specification of Incinerator 20 kg/hr

Capacity UPTO 20 kg/hr
Size: 940 x860x2700 mm
Material: STAINLESS STEEL STACK, REFRACTORY CONCRETE LINING SPECIAL INSULATION MATERIAL
With burner: 15 – 20 KW
Temperature: PRIMARY CHAMBER = 800°C AND SECONDARY CHAMBER = 850 – 1200° C
Sufficient heat generation for secure and complete combustion 600-800 °C in the first chamber and >1000 °C in the second chamber
Easy transportation on standard EURO-pallets
Constructed in a modular fashion easy on-site movement and assembly with a minimum of equipment and technical skills;
For the destruction of problematic waste like sharps, amputates and body parts, wet or moist matter;
Off-gas quality: moderate smoke emissions during one quarter of the total incineration time; no visible emission during three quarters. AS PER INTERNATIONAL STANDARDS
The remaining ash approximately 5-10% in weight and below 1% in volume of the original waste AS PER INTERNATIONAL STANDARDS
Chimney height at least 5 m above the incinerator 5m ABOVE FROM THE GROUND
Temperature resistance of the lining at least 1,200 °C

Incinérateur

Carburant Diesel
Capacité (M3) 1.18
Ave Capacity 750 kg
Consommation (l/h) 6
Dimension externes
Longueur (mm) 3110
Largeur (mm) 1800
Hauteur (mm) 3300
Ouverture Porte 770×2000
Dimension internes
Longueur (mm) 2100
Largeur (mm) 700
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire secs
garantie minimum 12 mois

Incinérateurs

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (50 – 60kg/hr)

COMPLIANCE (YES, NO or COMMENT)
Item
Description
Medical Waste Incinerator, 50 to 60
Kg/hr
Item Quantity 5 No.
Support Health Sector Support Project
Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals
1.     General Description
Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.
 
2.   Composition
2.1     Main unit
2.2   Accessories
 
3.   Performance specifications  
3.1 Main unit    
3.1.1 Application For incineration, general and pathological
3.1.2 Capacity 50 – 60 kg/h burn rate
3.1.3
 
Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
   3.2       Primary Chamber
3.2.1
 
Construction Constructed from heavy duty mild or aluminized steel Or
equal and approved equivalent
3.2.2
 
Insulation material Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
 
Internal Construction Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
3.2.4
 
Charging Door Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5 Door Lock Automatic, Electric type
3.2.6
 
Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9
 
Primary Burner Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted
3.2.10
 
Blower Provided. For supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
3.3       Secondary chamber
3.3.1
 
Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2
 
Insulation Refractory material lining
3.3.3
 
Combustion Temperatures Above 850 0C, controlled electronically
3.3.4
 
Gas residue or retention Time > 2 second at minimum 850 0C  
3.3.5
 
Secondary Burner Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                   Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                   Flange mounted
3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7
 
Combustion Air Fan Provided for supplying combustion and creating a negative drift and turbulences
3.3.8 Temperature Maximum 1600 0C
   3.4       Chimney
3.4.1
 
Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent                                                                   Refractory material lining
3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.5 Discharge temperatures About 850 0C
3.4.6 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5         Electrical System
3.3.5
 
Control unit Fully automatic with microprocessor based control                                                                       unit (PLC) automating all operations of the                                                                       incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous emission monitoring
3.5.2
 
Isolator switch Supply and install isolator switch 240V, 100A for the                                                                     incinerator unit, including all necessary cables 10m
3.5.3
 
Distribution Board Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring     to be done according IEE regulations.
3.5.4
 
Wiring Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                         Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6     Fuel System Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
3.6.1
 
Fuel Tank Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type Diesel
3.6.2
 
Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                         and approved materials
4               Physical characteristics  
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 1.2 x 2.2m (WxD)
5   Operating environment    
5.1 Power Requirements 240V,A/C 50Hz, single phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6. Accessories  
Rack, 2 m long 1 piece
6.1 Waste cart, stainless steel 1 piece
7 Spare parts
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3
 
All other spare parts                     required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2
 
Manufacturing standards NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards CE marked or any other internationally recognized documents
9         Local back up service
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2
 
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals
For installation, testing, NEMA Certification and commissioning
11 Pre installation works
 
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13          Training  
13.1
 
User training On site user training on operation and daily up keep
13.2
 
Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
17.   Maintenance contract
17.2 Comprehensive preventive & repair           service Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (100 – 120kg/hr)

  COMPLIANCE (YES, NO or COMMENT)
Item
Description
Medical Waste Incinerator, 100 to 120 Kg/hr
 
Item Quantity 3 No.
Support East African Networking Project
Point of Installation (Hospitals) Wajir, Kitale, and Busia District Hospitals
  1.     General Description

Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 100 to 120 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.

 
  1.   Composition

2.1     Main unit
2.2   Accessories

 
  1.   Performance specifications
 
3.1 Main unit    
3.1.1
 
Application For incineration, general and pathological
3.1.2 Capacity 100 – 120 kg/h burn rate
3.1.3
 
Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
3.2     Primary Chamber
3.2.1
 
Construction Constructed from heavy duty mild or aluminized steel
Or equal and approved equivalent
3.2.2
 
Insulation material Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
 
Internal Construction Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
 
Charging Door Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5 Door Lock Automatic, Electric type
3.2.6
 
Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9 Primary Burner Fully automatic, with fuel, temperature and speed   controls with ignition system   flame detector                                                           Air fan Complete with safety features, flame failure                                                                     Diesel fired fuel injector type
Flange mounted
3.2.10 Blower Provided. 3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
     3.3     Secondary chamber
3.3.1
 
Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2 Insulation Refractory material lining
3.3.3 Combustion Temperatures Above 850 0C, controlled electronically
3.3.4 Gas residue or retention time > 2 second at minimum 850 0C
3.3.5 Secondary Burner Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7
 
Combustion Air Fan Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8 Temperature Maximum 1600 0C
3.4         Chimney
3.4.1
 
Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent
Refractory material lining
3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.4 Discharge temperatures About 850 0C
3.4.5 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5       Electrical System  
3.5.1 Control unit Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous emission monitoring
3.5.2 Isolator switch Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
 
Distribution Board Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring   to be done according IEE regulations.
3.5.4
 
Wiring Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6     Fuel System
3.6.1 Fuel Tank Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type Diesel
3.6.2
 
Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator. Working length , 20m
Fuel pipe material Special copper pipes or similar and approved materials
  1. Physical characteristics
 
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 2.5 x 2.8m (WxD)
  1.   Operating environment  
 
5.1 Power Requirements 415V, A/C 50Hz, Three phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6               Accessories  
6.1 Rack, 2 m long 1 piece
Waste cart, stainless steel 1 piece
  1. Spare parts
 
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3
 
All other spare parts                 required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2
 
Manufacturing standards Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                           waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards CE marked or any other internationally recognized documents
9           Local back up service  
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2
 
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals
For installation, testing, NEMA Certification and commissioning
11 Pre installation works
 
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13          Training  
13.1
 
User training On site user training on operation and daily up keep
13.2
 
Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
  1. Maintenance contract
17.2 Comprehensive preventive & repair           service Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning