資企業,位於江寧開發區百家湖科技產業園內,主要生產液晶顯示器零配件產品及配套背光模塊專業製造廠商。瑪科賽光電在通訊電子的領域提供具競爭性及高附加價值的產品及技術,達成客戶最大滿意度。瑪科賽光電總部設立於韓國京緝道,創立於1992年,已擁有了液晶顯示器(LED)核心零件技術,已經成功的在液晶顯示器產業佔有一席之地. 行銷遍及亞洲、歐洲等地區。為了實現目標,我們在保證品質的前提下不斷開發新產品,以自信、謙虛的精神感動顧客!目前瑪科賽光電正處於高速發展階段,您的加盟將會使瑪科賽光電在市場中更具競爭力。

更多內容 網址: www.ecolead.cn 電話: 025-57138032

incinérateur de contrebande medi burn 30

rétention d’air pendant au moins 2 secondes à une température inférieure à 850 ° C, la combustion

Afin d’obtenir le bon effet.

? doit être un incinérateur à deux chambres, primaire et secondaire

Poêles à combustible

? Les déchets pour réduire le volume initial

Possibilité de minimiser (environ 5% de cendres stériles

Forme).

Objectif: Incinérateur à chargement par le haut de déchets généraux, médicaux et secs pour se conformer aux exigences de la qualité de l’air

Loi de 2004 (loi n ° 39 de 2004)

1 Conception standard Type de cornue, multiple

2 Description de la cheminée montée sur le dessus, autoportante, sans revêtement

3 Hauteur de la pile à partir de la base Au moins 11 mètres (dépend de la hauteur au-dessus du niveau de la mer)

4 Performances d’incinération Capacité 750 kg / heure

5 Température Primaire Minimum 850 degrés Celsius

6 Température Secondaire Minimum 1000 degrés Celsius

7 Dimensions (minimum) (cm)

Longueur

Largeur

Hauteur

210

180

210

8 Ouverture de la porte de chargement (m) 200

9 Description de la grille / foyer plein

10 Volume de la chambre primaire (minimum) 1,05 mètre cube

11 outils inclus Poker, houe, râteau

12 Matériaux de construction (minimum)

Cas

Entretoisement

Foyer

Porte cendrée

Porte de chargement

? Volume de la chambre: 0,1 m3

? Méthode de chargement: avant

? Options de carburant: diesel ou gaz naturel

? Carburant typique: Gaz propane liquide: 6 litres par heure

? Consommation: Gaz naturel: 6 litres par heure

BURNER For incineration of Laboratory wastes products

Incinerators to be appropriate for the expert disposal of scientific & & medical waste/ rubbish with a greater lots capacity in the series of about
1000-1500 Kg. The sturdy, self-contained incinerators will offer an efficient and extremely efficient, safe disposal as well as to be made according to relevant worldwide instructions, e.g. CE, EU, etc
. Type of Gas: Diesel or Petrol or Natural Gas. Temperature controlled,
effective burner for optimum gas economy. burner in the best innovation and an approximate capacity of 2000 bunch/ year. Perhaps an incineration ability of 200 kg/ human resources and also a calorific worth of 7500 kcal/ kg. Industrial and also domestical waste.INCINERATOR For incineration of Lab wastes materials

Functions
i.Smoke and odor free
ii.High Temperature, refractory cellular lining with excellent warmth retention
iii.Quick warm up time
iv.Must have a second chamber
v.Constant run follower
vi.Temperature tracking
vii.Thermostat Control

Technical Specifications
i.Capacity: approx. 0.20 m3
ii.Fuel intake: 5 litres/ hour Diesel Oil
iii.Min Operating Temp: 900 oC
iv.Max Operating Temp: 1350 oC
v.Residence Time: 2 sec
vi.Burning rate: 35kg/hr minimum

Accessories
Typical accessories needed

Consumables and also Spares
Provided with spares as well as consumables to accomplish a minimum of 1000 examinations

hospital incinerator manufacturer

Incinerator to have double combustion chamber and control quantity of dioxin and other gasses emitted without being detrimental.

Estimated dimensions, to producers standard, but to be compact as possible. Capacity: approximately 60kg per day, voltage: 220V and diesel fired.

CSH  Hospital, (Calabar, Nigeria)

Mmedical waste incinerator capable of disposing up to 0.5 cubic meter of infectious or pathological waste.

Incinerator to have double combustion chamber and control quantity of dioxin and other gasses emitted without being detrimental.

Estimated dimensions, to producers standard, but to be compact as possible. Capacity: approximately 120kg per day, voltage: 220V and diesel fired.INCINERATOR (WASTE INCINERATOR)
Waste destruction efficiency:> 90% by weight
Fast, complete, efficient waste disposal
Minimum installation and start up time
Long Shoes Pairs:    For waste handling — 06 Pairs.

