Archive: August 5, 2023

msw incinerator manufacturers

standard type, 11m long ,self supporting

Capacity-220kgs/hr

refuse-hospital waste

average moisture-15-20% on fist time

DIMENSIONS

height: 2710mm

length: 2840mm

Width; 2450mm

loading door opening: 610mm x 610mm

Grate/Heath Area: 2.0(square meters)

Primary chamber volume: 2.4(cubid  meters)

secondary chamber volume :2,72(cubid meters0

total volume: 5,12(cubid meters)

minimum stack diameter :560mm

 

  1. 300 kg per day healthcare waste incinerator

 

 

 

Our preferred technology is double-chamber incineration, but if you recommend an alternative technology, that is

acceptable as well.

 

 

 

We request information on the following for each of the above requirements:

 

 

 

  1. Capital cost (delivered cost in Oman)

 

 

 

  1. Operation and maintenance costs (per year)

 

 

 

  1. Number of operators required

 

 

 

  1. Product specifications (sizes, temperatures, residence time, cycle time etc)

 

 

 

  1. Other auxiliary equipment that is required or recommended by you

 

 

 

  1. Any other information and inputs that can facilitate the project and add value

 

 

  1. Would this mean that the plant would operate only 12 hours per day? Normally operating the station 24 hours

per day should be able to valorize 12 tons per day for an installation with a capacity of 500 kgs/hr.

Différents types d'incinérateurs

incinérateurs à haute température de déchets dangereux pour le traitement des déchets dangereux. Les déchets seront mélangés, y compris les déchets médicaux, huileux, bois et déchets de laboratoire. Combustion primaire
Chambre de combustion primaire / zone de combustion primaire à combustion diesel / GPL / GNL
Combustion secondaire
Temps de séjour dans la chambre secondaire pas moins de 2 secondes
Les températures primaire et secondaire sont maintenues jusqu’à ce que tous les déchets aient été complètement brûlés
Cheminée
Cheminée d’une hauteur minimale de 4 mètres au-dessus du niveau du sol
Vitesse minimale de sortie des émissions d’au moins 10 mètres / seconde
Avertissements de température
Alarme sonore et / ou visible pour avertir l’opérateur lorsque la température secondaire descend en dessous de la température requise
Général
Boîtier de commande qui peut être détaché et monté sur un support séparé à au moins 1,5 mètre de l’incinérateur à environ 1,6 mètre de hauteur

Incinérateur modèle A
Taux de combustion de 65 kg / h minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz – 2 secondes
Carburant – Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande – 220V-240V 50Hz monophasé
Température de fonctionnement minimum 850 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant I000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Incinérateur modèle B
Taux de combustion 150kg / h minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz – 2 secondes
Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande – 220V-240V 50Hz monophasé
Température de fonctionnement minimum 920 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant I000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Incinérateur modèle C
Taux de combustion 250 kg / h minimum
Poids (kg) veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz 2 secondes
Carburant Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande 220V-240V 50Hz monophasé
Température de fonctionnement minimum 920 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant I000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Lot 4 – Incinérateur de déchets à haute température
Incinérateur HTW modèle D
Taux de combustion – 150 kg / heure minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz 2 secondes
Carburant Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande 220V-240V, monophasé 50-60Hz
Température minimale de fonctionnement 1200 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant de 1000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Lot 5 – Incinérateur mobile
Incinérateur mobile modèle E
Taux de combustion 50kg / h minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz – 2 secondes
Carburant – Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande – 220V-240V 50Hz monophasé
Température de fonctionnement minimum 850 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant de 1000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Lot 6 – Incinérateur mobile
Incinérateur mobile modèle F
Taux de combustion 100kg / h minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz – 2 secondes
Carburant – Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande – 220V-240V 50Hz monophasé
Température de fonctionnement minimum 850 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant de 1000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur
Garantie, indiquez le nombre d’années

Lot 7 – Incinérateur mobile de déchets à haute température
Incinérateur mobile HTW modèle G
Taux de combustion 100kg / h minimum
Poids (kg), veuillez indiquer:
Chambre secondaire
Temps de rétention du gaz – 2 secondes
Carburant – Diesel / GPL / GNL, veuillez indiquer
Alimentation pour boîtier de commande – 220V-240V 50Hz monophasé
Température minimale de fonctionnement 1200 ° C, veuillez indiquer
Ensemble de pièces de rechange d’un an pour une maintenance complète
Tuyau de 10 m, indiquer la longueur
Réservoir de carburant de 1000 litres + système de tuyauterie, indiquer le volume
Extension de cheminée supplémentaire, indiquer la hauteur

pet animal cremation equipment

A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total recombustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with support of connection.

