mobile incinerator

  1. Petrol: diesel

 

  1. Consumption: 8-10liter/hour

 

  1. Capacity: to cremate (carrion and spoils) 350-400kg/hour

 

  1. Temperature: 900-1350?C

 

  1. Operation temperature: -30~40?C

 

  1. Incinerator weight: 1800-2000 kg

 

  1. Volume: 0.70-0.80m/cube

 

  1. Exterior dimension: 1.4-1.6*1.0-1.15m (L*W)

An incinerator represents a complete solution to the problem of disposal of all hospital waste types. The liquid fuel

is diesel. The incinerator should meet the environment standards. Expected Technical specifications

 

 

The incinerator shall be fully self contained. incinerators that are stainless

steel with destruction rate of 15kg per hr. bactch load of 10-15kg of

waste and average temperature of 8500 degress c.

incinerators

  1. The publications listed below form a part of this specification to the extent referenced. The publications are

referenced in the text by basic designation only.

A1) Technical Specification:

Incinerators

All types of diesel fired incinerators suitable for HCW may be offered as long as they can

safely treat medical waste. The equipment should be compliant with all requirements for

installation in Kenya. All components for installation must be included.

 Technical evaluation will consider the entire system including the treatment plant. It will be

the responsibility of the Bidder to supply a full system, including all necessary secondary

systems and/or additional equipment.

The calorific value of the generated waste from the healthcare facilities differs from 5,000 kJ/kg

(e.g. pathological waste) up to 40,000 kJ/kg (filled sharp boxes) with an expected average

heating value of waste of 14,000 kJ/kg.

An approved plant must have four distinct sections that demonstrate three principles of

Turbulence, Residence Time and Temperature inbuilt in the plant design .The regulated sections

may include but not limited to:

 Overall plant layout

 Feed chamber/ charging

 Primary Combustion Chamber

 Secondary Combustion Chamber

 Particulate Scrubbers

 Acid Gas Scrubbers

 The stack/ chimney

For the main incineration process, a static, two chamber system is required with one main

combustion chamber and one flue gas afterburning chamber. The incinerator must be able to

meet the following parameters:

  1. Treatment capacity of: a) 50 kg waste per hour.
  2. Temperature: Main combustion chamber up to 850°C, and in the second chamber > =

1,100 °C

  1. Retention Time: 2 seconds in the second chamber

The furnace (including secondary combustion chambers etc.) dimensions must be large enough

to provide for an effective combination of gas residence time and temperature such that

combustion reactions may approach completion and result in low and stable CO and VOC

emissions.

In order to avoid the generation toxic gases, the incinerator must combine the gasification or

pyrolysis stage with a subsequent combustion stage with flue-gas treatment that provides for

operational emission levels to air within the associated emission ranges specified in the standards

5

for incinerators which are described in the ENVIRONMENTAL MANAGEMENT AND COORDINATION

(WASTE MANAGEMENT) REGULATIONS 2006 of the Republic of Kenya.

Where grates are used, it is preferred that the design incorporates sufficient cooling of the

grate such that it permits the variation of the primary air supply for the main purpose of

combustion control, rather than for the cooling of the grate itself. Documents to be

provided by the Bidder in response to this RFP.

 Complete information on how the equipment matches the Technical Specification.

Include an additional statement with a calculation and description of all cost related to the

normal running of the plant over a 12 month period.

 Full description of the system(s) being proposed.

 Lay out drawing with all main equipments, flue gas ductwork and main piping.

 Piping and Instrumentation Diagram.

 Operation manual in the English language.

 Material lists.

 Implementation plan and training concept.

 Installation and maintenance plan.

 Detailed list related to wear and spare part package for 2500 h operation (items which

will be included in the contract). The list should be detailed enough to allow PATH to

carry out a cost estimation.

Other information such as process description, brochures, etc. should be only added if

the information will be useful for the technical evaluation of the treatment process.

 

A2) Technical Specification:

Medical Waste Autoclave

 

Manual autoclave with vertical loading; gravity displacement type with possibility for Vacuum.

Capacity: Up to 12 kg/h

Chamber size: >150 liters

Material: Stainless steel

Temperature: 134 °C

Further information:

 Minimum autoclave chamber size shall be 150 liters and shall have a usable volume

(loading basket) of 100 liters.

 Shall work according to gravity air displacement principle.

 The vacuum system shall be of a thermal shock type.

6

 The pressure vessels should be pressure tight, the rising of the pressure (at a start pressure

of below 80 mbar) shall be lower than 1 mbar/min.

 With in-build electrical heating elements for steam generation (heating elements > 4000

Kw).

 Chamber and door shall be made from high quality stainless steel (e.g. AISI 3161).

 Chamber in vertical position, it shall allow an easy loading/unloading of the loading

basket.

 2 Baskets of >100 l for the loading and unloading of waste shall be included. The baskets

shall be designed for the usage of non-heat resistant waste bags, a system for the

collection and controlled release of free liquids and condensate from the waste shall be

incorporated.

 The temperature measured at the reference measurement point of the treatment chamber

shall not be lower than 105°C (TDes 0+4). The treatment time shall be ≥30 minutes at

105°C, ≥20 minutes with a temperature used of ≥121°C (TDes 0+4) and ≥10 minutes

with a treatment temperature of ≥ 134.

 The steering of the treatment process should be semi-automatically as well as manual.

 The Treatment Equipment shall be equipped with at least the following instruments:

o treatment chamber temperature indicating instrument

o treatment chamber pressure indicating instrument

 For the treatment of the outgoing air, a HEPA filter in combination with a condensation

system should be used.

 The filter shall be built in a way that a disinfection of the filter shall be possible in a builtin

condition.

 The filters must be heat resistant, steam resistant, hydrophobic and pressure resistant for

the pressure difference.

 Cooling down phase after treatment should be existent; the temperature of the waste

should be not higher than 80°C after finishing the cooling down process.

 The pressure vessel should be equipped with a heat insulation, the maximum outer

surface temperature should be < 50°C.

 The manufacturer must provide a declaration that the pressure vessel is manufactured in

accordance with relevant guidelines for pressure equipment.

Following accompanying documents should be supplied with the treatment system and

shall be available at the Site:

  1. Operation instructions (including process description).
  2. Loading and maintenance procedures.
  3. Short-form of operation and loading procedures.
  4. P&I diagram, circuit plan, technical data sheet, pressure vessel certificate.

small animal incinerator

  1. Piping and stack connection locations and sizes.

 

  1. Technical data including temperature rating and arrangement of refractory and insulation.

 

  1. Weights of unit and loading diagram of foundation. Evidence that contractor has coordinated support

requirements with foundation design.

 

  1. Recommended anchorage to foundation. Seismic requirements apply. Submit calculations by professional engineer.

 

  1. Predicted external surface temperatures.
  2. Certified test report on performance of similar unit burning waste types which has composition similar to

Article, PROJECT CONDITIONS, this specification:

 

  1. Overall burn time and weight reduction.
  2. Waste quantity and composition per batch.
  3. Emissions in all categories specified in PART 2.
  4. Auxiliary fuel use.

 

  1. Catalog data on burners, sound attenuators, fuel trains, motors.

 

  1. Fuel requirements: Flow rate, pressure at inlet to fuel train.

 

  1. Full load power, efficiency, and power factor of all motors greater than one horsepower.

 

  1. Electrical service requirements for all motors and controls.

 

  1. Predicted sound level of all systems.

 

  1. Schematic diagrams of control systems. Catalog cuts on components of control and instrument systems.

Description of operation of control system.

 

  1. Arrangement and location of control panels.

 

  1. Stack System:

 

  1. Drawings showing system arrangement and dimensions.

 

  1. Weights of subassemblies.

 

  1. Design, construction, pressure and temperature limitations of entire system including expansion joints and

dampers.

hospital incinerator

* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.

