Archive: December 5, 2022

Waste Incineration Treatment Incinerators Avg. 100kgs per hour

HICLOVER incinerator exert the advantages and discard the disadvantages of the same kind of equipment at domestic and abroad. It is an unique and international advanced medical waste incineration equipment. The equipment is small size, high efficiency, reasonable process, leading technologies and a high harmless degree, ideal garbage treatment equipment for hospital, laboratory, hotel, station, etc.

Items/Model

TS100(PLC)

Picture

 

Principle

Waste Incineration Treatment

Burn Rate

Average 100 kg/hour

Feed Capacity

Average 200kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V

Power

0.7Kw

Oil Consumption (kg/hour)

average 20.4

Gas Consumption (m3/hour)

average 24.5

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

200L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm



 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

Brûleur de déchets médicaux pour le coronavirus COVID-19


Incinérateur de déchets médicaux HICLOVER en stock (production finie et semi-finie et nouvelle)
Modèle Capacité / taux de combustion Pour l’hôpital SickBed No. Type de carburant Qté. Prêt pour l’expédition Nouvelle production
TS30 moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 1 jeu 5 jours 20sets / 2 semaines
TS50 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 1 jeu 7 jours 20sets / 2 semaines
TS100 en moyenne 100kgs par heure 500 lits de maladie en moyenne Diesel 1 jeu 7 jours 15 ensembles / 2 semaines
TS150 150kg en moyenne par heure 750 lits de maladie en moyenne Diesel 5 ensembles 7 jours 15 ensembles / 2 semaines
YD10 moyenne 10kgs par heure Moyenne de 50 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD20C moyenne 20kgs par heure Moyenne de 100 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD50C 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD30 moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 1 jeu 5 jours 20sets / 2 semaines
YD30 petit moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 2 ensembles 5 jours 20sets / 2 semaines
YD50 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 5 jours 20sets / 2 semaines
YD100 en moyenne 100kgs par heure 500 lits de maladie en moyenne Diesel 1 jeu 10 jours 15 ensembles / 2 semaines
YD150 150kg en moyenne par heure 750 lits de maladie en moyenne Diesel 1 jeu 10 jours 15 ensembles / 2 semaines
YD300 300kg en moyenne par heure 1500 lits de maladie en moyenne Diesel 10 ensembles / 2 semaines
YD500 500kg en moyenne par heure Moyenne de 2500 lits de maladie Diesel 5 ensembles / 2 semaines
CA 50 Mobile conteneurisé 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 15 jours 10 ensembles / 2 semaines
HICLOVER – Environnement médical  

Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.

2020-04-02

BURNER SCREENING AND ALSO COMMISSIONING


A flue smokeshaft, 15,000 mm extensive and also 560mm size will be constructed from steel sheet, complete with lagging, damper and likewise water defense cone. The smokeshaft will certainly be lined with castable grade diatomaceous concrete combined with high alumina concrete according to BS 4076: 1989.

The damper will definitely manage the closing of the door to not less than 85%. The heap is to allow fresh air at the supply’s base to make sure that the flue gases are launched at stagnate afterwards 4000 C which the discharge satisfies the British Clean Air Act, the National Setting Management Agency (NEMA) Act or various other significant acts.

1.1.4 POWER SUPPLY

The sub-contractor will certainly supply tools which appropriate for operating a 415V, 3 stage, 50HZ or 240V, solitary phase, 50HZ electric power supply.

1.1.5 OIL STORAGE AND ALSO LIKEWISE SUPPLY

The system will include a mass oil storage tank, daily storage tank, move hand gas pump as well as additionally linked pipe task. Oil from the mass tank will be supplied to a high level daily storage tank located in the heater area by use of a transfer hand pump as well as automated electric pump.

1.1.6 SAVES AND ALSO LIKEWISE GUIDEBOOKS

The tenderer is to submit with his tender a listing of suggested initial supply of spares together with their prices. A part from the heater spares explained right here below, the spares rates are not to be included generally wrap-up of prices routine yet is to be separate and are shown to be ordered later on if as well as also when it ends up being needed as well as practical to the customer. The heating system conserves whose prices are to be contained generally summary of expenses schedule (BQ) are:-

i) 1No. Develop of safety and security controls
ii) 1No. Solenoid valve
iii) 1No. Oil ignition system
iv) 2No. Photo-electric cells

2 collections of operating as well as upkeep handbooks (both for the incinerator in addition to heaters) need to furthermore be provided. This include 2 collections of control schematic depictions for all the controls and also circuitry.