* Composition of the refractory;

Refractory concrete :

Thickness : ≥150 mm

Nature: 65% of Al203

Insulate in fibrous panel :

Thickness: ≥85 mm

 Nature: Calcium

* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition,

permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* A secondary injection of air to ensure perfect oxygen content.

19.A control box ensuring the complete cycle of combustion.

 

20.Fan:

* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and

following the control of the automatic cycle.

21.Controls and regulations:

Control box watertight to dust, including:

 

* A switch circuit breaker for each engine (ventilators and burners).

* A timer with adjustable temporization for the regulation of each burner.

* A regulator with digital watching for the temperature of combustion.

* A regulator with digital watching for the temperature of postcombustion.

* Electric box.

 

  1. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual

batch de ashing.

  1. Process Filtering system : Scruber to be mentionned as optional
  2. Emission Standards Compliance: BS 3316 or équivalent standard
  3. Capacity to treat Plastic: Not less than 40% by weight
  4. CE Manufacturing Compliance: BS EN 746-2-1997

22.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.

23.The installed incinerator must bear a one year guarantee.

24.The supplier shall perforn an onsite installation of the incinerator.

  1. The technical training of operators will have to be provided and given by a technician from

the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

Incinérateur pour ferme porcine crématoire animale modèle A1200

Incinérateur pour ferme porcine crématoire animale modèle A1200


*** 3 ensembles de brûleurs
*** Bon pour les animaux ou les gros animaux de compagnie
*** Double chambre de combustion
*** cheminée en acier inoxydable
*** L’Italie a fabriqué des brûleurs à mazout
*** Grande chambre de 1200 litres (1,2 m3)

Modèle

A1200

Photo

Taux de combustion

50 kg / heure en moyenne

Capacité d’alimentation

100 kg en moyenne / alimentation

Chambre de combustion primaire

1200 litres

Chambre de combustion secondaire

500 litres

Mélanger la chambre de combustion

Oui

Chambre de filtre à fumée

Oui ( épurateur à sec )

Mode d’alimentation

Manuel

Tension

220V / 380V

Type de carburant

Diesel

Brûleur

Italie Original

Consommation d’huile (gasoil)

Moyenne 34,4 kg /heure

Consommation de gaz (gaz naturel)

***

Dimensions internes

130 x 100 x 90 cm (chambre primaire)

Dimensions extérieures

220 x 180 x 360 cm (sans cheminée)

Moniteur de température

Oui

Capacité du réservoir d’huile (si carburant d’huile)

500 litres

Ouverture de porte

55 x 80 cm

Longueur de la cheminée

10,0 mètres

Type de cheminée

Acier inoxydable

Poids brut de l’équipement

7500 kilogrammes

Spécifications techniques de fonctionnement

Température de la chambre primaire

800 -1000

Température de la chambre secondaire

1000 -1200

Temps de résidence

2,0 sec.

Efficacité de combustion

98%

Déchets de puissance calorifique inférieure

3000Kcal

Modèle

A1200

Dimensions internes

130 x 100 x 90 cm

Costume pour animal

Chat – oui

Chien – oui

Cochon – petit

Vache – non

Liste de produits principale

Chambre de combustion primaire

Chambre de combustion secondaire

Chambre de mélange-combustion

Chambre de filtre à fumée (épurateur à sec)

Cas de contrôle d’incinérateur

Cheminée: 10,0 mètres * (mise à niveau vers l’acier inoxydable, coût gratuit)

Italie brûleur à mazout: 03 ensembles

Réservoir d’huile: 500 litres

HICLOVER – Environnement médical  

Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.

11/02/2020

производитель мусоросжигательных заводов Китай

Осадок должен быть должным образом распылен с помощью сжатого воздуха в горелке, чтобы обеспечить полное сгорание

осадок.

В инсинератор должен входить воздушный компрессор в комплекте с ресивером. И компрессор, и ресивер должны быть

установлен на той же платформе, что и мусоросжигательный завод.

Инсинератор также должен иметь цифровое окно мнемосхемы для мониторинга скорости подачи шламовых насосов, а также

скорость подачи используемого DO. Также должен быть предусмотрен цифровой контроль температуры дымовых газов. Цифровой

дисплей должен отображать аварийные сигналы и неисправности. Он должен быть оборудован соответствующими клавишами управления, позволяющими

прокрутка аварийных сигналов, изменение уставок, просмотр данных, подтверждение и сброс аварийных сигналов и ошибок.

