Incinerador Yd-500

Descripción del producto

Nanjing Clover Medical Technology Co., Ltd. es un fabricante líder de incineradores de desechos en China. Somos fabricantes locales y uno de los mayores exportadores de China. El equipo técnico de incineradores pirolíticos es el principal tratamiento de desechos en todo el mundo, para desechos médicos, incineración de animales, fabricantes de incineradores, fabricantes chinos de incineradores, ¿ee. , empresa de fabricación de incineradores, incineradores médicos de porcelana, cremación de mascotas y otros sólidos wste. La capacidad de 10kgs / Hr. Hasta 500kgs / Hr., Hasta 6ton por día. Actualmente, suministramos diferentes series para los requisitos de los clientes locales y diseñamos un incinerador actualizado con nuestra tecnología líder. La característica de diseño actualizado de nuestra gama de incineradores los convierte en uno de los más rentables del mundo.

Modelo YD-500
Tasa de quema
500 kgs / hora
Capacidad de alimentación 800 kilogramos
Cámara de combustión primaria 4000 litros
Cámara de combustión secundaria 1500 litros
Mezclar la cámara de combustión
Cámara de filtro de humo
Modo de alimentación Manual
Voltaje 220V / 380V
Energía 2,24 Kw
Tipo de combustible Gasóleo / Gas natural / GLP
Quemador Italia Original
Consumo de aceite (gasoil) 31–59,1 kg / hora
Consumo de gas (gas natural) 19,2–64,2 m3 / hora
Dimensiones internas 257 x 147 x 108 cm (cámara primaria)
Dimensiones externas 320 x 220 x 460 cm (sin chimenea)
Monitor de temperatura
Capacidad del tanque de aceite (si es combustible de aceite) 500 litros
Puerta abierta El 108 x 128cm
Longitud de la chimenea 14.0 metros
Tipo de chimenea Acero inoxidable
Peso bruto del equipo 13000 kilogramos
Especificaciones técnicas de operación
Temperatura de la cámara de Paimary 800 grados-1000 grados
Temperatura de la cámara secundaria 1000 grados-1200 grados
Tiempo de residencia 2,0 seg.
Eficiencia ardiente > 98%
Desperdicio de poder calorífico inferior 3000Kcal

hospital incinerator supplier

Burner to have dual burning chamber and also control quantity of dioxin as well as other gasses released without being dangerous.

Estimated measurements, to manufacturers typical, but to be compact as feasible. capability: roughly 60kg each day, voltage: 220V and also diesel fired.

CSH Health Center, (Calabar, Nigeria)

Mmedical waste burner capable of getting rid of approximately 0.5 cubic meter of transmittable or pathological waste.

Incinerator to have dual burning chamber as well as control quantity of dioxin and other gasses discharged without being harmful.

Approximated dimensions, to suppliers standard, however to be compact as feasible. ability: about 120kg daily, voltage: 220V and diesel fired.INCINERATOR (WASTE INCINERATOR).
Developed to shed disposables that can as well as need to be destroyed on-site. Theses wastes consist of contagious and also polluted “red bag.” Surgical dressings, plastic examination devices and also other wastes.
Quick, complete, reliable waste disposal.
Double chamber burning, Chambers shielded as well as lined with high temperature refractory. Programmable electronic temperature level controls, temperature signs and also charge recorder. Regulating control for fuel and air reduces gas consumption.
Minimum installation as well as launch time.
Aluminized steel coat lined with refractory and also firebrick. Screens recorders as well as other accessory tools ought to be offered.
Billing system:.
– Upright fee door on primary chamber.
– Pneumatic or hydraulic ram billing system.
– Vehicle closed down of the door after charging.
– Primary and second chamber temperature presented and also taped (optional).
Charging price:.
– Approximately 100kgs per hr of waste or red bag waste rated at 2200 BTU’s per kg.
Fuel:- Gas.
Capability (Cubic Mtr): 1.65 M3 or even more.
Ave Capacity: 100kg per hour.
Additional Chamber Capability (CubicMtr):3.88 or even more.
Size (mm): 1880 or much better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or better.
Ash Door Opening (mm): 475 × 900 or much better.
Min. Running temperature: 90 level centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Second Chamber: 2 sec.
Temperature Tracking: Both for key and also additional chambers.
Packing SystemManual/semi-automatic.
Waste damage performance:> > 90% by weight.
Filter: Ceramic or various other comparable filters in order to lower the induction of dangerous air contaminants, particulates, carbon monoxide, dioxin/furane right into the atmosphere.
De ashing system: Manual/semi-automatic.
The System needs to be quoted total with:-.
– Pipes.
– Electric panels.
– Civil functions.
– Waste collection Trolleys

