Tag: waste-incinerator

Large Size Burning Rate:150-200 kg/hr Solid Waste Equipment Primary and Secondary Combustion Chamber Incinerator

Items/Model

TS500(PLC)

Picture

Principle

Waste Incineration Treatment

Burn Rate

150-200 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

2700L

Internal Dimensions

190x120x120cm

Secondary Chamber

1300L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 28

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

1400L

Feed Door

90x80cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st.

800℃—1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

15000kg

External Dimensions

The air supply should be controlled efficiently;
Flame contact with all the gases should be achieved;
The minimum combustion temperature of the primary chamber should not be less than 850°C;
The primary combustion chamber should be equipped with a means to provide supplemental liquid fuel supply.
The primary chamber should be cold face refractory lining, with a minimum thickness 100 mm.
The following conditions should be met in the secondary combustion chamber:
The air supply should be controlled efficiently;
Flame contact with all the gases should be achieved;
The size of the secondary chamber should be properly designed to ensure that the gas retention time should not be less than 2 seconds;
The secondary chamber should be cold face refractory lining, with a minimum thickness 100 mm;
The chamber should incorporate an integrated combustion burner air fans with automatically controlled distribution;
The gas temperature, as measured against the inside wall in the secondary chamber (not in the flame zone) should not be less than 1,100°C;

400x210x300cm(without chimney)

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

INCINERATOR For incineration of Laboratory wastes Substances

Incinerators to be acceptable for the professional disposal of medical & clinical waste / garbage with a higher load capacity in the range of approximately
1000-1500 Kg.  The durable, self-contained incinerators shall give an effective and highly efficient, safe disposal and to be manufactured according to applicable international directives, e.g. CE, EU, etc..
Temperature controlled,
efficient burner for optimal fuel economy. Incinerator at the best technology and an approximate capacity of 2000 ton / year. Maybe an incineration capacity of 200 kg / hr and a calorific value of 7500 kcal / kg. Industrial and domestical waste.INCINERATOR For incineration of Laboratory wastes materials

Features
i.Smoke and odor free
ii.High Temperature, refractory lining with excellent heat retention
iii.Quick heat up time
iv.Must possess a secondary room v.Constant run fan
vi.Temperature tracking vii.Thermostat Control

Technical Specifications
i.Capacity:                    approx. 0.20 m3
ii.Fuel consumption:        5 litres /hour Diesel Oil
iii.Min Operating Temp:   900 oC
iv.Max Operating Temp:   1350 oC
v.Residence Time:           2 sec
vi.Burning rate:                 35kg/hr minimum

Accessories
Standard accessories required

Consumables and Spares
Supplied with  spares and consumables to execute at least 1000 evaluations

Medium Size:Burning Rate:60-80 kg/hr Pyrolytic Double Chamber Incinerator

Items/Model

TS100(PLC)

Picture

Principle

Waste Incineration Treatment

Burn Rate

60-80 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 20.4

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

1100L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st.

800℃—1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm


The requirement is for a pyrolytic double-chamber incinerator. The incinerator shall be capable of using diesel 
fuel as a supplemental fuel oil.
It should incorporate an Air Pollution Control (APC) System suitable for basic emission control.
The proposed incinerators shall be appropriate for critical harsh environmental conditions, suitable for rapid 
deployment, and different climate zones (e.g. desert, tropical country, mountain, etc.) in which there are several 
variations of the relative natural forces (e.g. temperature, humidity, wind, etc.) for a minimum period of 10 years 
if the specified maintenance schedule is followed.
The incinerators should be supplied assembled, whenever possible, and all parts and components should be 
packaged on pallets in order to be transported via road, air (via helicopters or air-cargoes, e.g. MI8 or C130) 
and via sea in a 20’ ISO sea shipping containers.

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

Pyrolytic Dual Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model

TS50(PLC)

Picture

Principle

Solid Waste Incineration

Burn Rate

30-45 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 13.3

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

800L

Feed Door

70x55cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st.

800℃—1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

4500kg

External Dimensions

HICLOVER – Medical Environmental 

230x130x155cm


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

Containerized Mobile Incinerator Pre-assembled, containerized Kind

Model

CA100

Picture

Waste Treatment

Medical Waste Incineration Treatment

Feed Capacity

Typical 100-200 kgs per feed

Burning Rate

Typical 100-120 kgs per hour

Burning Time per Feed

Average 1-2 hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Voltage

220V

Power

1.0Kw

Gas

Diesel oil

Burner

Italy Burner

Feed Mode

Manual

Temperature Monitor

Digital Screen

Fuel consumption (Oil)

Typical 20.4 Kgs/Hour

Internal Dimensions

100x80x70cm (Main Combustion Chamber)

External Dimensions

230 x 130 x 155cm (main body)

Waste combustion chamber

560Liters

Post Combustion Chamber

280Liters

Oil Tank Capacity

200 Liters

Door Opening

70 x 50cm

Chimney

5.0M

Gross Weight

4500kgs

Chamber Material

Firebrick,Refractory Concrete

Max.

166,000Kcal/Hr.

Operation Technical Specifications

Solid Chamber temperature

8000C -10000C

Gas Chamber temperature

10000C -12000C

Chamber Anti-Rate

17500C

Residency time

2.0 Sec.

Burning efficiency

>98 percent

Waste Lower Calorific Power

HICLOVER – Medical Environmental 

3000Kcal


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

hiclover waste incinerator spare parts

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.
Refractory cement,Ignition transformer – Secondary burner,Ignition transformer – Primary burner,Emergency push button,Temperature thermos couple with Locknut – 1600oC,Temperature thermos couple with Locknut – 1300oC,Temperature display controller – Secondary Chamber,Temperature display controller – Primary Chamber (Parameter – Digital Adjust Instrument),Burner Lighting Sensor (Photo Cell) PBT/PC
Circuit board (LM44.255C2BT) High Stage Secondary,Circuit board (LOA24.171B2BT) Primary
Fire proof flange gasket,Fire proof flange gasket
CA50-600,EB14HPM,26-48-3371T JT04,K1600,k1300,XMT – 3000,XMT – 2000 QRB1,LM44.255C2BT,LOA24.171B2BT,SN834457 8023020001,SN834451,3713798,AS47B,FO03,BTL20,SPARK35
Ignition electrode with leads(for burner BTL20/SPARK35),Solenoid(for burner BTL20/SPARK35),Burner fuel pump(for burner BTL20/SPARK35),Fuel filter(for burner BTL20/SPARK35)
Burner – Baltur,Burner – Baltur,Solenoid,Burner fuel pump
Ignition Cable,Ignition Switch -(Control Box),Photo Cell

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

INCINERATOR DIESEL FIRED

Incinerator 20 Kg
Incinerator electrically operated
including:
 A cage for receipt of biomedical waste;
 A combustion room with fireplace using a filter to retain ashes;
 A cover;
 An air supply;
A turbine  allowing supply air.
 ▪      The incinerator should be a modern waste disposal unit, designed
to buttocks medical waste in a clean and environmentally efficient
manner. It should use a temperature based logic control system
to provide optimum control of the working conditions and
incorporate a high capacity thermal oxidizing secondary room.
It should be designed to retain the exhaust gases, for at least two seconds to make sure the unit’s effective destruction of the combustion
products.
▪      All the incinerators to be provided and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and specifically 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
process for installing and operating incinerators.
▪      The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪      The incinerator shall be run on a three-phase power supply
(mains).
▪      For the technical analysis, not only the treatment plant but
the whole system will be considered. It will be the responsibility
of the Bidder to provide a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪      The machine offered shall be designed to function normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪      The Bidder must provide a guarantee for one year.
▪      All text, parameter etc. on all control working ports as
well as on information screens and on print-outs will be in
English language.
The Bidder shall provide all the essential documentation to be able to facilitate the legal requirements for the
installation and putting into use of their equipment.

▪      Period of Execution is 90 days from contract signature for
delivery to site and completion of verification operations
required for the issuance of provisional acceptance.
▪      Representatives of the Contracting Authority and the
Beneficiary, together with all the Bidder’s representative, shall
execute the controls, testing and initial approval for provisional
and final approval. The provisional and final acceptance shall
take place at the last destination.
▪     After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is approved by
the Manufacturer, and which is able to quickly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year guarantee period. In
fulfillment of the condition with their offer, bidders must
submit a statement signed by the manufacturer or representative
of this manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair facility is able to quickly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪      The Bidder will be responsible to deliver and install all
equipment provided to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time program within the whole construction and building period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall make certain that all areas of
the plant transported by sea will not be shipped as”deck
cargo”.
▪      It is anticipated that the Bidder cooperates closely with the
contractor to the new waste handling building/ housing and will
make available all necessary technical information, drawing, etc. to
the contractor.
.     Waste Calorific Value    4000 KCAL/Kg
iv.     Moisture content    10-25%
v.     Estimated ash  residue    5-10%
vi.     Nominal capacity     100Kg/hour batch load
vii.     Secondary room 2 minutes @ 1100°C
viii.     Environmental    Environmental Management Coordination Act, 1999 and specifically, Waste management regulations, 2006
2    Equipment
2.1    Primary Combustion Chamber
▪       The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
stainless steel sections. It’s carried from the floor level on a
significant steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face mixture of superb duty brickwork or high strength castable.
▪       The main combustion chamber must ensure minimum exit
temperature is less than 850°C.
One Manual Load Incinerator comprising:
▪       Manual Loading door (heavy duty steel door with proper refractory lining)
▪       Horizontal solid hearth, refractory lined main combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪       Full sized bulk load/ash removal door
▪       1 off diesel-fired ignition burner — temperature controlled
▪       1 off combustion air supply fan and distribution system, automatic
control
▪       High capacity secondary combustion chamber with home time
less than two seconds @ >1100°C
▪       1 off diesel-fired afterburner — temperature controlled
▪       Control panel — automatic operation
▪      Temperature indication primary and secondary chambers 0-
1200°C. Both chambers have to be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must be certain that the gas temperature as measured against the inner wall in the secondary room & not in the flame zone, isn’t less than 1100°C.
2.2     Throughput
100kg/hour in a minimal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for healthcare waste.
2.3    Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4    Quality/Environmental Standards
▪       Environment Management and Coordination Act, 1999
▪       BS3316
2.5    Operating Period
▪      Anticipated daily operating period 8 hours
▪      Maximum working period 12 hours
2.6    Chamber
▪      Should be refractory lined into the following standard; Hearth and
lower section of room walls
2.7    Hot face substance ▪      Super duty firebrick
▪      Limiting continuous service limit 1500°C
▪      Thickness 100mm
▪      Thermal conductivity 1.3 W/mk
2.8    Insulation
▪      Calcium silicate
▪      Limiting continuous service limit 1000°C
▪      Thickness 25mm
▪      Thermal conductivity 0.095 W/mk
2.9     Chimney / Stack
▪      Must be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪      Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪      Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as needed. ▪      The chimney shall be painted with heat resistant
paint after installation.
2.10     Ignition Burners
Fully packed oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and finish with all valves, fan and motor.
·         Maximum rating:            at least 450kW/hour
·         Burner:                            ordered for on/off operation
·         Maximum consumption: at least 6 litres/hour
·         Average consumption:    at least 3 litres/hour
2.11    Afterburner
Fully packed oil type, complete with electric ignition and flame failure controls wired with continuous running fan and finish with all valves, fan and motor.
A mechanical
particulate collector must be integrated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13    Diesel Tank
▪      To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪      The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank into the incinerator.
The connecting pipe must be a black pipe of accepted gauge
and diameter. Contain other accompanying accessories and
accessories ▪      Connect leftovers to fuel supply.
3    Documentation:
Operation manual    2 sets
Service/maintenance manual    2 sets
4    Certification
▪      National Environment Management Authority (NEMA)
certification
5    Capacity to support equipment
▪      The agent/supplier will have adequate facilities, spare parts,
consumables and qualified and skilled technical personnel.
Installation works
▪      Provide lifting gears like forklift, gantry, rollers, and lifting
jacks and position incinerator.
6    Commissioning and Training
▪      The Agent will test all set operating parameters

▪     The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7    Commissioning Maintenance Contract
▪     Before the expiry of the guarantee / signing off, the provider shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly regular maintenance price per quarter
for three (3) quarters.

Care control proposal.
▪      The maintenance contract price includes labour, transportation and
accommodation for the attending technicians.

Maintenance control proposal.
▪      The maintenance contract price includes labour, transport and
accommodation for the attending technicians.

hospital incinerator manufacturer

Incinerator to have double combustion chamber and control quantity of dioxin and other gasses emitted without being detrimental.

Estimated dimensions, to producers standard, but to be compact as possible. Capacity: approximately 60kg per day, voltage: 220V and diesel fired.

CSH  Hospital, (Calabar, Nigeria)

Mmedical waste incinerator capable of disposing up to 0.5 cubic meter of infectious or pathological waste.

Incinerator to have double combustion chamber and control quantity of dioxin and other gasses emitted without being detrimental.

Estimated dimensions, to producers standard, but to be compact as possible. Capacity: approximately 120kg per day, voltage: 220V and diesel fired.INCINERATOR (WASTE INCINERATOR)
Waste destruction efficiency:> 90% by weight
Fast, complete, efficient waste disposal
Minimum installation and start up time
Long Shoes Pairs:    For waste handling — 06 Pairs.

End / Paint:-
Filter: Ceramic or other equivalent filters to be able to reduce the induction of toxic air pollutants, particulates, co,dioxin/furane into the atmosphere.
•    Civil works
Charging rate:
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Aluminized steel coat lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Temperature Monitoring: Both for primary and secondary chambers.
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated”red bag.” Surgical dressings, plastic evaluation devices and other wastes
Loading SystemManual/semi-automatic
Waste Management Equipment must have;
Width (mm):    1280 or better
•    Pneumatic or hydraulic ram charging system.
Charging system:
•    Vertical charge door on primary chamber.
Installed Power (Electric Voltage): 440V/ 50 Hz
•    Primary and secondary chamber temperature displayed and recorded (optional)
Ash  Door Opening (mm):    475×900 or better