Должна быть предусмотрена вытяжная труба, через которую дымоход выводится в атмосферу. Высота штабеля должна быть не менее 15 м.

высокий и должен быть пригоден для работы в морских и агрессивных средах. Предлагаемая стопка должна иметь сверхмощную конструкцию,

включая гибкие компенсаторы, сильфон, переходник и должны быть спроектированы так, чтобы выдерживать сильные коррозионные

окружающей среды, высоких циклических нагрузок и способных противостоять циклоническим порывам со скоростью не менее 280 км / час.

Корпус инсинератора должен быть двухкорпусным, то есть с воздушным охлаждением. Инсинератор также должен работать на

отрицательная тяга, которая поддерживается с помощью эжектора, чтобы предотвратить утечку газов и дыма в

Окрестности. Воздух для горения должен подаваться в избытке, чтобы обеспечить полное сгорание ила.

Capability of devastation in weight 60 Kg/h


medical waste incinerator options in addition to expenses for 100 bed/ 500 bed/ 1000 bed/ 3000 bed health care facilities.
– – – – Assumption: basic medical facility beds 50%, procedure beds 50% for the 100 bed health center situation, while this

ratio is 30-70% for the other scenarios
–– – – international criteria as well as additionally waste manufacturings presumptions ought to use
INCINERATOR, DIESEL.

CAPABILITY: Burner 150 kg/hr.

Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
all-natural rubber, artificial rubber, polyurethane sheet, and also difficult films, solids as well as also
– – – – fragments that can be quickly prepared – – – Points that conveniently deteriorate such as paper, wood, natural leather and rubbish – – – Chemical waste solids as well as also fluids, waste oil as well as additionally numerous other difficult-to-handle things

The devices will absolutely be certified for procedure from PME after passing site investigations.Manual lots double chamber

burner for scientific waste to melt 50kg/hr on consistent treatment, with Key temperature level approximately

800degC minimum as well as 1200degC and even extra in the Added chamber, full with payment door, Ash door, Air as well as check out

ports, supporting air system with adjustable dampers, burners and also heater control system and also ignition system, the entire to

satisfy NEMA needs along with numerous other international needs. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technological details we respect are:

–– – – Capacity( burning ability of waste per human resources). 150kg/hour. Burner with 300l waste chamber

–– – – Build products, 5mm Excellent high quality light steel building; 100 mm superb quality refractory cellular lining.

–– – – High Temperature paint finish.we have 2 health centers, even more afterwards 20 dental expert workplaces, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we need

on this island.

–– – – Approximately 150 KG/Hrs. heater to dispose our daily routine death for this size of the cattle ranch.1. can the

100kg/hr melt strong waste/hazardous waste like run out paints, waste oil or chemicals.
BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2.

instance the burner will be running for 10 hrs day-to-day shows the oil use will be ~ 140 Litres or also a lot more? Do you have actually put up shelters?Installation of waste disposal system (biomedical) 500kg capability layout, MP 500

scientific burner.
2. It has to have the capacity to run not much less than 10 hours/day 3. This incinerator must have the capability to wreck all flammable wastes produced by medical centers, special facilities,

labs, institutes, and so on
4. Design Demands: Kinds A, B, C, D, as well as E of professional waste 5.” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to remain clear of the launch of black smoke as well as great dust, (Electric) throughout the loadings.
7. It should have the ability to lower the quantity of wastes by 98%.
8. It should be able to hold exhaust in the 2nd thaw with gas house of not less than 2 secs.
9. The incineration should be entirely lacking visible smoke in addition to offending smells.
10. – Message combustion: >> 1100oC.
The Internal size of the Smokeshaft: Ø 400 as well as its altitude: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13.
14. Heater procedure need to be Automatic On/Off.
15. Gas: diesel.
16. The supplier has to provide essential information for the greatest of the installment.
This heater with “PYROLYTIC” burning need to have: 17. A burning chamber of waste:.
* Faultlessly tight door for the hand-operated loading of waste. The loading needs to be Guidebook, Set Loads.
* A heater of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals risen on joints, wheel of screw plug, adaptable joint, as well as packaging shielding

out of refractory.
* The insulation of the burning chamber should certainly be comprised of refractory blocks, having a high material of aluminium

as well as also insulates bricks in order to make sure a minimum temperature level on the outdoors sheet steel.
– Refractory concrete:
. Nature: 42% of Al203.
– Shield in coarse panels:.
– Thickness: ≥ 75 mm.
– Nature: Calcium silicate. * Heater of lights of waste, with gas, typical mono-bloc spreading directing diving flame, lights as well as security of

electronic ignition, irreparable air circulation, electro-magnetic sluice gateway of law along with dividing shutoff.
* Plate of combustion in Carborundum, staying free from the dealing with of glass and slags.