Complete/ Paint:-.
Premium quality warm resistant, 2 layers state-of-the-art epoxy Paint layer.
Set Up Power (Electric Voltage): 440V/ 50 Hz.
Waste Management Tools must have;.
Mobile packing trolley: 06 No’s– For transportation of health center waste from wards to burner website/ area, Opening from the top.
WASTE BINS MOBILE: 06 No’s- Constructed from Plastic, in blue shade with a cover flap.
Plastic Bags: 2000 no’s each in Red and also Yellow shade.
Heavy Duty Hand Protection Pairs: For Waste managing staff-06 Pairs.
Long Shoes Pairs: For waste handling– 06 Pairs.

Установка для сжигания отходов животных

описание продукта

1. Clover Medical Limited сохраняет все права на исправление / обновление информации о продукте на веб-сайте. Технические характеристики могут быть изменены без предварительного уведомления.

2. Мы принимаем коммерческие условия: условия FOB / C и F / CIF, морским путем / поездом, в полном контейнере или навалочные грузы. 1. FOB (Free on Board), цена покинуть порт Китая. 2. C&F (Стоимость и фрахт), цена FOB и стоимость фрахта. 3. CIF (Стоимость, страхование и фрахт), цена FOB, страховой сбор и стоимость фрахта.

3. Срок оплаты:
По морю: 50% депозит T / T (банковский перевод) заранее и 50% баланс T / T до дня доставки.
Поездом: 100% T / T заранее.

4. Транспортный документ и упаковка: Как правило, мы поставляем (1) транспортную накладную (накладную), какой образец… (2) коммерческий счет-фактуру, (3) ТОЛЬКО упаковочный лист.
Если какие-либо дополнительные документы / сертификаты и печать / слова на этикетке на упаковочном материале или документах, запрашиваемых импортером или местной таможней, что бы ни происходило в Китае или за границей, должны проинформировать продавца заранее и взимать плату как фактическую стоимость. Например, сертификация фумигации, посольский сертификат, осмотр BV / SGS…, сертификат оригинала (C / O), форма A и т. Д. Тепловая ценность медицинских отходов, установка для сжигания свиней и цена, установки для сжигания свиней, установка для сжигания в домашних условиях, корма для установок для сжигания в больницах, изображения установки для сжигания отходов в больницах, установки для сжигания отходов в больницах в Китае, покупатель должен сообщить продавцу заранее и оплатить эти расходы. Продавец оставляет за собой все права отложить / отменить доставку и запросить потерю стоимости, вызвавшую этот инцидент. Если местная таможня импортера арестует / потребует штраф или другая ситуация вызвана ошибкой покупателя, Clover Medical сохраняет за собой право потребовать компенсацию / судебный процесс. Спасибо за сотрудничество.

5. Срок изготовления обычно составляет 3-6 недель, в зависимости от продуктов и количества.

7. Гарантия: Один год на оборудование. Мы поставляем запасные части для технического обслуживания бесплатно в течение первого года, а стоимость доставки ложится на покупателя.

8. Страхование: нести все риски потери или повреждения товаров с момента их пересечения с поручнями судна в названном порту отгрузки. Предлагаем применять страхование всех рисков по каждому договору. Когда покупатель забирает товар на местном сайте, необходимо внимательно осмотреть. Если в рамках страхового полиса произошел какой-либо ущерб, покупатель должен немедленно сообщить об этом страховой компании и Clover Medical Limited. Окажем необходимую помощь.