20.    Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
21.    Controls and regulations:
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system : Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.    The installed incinerator must bear a one year guarantee.
24.    The supplier shall perforn an onsite installation of the incinerator.
25. The technical training of operators will have to be provided and given by a technician from
the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

NB.: Civil works and any other related services for the installation and training of operators must be included in the incinerator’s price.
Specification for the shelter of the incinerator: House of the incinerator inclusive in offer (the house must have facilities for hand washing and firefighting).
This material and equipment must include in the shed of the incinerator: foundation in rubble stone, isolation roofing against humudity; elevation with brick of 20 cm (bloc cement), continuing lintel (linteau) in reinforced concrete; steel frame (charpente en metal); roofing in sheet B.C.A. 28 BG (Toiture en t?le),metal gutter, sanitary installation (wash basin, soakway pit of 20 m of depth); ash pit of 30 m3,electrical installation; concrete slab for fixing the incinerator; chanel for evacuation of rain water or waste water, wire mesh for aeration up the lintel; smooth rougtcasting of walls (interior and outside);plinth with cement; 2 metal doors ;email paintings inside and latex paintings outside the house on walls and on doors; roofing limit (planche de rive); measures for this specification will depend on the size of the incinerator which will determine the size of the shed of the incinerator., etc

Incinerator Video clip


Key Features:
— Full range incinerator with Economized Small Scale incinerator, 
Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, 
Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.
— Single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators.
— System solutions for medical waste environmental.
— High burn rate, from 5kgs to 1000kgs per hour.
— New Design for pet animal cremation business.
— HICLOVER, trusted partner with years of experience.


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


50-100-150-200 Kgs per Human Resources Strong Waste Heater Version TS150 PLC 1570Liters Chamber


Waste Heater Design TS150 PLC, Review

This design is small-scale waste incineration tools for tiny waste end result.

Construction is dual/double combustion chamber with 02 sets oil burner, batch load 
incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC). 
Primary & Secondary combustion chambers and smoke filter chamber. 
Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation.


Primary Combustion Chamber: 

※Main Feature:

— Double Combustion Chamber
— Double Italy Burner
— Smoke Filter included
–Burning Rate: 50-200kgs per hour optional
–Primary Combustion Chamber: 1.57M3(1570Liters)
— Incinerator Mainbody steel: 8mm thickness 
— Paint for outside face: 800°C Rate
Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate
— Idea for campsite average or below 600 people
— Chimney: 10 Meters, Stainless steel


Feeding door primary chamber:

Items/Model

TS150( PLC)

Picture

Idea

Waste Incineration Therapy

Shed Price

Typical 150 kg/hour

*( 50/100/200kgs/ hr optional)

Feed Capacity

Requirement 750kg/feeding

Control Mode

PLC( Programmable Reasoning Controller Burner)

Text Steel

8mm thickness

Chamber Material

High Alumina Fire Brick Wall Surface Area, 1750 ℃ Rate

Paint for outdoors face

800 ° C Rate

Burning Chamber

1570L

Inner Measurements

150x100x105cm

Added Chamber

750L

Smoke Filter Chamber

Yes

Feed Setting

Guidebook

Voltage

210/230V 50/60Hz

Power

0.9 Kw

Oil Usage (kg/hour)

Normal 20.4-28.0( D.O)

Gas Use (m3/hour)

***

Temperature Level Display

Digital Existing

Temperature Degree Protection

Yes

Oil Storage Tank

300L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless-steel

1st. Chamber Temperature

800 ℃—- -1000 ℃

second. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Outside Dimensions

300x160x280cm( without smokeshaft)




 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


50-100-150-200 Kgs per Hr Solid Waste Incinerator for sale


Waste Incinerator Design TS150 PLC, Testimonial

Construction is dual/double combustion chamber with 02 sets oil burner, batch load 
incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC). 
Primary & Secondary combustion chambers and smoke filter chamber. 
Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation.


Primary Combustion Chamber: 

※Main Feature:

— Double Combustion Chamber
— Double Italy Burner
— Smoke Filter included
–Burning Rate: 50-200kgs per hour optional
–Primary Combustion Chamber: 1.57M3(1570Liters)
— Incinerator Mainbody steel: 8mm thickness 
— Paint for outside face: 800°C Rate
Chamber Material: High Alumina Fire Brick Wall, 1750℃ Rate
— Idea for campsite average or below 600 people
— Chimney: 10 Meters, Stainless steel


Feeding door primary chamber:

Items/Model


TS150( PLC)

Photo

Principle

Waste Incineration Treatment

Burn Rate

Average 150 kg/hour

*( 50/100/200kgs/ hr optional)

Feed Capability

Standard 750kg/feeding

Control Establishing

PLC( Programmable Logic Controller Heater)

Text Steel

8mm thickness

Chamber Product

High Alumina Fire Block Wall, 1750 ℃ Rate

Paint for outdoors face

800 ° C Rate

Burning Chamber

1570L

Internal Dimensions

150x100x105cm

2nd Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

210/230V 50/60Hz

Power

0.9 Kw

Oil Consumption (kg/hour)

Common 20.4-28.0( D.O)

Gas Intake (m3/hour)

***

Temperature Level Screen

Digital Program

Temperature Level Safety

Yes

Oil Container

300L

Feed Door

80x60cm

Chimney

10Meter

Smokeshaft Type

Stainless-steel

1st.

Gross Weight

8500kg

Outside Dimensions

300x160x280cm( without smokeshaft)

Gross Weight

8500kg

Exterior Dimensions

300x160x280cm( without smokeshaft)




 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.


animal incinerators

The incinerator shall be equipped with a Diesel oil tank that will be supplied with DO from our DO tank located in the

power station. The tank shall be equipped with level switches and appropriate solenoid valves for automatic filling of

the tank. The tank shall also be equipped with a magnetic level indicator, level switches and appropriate drain valves,

separate overflow and vent pipes.

Oil-fired multi-stage waste incinerator of pyrolytic type shall be installed complete with interconnecting flue gas

ductwork between the incinerator and the chimney outlet.

 

The unit shall be manufactured in accordance with the latest ASME code, BS and DIN standards.

 

The waste disposal shall be environmentally acceptable and the incineration emission shall comply with the admissible

emission limits (international EC-Standards). The visibility of flue gases shall not exceed one Ringelmann. The waste

shall be completely burnt and the content of un burnt organic matter of the ash shall not exceed 3%.

 

The unit shall allow for a minimum of 2.0 seconds retention time.

 

1.2        QUALITY ASSURANCE:

 

  1. Coordinate the entire assembly of incinerator, stack, controls, fuel supply.

 

  1. Provide written certification that the entire assembly has been coordinated to achieve the required performance

and to provide the required features.

 

  1. Equipment, installation, and operation shall conform to NFPA 82. Where conflicts exist between NFPA 82 and this

specification, this specification shall govern.

 

1.3        SUBMITTALS:

 

  1. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

 

  1. Incinerator:

 

  1. Arrangement, description of construction, and outline drawings of incinerator and accessories showing

clearances and dimensions.

 

  1. Predicted performance including burn time based on waste composition specified.

 

  1. Calculation of secondary chamber retention time.

Waste Incineration Therapy Style TS75( PLC).


Average 50-100 kg/hour Burn Rate

Items/Model

TS75( PLC)

Principle

Waste Incineration Therapy

Burn Cost

Average 50-100 kg/hour

Feed Ability

Ordinary 200-300 kg/feeding

Control Mode

PLC( Programmable Reasoning Controller Burner)

Face Oil Paint

800 ℃

Combustion Chamber

768 Liters (0.768 M3)

Inner Measurements

1200x800x800mm

Added Chamber

384 Liters (0.384 M3)

Smoke Filter Chamber

Yes

Feed Setting

Manual

Voltage

210/240V 50Hz 1P

Power

1.3 Kw

Oil Intake (kg/hour)

Typical 20.4( D.O)

Thermal ability( kw/hour)

166-332

Gas Consumption (m3/hour)

***

Temperature Level Degree Monitor

Digital Show

Oil Tank

3000L

Feed Door

60x50cm

Smokeshaft

10Meter

Chimney Kind

Stainless-steel

1st. Chamber Temperature

800 ℃–– – – -1000 ℃

2nd. Chamber Temperature Level Degree

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

7500kg

Outside Dimensions

260x160x250cm( without smokeshaft)

We offer singular burning chamber, dual combustion chambers, 3 burning chambers and multi-combustion

chambers waste incinerators for lab, center, clinical facility, clinical facility, hygiene specialist waste devastation with scientific

non reusable, organic waste, clinical plastic waste, contaminated materials, red bag waste, needle disposal, gauze and additionally plasters,

secured sharp containers, pathological waste, trace-chemotherapeutic wastes, and so forth.

Our collection of incinerators provide for little to big range family pet cremation relevant business, such as fowl ranches, livestock

ranches, lamb ranches, pig ranches, stables, kennels, screening laboratory, catteries, pet dog crematoriums. Vendor clear up rate for incinerator consumer,

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to 

make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.

System solutions for medical waste environmental, including waste incineration, smoke emission treatment, high-temperature 

sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers, etc.

The pet cremation equipment humanized design with movable platform, small space covers for modern pet cremation 

business owner all over the world.

The containerized mobile incinerator mounted in ISO container before leave factory, pre-installation, no incineration house 

build construction, movable by truck and ultraviolet lamp sterilization inside.

We are growing brand for environmental protection field, and market share with most of 

Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental 

organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. 

We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan.

supply clinical burner, medical center burner, family pet burners, hog burners, pet dog cremation tools, small incinerator,

pet dog burner, pet dog burner, mobile burner, little pet dog burner, transmittable waste pyrolysis tool, lab

heater.

burner.


250kgs per human resources capacity waste incinerator


Burner Design TS250 PLC, Review

This design is small waste incineration tools for little waste result. Construction

is dual/double combustion chamber with 02 units oil burner, batch load incineration equipment. 
Waste feed chamber is 1800Liters (1.8m3, TS250 PLC). Primary & Secondary combustion chambers
and smoke filter chamber. Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. 

Key Product Listing per 01 collection

Key Burning Chamber

Extra Combustion Chamber

Smoke Filter Chamber

Incinerator PLC Control Circumstances

Smokeshaft:10.0 Meters

*( upgrade to Stainless-steel, complimentary cost)

Italy oil/gas heater: 02 systems

Oil Container (if oil fuel): 300Liters








Items/Model

TS200( PLC)

Image

Principle

Solid Waste Incineration Therapy

Melt Price

Average 250 kg/hour

Feed Ability

Requirement 350kg/feeding

Control Establishing

PLC( Programmable Logic Controller Burner)

Burning Chamber

1800L

Internal Measurements

150x110x110cm

Second Chamber

750L

Smoke Filter Chamber

Yes

Feed Mode

Handbook

Voltage

220V

Power

0.9 Kw

Oil Intake (kg/hour)

Common 28

Gas Usage (m3/hour)

Typical 33.6

Temperature Level Display

Digital Existing

Temperature Level Degree Security

Yes

Oil Tank

300L

Feed Door

80x60cm

Smokeshaft

10Meter

Smokeshaft Kind

Stainless-steel

1st. Chamber Temperature Level

800 ℃–– – – -1000 ℃

2nd. Chamber Temperature Level

1000 ℃ -1200 ℃

Residency Time

2.0 Sec.

Gross Weight

8500kg

Exterior Dimensions

300x160x190cm

Heater procedure should certainly be Automatic On/Off

Gas: diesel

The supplier need to supply needed details for the very best of the installment

This burner with “PYROLYTIC” burning need to have:

;

・ Refractory concrete:

§. Thickness: ≥ 100 mm

§. Nature: 42% of Al203

・ Guard in coarse panels:

§. Thickness: ≥ 75 mm

・ Nature: Calcium silicate.

* Heater of illumination of waste, with gas, typical mono-bloc casting directing diving flame, lights and additionally safety and security of digital ignition, permanent air circulation, electro-magnetic sluice entry of guideline in addition to isolating valve.

* Plate of burning in Carborundum, staying clear of the taking care of glass along with slags.

A chamber of short article burning of gases

* A heating system of burning of gases,

* A gadget of shot of air making it possible for a total recombustion of gases,

* A device of air inlet of air conditioning of waste gases,

* A sheath of clearing of the gases charred.

* Carcass in solid sheet steel with assistance of web link.

* Structure of the refractory;

・ Refractory concrete:

§ Thickness: ≥ 150 mm

§ Nature: 65% of Al203

・ Protect in rugged panel:

§ Thickness: ≥ 85 mm

Nature: Calcium