Tag: Waste Incinerators

pet dog incinerator up for sale

1. Ability of damage in weight: 60 Kg/h.
2. It should be able to run not much less than 10 hours/day
3. This burner must have the ability to demolish all flammable wastes created by healthcare facilities, exclusive clinics, laboratories, institutes, and so on.
4. Style Requirements: Kinds A, B, C, D, as well as E of medical waste
5. ” PYROLYTIC” burning, by managing the gasification of waste.
6. The burner must stay clear of the release of black smoke and also great dust, throughout the loadings.
7. It should have the ability to reduce the volume of wastes by 98%.
8. It ought to be able to hold discharge in the second shed with gas house of not less than 2 seconds.
9. The incineration should be completely without visible smoke in addition to offending odours.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
? The Temperature levels of burning: Minimum will be 850oC and also max 1400oC
? Article burning: >> 1100oC.
11. The Interior size of the Smokeshaft:? 400 and its elevation: 8 m.
12. The Quantity of the combustion chamber: 1.200 L.
13. The Dimension of the door for loading in cm: 70 × 70.
14. Heater operation must be Automatic On/Off.
15. Fuel: diesel.
16. The provider must supply needed info for the best of the installation.
This burner with “PYROLYTIC” burning should have:.
17. A burning chamber of waste:.
* Completely limited door for the hands-on loading of waste. The loading must be Handbook, Set Lots.
* A burner of illumination which the use is limited to the ignition of waste.
* Frontage of packing with door seals increased on joints, wheel of screw plug, adaptable joint, and also packing shielding out of refractory.

medical incinerators

* clinical burners, The insulation of the burning chamber need to be made up of refractory bricks, having a.
high content of aluminium and also protects bricks in order to ensure a minimum temperature on.
the outside sheet metal.
* Structure of the refractory;

? Refractory concrete:.
?. Thickness : ≥ 100 mm.
?. Nature: 42% of Al203.
? Protect in fibrous panels:.
?. Density: ≥ 75 mm.
? Nature: Calcium silicate.
* Heater of lighting of waste, with gas, standard mono-bloc casting leading diving fire, lights and also safety of electronic ignition, long-term ventilation, electromagnetic sluice entrance of regulation and also isolating valve.
* Plate of combustion in Carborundum, avoiding the dealing with of glass and slags.

18. A chamber of post combustion of gases.
* A heater of combustion of gases,.
* A gadget of injection of air permitting a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of emptying of the gases burnt.
* Carcass in solid sheet steel with support of link.
* Composition of the refractory;.
? Refractory concrete:.
? Thickness : ≥ 150 mm.
? Nature: 65% of Al203.
? Protect in fibrous panel:.
? Thickness: ≥ 85 mm.
? Nature: Calcium

healthcare facility incinerator

* Burner with gas, mono-bloc casting assisting kind with straight fire, lights and safety and security of digital ignition, permanent ventilation, electro-magnetic sluice gate of policy and separating shutoff.
* An additional injection of air to make certain excellent oxygen content.
19. A control box guaranteeing the total cycle of burning.

20. Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air circulation being accomplished by shutoffs and adhering to the control of the automatic cycle.
21. Controls as well as policies:
Control box watertight to dust, consisting of:

* A button circuit breaker for each engine (ventilators and also heaters).
* A timer with adjustable temporization for the law of each heater.
* A regulatory authority with digital watching for the temperature level of combustion.
* A regulatory authority with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing has to be performed in the bottom of the combustion chamber or the deashing need to be Automatic or manual set de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional
23. Emission Standards Conformity: BS 3316 or équivalent criterion
23. Capability to treat Plastic: Not much less than 40% by weight
24. CE Production Conformity: BS EN 746-2-1997
22. The provider has to give sets of extra parts of first seriousness as well as consumable of the incinerator.
23. The set up burner should bear a one year assurance.
24. The distributor shall perforn an onsite installment of the burner.
25. The technical training of drivers will have to be offered and also given by a professional from
the manufacturing facility; it will contain medicinal and also preventative upkeep, and using machine, etc

NB.: Civil works and any kind of other related services for the setup and also training of operators need to be consisted of in the burner’s cost.
Specification for the shelter of the incinerator: House of the incinerator comprehensive in offer (your house have to have facilities for hand cleaning and also firefighting).
This product and also tools must include in the shed of the burner: foundation in rubble stone, seclusion roofing versus humudity; elevation with brick of 20 cm (bloc cement), proceeding lintel (linteau) in enhanced concrete; steel frame (charpente en steel); roof covering in sheet B.C.A. 28 BG (Toiture en t?le), steel rain gutter, sanitary installation (laundry basin, soakway pit of 20 m of deepness); ash pit of 30 m3, electric setup; concrete piece for dealing with the burner; chanel for evacuation of rain water or waste water, cord mesh for oygenation up the lintel; smooth rougtcasting of walls (interior as well as outside); plinth with cement; 2 metal doors; email paints inside and also latex paints outside your home on walls and on doors; roofing limit (planche de rive); steps for this spec will certainly depend upon the dimension of the incinerator which will identify the size of the shed of the incinerator., etc

Wastes That Can be Burned or Incinerated

Total combustion converts waste into inert bottom ash with minimal development of smoke, fly ash and also harmful

gases. Numerous aspects affect this procedure including the heating value, moisture as well as chemical composition of the

waste itself, operating conditions in the shed chamber (i.e. temperature level, holding time and also turbulence) and also

driver ability.

The technique used is necessary in identifying what can securely be burned. Particular wastes can only be incinerated

making use of equipment that has actually been particularly developed and also equipped with enough air contamination controls which

attain particular air discharge standards. Waste having chlorinated substances (i.e. chlorinated

solvents and plastics, PVC piping, timber treated with pentachlorophenol or PCB-amended paint, marine driftwood)

must be separated from various other waste as their burning will certainly result in the de novo development as well as exhaust of various

dioxin and furan compounds. Waste including mercury (i.e. batteries, thermostats as well as fluorescent light bulbs) as well as

various other hefty metals (i.e. lead acid batteries, timber treated with lead paint) should not be burned as the mercury

as well as heavy steels will not be ruined. Other waste that needs to not be shed unless using specially developed

incinerators consist of made use of lubricating oil, hydrocarbon contaminated soil, biomedical waste, sewer sludge or any kind of

other waste specifically prohibited by the Division of Environment.

Table 2 supplies a listing of typical wastes that can be shed and those that call for special factor to consider and

therapy. Note that open burning and incineration are recognized as separate columns in the table which

various restrictions apply relying on which approach is used. In general, much more restrictions relate to the

different techniques of open burning because of the incomplete combustion achieved. Fewer restrictions put on

incineration as a result of the operator’s capability to control the burning procedure.

Non-combustible products such as steel and also glass do not burn as well as will certainly rob warmth away from waste that can be

ruined by burning. Flammable waste needs to always be separated from non-combustible waste prior to being filled

into the melt chamber.

mobile burner

  1. Petrol: diesel
  1. Consumption: 8-10liter/hour
  1. Capacity: to cremate (carrion and spoils) 350-400kg/hour
  1. Temperature: 900-1350?C
  1. Operation temperature: -30~40?C
  1. Incinerator weight: 1800-2000 kg
  1. Volume: 0.70-0.80m/cube
  1. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

A burner stands for a complete service to the trouble of disposal of all medical facility waste kinds. The liquid fuel

is diesel. The burner ought to fulfill the setting standards. Expected Technical specifications

The burner will be completely self consisted of. incinerators that are stainless

steel with destruction rate of 15kg per hr. bactch lots of 10-15kg of

waste as well as average temperature level of 8500 degress c.

pet incinerator

The incinerator plant shall incorporate a control board for its procedure. On the control panel we will have a visual

screen of the chamber temperature levels. This aesthetic display needs to manage and keep an eye on the burner as well as his performance.

Capacity of destruction in weight will be 60 Kg/h.

