Archive: September 5, 2024

Containerized Mobile Incinerator Medical Waste Incinerator Model CA50

HICLOVER – Containerized Mobile Incinerator Medical Waste Incinerator Model CA50


Model

CA50

Picture

Waste Treatment

Medical Waste Incineration Treatment

Feed Capacity

Average 100 kgs per feeding

Burning Rate

Average 50 kgs per hour

Burning Time per Feed

Average 2 hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Voltage

220V

Power

1.0 Kw

Fuel

Diesel oil

Burner

Italy Burner

Feed Mode

Manual

Temperature Monitor

Digital Display

Fuel consumption (Oil)

Average 16.9 Kgs/Hour

Internal Dimensions

100x80x70cm (Primary Chamber)

External Dimensions

230 x 130 x 155cm (main body)

Waste combustion chamber

560Liters

Post Combustion Chamber

280Liters

Oil Tank Capacity

200 Liters

Door Opening

70 x 50cm

Chimney

5.0M

Gross Weight

4500kgs

Chamber Material

Firebrick ,Refractory Concrete

Max. Heat Value

166,000Kcal/Hr.

Operation Technical Specifications

Solid Chamber temperature

8000C -10000C

Gas Chamber temperature

10000C -12000C

Chamber Anti-Rate

17500C

Residency time

2.0 Sec.

Burning efficiency

98%

Waste Lower Calorific Power

3000Kcal


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-24

INCINERATOR DIESEL DRIVEN


BURNER, DIESEL DRIVEN
waste kind: MEDICAL CARE WASTE
Waste calorific well worth: 4000KCAL/KG
Dampness Content: 10-25%.
Small Capacity: 50Kg/Hour set tons.
2nd Chamber: 2 Secs @ 850degrees C.
The major burning chamber have to ensure very little leave temperature degree is not less than 850 levels C.

INSULATION.
Calcium Silicate.
Limiting Regular solution limit 1000 levels C.
Thickness 25mm

THROUGHPUT.
50kg/hour at a small calorific well worth of 4,000 kcal/kg and additionally a regular mass thickness of 120kg/MCubed for standard waste and 160kg/MCubed for healthcare waste.


calentador de residuos profesional

incinerador de desechos médicos: desechos médicos y desechos generales
Capacidad para quemar residuos: 400 – 500 kg / h
Combustible: diesel
Consumo de combustible: 10 litros / hora máximo
Temperatura de incineración: 950-1300 ° C
Carcasa: carcasa de acero inoxidable de espesor (mínimo 5 mm) y totalmente
aislado para soportar la humedad del mar
Voltaje: 220/240 V o 380 / 415V
Frecuencia: 50 Hz
Alimentación: automática
Eliminación de sobras de Ash 1: Automático
Sistema de filtración de gas combustible: Sí
Garantía: 12 meses.
Capacitación del personal: Operador y personal de mantenimiento
Manuales de operación y servicio: 3 juegos cada uno
Especificaciones Gerais construcción de chapa de acero de 6 mm.
Revestimiento refractario de 11cm 1400 ° C
Quemadores de temperatura controlada
quemadores de combustión secundarios
interruptor de enclavamiento en puertas de carga
puerta de fresno separada
una residencia secundaria @ 1000 ° C
Pintura de acabado a base de silicona a 400 ° C
sensor de temperatura de aleación
cableado de fábrica y probado
Capacidad 20 kg / h
Cámara primaria 1607 L
Área del hogar 1.36 aq.m
Cámara secundaria 694L
Quemador primario (aceite) 420.00btu
Quemador secundario (aceite) 900,000btu
Combustión secundaria 1/6 hp
Pila de escape 46 cm x 6 m
Servicio eléctrico 220/50
Peso del sistema 5.700 kg
Dimensión “D” 152cm
Altura del puerto de Doad e 60x60cm
Altura del puerto de ceniza e 36x36cm
Especificaciones generales Construcción de chapa de acero de 6 mm
Revestimiento refractario de 11cm 1400 ° C
Quemadores de temperatura controlada
quemadores de combustión secundarios
interruptor de enclavamiento en puertas de carga
puerta de fresno separada
una residencia secundaria @ 1000 ° C
Acabado de pintura a base de silicona a 400 ° C
sensor de temperatura de aleación
cableado de fábrica y probado
Capacidad 20 kg / h
Cámara primaria 1607 L
Área del hogar 1:36 aq.m
Cámara secundaria 694L
Quemador primario (aceite) 420.00btu
Quemador secundario (aceite) 900.000 btu
Combustión secundaria 1/6 hp
Pila de escape 46 cm x 6 m
Servicio eléctrico 220/50
Peso del sistema 5.700 kg
Dimensión “D” 152cm
Altura del puerto Doad y 60x60cm.
Altura del puerto de ceniza y 36x36cm.
Residuos médicos, hospitalarios, veterinarios e industriales por proceso incinerador de residuos médicos.
Por lo tanto, estamos interesados en sus plantas incineradoras, y nos gustaría obtener una cotización y una descripción de las características clave de las diferentes capacidades de sus plantas incineradoras, en relación con: modelos pequeños (5 – 25 kg / h); modelos medianos (25-50 kg / h) y modelos grandes (50-100 kg / h) y más.