Предметы / Модель TS10 (ПЛК) TS20 (ПЛК) TS30 (ПЛК) TS50 (ПЛК) TS100 (ПЛК)
Скорость сжигания 10 кг / час 20 кг / час 30 кг / час 50 кг / час 100 кг / час
Емкость подачи 20кг 40кг 60кг 100кг 200 кг
Режим управления ПЛК ПЛК ПЛК ПЛК ПЛК
Камера сгорания 100л 210л 330 л 560 л 1200L
Внутренние размеры 50x50x40 см 65x65x50 см 75x75x60 см 100x80x70 см 120x100x100 см
Вторичная камера 50 л 110л 180л 280L 600 л
Камера дымового фильтра да да да да да
Режим подачи Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации
Напряжение 220В 220В 220В 220В 220В
Мощность 0,5 кВт 0,5 кВт 0,5 кВт 0,7 кВт 0,7 кВт
Расход масла (кг / час) 5,4–12,6 7,8–16,3 10,2–20 12.1–24 14–28
Расход газа (м3 / час) 6,2–11,4 8–15,7 9,8–20 9,9–26,1 10–32,2
Монитор температуры да да да да да
Температурная защита да да да да да
Масляный бак 100л 100л 100л 100л 200л
Дверца подачи 30×30 см 45×40см 55×50см 70×55см 80×60 см
Камин 3 метра 3 метра 5 метров 5 метров 10 метров
Тип дымохода Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь
Время проживания 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек.
Вес брутто 1500 кг 2200кг 3000кг 4500кг 6000кг
Внешние размеры 140x90x120 см 160x110x130 см 175x120x140 см 230x130x155 см 260x150x180 см

Medical Waste Incinerators

Basic Info.

Model NO.:medical waste incinerator 300kg/time china
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Laboratory incinerator china manufacturer, large animal incinerators, low-cost medical waste incinerator, pet crematory, pet incinerator deisel, pet incinerators, Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

hiclover waste incinerator spare parts

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.
Refractory cement,Ignition transformer – Secondary burner,Ignition transformer – Primary burner,Emergency push button,Temperature thermos couple with Locknut – 1600oC,Temperature thermos couple with Locknut – 1300oC,Temperature display controller – Secondary Chamber,Temperature display controller – Primary Chamber (Parameter – Digital Adjust Instrument),Burner Lighting Sensor (Photo Cell) PBT/PC
Circuit board (LM44.255C2BT) High Stage Secondary,Circuit board (LOA24.171B2BT) Primary
Fire proof flange gasket,Fire proof flange gasket
CA50-600,EB14HPM,26-48-3371T JT04,K1600,k1300,XMT – 3000,XMT – 2000 QRB1,LM44.255C2BT,LOA24.171B2BT,SN834457 8023020001,SN834451,3713798,AS47B,FO03,BTL20,SPARK35
Ignition electrode with leads(for burner BTL20/SPARK35),Solenoid(for burner BTL20/SPARK35),Burner fuel pump(for burner BTL20/SPARK35),Fuel filter(for burner BTL20/SPARK35)
Burner – Baltur,Burner – Baltur,Solenoid,Burner fuel pump
Ignition Cable,Ignition Switch -(Control Box),Photo Cell