1.1.7 MASS OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and additionally complying with BS 799 element 5: 1975 shall be put on 3 concrete cradles.

The works will consist of supply, distribution, putting together, erection, testing, commissioning and preparing to function. The container is to be of bound light steel kind with a format anxiety of 40KN/m2 as well as storage space temperature of 240 C. It is to be located beside the burner as well as central heating boiler home.

The container shall be round with dished end as well as be created of 6mm thick block modest steel plates according to BS 1966. Top premium galvanized materials will not be used.Welded building components shall be sprayed.

E-4

The tank will certainly be pressure examined with a general head of water or matching, evaluated from the base of the container, as well as also equal to 1 1/2 times the amount of:

(i) The elevation of the container and likewise

The stress will be elevated slowly as well as steadily up until the defined examination stress is gotten to which pressure will be maintained for a period adequate time to allow a thorough exam to be made to make certain that the tank is audio enough as well as discloses no leakages or excessive distortion.

The storage container will after that be cleaned on the surface area and also provided with rust preventing guide prior to utilizing 2No.

The storage tank will be supplied with the following:-

(i) 450mm bolted exam covers with liquid and vapour limited joint made with a gasket of gas immune materials.
( ii) 75mm (3″″) vent socket screwed B-SP as well as pipeline at the higher end of the storage tank with an unloading device to avoid the rise in storage space tank stress over the style stress and anxiety. The air vent pipe shall be empty of bends as well as will have a continual rise while being as quick as problem-free.
( iii) 65mm size filling up pipe with tube combining link
( iv) 50mm dimension evaluating connection with lockable cap.
( v) 50mm size supply pipe
( vi) 25mm size water drain-off worth

The tenderer will certainly give hydrostatic oil materials gauge (level indication) or a.
correctly adjusted stick (of dip tape) and get to ladder to the top of the storage tank.

The packing pipe shall be expanded inside the container to within 150mm of storage tank base,.
complete with anti-siphoning device.

The following details shall be entirely and additionally simply marked on the container on the.
centre line near the electrical outlet link.

– – Gross capacity in litres.
– – Test anxiety.
– – Day of examination. – Optimum allowed working stress.
– – Manufacturer’s name of occupation mark.
– – Year of manufacture.
– – The selection of British need as well as likewise type of storage tank

The container will be mounted with a 25mm loss in the direction of the water drain-off touching factor. The supply outlet will be increased inside the container to stay clear of accessibility of water in the supply line. The major service provider will certainly develop container assistances and also bund wall surface areas to information illustrations generated by the sub-contractor. A valued drain off from one of the most cost effective component of the container will be provided complete with tail pipe and likewise a specification for tube pipeline link.

E-5

1.1.8 TRANSFER HAND PUMP

A semi rotating hand pump will be offered filling the day storage tank from the oil drum. It will be set up complete with all the needed pipelines installations and devices.

1.1.9 DAILY SERVICE CONTAINER

A day-to-day storage tank of tiny capability 1,800 Litres will be positioned at 2.5 metre high level in the heater room. Storage tank will be made from 6mm thick pushed steel plates of 1220mm x 1220mm black light steel sheet, complete with bolted cover and likewise adequate venting. The storage tank will certainly satisfy BS 799 part 5 1995 in addition to be offered with a materials watch tube. The container will be lagged with 50mm thick fibre glass insulation of 0.4 W/m2 thermal conductivity as well as also finished with 20SWG galvanized sheets cladding.

The container will certainly be analyzed for any kind of sort of leaks of which if any type of type of is determined will certainly be made great prior to the tank is painted on the surface with corrosion preventing paint. Storage tank to be securely bolted.

1.1.10 AUXILLIARY TOOLS

All pipework made use of in the oil storage space systems will be to B.S. 1387 heavy grade. Joints shall be screwed, and likewise adequate unions should be offered to allow basic removing the equipment.

A 25mm size fire shutoff of the quick activity bar ran dead weight type will be installed, in the oil blood circulation line. This will certainly be kept in the job opportunity by a light scale steel wire linked to a fusible web link. The fusible link will be positioned directly over the heater. The relaxing heater oil feed pipeline from the high degree day container will be warmed by an electrical mapping tape effectively twisted around the pipeline. The pipe shall then be shielded with 25mm thick fiber glass insulation as well as completed with scale 22swg galvanized steel sheet.

The supply pipeline from the mass oil tank to the high degree day has actually been set up by others nonetheless the tenderer shall allow web link to the high level day container. The tenderer will additionally supply and additionally set up high ability filters along the supply pipe as well as the heater feed pipeline.

1.1.11 PIPE SUPPORTS

The array and kind of assistances will be kept to a minimum as well as also their style will be such as to advertise review along with safe managing to match concrete stonework or wood. When developing aids to the upkeep of preferred pipeline loss as well as the restraining of pipeline movements to a longitudinal axial directions only, pendtag

Consideration will be used.

The sub-contractor shall provide as well as set up all steel work creating part of pipeline assistance settings up as well as also will certainly be in charge of making good any kind of kind of problems to service providers function connected with contractors function installment.

Pipe runs will certainly be secured by clips connected to pipeline hangers, wall surface dental braces or trapeze type maintains. ‘‘ U’ screws will certainly not be made use of for clips without previous authorization of the Designer.

The sub-contractor will send his whole proposal for the pipeline supports to the Engineer for authorization before any type of erection job begins.

1.1.12 ELECTRICAL WORKS

All circuitry in between things, plant in addition to controls will be applied by the tenderer. The tenderer shall give enough guidance to make certain that electric links are properly made to all products of tools as well as controls provided by him, all to the Work Manager’s/ Designer’s satisfaction.

E-6

1.1.13 BURNER SCREENING In Addition To COMMISSIONING

The tenderer will certainly check and likewise appoint the burner in the existence of the Engineer.The tenderer will certainly additionally offer adequate oil to last a minimum of 2 (2) hours. The tenderer shall commission the burner as well as test in the existence of the Designer and additionally validate that the burner is working according to the specifications laid here-in as well as in the brochures along with guidebooks from the suppliers of he incinerator.The burner efficiency examination will be performed in conformity to BS3316: component 4:1987. Need to any type of issue be identified, it will certainly be corrected and the testing procedure duplicated to the Job Supervisor’s satisfaction.

1.1.14 FIRE INSTRUCTIONS ALERT

Continue and also acquire as well as likewise place as listed below;

Print fire instructions on the Perspex plate, 3mm close White Colour.
Background determining 510mm lengthx380mm dimension as follow;

1.1.5 OIL STORAGE As Well As ALSO SUPPLY


Incinerador de combustible diesel

Información básica.

Modelo NO.: Diseño de incinerador médico
Mercados de exportación: Global

Descripción del producto

Respuesta tecnológica (preguntas frecuentes)

P: ¿Qué tipo de residuos se pueden utilizar en este equipo?
R: Este equipo para desechos médicos, animales de compañía, desechos municipales, desechos vivos. Prohibir cualquier material explosivo y radiactivo, desechos líquidos y desechos gaseosos.

Q: Estándar de humo del incinerador
A: Estándar del gobierno de China: No. GB18484-2001.

Q: capacidad de tratamiento
A: Capacidad media calculada por residuo médico (menor poder calorífico (LC P): 3.0TH Kcal / Kg por hora), no significa ningún material de desecho. La tasa de combustión animal / mascota es de alrededor de 2/3 de la capacidad promedio.

Tiempo de uso del incinerador de trébol por día hasta 24 horas. Entre cada tiempo de alimentación / combustión, hay alrededor de 0,5 a 1 horas de tiempo de enfriamiento y tiempo para alimentar los desechos. El tiempo real de combustión por día es de alrededor de 16 horas. La vida útil del incinerador es de 5 a 10 años según el uso.

Generalmente, proponemos laboratorios pequeños, capacidad de uso de clínicas pequeñas por debajo de 20 kg por hora. Cuando se usa el incinerador en el hospital, calcule la capacidad de producción de desechos en alrededor de 2 kg por persona por día. Si hay 200 lechos de enfermo en el hospital, eso significa que necesita una capacidad de incinerador de alrededor de 400 kg por día, el cambio a la capacidad por hora es de alrededor de 30-40 kg por hora. Según el tiempo de operación por día, material de desecho, presupuesto, desarrollo, etc., puede utilizar una capacidad de incinerador de 30 a 50 kg por hora.
* Cómo calcular la tasa de quemaduras por cremación de animales: 2/3 de los desechos médicos.

Q: Montaje y prueba
R: Suministramos todos los documentos e incineradores de fácil instalación y funcionamiento. El cliente puede enviar personas a nuestra fábrica para aprender a instalar y operar. Incenerator de desechos médicos de gasoil, incinerador de doble cámara, incinerador ecológico, encenerator, incinerador agrícola, generalmente, no enviamos al ingeniero al sitio local si no lo solicita. El costo de envío es adicional según pedido.

Q: temperatura de combustión
R: La primera cámara de combustión: 800-1000 grados centígrados.
La segunda cámara de combustión: 1000-1200 grados centígrados.

Q: Modo de control del incinerador
R: El modo de control predeterminado es un caso de control común. Modo PLC según modelo y pedido.

P: Costos de operación y mantenimiento
A: Costo de operación según tasa de consumo de combustible y energía / personal, etc.

Anual alrededor de $ 500- $ 1000 USD por año de mantenimiento según modelo, situación de uso.

Una persona puede dar servicio a 02 incineradores unitarios. El personal debe tener conocimientos básicos de electricista para operar / inspeccionar / mantener el incinerador / quemador / soplador de acuerdo con la guía del usuario de operación, y conocer el riesgo de desechos médicos para proteger al trabajador con el elemento de protección necesario.

P: El tiempo de residencia en la cámara de combustión secundaria.
A: 02 seg.

Artículos / Modelo TS10 (PLC) TS20 (PLC) TS30 (PLC) TS50 (PLC) TS100 (PLC)
Velocidad de combustión 10 kg / hora 20 kg / hora 30 kg / hora 50 kg / hora 100 kg / hora
Capacidad de alimentación 20 kg 40 kg 60kg 100 kg 200 kilogramos
Modo de control SOCIEDAD ANÓNIMA SOCIEDAD ANÓNIMA SOCIEDAD ANÓNIMA SOCIEDAD ANÓNIMA SOCIEDAD ANÓNIMA
Cámara de combustión 100L 210L 330L 560L 1200L
Dimensiones internas Los 50x50x40cm Los 65x65x50cm Los 75x75x60cm El 100x80x70cm El 120x100x100cm
Cámara secundaria 50L 110L 180L 280L 600L
Cámara de filtro de humo
Modo de alimentación Manual Manual Manual Manual Manual
Voltaje 220 V 220 V 220 V 220 V 220 V
Energía 0,5 Kw 0,5 Kw 0,5 Kw 0,7 kilovatios 0,7 kilovatios
Consumo de aceite (kg / hora) 5,4-12,6 7,8–16,3 10.2-20 12.1-24 14-28
Consumo de gas (m3 / hora) 6.2-11.4 8-15,7 9,8-20 9,9-26,1 10–32,2
Monitor de temperatura
Protección de temperatura
Tanque de aceite 100L 100L 100L 100L 200L
Puerta de alimentación Los 30x30cm Los 45x40cm Los 55x50cm Los 70x55cm Los 80x60cm
Chimenea 3 metros 3 metros 5 metros 5 metros 10 metros
Tipo de chimenea Acero inoxidable Acero inoxidable Acero inoxidable Acero inoxidable Acero inoxidable
Tiempo de residencia 2,0 seg. 2,0 seg. 2,0 seg. 2,0 seg. 2,0 seg.
Peso bruto 1500 kg 2200 kg 3000 kg 4500kg 6000 kg
Dimensiones externas El 140x90x120cm El 160x110x130cm El 175x120x140cm Los 230x130x155cm Los 260x150x180cm

Specifications for Double Chamber Incinerator

INCINERATOR DESCRIPTION
The Model is for up to 300kgs capacity per batch load and will burn at around 55kgs per hour.
The unit has top loading design and has a heavy duty refractory cement lining for maximum heat retention. Unit have large top lid for easy loading, and specially designed front ash door, for ash removal.
This unit operates at over 1100°C in the primary chamber to ensure complete combustion. This model also benefits
from a heavy duty secondary chamber and burner which ensures a complete re-burn of any smoke and emissions and a 0.5 second gas retention time.
Burn rate    150kg/h minimum
Secondary Chamber    Yes
Gas Retention Time    2 seconds
Fuel    Diesel/LPG/LNG
Power Supply for Control Box    220V-240V 50Hz single phase
Minimum Operating Temperature    920˚C

PRIMARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
Large full size top load door and liquid retention sill
1 x diesel oil fired ignition burners operated on/off
SECONDARY CHAMBER
Heavy-duty steel casing
High quality refractory lining and insulation
1 x diesel oil fired ignition burners operated on/off
Specifications for Double Chamber Incinerator:
Primary Combustion
The primary combustion chamber shall be accepted as the primary combustion zone.
The minimum combustion temperature of the primary chamber shall not be less than 800 degrees c
Secondary Combustion
The residence time in the secondary chamber shall not be less than 2 seconds
The gas temperature as measured against the inside wall in the secondary chamber ,not in the flame zone shall not be less than as indicated in Lot 1-7
Both the primary and secondary temperatures shall be maintained until all the waste has been completely combusted
Chimney
The chimney shall have a minimum height of 4 metres above ground level
The minimum exit velocity of the emissions shall not be less than 10metres/second
Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box can be detached and mounted on separate stand of atleast 1.5metres from the incinerator at approximately 1.6 metre height
CE compliant or equivalent for incinerators of this size and model
Drawings and photos for the offered lots
1 year spare parts,fuel tanks and 10metre hose to come standard with every incinerator
Specifications for Mobile Incinerator Units
Trailer mounted mobile incinerator units suitable for the following applications
Medical waste
Domestic waste
Industrial waste
Animal cadavers
CHIMNEY
Heavy-duty stainless steel casing
1.5m length
0.6m refractory lined stack
CONTROL PANEL
Control of 1 burner
Timer control 0- 12 hours
Integral fan timer control
Temperature Monitoring
Thermostatic Control
Automatic Control
Cycle time set up
ANCILLARIES
Operating and maintenance manuals
Spares list
CONTAINERISATION
incinerator fully installed inside of 10 ft ISO certified container
3,5 kwA electricity generator, 1000 litres fuel tank
Incinerator mounted on the silenblock cushion.

small capacity incinerators

7.     A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:

DRE = [(Win – Wout)/Win]*100
2.     If the minimum combustion temperatures aren’t maintained.
Arsenic                                       As
Barium                                        Ba
5.     All the emission to the air apart from steam or water vapour has to be odourless and free of mist, fume and droplets.

6.     The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.

Cadmium and compounds as     Cd
21 – OM

Where:    Es    = Calculated emission concentration in the standard percentage oxygen concentration
Wout = mass emission rate of POHC from the stack before the release to the air.

8.     The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

Note:
2.     Be fitted with secondary burner/s burning gas or low sulphur liquid gas or some other acceptable fuel.

3.     Ensure secondary air supply is controlled efficiently.
4.     The incinerator must not be overcharged.
6.     Ensure the gas temperature as measured against the inner wall at the secondary room & not in the flame zone, is less than 1100oC. Ensure the oxygen content of the emitted gases is less than 11%.
Manganese                                  Mn
A solid particulate meter/recorder
3.     The incinerator has to be preheated to working temperature before charging any waste.
Percent CO2 + CO

2.     The secondary chamber  gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.

4    Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
6    Chimney / Stack    1.     The chimney should have a minimum height of 10 meters above ground level and clear the maximum point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius ought to be taken into consideration.

2.     If possible the chimney needs to be visible to the operator from the feeding area.
3.     Whenever the previous charge hasn’t been fully combusted in the case of batch feeding. Until such time as the addition of more waste won’t cause the layout parameters of the incinerator to be surpassed.

3    Main Combustion Chamber    The main combustion chamber must:

1.     Be accepted as the main combustion zone.
The Combustion efficiency is computed as follows;

C.E=% CO2           x 100
Thallium                                     Tl

Chromium                                  Cr
Tin                                               Sn
Mercury                                      Hg
Hydrochloric                                HCL
Any other instrument or measurement that may be considered necessary

8    Location / Siting    1.     Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the Region and be compatible with premises in the area,

2.     Has to be placed in a suitably ventilated room. Combustion efficiency:

Combustion efficiency (CE) shall be at least 99.00%
Nickel                                           Ni
4.     Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.     Staff handling waste must be well trained on safe handling of hazardous wastes
2    Feeding And Charging    Controlled hygienic, mechanical or automatic feeding methods have to be used which won’t influence the air temperature in the primary and secondary chambers of the incinerator negatively.

No waste is to be fed into the incinerator:

1.     Until the minimum temperatures have been reached.
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

Oxygen correction is computed as:

Es =     21 — Os    x EM
Silver                                          Ag
OM    = measured oxygen concentration

10    Operation    1.     Materials destined for incineration should be of known origin and makeup and must be only incinerated in a furnace that’s registered for the specific type of waste.

2.     A record must be kept of the amount, type and origin of the waste to be incinerated.
3.     The addition of dilution air after combustion in order to reach the requirement of these guidelines is unacceptable. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is greater to make sure no down washing of exiting gases.

5.     Point for the measurement of emissions shall be provided.

7    Instrumentation    Instrument for determining the interior wall temperature rather than burner flame temperature has to be provided for both primary and secondary chambers.

2.     An audible and visible alarm must be set up to warn the operator when the secondary temperature drops to below the required temperature.

3.     In addition to the above the following instruments may also be required.
4.      Fire fighting equipment must be provided
5.     The incinerator must be in good working order at all times and must not be used if any part fails. Any malfunction ought to be recorded in a log book and reported to the relevant authority.

6.     The incinerator operator and all relevant personnel must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.     Have running water.
Where: Win = mass feed rate of the POHC from the waste stream fed to incinerator, and
Antimony                                    Sb
4.     Ensure minimum exit temperature is not less than 850oC

4    Secondary Combustion Chamber (Afterburner).     The secondary combustion chamber must:

1.    
Fabric filters
A smoke density meter/recorder
Acid Gas Scrubbers
3.     Have light if 24hrs operation
Vanadium                                     V
Beryllium                                    Be

1    Basic Plant Design    An approved plant has to have four different sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant layout .The regulated segments may include but not limited to:

Overall plant layout.
4.     Make sure fire contact with gases is achieved.
Electrostatic precipitators
Cobalt                                         Co
5.     Ensure residence time isn’t less than two (2) seconds.
Os    = Standard oxygen concentration
Primary Combustion Chamber.
5.      There should be no smoking or eating on the site.

3.      Caution and Warning signs must be provided.
Hydrofluoric acid                         HF
Lead                                            Pb
A carbon monoxide and/or oxygen meter/recorder
EM    = Measured emission concentration
2.     Have a good floor.
8.     Ensure both main and the combustion temperatures are maintained until all waste was fully combusted

5    Particulate Removers    A mechanical particulate collector has to be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

Cyclone separator
2.     Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.

3.     Ensure main air supply is controlled efficiently

6.    The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.    Have running water.
2.    Have a solid floor.
3.     Have lighting if 24hrs operation
4.    Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.    Staff handling waste must be well trained on safe handling of hazardous wastes
2.     Staff must be provided with appropriate  protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.

3.     Caution and Warning signs must be provided.
4.     Fire fighting equipment must be provided
5.     There should be no smoking or eating on the site.

Инсинератор YD-500 для Вьетнама »

Мы завершаем этот проект в 2010-2011 годах и доставим в порт Хошимин, Вьетнам, полный контейнер размером 1 × 40 футов с открытым верхом.

Камера сгорания большого размера – до 4,0 м3, внутренние размеры – 257 x 147 x 108 см с отверстием для загрузочной дверцы 108 x 128 см. Эта модель может быть небольшой мусоросжигательной фабрикой с небольшими бюджетными средствами. Если конечный покупатель использует его на ферме для сжигания животных, таких как корова, лошадь или верблюд, нет проблем!

Модель Ярд-500
Скорость горения 500 кг / час
Емкость подачи 800 кг
Первичная камера сгорания 4000 литров
Вторичная камера сгорания 1500 литров
Камера сгорания смеси да
Камера дымового фильтра да
Режим подачи Руководство по эксплуатации
Напряжение 220В / 380В
Мощность 2.24кВт
Тип топлива Дизельное топливо / природный газ / сжиженный нефтяной газ
Горелка Италия Оригинал
Расход масла (дизельное топливо) 31–59,1 кг / час
Потребление газа (природный газ) 19,2–64,2 м3 / час
Внутренние размеры 257 x 147 x 108 см (основная камера)
Внешние размеры 320 x 220 x 460 см (без дымохода)
Монитор температуры да
Емкость масляного бака (для жидкого топлива) 500 литров
Открытие двери 108 х 128 см
Длина дымохода 14.0 метров
Тип дымохода Нержавеющая сталь
Вес брутто оборудования 13000 кг
Технические характеристики эксплуатации
Температура в основной камере 800 ℃ –1000 ℃
Температура вторичной камеры 1000 ℃ -1200 ℃
Время проживания 2.0 сек.
Эффективность горения > 98%
Отходы с более низкой теплотворной способностью 3000 ккал

Medium Scale Solid Waste Incinerator

Double Combustion Chamber,Double Italy Burner,Smoke Filter Included,Burning Rate: 50-200kgs per hour optional,Primary Combustion Chamber: 1.57M3(1570Liters),Incinerator Mainbody steel: 8mm thickness,Paint for outside face: 800°C Rate,Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate,Idea for campsite average or below 600 people,Chimney: 10 Meters, Stainless steel…

Items/Model

TS150(PLC)

Principle

Waste Incineration Treatment

Burn Rate

Average 150 kg/hour

*(50/100/200kgs/hour optional)

Feed Capacity

Average 750kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Main Body Steel

8mm thickness

Chamber Material

High Alumina Fire Brick Wall, 1750℃ Rate

Paint for outside face

800°C Rate

Combustion Chamber

1570L

Internal Dimensions

150x100x105cm

Secondary Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

210/230V 50/60Hz

Power

0.9Kw

Oil Consumption (kg/hour)

Average 20.4-28.0(D.O)

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

300L

Feed Door

80x60cm

Chimney

10Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

8500kg

External Dimensions

300x160x280cm(without chimney)


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

Incinérateur de déchets médicaux en approvisionnement pour la maladie à coronavirus COVID-19

Incinérateur de déchets médicaux HICLOVER en stock (production finie et semi-finie et nouvelle)
Modèle Capacité / taux de combustion Pour l’hôpital SickBed No. Type de carburant Qté. Prêt pour l’expédition Nouvelle production
TS30 moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 1 jeu 5 jours 20sets / 2 semaines
TS50 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 1 jeu 7 jours 20sets / 2 semaines
TS100 en moyenne 100kgs par heure 500 lits de maladie en moyenne Diesel 1 jeu 7 jours 15 ensembles / 2 semaines
TS150 150kg en moyenne par heure 750 lits de maladie en moyenne Diesel 5 ensembles 7 jours 15 ensembles / 2 semaines
YD10 moyenne 10kgs par heure Moyenne de 50 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD20C moyenne 20kgs par heure Moyenne de 100 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD50C 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 7 jours 20sets / 2 semaines
YD30 moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 1 jeu 5 jours 20sets / 2 semaines
YD30 petit moyenne 30kgs par heure Moyenne 150 lits de maladie Diesel 2 ensembles 5 jours 20sets / 2 semaines
YD50 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 5 jours 20sets / 2 semaines
YD100 en moyenne 100kgs par heure 500 lits de maladie en moyenne Diesel 1 jeu 10 jours 15 ensembles / 2 semaines
YD150 150kg en moyenne par heure 750 lits de maladie en moyenne Diesel 1 jeu 10 jours 15 ensembles / 2 semaines
YD300 300kg en moyenne par heure 1500 lits de maladie en moyenne Diesel 10 ensembles / 2 semaines
YD500 500kg en moyenne par heure Moyenne de 2500 lits de maladie Diesel 5 ensembles / 2 semaines
CA 50 Mobile conteneurisé 50kg en moyenne par heure Moyenne de 250 lits de maladie Diesel 2 ensembles 15 jours 10 ensembles / 2 semaines
HICLOVER – Environnement médical  

Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.

29/03/2020