WASTE CATALOGUE AND HAZARDOUS WASTE LIST

1 Incinerator 30 =KG  burn/h and it must have a Scrubber.

2 Incinerator must have Electrical Plastic Shredder for cutting of glass bottle,surange of Medicine.

3 Incinerator must have Electrical Auto Clave or Microwave for Dis Infection  separately with incinerator.
4 Incinerator must have Double Chambers first Chamber must gave 800C temperature and secondary Chamber working 1200C temperature.
5 Incinerator in out place must have a Parameter to show inner temperature of incinerator.
6 Incinerator must work in two systems Electric and fuel describe in which kind of fuel works.
Note we want it works on diesel fuel and electric also.for a small pig slaughterhouse project in Vietnam we are looking for a
solution to destroy safely inedible  and seized animal products.

As the slaughtered pigs are consumed by more than 90% (from hooves to
head, blood, etc) the waste volume is quite small even in
slaughter-points with up to 100 slaughtered pigs per day.

Although the use of meat and bone meal is not prohibited in Vietnam the
small volumes of waste do not seem to justify the installation of a
rendering unit, not even of a batch cooker, so incineration seems to be
the best option.

I would like to receive more technical details e.g. fuel consumption for
incinerating 100/200 kg of animal products per day and also the FOB
price of the unit.The types of waste to be treated are (after EUROPEAN WASTE CATALOGUE AND HAZARDOUS WASTE LIST, 2002):

18 01 01 sharps (except 18 01 03)

18 01 02 body parts and organs including blood bags and blood preserves (except 18 01 03)

18 01 03* wastes whose collection and disposal is subject to special requirements in order to prevent infection

18 01 04 wastes whose collection and disposal is not subject to special requirements in order to prevent infection (for example dressings, plaster casts, linen, disposable clothing, diapers)

18 01 06* chemicals consisting of or containing dangerous substances

18 01 07 chemicals other than those mentioned in 18 01 06

18 01 08* cytotoxic and cytostatic medicines

18 01 09 medicines other than those mentioned in 18 01 08

18 01 10* amalgam waste from dental care

Горелки

сбросить 5000-10000 кг в час. В основном отходы из резервуаров для хранения нефти. расходы на строительство, установку и 6 месяцев содержания, включая технические характеристики. CMSD для двухкамерного вращающегося мусоросжигателя Klin Kind (температура в 1-й камере не менее 850 градусов по центру и температура во 2-й камере не менее 1200 ° C с вытяжным трубопроводом длиной 100 метров со сливом механизм фильтрации газа), Гидроклав (Клинический) с вспомогательными устройствами. Критерии работы: Температура 250-275 градусов Фаренг, Стресс 15-35PSI, Время санации 30 минус, Установленная емкость -463 кг. 2 Горелки для ЛПУ в ВН. Ожидаемая способность – примерно 1000 кг каждый день.

medical incinerators in china

Would plant operations be operational on a basis of 24 hours per day, 7 days a week, all year long except for

regular and preventive maintenance periods?

 

  1. How many hours per year could your process be operational?

 

  1. What would be your approach for larger projects aiming to valorize 1 000 tons per day?

 

  1. How much electricity could be produced using you technology based on a 1 000 tons per day installation to

valorize urban wastes having a humidity factor of say 50% and a calorific value in the order of 2.5 MW/ton of wastes at

the entrance of the waste-to-energy station (i.e. before pre-treatment of wastes)? What volume and characteristics of

ashes would be produced from such solid wastes valorization?

 

  1. What would be the capital cost necessary to meet the requirement to valorize 1 000 tons per day of urban

wastes?

 

  1. What would be the selling price of electricity per kWhour to meet targeted profitability?

 

  1. Could you valorize sludge volumes coming from sewage treatment plants and if so at what maximum humidity

factor could you operate the station at?

 

  1. Considering that your process is an incineration process, oxygen will be required, therefore there will be

some air emissions from the process, how can air emissions be controlled to meet environmental norms?

 

  1. What would be your implication in any project : would you prepare process engineering, electricity production

engineering, engineering for site work, buildings, electrical hook up to existing electrical network? Do you have

complete construction capabilities or would you require a local partner to carry out which portion of construction

work? Would you also operate the station or use a local partner to operate the station?

 

  1. Do you also have the financing capacity for the design, construction and operation of any project? In Algeria,

financing would most likely not be required but this could be the case in other countries where Gestech International

is presently involved in.

Medical Waste Incinerator for Coronavirus Disease

Coronavirus Disease 2019 (COVID-19) pandemic continues all over the world, clinics,hospitals,goverment may need to consider on-site disposal for the infectious 

medical waste. The medical waste incinerators that has been effectively used to dispose of hazardous waste during 

viral outbreaks like Ebola. HICLOVER.COM reaches temperatures of up to 1200oC and is able to destroy health care waste 

for laboratories, small clinics, and hospitals treating patients of the Novel Coronavirus (COVID-19) such as linens, sharps, gauze, gowns, etc.

— Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.

— Single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators.
— System solutions for medical waste environmental.
— High burn rate, from 5kgs to 1000kgs per hour.
— New Design for pet animal cremation business.
— HICLOVER, trusted partner with years of experience.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project. 
We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc. 

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 5300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 300
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chmaber Temperature 1000-1200 1000-1200 1000-1200 1000-1200


Our range of incinerators cater for small to large scale animal cremation related businesses, such as poultry farms, cattle farms, sheep farms, pig farms, stables, kennels, testing laboratory, catteries, pet crematoriums.
The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection. 
System solutions for medical waste environmental, including waste incineration, smoke emission treatment, high-temperature sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers, etc. 
The pet cremation equipment humanized design with movable platform, small space covers for modern pet cremation business owner all over the world. 
The containerized mobile incinerator mounted in ISO container before leave factory, pre-installation, no incineration house build construction, movable by truck and ultraviolet lamp sterilization inside.
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan.
Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chmaber Temperature 1000-1200 1000-1200 1000-1200 1000-1200
We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.
Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-22

Tinian solid waste: Where to go?



THREE options are on the table for disposing off Tinian solid waste: incineration, Fukuoka method or off-island disposal.

The Marine Forces Pacific recently held an ad hoc committee meeting with the Bureau of Environmental and Coastal Quality, Environmental Protection Agency, Tinian Mayor’s Office, Department of Public Works and Administration representatives at the BECQ office on Middle Road to map out the directions to take relating to the potential solid waste solutions beneficial for both the military and the civilian population.

In light of the ongoing National Environmental Policy Act process on the construction of ranges and training areas on Tinian, the Marine Forces Pacific examined these options and discussed these with the CNMI.

In analyzing these options, the U.S. military held the assumption that the current dumpsite located at Puntan Diablo on Tinian — the area where the Chinese group of investors is planning to develop into an integrated resort — will be closed and that a transfer station is being considered.

MARFORPAC environmental specialist Sherri Eng said the dumpsite is not something that the military will be able to use.

Just by looking at the requirements and the benefits of the options explored, Eng said that the easiest would be the off-island disposal.”

In choosing the off-island disposal option, the parties will have to look into the capacity of the Marpi landfill to accommodate the waste coming from Tinian — both military and civilian waste.

Eng, in a meeting with the local regulatory agencies and officials walked them through the three systems being considered.