18. A chamber of post burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting a general re-combustion of gases,.
* A device of air inlet of cooling of waste gases,.
* A sheath of discharge of the gases sweltered.
* Carcass in solid sheet steel with support of link.
* Make-up of the refractory;.
– – Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– – Safeguard in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heating system with gas, mono-bloc spreading assisting type with straight fire, lights in addition to safety of digital

ignition, lasting air circulation, electro-magnetic sluice entryway of guideline and isolating valve.
* A second shot of air to guarantee exceptional oxygen web content.
19. A control box making certain the complete cycle of burning.

20. Follower:.
* Electro-ventilator distributing the second air, the plan of the air flow being executed by valves and also

following the control of the automatic cycle.
21. Controls along with plans:.
Control box watertight to dust, consisting of:

* A switch breaker for every single engine (ventilators and also heaters).
* A timer with flexible temporization for the legislation of each heater.
* A regulator with digital watching for the temperature of burning.
* A regulative authority with expect the temperature level of article burning.
* Electric box.

21. The de- ashing needs to be performed in lowest level of the burning chamber or the deashing need to be Automatic or hands-on

established de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional.
23. Discharge Specifications Conformity: BS 3316 or similar need.
23. Capability to treat Plastic: Very little less than 40% by weight.
24. CE Production Conformity: BS EN 746-2-1997.
22. The carrier needs to provide sets of extra components of initial necessity in addition to palatable of the heater.
23. The installed incinerator needs to birth a one year guarantee.
24. The provider will execute an onsite installation of the burner.
25. The technical training of vehicle drivers will absolutely need to be offered as well as additionally provided by an expert.
from the manufacturing facility; it will include medicinal as well as likewise preventative maintenance, as well as using tool, etc

CAPABILITY: Burner 150 kg/hr.

Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
– – – Chemical waste solids as well as likewise liquids, waste oil and also numerous other difficult-to-handle items

The tools will absolutely be accredited for procedure from PME after passing website investigations.Manual tons double chamber

burner for clinical waste to melt 50kg/hr on consistent treatment, with Key temperature level roughly

800degC minimum as well as 1200degC or even extra in the Extra chamber, complete with invoicing door, Ash door, Air as well as check out

ports, complementary air system with adjustable dampers, burners and heater control system and also ignition device, the entire to

satisfy NEMA needs as well as various other international requirements. BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capacity design, MP 500

medical burner.

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc


กวางโจว Xinpu Electronics

2019-05-22 ความสำเร็จและ คดี361 ยอดเข้าชม

ใหม่ Spectrum Electronics

โรงทำความสะอาดเครื่องทำความร้อนไฟฟ้า

ชื่อโครงการ: โรงทำความสะอาดเลนส์ใหม่ เครื่องทำความร้อนไฟฟ้า

แนะนำโครงการ: โรงทำความสะอาด การออกแบบเครื่องทำความร้อนไฟฟ้า การผลิตและการติดตั้ง






Xinpu (กวางโจว) Electronics Co., Ltd. ลงทุนและก่อตั้งขึ้นในปี 2550 โดยสำนักงานใหญ่ของ NEW OPTICS LTD ในเกาหลีใต้ บริษัทตั้งอยู่ในเมืองวิทยาศาสตร์ เขตพัฒนาอุตสาหกรรมไฮเทคของกวางโจว บริษัท มีทุนจดทะเบียนของ 12 ล้านเหรียญสหรัฐ และการลงทุนรวม 60 ล้านเหรียญสหรัฐ . ส่วนใหญ่ผลิต “แสงไฟ” ในส่วนประกอบ LCD และจัดหาโดยตรงให้กับ LG Group (LG Display (Guangzhou) Co., Ltd.)

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

diesel oil fired medical waste incenerator

High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber

(double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single

phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose

pipe. 1100 litre fuel Tank +pipe system Containerised (the container will serve as housing) Additional chimney extension

1 metre high One (1) year warranty.

Incinerator of 20 Kg : 03 Units

Electrically controlled incinerator.

Two-compartment incinerator with a capacity of 20 kg / hour.

Incinerator with low maintenance and operating costs; Equipped with an automatic control panel and easy to use with

electromagnetic locking of the door.

A main waste reduction chamber of 900 ° C. A post secondary combustion chamber of gases generated in the primary chamber

at least 1100 ° C.

Carbon residues in ash less than 5% by weight in accordance with European Directive 2000/76 / EC.

With refractory lining in materials of higher quality
1/ Cost of a 200kgs/Hr medical waste incinerator.
2/ (CIF Term) Cost of shipping from factory to PAPUA NEW GUINEA seaport of LAE, Morobe province
3/ Cost of 2 Clover engineers to Supervise, Installation, Training our engineers and commissioning the medical; waste

incinerator.

Planta de incineración de desechos

Información básica.

Fuentes de extracción: procesamiento de residuos sólidos
Métodos de procesamiento: combustión
Mercados de exportación: Global

Descripción del producto

Nanjing Clover Medical Technology Co., Ltd. es un fabricante líder de incineradores de desechos en China. Somos fabricantes locales y uno de los mayores exportadores de China. El equipo técnico de incineración pirolítica es el principal tratamiento de desechos en todo el mundo, para desechos médicos, incineración de animales, cremación de mascotas y otros wste sólidos. La capacidad de 10kgs / Hr. Hasta 500kgs / Hr., Fabricación de incinerador, equipo incinerador de porcelana, equipo de desechos médicos de porcelana, equipos de incinerador de animales, hasta 6 toneladas por día. Actualmente, suministramos diferentes series para los requisitos de los clientes locales y diseñamos un incinerador actualizado con nuestra tecnología líder. La característica de diseño actualizado de nuestra gama de incineradores los convierte en uno de los más rentables del mundo.
Características principales:
* Todos los modelos con doble cámara de combustión.
* Chimenea / chimenea de acero inoxidable, larga vida útil. * según pedido
* Alta temperatura, larga vida útil del incinerador.
* Instalación gratuita o mínima en obra.
* Alta velocidad de combustión, de 10 kg a 500 kg por hora, hasta 6 toneladas por día.
* Plano de control PLC. * según pedido
* Nuevo diseño para el negocio de cremación de animales de compañía.
* Garantía de un año en incinerador y piezas en stock.
Ámbito de aplicación:
1. Hospital y clínica: Residuos Iátricos, Residuos Infecciosos, Vendajes, Biorresiduos, Medicina.
2. Matadero y hospital y granja de mascotas: animal muerto, biorresiduos.
3. Comunidad, puerto y estación marítima: residuos sólidos urbanos, etc.
4. Laboratorios, ubicaciones remotas, operaciones de socorro en casos de desastre, cremación de animales

Artículos / Modelo YD-10C YD-20C YD-30C YD-50C
Tasa de combustión (kg / hora) 10 kg / hora 20 kgs / Hr. 30 kg / hora 50 kgs / Hr.
Capacidad de alimentación (kgs) 40 kilogramos 40 kilogramos 50 kilogramos 80 kilogramos
Peso del equipo 1200 kilogramos 1200 kilogramos 1800 kilogramos 2200 kilogramos
Imagen
Cámara primaria (litros) 200 200 250 400
Cámara secundaria (litros) 140 140 140 140
Dimensiones externas (cm) 170 x 140 x 160 170 x 140 x 160 170x140x190 180x160x200
Dimensiones internas (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Tanque de aceite (litros) 50 100 100 150
Apertura de la puerta (cm) 38 x 48 38 x 48 38 x 48 45 × 55
Chimenea (M) 5 5 5 5
Tipo de chimenea Acero inoxidable Acero inoxidable Acero inoxidable Acero inoxidable
Cámara secundaria
Cámara de mezcla de combustión
Cámara de filtro de humo
Combustible de combustión Gas de petróleo Gas de petróleo Gas de petróleo Gas de petróleo
Tiempo de residencia 2,0 seg. 2,0 seg. 2,0 seg. 2,0 seg.
Monitoreo de temperatura

Small Medical Waste Incinerator

Basic Info.

Model NO.:small mobile veterinary incinerator 20 kg hour bur
Export Markets:Global

Product Description

Key Features:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *according to sequence * High fever, long lifetime of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton daily.  *according to order  * New Design for pet animal cremation business.  * One year guarantee on incinerator and components in stock.  Application Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet biological incinerator costs, biological waste, biological aste equipements in china, biological waste incinirator, biological waste portable incinerator usa, Hospital &Farm: Dead Animal, Bio-Waste.  3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES