pet waste incinerator manufacturer

Technical requirements for burning device, animal waste incinerator supplier
1. 2 systems are called for to be mounted in the south of the Kingdom of Saudi Arabia. The two systems will be utilized by personalized authority to burn different sort of drugs. All demand devices need to be provided.
2. Warranty: booth systems need to be given with 3 years warranty from the date of approval. All required extra components, preventative upkeep repair and also restorative upkeep need to be included in the cost as well as provided to the client.
3. All required electric as well as water links should be offered.
4. Both systems have to be of premium quality and must be environmental friendly.
5. The capacity of each system must be up to 100 kg/hr.
6. The system has to have automated feeding.
7. Each system must includes two burning rooms, one main space for burning the medication and also one more space for burning the gases that emit as a result of main burning.
8. The oven should be constructed from steel that is corrosion resistance and with thickness not less than 6 mm.
9. Each system should be of high reliable in shedding various sort of medicines, and also ought to have 99.9% effectiveness for burning organic products.
10. Waste products need to not exceed 5%.
11. System needs to have automatic ignition system.
12. System needs to utilize diesel (HSD) as fuel and ought to not consume more than 8 to 10 lt/hr.
13. Each system ought to be given with fuel storage tank of dimension appropriate to run the system for one complete day.
14. The temperature level in the primary room should be 850 C ± 50 C. the system need to additionally be qualified to operate as much as 1050 C ± 50 C. the system should can continues operation as well as should be supplied with concrete layer insulator with appropriate density.
15. Oven should be provided with warm insulator to permit easy operation.
16. Gas ought to stay in the additional area for not greater than 1.5 second.
17. The main burning area must contend least 2 heaters.
18. The second burning area need to have one heater.
19. Each system must have doors for ash, leave for air to the smokeshaft and also windows to allow looking inside and for maintenance.
20. Each system must have filtering system for gas handling with 2 tanks utilizing average water. Each water container must have capability of 1000 lt and ought to be repaired to the system as well as offered with water degree indication.
21. Each system must have special innovation for separating midsection products and also humidity after gas processing.
22. Each system needs to have cooling down ability after procedure.
23. Each system m must be offered with exhaust pipe with 250 mm diameter and also 10 m high. The base of the exhaust system ought to be 1000 mm. The exhaust pipe must be 6 mm as well as needs to be supply with heat insulator. The exhaust system should be provided with pressure sign. It ought to additionally offer with ladder and Lightning Arrestor.
24. Electric power: need to be 220 volt, 3 phase, 60 Hz, as well as the motor must not be less than 15 HP.
25. Each system must be given with control panel and also indicators and needed security devices and alarm. The control panel ought to reveal at least temperature level in both the key and additional areas and also injectors of the filters and also load.
26. Each system ought to be offered with security system for any break down or defect of any type of part of the system.
27. The complying with personal protective tools have to be provide:
a.Heat immune garments for 20 individuals.
b.Heat resistant goggles for 20 persons.
28. All elements of each system must be repainted with silver color that is heat resistant.

affordable incinerators

RECYCLABLE WASTE PLASTIC (NON-PVC) 218,693
CARDBOARD 85,046
PAPER 4,956
PVC 15,115
HAZARDOUS WASTE MEDICAL WASTE 1,084
SOLID WASTE CONTAMINATED WITH HYDROCARBONS 300,680
USED ENGINE OIL FILTERS 85,423
HYDROCARBON-CONTAMINATED DIRTS 88,680
COMMON WASTE FIBERS 14,078
USED AIR FILTERS (AUTOMOTIVE AND ALSO SIMILAR) 23,149
INDIVIDUAL PROTECTIVE DEVICES (PPE), INCLUDING INFECTED CLOTHING AND ALSO SIMILAR PARTICLES 130,861
Pig corpses/ roaming pet dogs and also bigger pet carcasses economical incinerators ––.
Lots ability in the variety of up to 300 kg/ Melt rate approx. 50 kg per hour

Temperature Controlled Heater. Burners to be made to meet the Norms of Pollution Control. Modern technology: Heavy-duty covering, to be a top quality, rugged, dependable, affordable Burner with pertinent control, very easy to operate and also self-supporting. Systems to be pre-assembled, pre-piped, pre-wired & & examined prior to Transport/ Export.

Note: Comparable Modern Technology and/ or Tenderers Proposals rate.

Within the structure of an ecological tools & & technology consultation and joint buying, this Procurement/ Notary Bureau welcomes candidates for pre-qualification in the purpose of largely choosing qualified companies to bid for the above tender.
The supply will make up the special devices for efficient waste monitoring as pointed out above for a brand-new personal setting contract management firm with prepared procedures 2013 in Indonesia as well as Thailand, as well as 2015 in West & & East Malaysia to execute those expert services in order to follow the federal governments safety disposal requirements for animal waste in the region as well as to satisfy the higher technical standard in this specific area in order to secure the public and consist of infectious & & contagious infections and also pet triggered conditions. The spread of a brand-new illness of pigs, likewise the ‘‘ Nipah Infection Illness’, first noticeable in 1998 in S.E.Asia, which causes illness and also fatality in both humans as well as pigs, is on the rise once again; as well as the premature death of plants and also boars was recorded in pig farms in Malaysia as well as other locations in S.E. Asia.

Incinerator A4000



Basic Info.

Model NO.:A4000
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, medical waste incinerator yd-30, medical waste incinerators china manufacturers animal waste incineration pet cremation equipment, manufacturer in china, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

waste burner maker china

waste incinerator producer china, Waste chamber
Chamber capacity 300 kg
Chamber volume.54 m3.
Chamber size (exterior) Size: 91cm, Elevation: 86cm Length: 152cm.
Door opening 66 x 76 cm.
Elevation to door 84 centimeters.
Height to top of stack 5.4 m.
Suggested slab size (L x W x Thickness) 1.8 m x 2.4 m x 10 centimeters.
Shed price: About 45 kg/hr.
Stack:.
2′′ -14 ″” dia.( 36 cm), 14 scale (1.90 mm) aluminized steel, refractory lined.
8′′ -12″″ “dia.( 30.5 cm), 16 scale (1.52″″.
” Burners Diesel.
Operation Manual timer.
Electric solution Requirement – – 115 volt, 60 HZ, 20 amp.
General Description:.
Primary Chamber: Sturdy steel covering.
Top quality refractory cellular lining and insulation.
Huge complete dimension top tons door as well as liquid retention sill.
1 x diesel oil terminated ignition heaters operated on/off.
Ash removal door.
Chimney: Durable stainless steel housing.
1.5 m size.
0.6 m refractory lined stack.
Control Panel: Control of 1 heater.
Timer control 0-12 hours.
Indispensable follower timer control.
Temperature surveillance.
Automatic Control.
Cycle time set up.
Ancillaries: Operating and upkeep handbooks.
Spares list.
Ash Rake.
Containerization: 20 foot shipping container with incinerator fitted.
500 litre gas storage tank

china medical burner

the following containerized burners. (Kitchen area and lodging and grey water and black water plant eliminating waste) we need burner is each function different are done in one burner we need notified. Plant we installing for our holiday accommodation barge made use of in an offshore marine building and construction project. 200 Individuals would certainly be fit onboard.
WASTE BURNERS RECOMMENDATIONS

china medical incinerator Capability
? Blaze minimal 80kg/hr X 12 humans resources per day
? Disposal of both non-hazardous and contaminated materials streams (per waste inventory).
? Mobile System (Skid installed preference with lifting factors).
Design/Specifications.
? Incinerators must have an additional combustion chamber with a minimum temperature variety of 900c.
? Fluid waste streams shall be incinerated by a proper fluid injection system.
? The burners will certainly be mounted with visual alarms to signal procedures of low temperature in the secondary chamber.
Running Environment and also Ambient Problems

The Incinerators plan shall be developed to operate under the following conditions:.
? Ordinary Daily Max/Min June Temperature Level, 21-39 ° C.? Ordinary Daily Max/Min January Temperature Level, 2-12 ° C.
Medical waste burner,.
approx. 0.4 cubic metres,.
gasoline/ keys power operated,.
thermostatic temperature level control,.
programmable cycle

small capacity burners

1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to:

Overall plant layout.
Feed chamber/ charging
Primary Combustion Chamber.
Secondary Combustion Chamber.
Particulate Scrubbers
Acid Gas Scrubbers
The stack/ chimney.
2    Feeding And Charging    Controlled hygienic, mechanical or automatic feeding methods have to be used which will not influence the air temperature in the primary and secondary chambers of the incinerator negatively.

No waste is to be fed into the incinerator:

1.    Until the minimum temperatures have been reached.
2.    If the minimum combustion temperatures are not maintained.
3.    Whenever the previous charge has not been completely combusted in the case of batch feeding.

4.    Until such time as the addition of more waste will not cause the design parameters of the incinerator to be exceeded.

3    Primary Combustion Chamber    The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently
4.    Ensure minimum exit temperature is not less than 850oC

4    Secondary Combustion Chamber (Afterburner).    The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.
4.    Ensure flame contact with all gases is achieved.
5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
8.    Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

5    Particulate Removers    A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

Cyclone separator
Electrostatic precipitators
Fabric filters
6    Chimney / Stack    1.    The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account.

2.    If possible the chimney should be visible to the operator from the feeding area.
3.    The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable.

4.    The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.

5.    Point for the measurement of emissions shall be provided.

7    Instrumentation    Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.

2.    An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the required temperature.

3.    In addition to the above the following instruments may also be required.
A carbon monoxide and/or oxygen meter/recorder
A smoke density meter/recorder
A gas flow meter/recorder
A solid particulate meter/recorder
Any other instrument or measurement that may be considered necessary

8    Location / Siting    1.    Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the area and be compatible with premises in the neighborhood,

2.    Must be housed in a suitably ventilated room.

9    Emission Limits    1.    Combustion efficiency:

Combustion efficiency (CE) shall be at least 99.00%
The Combustion efficiency is computed as follows;

C.E=             % CO2           x 100
% CO2 + CO

2.    The temperature of the primary chamber shall be 800 ± 50o C

3.    The secondary chamber  gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.

4    Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
5.    All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets.

6.    The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.

Cadmium and compounds as     Cd
Mercury                                      Hg
Thallium                                     Tl

Chromium                                  Cr
Beryllium                                    Be
Arsenic                                       As
Antimony                                    Sb
Barium                                        Ba
Lead                                            Pb
Silver                                          Ag
Cobalt                                         Co
Copper                                        Cu
Manganese                                  Mn
Tin                                               Sn
Vanadium                                     V
Nickel                                           Ni
Hydrochloric                                HCL
Hydrofluoric acid                         HF
Sulphur dioxide                           S02

7.    A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:

DRE = [(Win – Wout)/Win]*100
Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and
Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

8.    The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

Note:
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

Oxygen correction is computed as:

Es =     21 – Os    x EM
21 – OM

Where:    Es    = Calculated emission concentration at the standard percentage oxygen concentration
EM    = Measured emission concentration
Os    = Standard oxygen concentration
OM    = measured oxygen concentration

10    Operation    1.    Materials destined for incineration should be of known origin and composition and must be only incinerated in a furnace that is registered for the particular type of waste.

2.    A record must be kept of the quantity, type and origin of the waste to be incinerated.
3.    The incinerator must be preheated to working temperature before charging any waste.
4.    The incinerator must not be overcharged.
5.    The incinerator must be in good working order at all times and must not be used if any component fails. Any malfunction should be recorded in a log book and reported to the relevant authority.

6.    The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.    Have running water.
2.    Have a solid floor.
3.     Have lighting if 24hrs operation
4.    Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.    Staff handling waste must be well trained on safe handling of hazardous wastes
2.     Staff must be provided with appropriate  protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.

3.     Caution and Warning signs must be provided.
4.     Fire fighting equipment must be provided
5.     There should be no smoking or eating on the site.

waste incinerator producers china

Ability Not much less than 500Kg/hr.
Procedure 24hr-7days/ week constant operation.
Burning chamber 2 burning chamber.
Temperature. Burning chamber 800-1000 C.
Secandry combustion burning 1000-1200 C, with the possibility to be upgraded to 1400 C.
Combustion Efficiency Effectiveness 99.99%.
Retention time Of the circulation gases not less than 2 Sec in the hot part.
Excess Oxygen concentration Of primary burning chamber 3-6% max.
Refractory The chambers must be lined with high thermal shielding refractory blocks with ideal density and also with extremely temperature. resistance. Not less than 1400 C for the first combustion chamber, and not much less than 1600 C for the secandry combustion chamber, and also at the exact same time prevent the Temp. of the outside body of the chamber not higher than 70 C.
Doors Must be lined with the very same bricks, and the sides lined with unique ideal shielding product to avoid any kind of gas running away, and also the doors must be kept under unfavorable stress during the operation.
Air Exhaust Control System With high damage and elimination performance (DRE). Not less than 99.9999 based on KEPA.
Wet System If the system equiped with a CEMS washing the circulation gas with water, then it must be produced from suitable anti corrossion materials, and also equiped with pH meter to gauge as well as reduce the effects of the water. It ought to be able to utilize the water in shut recycled circuit often times prior to treating/ discharging right into the sewage system in compliance with KEPARS.
Chemical application It must be equiped with appropriate autochemical application system to manage the pH for the water of the wet scrubber system consisting of sensing units.
Chimney It need to be suitable with the capacity as well as the technical requirements, with height not much less than 12m from ground degree. With simple opennable sampling point equal about 3 inch, and the maximum sampling areas is at the very least 8D downstream instructions and also 2D upstream from any type of flow disturbancies.
Sampling factor Needs to be equiped with a system situated down the sampling factor by a range not much less than 1 m, and also equiped with ideal stairs from ground to the port with comfortable slope.
Ash Removal It need to be vehicle ash removal system.
Fuel It ought to be twin system, such as diesel as well as gas.
Feeding System Should be car feeding system into primary chamber.
Control Area Should be equiped with a control board shows Temp. of the combustion heaters, gas tracking, digital Temperature. indecation for the primary/secondary chambers, electronic Temperature. sign for the gases … etc. it ought to be also Car operation, burnures on/off car lights switch over, auto start/stop for air discharge control system, automobile gas continual surveillance system analysis as well as print out of gas emission specifications…… etc. Air conditioning System The main chamber ought to be given with auto cooling systemthrough nozzles to permit direct air conditioning if the Temperature. will certainly be heigher than 1100 C.
Inter-lock system The incinerator should be equiped with inter-lock system to stop feeding the waste to the primary chamber if the burning Temperature. less than 500 C.
Flue therapy and also cleansing To consist a consolidated system (wet/dry), making use of water, lime, energetic carbon as well as ceramic filters.
Appeasing system/Heat exchanger Must be made as well as produced from anti rust and acid attack products such as stainless steel 316 or comparable.
Noise Degree Not greater than 85 dBA throughout normal operation.
Inaddition The desigh ought to insure that responsive secure control systems are utilized.
The burner should be mounted inside closed appropriate structure with great oygenation as well as air flow system. The building has facilities for off-loading of wastes from transport lorries. Automobile cleansing system for trucks and also waste containers, and also great storage area…… and so on
. The quotation ought to included list of original spare components for 7 years.
The quotation must consist of supervising, launching and training of the drivers and also ministry of health and wellness designers inside/outside Kuwait.
In-depth drawings, magazines ought to be consisted of.

clinical burner primary combustion cost

Our normal activities creates 2-5 tons of various waste products daily which vary from condemned carcasses, and also medical incinerator main combustion price

other wastes all which need to be blazed at above 800Centigrade gauged flue exhaust gas.To be used by small

healthcare facilities and facilities to safely take care of infectious as well as pathological wastes.

Tons Ability in the range of as much as 200 kg
– – Burning Rate approx. 50kg/Hour – –

Burners to be really reliable, gas efficient with high/ reduced ability melt rates
and to be made to meet the Norms of Air Pollution Control/ DEFRA, etc. Technology:

Temperature Controlled Heater. Heavy-duty housing, to be a quality, rugged, trustworthy, affordable Clinical Waste

Incinerator with relevant control, very easy to run and also self-supporting. Type of Gas: Diesel/ Oil or Petroleum.
Systems to be pre-assembled, pre-piped, pre-wired & & evaluated before Transport/ Export.

Within the structure of an environmental and medical equipment & & technology appointment and joint buying, this

Procurement Bureau welcomes applicants for pre-qualification in the purpose of mainly picking qualified firms to bid

for the above tender.
The supply will make up the unique devices for reliable waste administration as stated over for a new personal

atmosphere contract administration company with prepared operations 2013 in Indonesia as well as Thailand, as well as 2014 in West & & East

Malaysia to accomplish those expert services in order to abide by the federal governments safety and security disposal needs

for medical as well as hospital, professional waste in the region and also to fulfill the greater technical standard in this certain

field.small incinerators with filter (with the very least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr,

20kg/hr, 25kg/hr to 50kg/hr and also 300kg/hr of STRONG NATURAL DRY AND DAMP NON-HAZARDUOUS of any kind (including healthcare facility

wastes) daily or per hr. Should it be with no smoke, no fumes, no odour (odor), no dust, no emission of solid

particles and with the very least minimal contamination (within national as well as worldwide criteria). Need to be eco

healthy and balanced as well as acceptable with worldwide criteria. Need to not be with water scrubbers. Ash materials after burning

should be 3-4%.

hospital incinerator style

INCINERATEUR DE DECHETS HOSPITALIER hospital incinerator layout

SPECIFICATIONS TECHNIQUES.
Capacité damaging de 55 Kg/h jour de déchets hospitaliers avec un p?. c. i jusqu’ à 3.200 Kcal/Kg
1) Kind de déchet

hospitalier
2) Pouvoir calorifique inférieur 3.200 kcal/kg
3) Humidité 20%.
4) Teneur en cendres et/ou inertes 8%.
5) Capacité destructive nominale 55 kg/h.
6) Quantity chambre de burning 1,65 m3.
7) Quantity chambre postcombustion 2.1 m3.
8) Temps transportation des fumées en post burning/ sec. << 2. 9) Température minimale en postcombustion 1.100 ° C. 10) Teneur d’oxygène libre en postcombustion 6%. 11) Acknowledgment refuse confectionné en sachets HDPE. 12) Dispositif de chargement?: hydraulique?; capacité de charge 0.5 m3

13) Flammable prévu Gasoil.
14) Br?leur en chambre de combustion nbr?: 1.
15) Br?leur en chambre de postcombustion nbr?: 2

CONSTITTUTION DE L’APPAREIL.
1. CHARGEMENT.
Système de chargement hydraulique afin de pouvoir battery charger le 4 en toute sécurité même durant child fonctionnement et

aussi assurer la puissance devastating globale de 450 kg/j?
Le système comprend?:.
1-1Trémie de chargement de forme parallélépipédique de 0,5 m3 de volume, réalisée en t?le d’acier, bridés sur la paroi

frontale de la chambre de burning et munie d’un couvercle à charnières actionné par vérin hydraulique?.
Dimensions?:.
oLongueur 1200 mm.
oHauteur 700 mm.
oLargeur 600.
1-2Un poussoir hydraulique assurera le chargement de la chambre de combustion.
1-3 Une porte de chargement de la chambre de combustion constituée d’une guillotine à vérin hydraulique revêtue

de réfractaire.
1-4Un main hydraulique put piloter tous les vérins de commande, comprenant?: réservoir, pompe, électrovannes et

tuyauteries

2. CHAMBRE DE COMBUSTION PRIMAIRE

2-1- Le bati est une structure métallique cylindrique revêtue intérieurement d’une couche d’isolant et d’une

couche de réfractaire.
2-2-Volume intérieur?: 1,65 m3.
2-3-Aménagement.
? portillon de décharge des cendres?: frontal?; monté sur double charnière et revêtu de réfractaire avec hublot

d’inspection.
? La connexion à la chambre de chargement est revêtue de réfractaire.
? La connexion de la chambre de combustion et de la chambre de article combustion est revêtue de réfractaire.
? Setup des bruleurs.
? Setup du système de circulation de l’air comburant.
? Installment des sondes de mesure de la température.
? Le bac de récolte des cendres est en acier au carbone sur roulettes, équipé de racloir métallique permettant

l’évacuation manuelle des cendres.
3. BRULEUR DE LA CHAMBRE DE COMBUSQTION.
Un bruleur de kind à une flamme à l’air soufflé, alimenté the same level gasoil, équipé des dispositifs de sécurité Puissance

thermique installée 165 KW.
4. AIR COMBURANT.
Le système de distribution et dosage de l’air primaire en chambre de burning comprend?:.
? Ventilateur centrifuge.
? Canalisations de distribution air.
? Systéme de circulation d’air à 2 canaux.
? Soupape de régulation de l’air motorisé selon les phases de cycle de fonctionnement et de la température

5. CHAMBRE DE POST BURNING.
5-1- Chambre de article burning est installée au dessus du foyer de combustion, elle est constituée d’un

cylindre métallique revêtu intérieurement d’une couche d’ isolant et d’une couche de matériaux réfractaires.
5-2- Volume intérieur?: 2,1 m3.
Est dimensionnée put pouvoir garantir un temperatures de fumée de 2 secondes à 1100 ° C avec un pourcentage d’oxygène libre

d’au moins 6 %.
5-3 -Accessoires.
? Trappe de visite boulonnée frontal put permettre l’inspection périodique.
? La intermediary à la chambre de burning est tapissée de réfractaire.
? Setup les br?leurs.
? Installation des sondes de mesure température.
6. MANUFACTURING DE L’AIR COMBURANT DE LA CHAMBRE DE POST COMBUSTION.
? Ventilateur centrifuge.
? Tuyauteries de distribution d’air.
? Série de vannes de circulation d’air.
? Soupape de régulation de l’air soufflé asservi par la sonde du débit d’ oxygène

7. BRULEUR DE LA CHAMBRE DE MESSAGE COMBUSTION.
Sont prévus 2 br?leurs du type à l’air soufflé au gasoil équipés des dispositifs de sécurité.
A la mise en route du four les deux br?leurs sont allumés pour assurer la température minimale d’au moins 1100 ° C?;

ils restent en marche successivement pour maintenir la température constante.
Puissance thermique installée (290 + 350) KW.

8. CHEMINEE D’EVACUATION.
Constitué the same level un avenue métallique vertical de 8 m de long installée au-dessus de la chambre de COMPUTER, diamètre 630 mm

en t?le d’acier au carbone avec garnissage intérieur en réfractaire

9. ARMOIRE ELECTRIQUE DE COMMANDE ET GUIDELINE.
Composée de?:.
? Circuit 380 V- 50 HZ-3 stages.
? Voyant sous stress.
? Commande d’arrêt général.
? Voyant état des bruleurs.
? Affichage des températures des deux chambres.
? Minuterie des temps des cycles.
? Une variation des vitesses des ventilateurs.
? Le tableau et les cablages sont prévus aux règles CEI avec security IP 55.
? Microprocesseur put le contr?le et la régulation des températures, ainsi que les cycles d’opération.
? Cablages réalisés selon les règles CEI.

10. INSTRUMENTATION DE CONTROLE ET DE MESURAGE CONTINU.
Les dispositifs suivants sont prévus?:.
1) Thermocouples pour la mesure de la température en chambre de combustion? et postcombustion, à la sortie de

l’échangeur dans la area d’entrée du filtre.
2) Système de mesure de la concentration d’oxygène dans les fumées humides a la sortie de la chambre de postcombustion

constitué de?:.
? Sonde de mesure de l’oxygène à l’oxyde de zirconium.
? Pompe à la membrane.
? débitmètre

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine



1. N95 and Disposable Mask Machine

 

2. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Capacity: 1600mm

Efficiency: 95-97%

FOB Term Price: USD per set

Price Valid: 5days.

Ave.60 Days ready for shipping.

In stock Price: USD per set

 

 

B.)Optional Capacity: 400mm

Efficiency: 40-50% .

FOB Term Price: USD per set

Price Valid: 5days.

Ave.20 Days ready for shipping.

Payment: TT 70% In advance, TT 30% before leave factory

Shipping: 1*20′ container per set, Ave. 2000Kgs.

 

Main Parts: Extruder, mold, winder, oven, ultrasonic

Daily Capacity100-150Kgs/24Hours

Screw extruder100-150Kgs

Motor power: 15KW frequency conversion speed regulation
Reducer speed ratio: 1:10 or 1:16
Screw length to diameter ratio: 30: 1
Screw diameter: 50mm
Winding machine diameter:
630mm
Winding machine drive motor power: 0.55kw
Speed ratio of winder drive reducer (if any): 1:71
Air heater power: 15kw
Power of vacuum calciner: 12kw
The size of vacuum calciner: 500 × 300 × 200
Ultrasonic power: 1800, frequency 28kHZ
Ultrasonic sink size: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20