Option 1: Incineration

Eng said the system that calls for the use of incinerator or waste-to-energy system requires a “properly sized incinerator,” fenced site, ash landfill, wastewater disposal, trained operators and secondary disposal site for C&D or construction and demolition waste, green waste, recyclables and white goods.

She said that this system could lead to significant waste reduction and energy production.

However, there are challenges to be met: siting and permitting, maintaining consistent operations, the need for sorting and waste monitoring, high initial cost, high maintenance cost and long timeline for construction.

“Construction timeline is long. It is not something that we can set up tomorrow,” said Eng.

Department of Public Works Secretary Martin C. Sablan mentioned about the CNMI getting an incinerator which it never used owing to the difficulty of permitting through the regulatory agencies.

“Permitting was a problem,” said Sablan.

Option 2: Fukuoka Landfill

The Fukuoka landfill is a new approach to handling solid waste. It is a semi-aerobic landfill with a leachate collecting pipe set up at the landfill floor that drains the leachate to a treatment facility.

This method does not require a synthetic liner.

But if this were to be pursued, Tinian will need an additional 15 hectares and the use of specific construction material.

The MARFORPAC representatives said they have conducted research on this method.

It was done in Palau, Yap and American Samoa but nowhere else in the continental United States due to permitting.

“We have to get some kind of waiver,” said Eng citing that it is not a permitted system in the U.S.

But with Fukuoka method, there is a potential to convert the existing dumpsite on Tinian.

As for leachate, the military is considering to upsize its waste water treatment facility to accommodate this if this were the option to consider.

As the Fukuoka landfill will need clay, Eng said their research showed the lack of this material on Tinian; however, it was suggested there’s a source in Papago.

Option 3: Off-island disposal

This option proposes to utilize the existing Marpi landfill.

With this option, Eng said there will be no additional land requirements.

She said this centralizes waste management system on Saipan.

But Eng was quick to point out that among the challenges will be how to deal with the perception that Saipan becomes a dumping ground.

The military also sees the need to upgrade shipping infrastructure.

“We’re willing to accept military waste,” said DPW Secretary Martin C. Sablan.

He said they had excavated the ground to construct the third cell of the landfill facility.

With this option, Eng assured that “whatever we do, we are going to take the Tinian waste with us.”

Asked by DPW if the military were to foot the bill for shipping and transfer of the waste, Eng said, “We agree to find the solution and hope to find the solution.” She said she could not commit to anything.

Sablan said it will cost less for the military to bring their waste to Saipan but the municipality will be needing assistance.

Feasibility study for three options?

Eng pointed out that the options has to be brought down to two.

“I don’t think we have the time and money to do all three,” she said.

Transfer station is key

As they mulled the potential solutions to Tinian’s solid waste issues, Eng said it is assumed that there will be a transfer station.

“Transfer station is important in all these sytems,” she said.

Closure of the dumpsite

Tinian Mayor Ramon M. Dela Cruz pointed out that it is not the responsibility of the developer to close the existing dumpsite at Puntan Diablo.

He, however, said that Alter City has committed to providing up to $5 million in assistance.

Asked by CIP’s Elizabeth Balajadia if they could continue to use the dumpsite for five more years, Tinian Mayor’s Office chief of staff Don Farrell said “five years is too long.”

Mayor Dela Cruz said three years would be reasonable.

“That will allow the developer to work on the adjacent property,” he said.

Alter City Group is proposing to build a golf course at the current site of the dumpsite.

Alter City committed to assist

At a hearing before the CNMI legislature last week, Alter City’s legal counsel Rober Torres said, “Investor is motivated to assist in its removal.”
But he said the government too has to pitch in.
by: http://www.mvariety.com/special-features/business-edge/70491-tinian-solid-waste-where-to-go