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

INCINERATOR DIESEL FIRED

Burner 20 Kg
Burner electrically operated
consisting of:
A cage for receipt of biomedical waste;
A burning chamber with fireplace with a filter to maintain ashes;
A cover;
An air supply;
A wind turbine allowing supply air.
Burning temperature: 1800 ° C.
Includes all devices. ▪ The incinerator should be a modern-day waste disposal system, made
to bum medical waste in a tidy as well as environmentally effective
fashion. It should use a temperature based reasoning control system
to supply optimal control of the operating problems and also
incorporate a high capacity thermal oxidizing additional chamber.
It must be made to keep the exhaust gases, for a minimum of 2
seconds to make sure the unit’s reliable destruction of the combustion
products.
▪ All the burners to be supplied and set up meet the
Waste Monitoring Guideline 2006, lawful notice No. 121 of
29th September 2006 as well as particularly third timetable law
( 26, 47) relating classification, criteria, standards, as well as
procedure for setting up as well as running incinerators.
▪ The ability of the incinerator called for should be to the
specs with a capability to melt 100kgs/Hr.
▪ The incinerator shall be operated on a three-phase power supply
( keys).
▪ For the technological examination, not just the treatment plant
the entire system will certainly be taken into consideration. It will be the responsibility
of the Bidder to provide a full system, including all ultimately
furthermore necessary additional systems and extra
tools.
▪ The system supplied will be developed to run usually under
the conditions of the buyer’s nation. The conditions include
Power Supply, Climate, Temperature Level, Moisture, etc.
▪ The Prospective buyer has to provide a warranty for one year.
▪ All message, specification etc. on all control operating user interfaces as
well as on information displays as well as on print-outs will remain in
English language.
▪ The Prospective buyer is in charge of all authorizations and also approvals for
importation. The Prospective buyer shall offer all the essential
paperwork in order to help with the lawful needs for the
installment and also putting into use the equipment.

▪ Duration of Execution is 90 days from contract signature for
delivery to site as well as completion of all verification operations
required for the issuance of provisional approval.
▪ Agents of the Getting Authority and also the
Recipient, together with the Prospective buyer’s rep, shall
carry out the controls, screening and also first authorization for provisional
and also final approval. The provisional and last approval shall
take place at the last destination.
▪ Customer service: The Bidder is called for to guarantee that a.
maintenance, service and also fixing centre, which is accredited by.
the Producer, and which has the ability to rapidly provide genuine.
extra components and consumables recommended by the Supplier.
is offered throughout the one year service warranty period. In.
fulfillment of this need with their offer, prospective buyers must.
send a statement authorized by the producer or representative.
of the manufacturer:.
ͦ Supplying the name as well as address of its licensed.
maintenance, solution as well as repair centre,.
ͦ Verifying that this accredited maintenance, service and also.
repair work centre is able to rapidly supply authentic spare parts as well as.
the consumables suggested by the Producer; and.
▪ The Bidder will be accountable to provide and also install all.
tools supplied to the hospitals in the.
Republic of Kenya. The Bidder will supply a time routine over.
the total building and constructing period. The delivery.
and also setup time have to be agreed between bidders, target.
Medical facility and also the Getting Authority. The therapy plant must.
arrive pre-assembled. The Prospective buyer shall guarantee that all parts of.
the plant moved by sea shall not be delivered as “deck.
cargo”.
▪ It is anticipated that the Prospective buyer cooperates very closely with the.
service provider for the brand-new waste managing structure/ real estate and also will.
make available all needed technological information, drawing, and so on to.
the specialist.
▪ The Prospective buyer shall supply and also install the incinerator with the.
following connected specs

For the Supply, setup & & appointing of a Clinical Waste Burner as in-depth listed below:.
i. Waste type Health care waste.
ii. Waste thickness 125 to 350Kg/M3.
iii. Waste Calorific Value 4000 KCAL/Kg.
iv. Moisture web content 10-25%.
v. Estimated ash residue 5-10%.
vi. Small ability 100Kg/hour set tons.
vii. Second chamber 2 seconds @ 1100 ° C. viii. Environmental Administration Coordination Act, 1999 and also specifically, Waste monitoring guidelines, 2006.
2 Tools.
2.1 Key Combustion Chamber.
▪ The key combustion chamber is the major structure of the.
burner, made from light steel plate and stiffened with.
rolled steel areas. It is brought from the floor degree on a.
substantial steel assistance frame. Internally the covering is lined with.
calcium silicate insulation and also a hot face combination of very.
responsibility brickwork or high toughness castable.
▪ The main burning chamber need to guarantee minimum departure.
temperature level is not less than 850 ° C
. One Manual Tons Burner comprising:.
▪ Manual Loading door (heavy duty steel door with ideal.
refractory lining).
▪ Horizontal strong hearth, refractory lined key combustion.
chamber. Approximate measurements 800 mm diameters x 2100mm.
long.
▪ Complete sized bulk load/ash removal door.
▪ 1 off diesel-fired ignition burner– temperature controlled.
▪ 1 off burning air supply follower and also circulation system, automated.
control.
▪ High capacity second combustion chamber with residence time.
not less than 2 secs @ >> 1100 ° C. ▪ 1 off diesel-fired afterburner– temperature level managed.
▪ Control panel– automated operation.
▪ Temperature level indicator main and also secondary chambers 0-.
1200 ° C. Both chambers have to be protected with refractory.
material (very obligation 100mm thick firebrick with 25mm thick.
calcium silicate insulation).
Keep in mind: The secondary burning chamber must make sure that the gas temperature as determined versus the within wall surface in the second chamber & & not in the fire area, is not less than 1100 ° C. 2.2 Throughput.
100kg/hour at a small calorific value of 4,000 kcal/kg and an ordinary bulk thickness of I20kg/ M3 for basic waste as well as l60kg/ M3 for health care waste.
2.3 Ash.
The waste will be minimized by 90 ~ 95% to leave 10 -5% ash.
2.4 Quality/Environmental Requirements.
▪ Setting Management and also Sychronisation Act, 1999.
▪ BS3316.
2.5 Running Period.
▪ Anticipated daily operating period 8 hours.
▪ Maximum operating duration 12 hrs.
2.6 Chamber.
▪ Must be refractory lined to the following criterion; Hearth as well as.
reduced section of chamber walls.
2.7 Warm face material.
▪ Super duty firebrick.
▪ Restricting continuous solution restriction 1500 ° C. ▪ Thickness 100mm.
▪ Thermal conductivity 1.3 W/mk.
2.8 Insulation.
▪ Calcium silicate.
▪ Limiting continuous solution restriction 1000 ° C.
▪ Density 25mm.
▪ Thermal conductivity 0.095 W/mk.
2.9 Smokeshaft/ Heap.
▪ Ought to be manufactured from refractory lined mild steel or high.
top quality air-cooled stainless steel. The chimney/stack must have a.
minimum height of 10 meters above ground level.
▪ Refractory lined flanged chimney should be over the height of.
any type of existing roof adjacent to the incinerator.
▪ Give lifting equipment to hoist, erect and also place smokeshaft, as well as.
offer supports slings as necessary. Enable cutting of tree.
branches to assist in the workout.
▪ The smokeshaft will be painted with accepted warmth immune.
paint after setup.
2.10 Ignition Burners.
Fully packaged oil kind, total with electrical ignition and also flame failure controls, wired with constant running fan and also total with all shutoffs, fan and also electric motor.
· Optimum rating: a minimum of 450kW/hour.
· Heater: scheduled on/off operation.
· Maximum usage: a minimum of 6 litres/hour.
· Ordinary consumption: at least 3 litres/hour.
2.11 Afterburner.
Fully packaged oil kind, total with electric ignition as well as flame failure regulates wired with constant running follower and complete with all valves, fan and also electric motor.
Maximum rating: at least 450kW/hour.
Burner: scheduled on/off operation.
Optimum usage: at least 9 litres/hour.
Average intake: at the very least 4.5 litres/hour.
2.12 Flue gas treatment.
▪ Needs to have particulate cleaner (scrubbers). A mechanical.
particle collector should be integrated after second.
burning chamber for elimination of particle pollutants.
entrained in the flue gas stream.
2.13 Diesel Storage tank.
▪ To offer diesel solutions tank (Ability 400 litres).
consisting of level indicator.
▪ The container should be connected to the incinerator at higher level.
to make it possible for free-flow of diesel from the storage tank to the incinerator.
The linking pipe needs to be a black pipe of accepted gauge.
as well as diameter. Consist of various other accompanying devices and.
fittings.
▪ Connect heaters to fuel supply.
2.14 Electrical Supply.
▪ 3 stage 415 V a.c., 50/60 Hz.
3 Documents:.
Procedure manual 2 sets.
Service/maintenance guidebook 2 collections.
4 Certification.
▪ National Atmosphere Monitoring Authority (NEMA).
accreditation.
5 Ability to service tools.
▪ The agent/supplier shall have sufficient facilities, spare components,.
consumables and also certified and also experienced technical personnel.
Setup works.
▪ Provide raising gears as forklift, gantry, rollers, and lifting.
jacks and also setting burner.
6 Appointing as well as Training.
▪ The Representative will check all set operating specifications

▪ The representative shall perform a two days operation & & maintenance
. training to the Biomedical engineering employees as well as burner.
operators after setup & & commissioning of the devices.
7 Commissioning Maintenance Contract.
▪ Prior to the expiration of the service warranty/ signing off, the supplier shall.
supply an one-year substitute solution components (e.g. oil filters, air.
filters), the Quarterly regular upkeep cost per quarter.
for 3 (3) quarters.

Upkeep control proposition.
▪ The maintenance agreement price includes work, transportation and also.
accommodation for the attending service technicians.

incinérateur de déchets à sac rouge

«Chambre à déchets

Capacité de la chambre 300 kg

Volume de la chambre .54m3

Taille de la chambre (extérieur) Largeur: 91cm, Hauteur: 86cm Longueur:

152 cm

Ouverture de porte 66 x 76 cm

Hauteur jusqu’à la porte 84 cm

Hauteur au sommet de la pile 5,4 m

Taille de dalle suggérée (L xlx épaisseur) 1,8

mètres x 2,4 mètres x 10 centimètres

Vitesse de combustion: environ 45 kg / h.

Empiler:

2′-14 ″ ”de diamètre. (36 cm), acier aluminisé de calibre 14 (1,90 mm),

réfractaire doublé

8′-12 ″ ”de diamètre. (30,5 cm), calibre 16 (1,52 ″

“Brûleurs Diesel

Fonctionnement Minuterie manuelle

Service électrique Standard – 115 volts, 60 HZ, 20 ampères

Description générale:

Primaire

Chambre: boîtier en acier robuste

Doublure et isolation réfractaires de haute qualité

Grande porte de chargement par le haut pleine grandeur et liquide

seuil de rétention

1 x brûleurs d’allumage au diesel fonctionnant marche / arrêt

Porte de retrait des cendres

Cheminée: acier inoxydable robuste

enveloppe

1,5 m de longueur

Pile doublée réfractaire de 0,6 m

Panneau de contrôle: Contrôle de 1 brûleur

Contrôle de la minuterie 0-12 heures

Ventilateur intégral

contrôle de la minuterie

Surveillance de la température

Contrôle automatique

Configuration du temps de cycle

Accessoires: manuels d’utilisation et d’entretien

Liste des pièces de rechange

Râteau à cendres

Conteneur: conteneur d’expédition de 20 pieds avec incinérateur installé

Réservoir de carburant de 500 litres »

Industri mana yang digunakan terutamanya penapis udara roller shutter automatik?

22 Mei 2019 Berita Industri 204 tontonan

Dengan perkembangan sains dan teknologi di China, perkembangan ekonomi dan industri akan menyusul. Oleh itu, beberapa kilang akan menggunakan peralatan yang lebih maju. Dalam peralatan ini, instrumennya lebih canggih dan mudah terkena debu. Kilang biasa akan menggunakan automatik penapis udara rolling-blind untuk menapis udara. Oleh itu, untuk sekumpulan peralatan canggih, di mana ia digunakan?

 

Pertama, industri peleburan logam

 

Perusahaan tugas paling berat di China adalah industri peleburan logam. Keperluan kualiti udara di bengkel relatif tinggi di kilang-kilang perusahaan tersebut. Kualiti udara secara keseluruhan sangat buruk, bahan pencemar partikulat serius, dan luasnya besar , dan sukar dikawal dan dikendalikan Oleh itu, penapis udara tirai bergulir automatik digunakan untuk membersihkan sistem sintering, sistem pengudaraan dan pautan lain.

 

Kedua, loji janakuasa

 

Digunakan di loji janakuasa, turbin gas yang digunakan di loji janakuasa perlu memastikan tahap kebersihan yang tinggi, jadi loji janakuasa umum akan menggunakan penapis udara penggulungan automatik untuk membersihkan dan menyaring sistem masuk udara dari set peralatan yang lengkap.

 

Ketiga, di lebuh raya

 

Jenis peralatan ini juga digunakan di lebuh raya, terutama di gorong-gorong. Oleh kerana peredaran udara di gorong-gorong buruk, kebersihan udara harus dipastikan ketika penyaman udara dilakukan, jadi peralatan jenis ini harus digunakan. menapis udara.

 

Projek pertahanan udara bawah tanah dan kereta api keempat

 

Ia digunakan dalam proyek pertahanan udara bawah tanah dan udara sipil, kerana pengudaraan buatan diperlukan di dua kemudahan ini, oleh itu penapis udara bergulir automatik digunakan untuk menyaring udara yang dihirup, sehingga kebersihan udara dalam proyek-proyek ini dapat dijamin. Mencegah udara buruk daripada memberi kesan buruk kepada tubuh manusia.

 

Kelima, industri arang batu

 

Terdapat banyak zarah debu di industri ini, banyak orang yang terlibat dalam projek buruh ini mempunyai penyakit pekerjaan, dan seluruh saluran pernafasan dan paru-paru mengalami kecederaan terperinci. Untuk memastikan udara segar di saluran pernafasan orang yang bekerja di bawah tanah, penapis udara ini mesti digunakan untuk menyaring udara di lubang udara. Ini adalah alat penapis udara penggantian automatik yang disesuaikan dengan persekitaran yang keras.

 

Di atas adalah senarai beberapa tempat di mana penapis udara bergulir automatik sering digunakan. Masih banyak persekitaran di mana anda dapat melihat bunyi dan bayangan penapis penggulungan. Saya tidak akan menyenaraikannya satu persatu. Saya harap ia dapat digunakan sebagai rujukan untuk pelanggan.

Lebih banyak URL kandungan: www.ecolead.cn Tel: 025-57138032

Medical Waste Incinerators

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Incinerator calculation, incinerator capacities pdf, incinerator capacity, incinerator capacity 30 kg/hour, incinerator capacity 300kg, Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

CLINICAL BIOLOGICAL WASTE BURNER

It should be a 3 chambered burner
The tons capacity of 250 kg
The real estate for the incinerator need to be able to stand up to the temperatures and also various other functional needs.
The chimney ought to have a strong refractory cellular lining of special type of cement to withstand temperature levels greater than 1200oc.
It must have a solid base for the device to keep it stable, firm as well as safe and secure throughout its operational lifespan.
The primary (burning) and also the second (scorching) chambers to be fitted with burners for effective burning.
In the 3rd chamber, scrubbers as well as precipitators will certainly require to be set up as pollution control equipment prior to emission of gases into the environment.
A system for constant emission Surveillance as well as Ecological Tracking.
A system with which to deal with the waste water prior to discharge into the sewage system.
Temperature control and also surveillance gadgets (probe thermostat) need to be availed to make sure that the ideal temperature levels are obtained in the chambers throughout procedure.
Electric motor (followers) adequate to cause adequate air right into the combustion chambers and also guide the gases in the direction of the flue 9 chimney).
High power electrical energy and emergency generator link for automated ignition objectives.
The chimney ought to be tall sufficient and be at the very least one meter over the highest building around.
The fuel storage tank (industrial diesel) to be built beside but out side the incinerator housing for security functions as well as to avoid fire hazards. Capability of 250.
Various other Requirements
Training of all the workers involved in healthcare waste (HCW) administration.
The Automatic Feeding system of the Burner
Automatic waste filling system with conveyor belts. These will lead the waste into the initial primary chamber.
An Automatic base ashes discharge system.