End / Paint:-
Filter: Ceramic or other equivalent filters to be able to reduce the induction of toxic air pollutants, particulates, co,dioxin/furane into the atmosphere.
•    Civil works
Charging rate:
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Aluminized steel coat lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Temperature Monitoring: Both for primary and secondary chambers.
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated”red bag.” Surgical dressings, plastic evaluation devices and other wastes
Loading SystemManual/semi-automatic
Waste Management Equipment must have;
Width (mm):    1280 or better
•    Pneumatic or hydraulic ram charging system.
Charging system:
•    Vertical charge door on primary chamber.
Installed Power (Electric Voltage): 440V/ 50 Hz
•    Primary and secondary chamber temperature displayed and recorded (optional)
Ash  Door Opening (mm):    475×900 or better

Малая ветеринарная инсинераторная установка для сжигания 20 кг в час

Базовая информация.

Номер модели: минимальное сжигание отходов в энергетической системе
Экспортные рынки: глобальный

описание продукта

Аналитика международного рынка мусоросжигательного завода
Дата. 10 июня 2012 г.
Скачать: формат Word / формат PDF

Ключевое слово:
Малые мусоросжигательные заводы
Установка для сжигания медицинских отходов
Мусоросжигательная установка для кремации домашних животных
Производители инсинераторов

Инсинератор – это оборудование для сжигания отходов прямого сжигания газообразным или масляным топливом. В другом описании, мусоросжигательный завод можно назвать многими словами, как показано ниже:

Мощность обработки: малая установка для сжигания отходов, крупная установка для сжигания отходов и мусоросжигательная печь.
Отходы: установка для сжигания бытовых отходов, установка для сжигания медицинских отходов, установка для сжигания кремации животных, крематоры для людей.
Топливо для инсинератора: установка для сжигания газа, установка для сжигания нефти.
Из отходов в энергию (WTE): установка для сжигания отходов WTE, установка для сжигания отходов, не связанных с WTE
Производитель инсинераторов: производитель инсинераторов в Китае, производитель инсинераторов в Великобритании, производитель инсинераторов в США, производитель инсинераторов в Индии.
Известные компании-производители мусоросжигательных установок: Inciner8 (Великобритания), Clover Incinerator (Китай), Pennram (США), Haat (Индия).
Скорость горения: 5 кг / час, 10 кг / час, 15 кг / час, 20 кг / час, 30 кг / час, 50 кг / час, 100 кг / час, 150 кг / час, 300 кг / час, 500 кг / час. час

Пиролитическое сжигание технических отходов – традиционный способ обращения с отходами на протяжении многих лет. Во всем мире, во многих странах люди выступают против мусоросжигательных заводов, потому что мусоросжигательные заводы производят большое количество диоксина в дыму. «Диоксины» относятся к группе токсичных химических соединений, которые имеют определенные химические структуры и биологические характеристики. Диоксины могут попадать в окружающую среду в результате лесных пожаров, сжигания мусора на заднем дворе, некоторых промышленных мероприятий и остатков от прошлых коммерческих сжиганий отходов. Диоксины распадаются очень медленно, и прошлые выбросы диоксинов как из искусственных, так и из природных источников все еще присутствуют в окружающей среде. Медицинские инсинераторы мощностью 40 кг, медицинские инсинераторы из Китая, производитель медицинских инсинераторов, установка для сжигания медицинских твердых отходов 100 кг, установка для сжигания медицинских отходов, В любом случае, мы должны напомнить, что это крупномасштабные мусоросжигательные установки, обычно более 30 тонн в день. Это социальная проблема, которую нужно анализировать и предлагать пути под разными углами зрения общественности, правительства, экономического развития, защиты окружающей среды, развития технологий и т. Д.

Итак, почему мы все еще используем мусоросжигательный завод?
Во-первых, для медицинских отходов из больниц на сегодняшний день лучше всего подходят пиролитические печи для сжигания. Пиролитическая технология может убить вирус, борьба с загрязнением.
Во-вторых, во многих странах и регионах мы желаем кремировать человеческое тело, домашнее животное. Это церемония в процессе развития общества и церемонии, посвященные исчезновению жизни.

По двум причинам, указанным выше, но не только по указанным выше, мы по-прежнему используем мусоросжигательные заводы.

Как найти подходящую мусоросжигательную печь для вашего местного объекта?
Инсинератор – это не дешевое оборудование, как правило, цена мелкомасштабной модели составляет около 5 000 долларов США за единицу, а цена крупномасштабной модели превышает 50 000 долларов США за единицу. Итак, перед покупкой одной установки для сжигания мусора необходимо уточнить следующие моменты:
А, что сжечь? Инсинератор – это мусоросжигательное оборудование, предназначенное для сжигания отходов. Итак, какие отходы вы хотите перерабатывать?
Б, маленький или большой? Это зависит от количества отходов за день или количества отходов за время кормления, например, размера животных.
C, топливо? В инсинераторе используется жидкое или газовое топливо, как правило, газовое топливо дешевле, чем масло, а дым чище, чем модель с жидким топливом. Но на каком-то участке нет системы газоснабжения.
И другие технологические элементы, такие как мощность (220 В, 380 В), тип дверцы для подачи отходов, конструкция мусоросжигателя и т. Д.

После того, как вы их проясните, вы можете найти местного или международного производителя, узнать цены, технические характеристики и, в конечном итоге, приобрести нужные продукты.

Автор Nicky

Предметы / Модель Ярд-30 Ярд-50 Ярд-100 Ярд-150
Скорость горения (кг / час) 30 кг / час. 50 кг / час. 100 кг / час. 150 кг / час.
Емкость подачи (кг) 60 кг 150 кг 200 кг 300 кг
Вес оборудования 2300 кг 4000 кг 4300 кг 7000 кг
Первичная камера (литры) 360 900 1200 1500
Вторичная камера (литры) 200 200 500 500
Внешние размеры (см) 145x90x175 200x160x230 220x180x360 240x170x380
Внутренние размеры (см) 100x60x60 120x90x85 130x100x90 150x100x96
Масляный бак (литры) 200 300 300 500
Дверной проем (см) 48 х 60 62 х 80 55 х 80 59 х 81
Дымоход (M) 5 5 10 10
Тип дымохода Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь
Вторичная камера ДА ДА ДА ДА
Камера смешанного сгорания ДА ДА ДА ДА
Камера дымового фильтра ДА ДА ДА ДА
Горючее топливо Нефтяной газ Нефтяной газ Нефтяной газ Нефтяной газ
Время проживания 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек.
Контроль температуры ДА ДА ДА ДА

INCINERATOR DIESEL DRIVEN

INCINERATOR, DIESEL DRIVEN
waste kind: HEALTHCARE WASTE
Waste calorific worth: 4000KCAL/KG
Wetness Content: 10-25%.
Nominal Capability: 50Kg/Hour set load.
Second Chamber: 2 Secs @ 850degrees C.
The main combustion chamber must ensure minimal leave temperature level is not less than 850 levels C.

INSULATION.
Calcium Silicate.
Restricting Continual service limit 1000 degrees C.
Density 25mm

THROUGHPUT.
50kg/hour at a small calorific worth of 4,000 kcal/kg and also an ordinary mass thickness of 120kg/MCubed for basic waste and 160kg/MCubed for health care waste.

Соответствующие концепции и стандарты чистоты чистых помещений

22 мая 2019 г. Новости отрасли 500 просмотров

Чистота – это количество пыли (включая микроорганизмы) в чистом воздухе.

Чистота воздуха в чистом помещении обычно требует проведения следующих испытаний, чтобы сделать выводы:

л  Холостой ход, статический тест

Чистое помещение установлено, система кондиционирования чистого воздуха работает в обычном режиме, а производственное оборудование и операторы в помещении отсутствуют.

Или система кондиционирования воздуха в чистом помещении работает нормально, технологическое оборудование установлено, и испытание проводится без присутствия производственного персонала в помещении.

л  Запуск, динамический тест

Чистая комната была протестирована в нормальных производственных условиях. Обнаружение объема воздуха, скорости ветра, положительного давления, температуры, влажности и шума в чистом помещении может выполняться в соответствии с соответствующими нормативными актами по общему кондиционированию воздуха.

Таблица сравнения чистоты-количества частиц пыли

Состояние простоя

Рабочее состояние

оценка

Максимально допустимое количество частиц на кубическую площадь

0,5 мкм

5 мкм

0,5 мкм

5 мкм

А

3500

20

3500

1 *

B

3500

29

350 000

2 000

C

350 000

2 000

3 500 000

20 000

D

3 500 000

20 000

Нет особых требований

Нет особых требований

Чистота – стандарты ЕС и ISO

оценка

Состояние простоя

Рабочее состояние

Замечания

Класс А

ISO 5

ISO 5

Локальная зона для операций с повышенным риском

Класс B

ISO 5

ISO 7

Стерильные препараты и консервирование

Класс C

ISO 7

ISO 8

Некритическая область процесса

Класс D

ISO 8

Нет особых требований

  Некритическая область процесса

URL с дополнительным содержанием: www.ecolead.cn Тел: 025-57138032