МЕСТНЫЕ СЖИГАТЕЛЬНЫЕ ИНСИНЕРАТОРЫ ДЛЯ ОТХОДОВ

определенного типа для использования в крематории. Что-то, что позволяет, в частности, собирать пепел и т. Д. Для кремации членов семьи умершего. Является ли этот предмет идеальным, легко ли собирается пепел и т.д. в крематоре для домашних животных, можете ли вы представить, а также все детали продаж, налоговых обязательств, окружающей среды. -Пластик. 500 кг / час и оптимальное использование 6 раз, означает ли это, что он будет давать только 3 тонны в день? Имея в виду, что рабочая документация требует 10 тонн / день
Пластиковый контейнер-.
– Тряпки и промасленные.
Стеклянная тара, а также алюминиевая.
– Масла.
Толстый-.
Фильтр, шины, ремни.
– Химия, краски.
Домашние отходы-.
Муниципальные мусоросжигательные заводы производительностью 10 метрических тонн / 24 часа, заполненные кучами, панелью управления, а также всеми принадлежностями, соответствующими требованиям 01015 пар. 5.16.1.
ОТЛИЧНАЯ СДЕЛКА.
2.0

Медицинский мусоросжигательный завод производительностью 10 кг / час (15 фунтов / час) должен быть построен на участке, вместе с кучами, панелью управления, а также всеми устройствами, соблюдая тот же уровень 01015. 5.16.2.
БЫТОВЫЕ СГОТОВИТЕЛИ ДЛЯ СИЛЬНЫХ ОТХОДОВ

Количество и возможности местного мусоросжигательного завода будут рассчитаны на круглосуточную постоянную работу 7 дней в неделю.

Инсинераторы должны быть способны обрабатывать как влажный, так и сухой материал, а также работать на дизельном топливе, газе JP-8,

или отработанное масло; см. Сантехника для нужд системы хранения газа. Как минимум будет обеспечено соблюдение:

Фундаменты для укладки усиленного бетона, загрузочные бункеры (или погрузчики), главные камеры сгорания

с дверцами для очистки от золы, вторичными камерами сгорания с дверцами для очистки от золы, циклонными воздушными фильтрами (или сепараторами),

а также насыпи (или дымоходы) с принудительной вытяжкой воздуха.

Биллинговая система должна содержать, как минимум, приемник для верхней подачи, а также гидравлический привод с механическим приводом.

заряжающий таран или авгур. Чтобы остановить коробление или экстремальное тепловое расширение, система охлаждения зарядного устройства использует либо

будет предложен воздух или вода.

Первичная камера сгорания будет представлять собой инсинератор с вращающимся или неподвижным подом (или печью). Горелка

а также управление воздухом для горения должно быть полностью автоматическим, включая, как минимум, цифровое зажигание, а также все

необходимые блокировки, а также инструменты безопасности для обеспечения безопасной работы. Камера и горелка будут созданы для

поддерживать минимальную температуру горения, по крайней мере, от 700 до 870 C (от 1300 до 1600 F), но не превышать 980

С (1800 ° F). Система золоудаления будет включать автоматическое непрерывное удаление золы в золоуловитель.

яма была охлаждена водой, а также выброшена конвейером.

Дополнительная камера сгорания должна представлять собой горелку с вращающимся или стационарным подом (или печью), предназначенную для

окисляют (или сжигают) органические пары, а также газы. Управление горелкой и воздухом для горения должно быть полностью автоматическим.

состоящий, как минимум, из электронного зажигания, а также всех необходимых блокировок и устройств защиты и безопасности для обеспечения безопасности

операция. Камера и горелка будут спроектированы таким образом, чтобы поддерживать минимальную температуру горения не менее

От 930 до 980 ° C (от 1700 до 1800 ° F), но не будет превышать 1150 ° C (2100 ° F). Система золоудаления должна состоять из:

минимум, прямое извлечение путеводителя в полностью сухой

Циклонные воздушные фильтры будут предлагаться для удаления более крупных частиц. Циклонные воздушные сепараторы могут быть снабжены

приводные толкатели для увеличения скорости прохождения газов внутри циклона для повышения эффективности сбора для меньших размеров

биты.

5.16.2 Сжигатели медицинских отходов

Сжигатели медицинских отходов будут специально разработаны поставщиком для утилизации всех медицинских отходов. Все устройства должны быть изготовлены за 8 часов.

в день непрерывной процедуры, а также рассчитывается по количеству в час (т.е. кг / час или фунт / час).

Упаковка горелки или счет медицинских отходов будут загружаться вручную.

Первичная камера сгорания должна быть стационарной с неподвижным подом (или печью), многокамерной, ретортного типа или большего размера.

Возможность роторно-подового (или печного) вида. Управление нагревателем, а также воздухом для горения будет полностью автоматизировано, в том числе,

минимум, цифровое зажигание и все необходимые блокировки, а также средства безопасности для обеспечения безопасной процедуры. В

камера, а также горелка будут спроектированы для поддержания минимальной температуры горения от 760 до 870 ° C.

(От 1400 до 1600 F). Система золоудаления должна включать автоматическое непрерывное удаление золы прямо в золоуловитель.

приямок охлаждается водой и удаляется конвейером.

Вторая камера сгорания будет представлять собой цельностенную, а также напольную, горизонтальную цилиндрическую трубу с огнеупорной футеровкой.

инсинератор, разработанный для окисления (или удаления) органических паров, а также газов. Управление нагревателем и воздухом для горения будет

полностью автоматический, включающий, как минимум, цифровое зажигание, а также все необходимые блокировки, а также инструменты безопасности для

предлагают безрисковую работу. Камера и горелка будут созданы для сохранения минимального уровня температуры горения.

минимум от 930 до 1200 C (от 1700 до 2200 F) с минимальным временем газового помещения (или выдержки) 2,0 секунды. Удаление пепла

Система должна содержать, как минимум, прямое удаление вручную прямо в полностью сухой сборный резервуар.

Циклонные воздушные фильтры будут предоставлены для удаления более крупных частиц. Циклонные сепараторы воздуха могут поставляться с

приводные толкатели для увеличения скорости газов внутри циклона для повышения эффективности сбора для меньших

частицы.

5.16.3 ТОПЛИВЫ ИНСИНЕРАТОРА (ИЛИ ДЫМОХОДЫ)

Размер кучи будет соответствовать рекомендациям производителя. Стеллажи должны быть приточно-воздушными, а также

полностью независимые, а также не привязанные к близлежащим строениям. Как минимум уменьшится высота ворса.

смыв стоков дымовых труб из-за ветроустойчивых ударов от близлежащих каркасов и определяться в соответствии с

с DoD 4715.05-G, Файл помощи по стандартам охраны окружающей среды за рубежом. Отвалы должны быть снабжены

климатические колпачки из коррозионно-стойкой стали ».

Hospital Waste Management

Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements
Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control
Description of the Chimney    Top mounted, self supporting
Incinerator performance    150kg/hr
Refuse     Hospital waste and carcasses
Recommended Temperatures    Minimum 1000⁰C
Dimensions:
Length
Width
Height
Extra width for burners    At least 3000mm
Loading door opening    Minimum 700mm x 600mm
Hearth area    5.00square meters
Description or grate/hearth    A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated
Primary chamber volume    At least 3 cubic meters
Mixing chamber volume    At least 1 cubic meters
Settling chamber volume    At least 3 cubic meters
Weight excluding chimney    15, 000kg at manufacture
Firing tools supplied    Hoe, Poker and rakeMaterial of construction    Case – 5mm mild steel.
Bracing – Heavy angle and channel.
Hearth – 1550⁰C castable general purpose high strength, high abrasion resistant monolithic refractory concrete.
Ashing door – High grade cast iron.
Loading door – 5mm mild steel lined with 1550⁰C castable  general purpose high strength, high abrasion resistant monolithic refractory concrete.
Refractory  concrete:
Alumina content of refractory
Refractory thickness
Minimum 49%
At least 127mm.
Insulation  to walls     1000⁰C Castable insulation
Chimney stack:
Chimney
Height from base    3.5 mm mild steel
9 meters above ground level and clear the highest point of the building by not less than 3 meters
At least 560mm
At least 750Kg
Controls:
Draught

Air supply

Electric

Barometric indicator, door operated draught limiter

Built-in forced heated air ducts, primary and secondary (intensifier)
Control panel – Circuit breakers, main switch, timer, pilot lights, 2 set point pyrometer and one set point pyrometer.
Electricity supply required    415 Volts Three phase.
Auxiliary  fuel    Electrically operated only
Emission     Multiple chamber design with inbuilt emission control
Paint: Case and stack    400⁰C Heat Resistant Grey
Temperature of case    100⁰C