It must be able to operate not much less than 10 hours/day

This incinerator need to have the ability to wreck all combustible wastes produced by healthcare facilities, private centers, research laboratories,

institutes, and so on.

Style Specification: Types A, B, C, D, as well as E of clinical waste

Supply, setup & & testing DUCTED SPLIT UNITS at waste store with enough ability to maintain the internal

temperature at 14 levels Celsius in summer seasons as well as winters months

burner supplier

“PYROLYTIC” burning, by controlling the gasification of waste

The incinerator producer should stay clear of the launch of black smoke as well as great dust, during the loadings.

It will be able to reduce the quantity of wastes by 98%.

It shall have the ability to hold discharge in the second shed with gas residence of not much less than 2 seconds.

The incineration should be completely without noticeable smoke as well as offensive odours.

1.0 The main ignition burner shall supplying ignition of the waste to 850 ° C as well as must turn off to conserve fuel.

The key burning chamber shall be constructed from hefty steel plate and also the system is internally lined with a

complete layer of hote face refractory and high performance insulation.

The Interior diameter of the Smokeshaft a minimum of:? 400 and also its elevation: 8 m

00 BEDS HEALTHCARE FACILITY INCENERATOR TECHNICAL INFORMATIONS

1) Policy

– – Waste disposal administration will be taken unique note to prevent health center infection.

– – Infections wastes shall be taken care of, stored purely and also burned by a burner situated at hospital site.

2) Waste Disposal Plan

  1. a)Classification

– – Medical wastes in healthcare facility are categorized as follows;

Infections Waste Specially-controlled waste Organ, needle, etc.
Industrial waste Rubber gloves, etc.
General waste Gauze, etc.
General Waste Plastic, Rubber Infusion bottle, etc.
Paper, wood, Vinyl Voucher, etc.
Metal, Glass Can, Glass bottle
  1. b) Infections Waste Disposal

– – Partition: Infections garbage disposal will be set apart suitably and also crammed in particular containers as well as delivered to particular storage space. The partition, packaging and distribution will be run appropriately at each room such as outpatient, operation cinema, blood collection area and also dialysis space.

– – Safety measure: Infections waste will not be location in other containers on the way of partition, packing as well as delivery.

– – Storage space: Infections waste will be kept at the storage space in health center website briefly until infections waste is incinerated.

– – Incinerator:

It is developed to sanitize clinical waste, decrease its quantity, and make its parts unrecognizable all in one completely enclosed and automated system.

It combines straight heated steam, high stress and also shredding to deal with contagious materials.

The infected waste is filled right into the top stainless-steel chamber where a sturdy shredder reduces the waste into tiny items. Utilizing gravity, the processed material comes under the therapy chamber where every item is heavy steam warmed to 134 and also pressurized to 3 to bar for 20 mins. The operating conditions are continuously kept track of as well as validated to achieve complete sterilization.

The 60 mins typical duration procedure cycle is totally automated. A computerized system monitors the procedure and also instantly prints a record with the crucial disinfecting criteria at the end of the cycle for exact record keeping.

The ability is between 500 to 600 kg/cy. h or even more.

Therapy cycle:

1- Filling; the polluted waste is automatically -filled into the chamber of the system

2-Shredding; the durable shredder reduced the product right into small pieces and also includes a special turning around system to avoid jamming

3-Heat; saturated pressurized heavy steam increases the temperature to 134 C and the pressure to 3 bar

4-Sterilization; the sterilization enters straight call with the shredding material (134 c, 3 bar) for 20 mins

5-Cooling; temperature level is decreased to 80 C by spraying awesome water onto Double coat of the treatment vessel, concurrently, the unit returns to ambient pressure

6-Draining; the heavy steam is condensed to water and released with the cooling water to the sanitary sewer system

7-vacuum; the staying residual steam is vented out through an air pump

8-Unloading; a digital signal educates the operator that all safe operating conditions have been fulfilled

The problem unlocks the device and also permits gravity dumping of the cured waste right into a container

