Archive: June 30, 2024

Medical Center Waste Monitoring


Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements
Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control
Description of the Chimney    Top mounted, self supporting
Incinerator performance    150kg/hr
Refuse     Hospital waste and carcasses
Recommended Temperatures    Minimum 1000⁰C
Dimensions:
Length
Width
Height
Extra width for burners    At least 3000mm
Loading door opening    Minimum 700mm x 600mm
Hearth area    5.00square meters
Description or grate/hearth    A full hearth supplied to prevent contaminated liquids from flowing into the ash pit without being incinerated
Primary chamber volume    At least 3 cubic meters
Mixing chamber volume    At least 1 cubic meters
Settling chamber volume    At least 3 cubic meters
Weight excluding chimney    15, 000kg at manufacture
Firing tools supplied    Hoe, Poker and rakeMaterial of construction    Case – 5mm mild steel.
Bracing – Heavy angle and channel.
Hearth – 1550⁰C castable general purpose high strength, high abrasion resistant monolithic refractory concrete.
Ashing door – High grade cast iron.
Loading door – 5mm mild steel lined with 1550⁰C castable  general purpose high strength, high abrasion resistant monolithic refractory concrete.
Refractory  concrete:
Alumina content of refractory
Refractory thickness
Minimum 49%
At least 127mm.
Insulation  to walls     1000⁰C Castable insulation
Chimney stack:
Chimney
Height from base    3.5 mm mild steel
9 meters above ground level and clear the highest point of the building by not less than 3 meters
At least 560mm
At least 750Kg
Controls:
Draught

Air supply

Electric

Barometric indicator, door operated draught limiter

Built-in forced heated air ducts, primary and secondary (intensifier)
Control panel – Circuit breakers, main switch, timer, pilot lights, 2 set point pyrometer and one set point pyrometer.
Electricity supply required    415 Volts Three phase.
Auxiliary  fuel    Electrically operated only
Emission     Multiple chamber design with inbuilt emission control
Paint: Case and stack    400⁰C Heat Resistant Grey
Temperature of case    100⁰C


Tipo de quemador de capacidad del quemador de desechos clínicos pirolíticos

Incluye: Incinerador: Estructura a especificar
La marca que se especificará
Temperatura del agua: 800 a 1000 ° C;
Refractario
Temperatura de más de 1100 ° C + obtenida;
Capacidad: 20-50 kg / hora
Chimenea: 4 a 6 metros de altura;
Dimensión 70 cmx70 crn
Altura: 1,10 metros
Combustible: carbón;
Aspiración: natural

– Una jaula receptora para desechos biomédicos;

– Cámara de combustión con chimenea con filtro para retener las cenizas;

Sección de la chimenea: unos 300 cm; Con una altura mínima de 6 m

Tamaño de la puerta: aproximadamente 50 × 60 cm

Se suministra con depósito de combustible de 500 litros y todos los accesorios necesarios para la instalación.
– INCINERADOR para el tratamiento de residuos farmacéuticos con sistema de lavado

Con los siguientes datos técnicos:

1. Una unidad de incineración de desechos sólidos farmacéuticos que contiene dos cámaras de combustión y una base de acero con fregado

sistema.

2. Horas de trabajo / día: mínimo 10 horas / día.

3. Capacidad: Aproximada 150 kg / h. Más de 10 hrs.

4. Características de los desechos:

· Densidad GRANEL: 70 – 100 kg / bm³.

· Valor calorífico: 2000-3000 kcal / h.

· Contenido de humedad: 20-30% en peso.

· Contenido de cenizas: 2 – 8% en peso.

· Contenido de plástico: 15-20% en peso.

5. Dos cámaras de combustión.

6. Temperaturas de funcionamiento:

· Primera cámara: no menos de 700 – 800 ° c.

· Segunda cámara: no menos de 1200 ° c (durante el funcionamiento estable).

7. Los quemadores deben apagarse automáticamente si alguna de las puertas de las cámaras de combustión está abierta.

8. Los quemadores de la primera y segunda cámaras de combustión se seleccionan para quemar gasoil (combustible ligero).

9. Se proporcionará cargador y descargador automático.

10. Los gases de escape deben cumplir con los requisitos y el código medioambiental internacional.

Мобильная установка для сжигания медицинских отходов малого радиуса действия с тележкой или колесом

Мобильная малогабаритная установка для сжигания медицинских отходов с тележкой (E-Power) или колесом
Модель Ярд-30
Картина

Скорость горения в среднем 30 кг / час
Емкость подачи в среднем 40 кг
Основная камера сгорания 200 литров
Вторичная камера сгорания 100 литров
Камера сгорания смеси да
Режим подачи Руководство по эксплуатации
Напряжение 220В
Мощность 0,59 кВт
Тип топлива Дизельное топливо
Горелка Италия Оригинал
Расход масла (дизельное топливо) в среднем 13,3 кг / час
Потребление газа (природный газ) ***
Внутренние размеры 80 x 50 x 50 см (пижамная камера)
Внешние размеры 125 x 90 x 180 см (без дымохода)
Монитор температуры да
Емкость масляного бака (для жидкого топлива) 60 литров
Открытие двери 40 х 40 см
Длина дымохода 1.0 метров
Тип дымохода Нержавеющая сталь
Вес брутто оборудования 1500/1700 кг

1 ИНСИНЕРАТОРНАЯ ГОРЕЛКА 1N 230 В, 50/60 Гц, 0,32 кВт, IP 40, марка: BALTUR, сделано в Италии (прилагается согласно заводской табличке и спецификации) Полный набор 1
2 ИНСИНЕРАТОРНАЯ ГОРЕЛКА 1N 230 В, 50/60 Гц, 0,15 кВт, IP 40, марка: BALTUR, сделано в Италии (прилагается согласно заводской табличке и спецификации) Полный набор 1
3 ИНСИНЕРАТОРНАЯ ГОРЕЛКА, 220 В, 50 Гц, 119 кВт, CX 10, марка: CAREER (прилагается согласно паспортной табличке и спецификации фотографии) Полный набор 1
4 ИНСИНЕРАТОРНАЯ ГОРЕЛКА, 220 В, 50 Гц, 172 кВт, CX 14, марка: CAREER (прилагается согласно паспортной табличке и фото) Полный набор 1
5 Контроллер для мусоросжигательного завода, модель: LOA24.171B2BT, бренд: SIEMENS, 220-240 В переменного тока, 50/60 Гц, 3 ВА, сделано в Германии (прилагается согласно спецификации фотографии) каждый 1
6 Контроллер для инсинератора, модель: LMO14.111 C2BT, торговая марка: SIEMENS, 230 В переменного тока, 50/60 Гц, TSA макс .: 10 с, Сделано в Германии (прилагается в соответствии со спецификацией фотографии) каждый 1
7 Контроллер температуры для инсинератора, бренд: XMT, Сделано в КИТАЕ (прилагается в соответствии со спецификацией на фото) каждый 1
8 Таймер для инсинератора (супер-таймер, многодиапазонный, тип: ST3P AF, вход: 200-220 В переменного тока, 50/60 Гц, номинальная мощность контактов: 200 В переменного тока, нагрузка IND, изготовление: 3 А с основанием, сделано в КИТАЕ (прилагается на фото) Спецификация) Каждые 2
9 Трансформатор зажигания для инсинератора, тип: TC2STCSF, код: 15910662, первичный: 220-240 В, 30 ВА, 50/60 Гц, вторичный: 2X12 кВ, 20 мА, AB 100% T60 H, Сделано в ИТАЛИИ (прилагается согласно спецификации фотографии)
Для медицинских и животноводческих отходов
HICLOVER – Медицинское окружение  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

2020-06-30

50 to 60kg/hr and 100 to 120kg/hr diesel powered incinerator

50 to 60kg/hr and 100 to 120kg/hr diesel powered incinerator.1. Capability to Incinerate the Following Types of Waste:
Household waste, glass, steel, aluminum cans and window extrudes, steel cans (crushed), timber, tires, white goods, plastic bottles, pressure packs, medical waste and quarantine waste.
2. Required Incinerating Capacity:
Approximately 4,500 tons per year. The incinerator must capable of incinerating type of waste mentioned or any combinations thereof at a rate of 3 tons per hour. The system shall be designed to run for at least five consecutive days non-stop if required.
3. Incinerator Design Requirements:
The system should be simple in design and operation, with minimal electronic components.
The incinerator and associated air pollution control technology will be:
a.Low in use of auxiliary fuel;
b.Low in electrical power use;
c.Require minimal pre-processing of Municipal solid waste;
d.The air pollution system shall comply with EU Waste Incineration Directive 2000/76 and forms part of the whole incinerator setup.
3.1 Specific Data that must be Provided with the Design
3.1.1 Incinerator Data:
a.Batch Load Capacity;
b.Primary chamber design (thickness , diameter, length, insulation , lining, volume hearth area, weight); c.  Secondary chamber design (thickness , diameter, length, insulation , lining, volume hearth area,  weight);
c.Exhaust stack design (thickness , diameter, lining number of sections, total stack length, height above base, weight);
d.Type and number of auxiliary fuel burners;
e.Fuel requirements – type, quantities;
f.Electrical power usage;
g.Electrical services required;
h.Water requirements – quantities;
i.Any other input requirements and consumables ;
j.Temperatures to be achieved to ensure suitable destruction of waste and comply with required air pollution control standards (EU Waste Incineration Directive 2000/76);
k.Residence time to ensure suitable destruction of waste and comply with required air pollution control standards;
l.Potential weight reduction (percentage) of waste;
m.Options to automatically and continuously monitor and record data such as dates, time of day, batch sequential number;
n.A temperature or visual indicator to display heat status of equipment; and
o.Details on graphic displays and / or computer recording devices.

3.1.2  Air Pollution Control System Data
a.The type of air pollution control equipment selected will comply with EU WID Waste Incineration
b.Directive 2000/76;
c.Details on the gas cleaning systems to enhance the removal of fine particles, acid gases and heavy
d.metals;
e.Details on components, such as:
quencher;
condenser / absorber;
venturi scrubber;
entrainment separator and
emissions stack(s).
Electrical power usage;
f.Any other input requirements and consumables (e.g. lime);
g.Details on graphic displays and / or computer recording devices;
h.Environmental requirements – The system would have the capacity / ability to comply with relevant air quality criteria; i.e.EU Waste Incineration Directive 2000/76. (or similar standards and criteria acceptable to the Australian Commonwealth Government Department of the Environment);
i.Specify air pollution parameters that are monitored.
3.1.3  Site Requirements for the Incinerator
a.Total land area dimentions;
b.Infrastructure required ( water supply, electricity supply drainage); and
c.Any specific environmental or climatic/meteorological factors that needs consideration.
3.1.4  Housing Requirements and Design
a.Details on requirements for a secure enclosure for the incinerator and associated air pollution control system. The enclosure will be designed to achieve occupational health and safety requirements such as: a. Free space is available on all sides and heat radiation is kept at a minimum giving the operators an:
b.easy workable environment and ventilation;
c.There are secure storage facilities for waste;
d.There are measures to avoid vermin and pests;
e.The materials will be of sufficient structural thickness for safety and to withstand sea corrosion.
4. Training, Maintenance And Instruction Manuals
4.1 Maintenance Manuals
Provide details on maintenance requirements, such as:
a.General cleaning and maintenance – frequency, skills / technical expertise required;
b.Expected life span of parts and the system as a whole;
c.Expected frequency of the need for replacement of parts;
d.Availability of parts and location of suppliers;
e.Frequency of need for major overhauls; and
f.Estimated down time required for general maintenance and major overhauls.an incinerator  for our dead animals in the farm particularly chicken.

Burner for medical center waste monitoring


Heater for health care facility waste surveillance with the adhering to attributes:

– – In high temperatures( pyrolytic burner 2 chambers with temperatures varying from 950 º C to 1320 º C;

– – Capability to damage of 400 to 600kg per hr;

– – Effective in ruining germs;

– – Drain ash;

– Drain needle as well as glass crusher;

– – Patio with faucet water for hand cleaning and decontamination;

– – Observe the trouble of ecological high quality requirements, discharges proficient in addition to plan on the concern of waste; place big incinerator to among the largest veterinary university hospital in KSA so if you will certainly support us with one system (big incinerator) and also ecological with onsite training, the ability for the tool is 2000 Kg for cattle, equines as well as additionally farm animals in addition ideal to all animal waste kinds, we require it diesel fired. OES-Industrial MultiWaste Burner System (Solid/Liquid)

Level of the Job:
Style, setup along with appointing of multi hazardous waste burner.
Ability: 315 KG/HOUR STRONG WASTE/ OR 200 LITRES/HOUR FLUID WASTE (with dual chamber system).
1st chamber-870 Deg.C – – – – 900 Deg.C. Second chamber-1000 deg.C – 1200 Deg.C

Resources Of The Wastes.
The following types of wastes can be taken care of by using burner.
a). biography medical waste/pharmaceutical waste.
b). solid chemical waste/textile markets waste.
c). liquid chemical waste.
d). dyes in addition to intermediate waste.
e). all-natural chemical waste.
f). fluid ink waste/acidic deposit.
g). insecticides/herbicides/pesticides.
h). fungicide waste.
i). ethanolamine.
j). amino ethanol.
k). mono ethanolamine.
l). ETA, MEA waste.
m). wastes after treatment of chemicals in etp plant.
n). combined alcohol waste water.
o). alcoholic waste.
p). farming liquid chemical waste.
q). sludge mix fluid.
r). slurry/adhesive/grease/ powder coating wastes.
s). semi strong fluid chemical waste.
t). mass completely dry chemical waste.
u). pharma chemical wastes.
v). solvent chemicals/paint wastes/used glass grains.
w). used tires.
x). made use of cotton fabrics.
y). contaminated plastics/resin wastes.
Series of Job:.
Blaze all sorts of liquid/solid hazardous/chemical/non contaminateds products avaliable in the markets with proper scrubbing up system with typical emission rates.
The twin stage incinerator aids to burn the waste in 2 phases, initially at a tool temperature level of 870- 900 Deg C and likewise the 2nd stage at 1200 deg C.
Producing ash as well as Aeriform fumes which are treated with cyclone type wet scrubber in addition to caustic scrubber to produce air with contaminants in the enabled variety as well as Non dangerous ash mostly not natural salts.

Incinerator utilities.
Heater should have adhering to demands:.
Metallic seal framework with ceramic insulation to stay free from cozy radiation and additionally regulate radiant temperature degree.
Advanced gas treatment system to avoid discharge of dangerous gases (massaging system).
Reduced consumption high performance compact computerized burning system.
Low operating as well as maintenance rates.
Fully automatic and also very easy to operate control panel.
Afterburner Preheat.
Thick refractory concrete lining ranked at 1600 C.
Solid Hearth to make it possible for optimal Fatigue.
Large Leading opening cover for simple loading.
Wide door for ash removal.
Optional Stainless-steel Situation.
Warmth healing choice


incinerator manufacturer 200kgs/h

Waste is thermally decomposed in the primary chamber at temperatures of 800 °C +. The resulting gaseous products are completely oxidized in the secondary chamber at higher temperatures with sufficient resident time. Other specifications are as follows. A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load

* A burner of lighting which the use is limited to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.

* Composition of the refractory


Burning Capacity

Max. 200kgs/h

Auxiliary Fuel

Diesel

Type of Burner

Monoblock automatic burners

Temperatures

Primary Chamber: 800°C ± 50°C

Secondary Chamber: 1300°C ± 50°C

Type

Static solid hearth

Material of Construction

Mild Steel

Refractory thickness

115 mm thick

Material

Refractory bricks

Insulation thickness

50 mm thick

Waste Charging

Manual

Ash Removal

Manual

Type

Static solid hearth

Material of Construction

Mild Steel

Refractory thickness

115 mm thick

Material

Refractory bricks

Insulation thickness

50 mm thick

Type

Centrifugal

Modulation

Manual damper control

Material of Construction

Mild Steel

Type of temperature controller

Digital

Finish & painting type

Double coat

Material of construction & capacity

Mild Steel/ Plastic, suitable capacity

Other Standard Accessories

Diesel oil level indicator, piping with valves & Non-return valve

Visual Checking of Fuel

Provided

No. of Burners

2 one in primary and in secondary chamber)

Type & Model

Monoblock automatic oil fired

Make

Riello

Fuel

Diesel

Fuel delivery

10 C 20 kg/h

Firing stage

1

Thermal power

118 C 236 kW

Motor power

240 W

Pump pressure

10 C 12 bar (standard calibration), Max. pressure 15 bar

Electrical supply

Single phase 220V, 50Hz.

Material of construction

Burnt bricks

Height

9 meters from ground level

Скорость 30 кг 60 кг питательного масла, а также горелка для крошечных отходов

Тариф 30 кг 60 кг кормовая горелка для мазута и газа небольшая установка для сжигания отходов для Афганистана

Настройка машины

Нефть или газ + электроэнергия

Напряжение

220В

Расход масла (л / час)

Обычно 13,3 л / час / камера

Расход газа (NG) (м3 / час)

16,0 (м3 / час) (НГ)

Забор газа (LPG) (м3 / час)

11,7 (м3 / час) (сжиженный газ)

Скорость горения

Обычные 30 кг / час

Настройка подачи

С ручным управлением

Ключ Камера сгорания

360 литров

Вторая камера сгорания

200 литров

Продукт камеры сгорания

Огнеупорный бетон Цемент + огнеупорный кирпич

Внутренние размеры

Да (основная камера)

Внешние измерения

210x120x210см (без дымохода)

Открытие двери

48X60 см

Вид топлива

Дизельное топливо / газ / сжиженный нефтяной газ

Горелка

Исходный

Размер дымового вала

13.0 метров

Камера дымового фильтра

да

Монитор температуры

2 номер Цифровое шоу

Защита уровня температуры

да

Емкость для масла

200л

Горящая производительность

>> 98%

Тип дымохода

Нержавеющая сталь

1-й. температура в камере

800c– 1000c

второй. уровень температуры в камере

1000c– 1200c

Время проживания

2,0 сек.

Вес брутто

4000кг

Электрический пластик, а также измельчитель стекол

да

Скруббер

да

Гарантийный срок обслуживания

1 год

Основная камера сгорания

да

Вторичная камера сгорания

да

Ситуация контроля мусоросжигательного завода

S. сталь

Дымоход инсинератора

Исходный

Газовый обогреватель

да

Возможность резервуара для хранения масла

да

Поддержка масляного стенда

да

Камера сухого дымового фильтра

да

Воздушный последователь

да

Общая мощность сжигания отходов / время

Минимум 60 кг

для Министерства общественного здоровья, Кабул, Афганистан

инсинератор для птицеводства
скорость горения около 150 кг / час
грузоподъемность около 350 кг.
Установка для сжигания бытовых отходов производительностью 50 т / сут.
Установка для сжигания медицинских отходов производительностью 200 кг / сутки
Установка для сжигания медицинских отходов производительностью 500 кг / сутки
Средний блок – для обработки среднего количества отходов 500 кг / день и соответствия производственной мощности
Мусоросжигательная установка с автоматическим контроллером ПЛК с двойными тепловыми горелками и двойной камерой.
Горючесть до 30 кг в час.
Циклонный воздухоочиститель с водяным душем
Лист из нержавеющей стали марки 304 для водоочистной камеры
Время до 250 мин.
Полностью автоматическая электрическая схема управления с таймерами
Первичная температура до 850 ° C
Температура вторичного контура до 1100 ° C
Ручная / автоматическая загрузка / разгрузка
Автоматический запуск при сбое питания во время процесса
Автоматическое управление быстрым повышением температуры обнаруживает быстро горящие материалы и снижает расход топлива горелки за счет автоматического выключения / включения горелки.
Подходит для отходов больниц
Количество конфорок 2 шт.
Напряжение 440 В 50 Гц
Эксплуатация 5 C 60 C Влажность 10 C 90%
Тип топлива Природный газ Количество камер 02 шт.

HICLOVER – Медицинское окружение  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

2020-06-30

Incenerator de desechos médicos de gasoil

Disposición del incinerador de residuos térmicos D. MEGABYTES 750XL Tasa de fusión: 150 kg / h mínimo Peso (kg) -4000 kg Cámara añadida

(doble cámara con post-combustión) Tiempo de retención de gas 2 Fuente de alimentación diesel de 2o gas para caja de control 220V-240, solitaria

fase 50-60Hz Grado de temperatura mínima de funcionamiento 1200 oC Un año de paquete de piezas adicionales para un mantenimiento completo Tubería de 10 m

tubo. Tanque de almacenamiento de combustible de 1100 litros + sistema de tuberías En contenedores (el contenedor definitivamente funcionará como alojamiento) Desarrollo de pozo de humo agregado

1 metro de altura Un (1) año de garantía.

Calentador de 20 Kg: 03 Gadgets

Quemador controlado eléctricamente.

Calentador de dos compartimentos con una capacidad de 20 kg / hora.

Quemador con mantenimiento y gastos operativos minimizados; Preparado con un tablero de control automatizado y muy fácil de utilizar con

Fijación electromagnética de la puerta.

Una cámara principal de reducción de desechos a 900 ° C.Una cámara de gases posterior a la segunda combustión desarrollada en la cámara principal

al mínimo 1100 ° C.

Depósitos de carbón en cenizas mucho menos del 5% en peso de acuerdo con la Directiva Europea 2000/76 / EC.

Con revestimiento celular refractario en productos de mejor
1 / Costo de un calentador de desechos médicos de 200 kg / hora.
2 / (Término CIF) Costo de distribución desde el centro de fabricación a PAPUA NUEVA GUINEA puerto de LAE, distrito de Morobe
3 / Costo de 2 ingenieros de Clover para supervisar, configurar, educar a nuestros ingenieros y designar la clínica; desperdicio

incinerador.

Medical Incinerator Specification



Capacity Not less than 500Kg/hr.
Operation 24hr-7days/week continuous operation.
Combustion chamber 2 combustion chamber.
Temp. First combustion chamber 800-1000 C.
Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.
Combustion Efficiency 99.99%
Retention time Of the flow gases not less than 2 Sec in the hot portion.
Excess Oxygen concentration Of primary combustion chamber 3-6% max.

Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. 
resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the 
same time prevent the Temp. of the outside body of the chamber not higher than 70 C.
Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and 
the doors should be kept under negative pressure during the operation.
Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.
Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti 
corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled 
circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.
Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system 
including sensors.
Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy 
opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any 
flow disturbancies.
Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable 
stairs from ground to the port with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be dual system, such as diesel and natural gas.
Feeding System Should be auto feeding system into primary chamber.
Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the 
primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, 
auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.
Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be 
heigher than 1100 C.
Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the 
combustion Temp. less than 500 C.
Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.
Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or 
equivalent.
Noise Level Not more than 85 dBA during normal operation.
Inaddition The desigh should insure that responsive fail-safe control systems are used.
The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has 
facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage 
area…etc.
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside 
Kuwait.
Detailed drawings, catalogs should be included.


install a diesel fired incinerator

incinerate mainly pharmaceuticals ( all types of dosage forms … syrups, tablets, injectables ) medical consummabables, and also biological fluids …
Capacity around 10 kg/ hour. install a diesel fired incinerator that can accommodate a batch load of up to 100 kg with a daily burning requirement of up to 500kg per 8 hour day. Industrial Incinerator to destroy
the pharmaceuticals waste like Alu, PVC,PVDC etc.Installation for burning of animal waste cost, presence, repayment terms where it is possible to buy in Russia? I am looking to for capacity between 200 -400kg
1.2FIELD PAINTING
Perform painting required for surfaces not otherwise specified, and finish painting of items only primed at the factory

1.3FIELD TRAINING
a. Submit [Six] complete copies of operating instructions outlining the step-by-step procedures required for system startup, operation and shutdown. Include in instructions the manufacturer’s name, model number, service manual, parts list, and brief description of all equipment and their basic operating features. And [Six] complete copies of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, troubleshooting guides, and simplified schematic diagrams for the system as installed.

3.6.Performance
Preheat the incinerator for 4 hours to reach the firing temperature of 982degrees C [1800] degrees F. Weigh and record the total charge weight. Charge the incinerator at the rated burning capacity in kg pounds per hour for a period of [4] hours and operate in accordance with the manufacturer’s written instructions. Include in performance testing the operation of the mechanical charging facilities, the incinerator, the air pollution control equipment, the ash
handling equipment, and the operation monitoring facilities. Perform testing full scale for a full- operation cycle, and monitor performance to verify compliance with the contract requirements submit a report on monitoring results. Reduce the waste to a fine ash residue. Follow normal burnout procedure. After the incinerator has cooled, weigh the residue. The weight of the residue shall not exceed 5.0 percent combustible material of the total charge weight.
After clean-out, the incinerator shall not show any evidence of deterioration, such as shagged or spilling refractory, warping of parts, and discolored exterior paint.

•Control
Test the incinerator under actual firing conditions. Verify with testing that all controls function within the maximum and minimum limits for temperature or timing. Simulate actual unsafe conditions such as high temperatures and flame failure by reducing the settings for the activation of limit and safety controls.

•Shell Temperature
Operate the incinerator under normal load conditions for not less than 6 hours. After 6 hours, temperature readings of the outer shell, taken at not less than 5 random locations, shall not exceed the temperature limitation of paragraph furnace construction.
– capacity: 300-400 kg/hour
– Fuel syetem: Dual fuel( both oil and gas)