Archive: July 2, 2021

Google快讯 – incinerator

Google
incinerator

实时更新 2021年7月2日
新闻

But incinerators like the one in Chester, and those in Baltimore, are coming … Ocean City's contract with the Chester incinerator, operated by waste …

Facebook Twitter 标记为不相关

Incineration that burns garbage for heat and electricity; Hot water liquefaction that converts moist organic matter into bioclude. Incinerator is no longer …

Facebook Twitter 标记为不相关

Obtenga un PDF de muestra gratuito del informe: https://marketresearch.biz/report/incinerator-equipment-market/request-sample. El informe de …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

7. Type of waste  : Bio-medical / Hazardous / Municipal / Trash  = ALL and Mixed
8. Any other : Rubber, rubber tyres, Batteries, green waste, paper and cardboard
9. Quantity of waste generated per day in kg : 3 -5 tonnes per day
10. Duration C incinerator will be used per day : 1 C 8 hours / 1 C 16 hours / Continuous 
11. Approximate moisture content: Variable
12. Local incinerator operating and emission standards : India / EURO / US-EPA  Australia
13. What is the height of the chimney required? : No chimney is required. Flue length should be approximately 2 to 3 metres to join to a downstream process
14. Fuel proposed to be used :  LDO / HSD / FO / SKO/ Gas / Other  – No fuel required – Intended to free burn waste products
15. Availability of power and type : Electricity if required
16. Details of space available :  Not restricted
17. Do you require an automatic loading system? : [X ] Yes         [ ] No 
18. Do you require a gas scrubbing system? : [ ] Yes         [X ] No 
19. How soon do you require the system to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in approximately Two months
20. City and country of use :  Australia
21. Whether the location is a coastal area : [ ]Yes         [X ] No 
22. Any other specific requirements: Primary combustion chamber only is required. Solid and inflammable waste products need to be capable of being recovered from the incinerator easily using an automated procedure. This is because the incinerator will be required to operate 24/7. Rotary kiln or moving floor may be considered if deemed practical by the supplier. One initial incinerator is required for a proof of concept project and future orders for the successful supplier, following successful implementation of this project, are likely to be significant.
23. It would be most useful if the supplier could send a video of the incinerator in operation or diagrams and pictures to show how it works.

US EPA Notice of New Litigation

Notice of New Litigation message header and EPA seal
US EPA Notice of New Litigation

RE: Notice of Lawsuit Filed Against EPA – Midwest Ozone Group v. EPA, No. 21-1146 (D.C. Cir.)

The U.S. Environmental Protection Agency has recently received a petition for review in the above-captioned case that may be of interest to you. This information is provided for your information only, and this notice does not require you to take any action.

A copy of this can be found here: https://www.epa.gov/sites/production/files/2021-06/documents/mog_21-1146_pfr_0625202_0.pdf

# # #

To view other complaints and filings, please visit: https://www.epa.gov/ogc

You are receiving this notice because this email address is subscribed to this topic. Manage your subscription at https://www.epa.gov/ogc/email-subscriptions-new-litigation-notifications.

Disclaimer: Posting does not mean that the notice was properly filed and/or served upon EPA or the United States, and EPA does not waive any defenses related to improper filing or service as it relates to the notices posted.
 

 

If you would rather not receive future communications from US EPA, let us know by clicking here.
US EPA, Office of General Counsel 1200 Pennsylvania Ave NW, Washington, DC 20460 United States

Google快讯 – enviromental

Google
enviromental

实时更新 2021年7月2日
新闻

Terakhir dari sisi Enviromental sustainability, Sandi mengharapkan para pegiat ekonomi kreatif bisa menggunakan inovasi yang lebih ramah …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Leading Waste Incinerator

Basic Info.

Model NO.:construction of fire brick incinerator
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What’s kind of waste can utilize within this equipment?  A: This gear for medical waste, pet animal, Municipal waste, live waste. Prohibit any volatile and radiation material, liquid waste and gas waste.  GB18484-2001. 

Q: Treatment capacity  A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material.

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are approximately 0.5-1 hours cooling time and time for feeding waste. Actual combustion time daily is about 16 hours. The life of incinerator between 5-10 year according to use. 

Generally, we proposal small lab, little clinic use capability under 20 kgs per hour. When incinerator use in hospital, please compute the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is approximately 30-40 kgs per hour. According the operation time daily, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *How to compute Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing  A: We provide all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn operation and installation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order.  The second combustion chamber: 1000-1200 centi level. 

Q: Incinerator Control Mode  A: Default Control mode is common control case. PLC mode according to order and model. 

One person can service 02 device incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber  A: 02 sec.

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

HICLOVER is incinerator manufacturers, growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chamber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

установка для утилизации горячих медицинских отходов, Условия эксплуатации: 8-16 часов / день

установка для утилизации горячих медицинских отходов, Условия эксплуатации: 8-16 часов / день
Управление: встроенная запись данных
Рабочая температура: инсинератор
/ Первичная камера сгорания
Первичная камера: 900 – 1200 0C

Тип: непрерывная загрузка, верхняя загрузка
Производительность / скорость сжигания в час: 250-300 кг / час
Материал:
Внешний – 3 слоя
Внутренняя футеровка: огнестойкий материал из предварительно обожженных огнеупорных кирпичей с алюминиевой футеровкой, устойчивый к коррозионным отходам или газам, а также к термическому удару.
Вторичный
Горение
Камера:
Тип: горизонтальный / вертикальный
Температура: 1200-1300 oC
Время пребывания газов:> 2 секунд
Остаток золы: <5% от исходного размера отходов
Система удаления золы: как автоматическое, так и ручное удаление золы. Должен обеспечивать удаление / обработку опасных остатков золы.
Система очистки дымовых газов: способна обрабатывать поток дымовых газов, когда мусоросжигательная печь работает с максимальной производительностью.
Вспомогательное устройство: датчик уровня воды, датчик давления, датчик PH … и т. Д.
Вспомогательное устройство: Устройство отключения подачи топлива
Механизм подачи отходов: Автоматическая пневматическая / гидравлическая система загрузки отходов или конвейерная лента, емкость 650-800 л за раз.
Дымоход (Стек):
Тип: Вертикальный тип
высота:> 7 метров ‘
Материал: огнестойкое литье, нержавеющая сталь
ВЫХОД:
БЕЗ ДЫМА, БЕЗ ЗАПАХА
Зола -Макс <5% от первоначального размера отходов
Снижение выбросов загрязняющих газов SO2, HCL, HF и твердых частиц в трубопроводе
Стандарт выбросов:
ВОЗ / Европейский
Отчет об испытаниях на выбросы предоставлен?
Режим теплообмена: автоматический

Аксессуары:
Все стандартные аксессуары для инсинератора, включая, помимо прочего, систему загрузки, теплообменники, систему контроля загрязнения, систему удаления золы, включая лестницу и нефтяной танкер (емкость 2500 литров).
Рабочая среда:
Инсинератор может работать на высоте 2400 м над уровнем моря. (согласно условиям сайта)
Требования к питанию:
220 В переменного тока однофазный или 380 В переменного тока трехфазная 4-проводная система, 50 Гц
Монтажные испытания и ввод в эксплуатацию: должны проводиться сертифицированным или квалифицированным персоналом.
Поставщик должен предоставить следующую документацию
Руководство пользователя (по эксплуатации) на английском языке.
Руководство по обслуживанию (техническому / техническому обслуживанию) на английском языке.
Свидетельство о поверке и поверке с завода.
Быстро движущиеся запасные части: Поставщик может предоставить быстродвижущиеся запасные части в количествах, указанных в прейскуранте или их эквиваленте.
Обучение: Поставщик может провести обучение по эксплуатации, управлению и техническому обслуживанию мусоросжигательных заводов.
Гарантия
Полная гарантия минимум 2 года.
Сервисное обслуживание в течение гарантийного срока
В течение гарантийного периода поставщик должен обеспечить ремонтное / аварийное обслуживание, когда это необходимо.
У поставщика есть местный агент или филиал в Эфиопии (укажите имя и контактные данные агента)
Поставщик предоставляет рабочую силу, подъемное оборудование и инструменты, необходимые для установки, тестирования и ввода в эксплуатацию мусоросжигательного завода. Поставщик несет ответственность за безопасность своего персонала, рабочих и рабочих во время установки, тестирования и ввода в эксплуатацию.
Способен предоставить всю необходимую информацию, которая будет использоваться в качестве исходных данных для подготовки пола (платформы) и помещения для установки мусоросжигательного завода, например, следующего:
План (чертежи) и фотографии устанавливаемых инсинераторов
 Длина, ширина и высота инсинератора,
 Площадь (длина x ширина) пола (платформы) и длина, ширина и высота кровли для каждого типа устанавливаемых инсинераторов
Потребности во время транспортировки, установки, сборки, ввода в эксплуатацию и эксплуатации оборудования с точки зрения точек доступа, доступного пространства для работы (внутри и снаружи помещения), способов добраться до места, где будет размещено оборудование, или любых других . ;
Технические характеристики (расход топлива, масса, система крепления, точки опоры и др.);
 Технические характеристики дымохода, которые будут использоваться при проектировании крыши (размер, потребности в опорах, изоляция);
 Соображения, связанные с эксплуатацией и техническим обслуживанием, например, наличие минимальной доступной площади для выполнения текущих задач технического обслуживания и замены ключевых частей, которые необходимо менять чаще;
Любые соображения / потребности в установке для сжигания отходов во время работы, которые могут повлиять на дизайн помещения / укрытия, в котором она будет размещена.
Другая важная информация, которую следует учитывать, которая может повлиять или повлиять на процессы проектирования и строительства инфраструктуры для мусоросжигательных заводов, например размер площади для других вспомогательных частей, таких как хранилище топливных цистерн, если применимо, и т. Д.
Срок доставки (DAP, Аддис-Абеба) в неделях
Название производителя, включая веб-сайт производителя и / поставщика и страну происхождения.

Google快讯 – medical waste

Google
medical waste

实时更新 2021年7月2日
新闻

… administer the vaccines and handle other issues, such as medical waste disposal. LIPAD serves as the facility manager for the vaccination process.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2021年7月2日
新闻

The technology and knowledge to build an incinerator exists and has … There have been complaints that incinerators allow harmful toxins to enter the …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

US EPA Notice of New Litigation

Notice of New Litigation message header and EPA seal
US EPA Notice of New Litigation

RE: Notice of Lawsuit Filed Against EPA – Chevron U.S.A. Inc. v. EPA, No. 21-1140 (D.C. Cir.)

The U.S. Environmental Protection Agency has recently received a protective petition for review in the above-captioned case that may be of interest to you. This information is provided for your information only, and this notice does not require you to take any action.

A copy of this can be found here: https://www.epa.gov/sites/production/files/2021-06/documents/21-1140_docketentry_06-18-2021_.pdf

# # #

To view other complaints and filings, please visit: https://www.epa.gov/ogc

You are receiving this notice because this email address is subscribed to this topic. Manage your subscription at https://www.epa.gov/ogc/email-subscriptions-new-litigation-notifications.

Disclaimer: Posting does not mean that the notice was properly filed and/or served upon EPA or the United States, and EPA does not waive any defenses related to improper filing or service as it relates to the notices posted.
 

 

If you would rather not receive future communications from US EPA, let us know by clicking here.
US EPA, Office of General Counsel 1200 Pennsylvania Ave NW, Washington, DC 20460 United States