Mentor Specification

General Characteristics

Operational temp. max 160 C
Max Weight when filld with waste For a special hydraulic test. Kg 10500
Stress. Kg/ cm3 3.5
Steam Pressure. Bar 8
Max Steam Flow Kg/h 500
Compressed Air Bar 6
Electricity 380 V/3 – phase Surge Protection system 35KW
Operating Characteristics
Average Cycle Time. minutes 60
Process Wight Capacity . Kg 500 – 600
Density. Kg/m3 100
Average process wight capacity Kg./cycle microbial inactivation 200-300

8log 10

Waste volume reductin 80%
Consumption / Cycle
Steam. Kg 40
Electricity . KW/h 9
Water Liters 500

TECHNOLOGICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications
           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
  NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank need to be attached to the incinerator at a greater degree to enable free-flow of diesel from the storage tank to the incinerator. The connecting pipeline has to be a black pipe of accepted gauge as well as diameter. Include various other coming with accessories and installations

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Give lifting gears as forklift, gantry, rollers, as well as raising jacks and also setting burner.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a smokeshaft with scrubber (for purification)

Provide raising equipment to hoist, set up as well as mount chimney, and give assistances slings as needed. Enable cutting of tree branches to facilitate the exercise.

The chimney shall be repainted with approved warmth immune paint after installment.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

EXAMINATION CRITERIA

Analysis will be performed in 4 phases particularly preliminary examination of files for uniformity with compulsory demands, technical assessment, site check out and also commercial examination.

Stage One: Initial Assessment

– – Initial Evaluation under special condition of the tender. These are required requirements.

This shall include confirmation that a bidder has followed the unique problem of tender over.

Failing to satisfy any kind of among the above needs stated in the special conditions of the contract will cause automated incompetency.

Stage 2: TECHNICAL ASSESSMENT (70 MARKS)

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
  The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The storage tank must be linked to the burner at a greater degree to make it possible for free-flow of diesel from the tank to the burner. The connecting pipe must be a black pipe of approved gauge and also diameter. Include other going along with accessories as well as installations

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Offer lifting gears as forklift, gantry, rollers, and also lifting jacks and placement burner.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Give lifting gear to lift, erect and also mount chimney, as well as provide assistances slings as essential. Enable cutting of tree branches to help with the exercise.

The chimney will be painted with authorized warmth resistant paint after installment.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

Pass mark for technical analysis is 70/100 marks

Stage Three: Website Browse Through

The assessment committee will check out the properties of the prospective buyers who are receptive to technological evaluation phase to confirm the authenticity of legal file sent; establish the precision of the info given in the tender records, examine company’s ability, place, to name a few.

The Tenderer will be immediately disqualified where incorrect or deceptive Info is discovered to have been provided.

Stage 4 Business Analysis

Bids that pass the above 3 (3) stages will be contrasted on the basis of costs/ cost estimated and the most affordable valued will certainly be taken into consideration the lowest examined bid and also consequently advised for award. Prevailing market prices will be used to identify the price responsiveness of the prospective buyers.

AREA V– TIMETABLE OF CRITERIA

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

waste burner supplier in china

  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration must be entirely free from noticeable smoke along with offending smells.

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” burning should have:

  1. A combustion chamber of waste:

* Completely tight door for the manual loading of waste.The loading need to be Handbook, Set Lots,

* A burner of lighting which the use is limited to the ignition of waste.

* Leading Loading loading with door seals gone up on joints, wheel of screw plug, flexible joint, and also packing shielding out of refractory.

* The insulation of the combustion chamber should be composed of refractory blocks, having a high material of aluminum and shields blocks in order to assure a minimum temperature level on the outside sheet steel.

* Make-up of the refractory;

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* Burner of illumination of waste, with gas, standard mono-bloc spreading directing plunging flame, illumination and safety of digital ignition, irreversible air flow, electromagnetic sluice gate of guideline and isolating valve.

* Plate of combustion in Carborundum, preventing the repairing of glass as well as slags.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :