Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance

for thermal expansion as necessary.

 

  1. Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so

that all control switches and indicators are within 1700 mm (5.5 feet) of the floor and are located alongside the area

where personnel will be loading the unit.

 

  1. Clean interior and exterior of all equipment before placing in service.

 

  1. Initially operate incinerator at firing rates and time periods recommended by the manufacturer of the

refractory to provide proper curing of the refractory. Provide printed curing instructions from refractory manufacturer

at the site prior to first start up.

 

  1. Personnel Protection for High Surface Temperature: If incinerator has surface temperatures exceeding 40 degrees

C (70 degrees F) above ambient, provide removable chain barricades mounted on 1070 mm (3 1/2 feet) high removable steel

posts spaced 1200 mm (four feet) on centers. Locate barricade at least 900 mm (three feet) away from hot surfaces.

Provide yellow polyethylene chain with removable hooks at each post. Provide sign attached to each chain reading,

“Caution, High Temperature”.

  1. Do you have model YD-500 as a mobile unit? In case of a major crisis in one of the clusters we would like to have

the option to move the unit closer to the location to avoid transporting the dead cows. Do you have any mobile

solution?

  1. Please elaborate what additional equipment we will need to buy to operate each unit? I need to know the total cost

per unit.

  1. Does the unit need to be under a roof?
  2. How is the loading of the dead cow into the incinerator done?
  3. How is the incinerator emptied?
  4. Are there any limitations on how we should dispose the remains from the incinerator?
  5. Does the unit require a dedicated trained operator? How long does it take to train one?
  6. Do you send your engineer for installation, commissioning and operation?
  7. Assuming we have 3 dead cows a day per incinerator – how many hours a day it would take to complete the job?
  8. In case of crisis can the unit work continuously 24H a day?
  9. Is there any impact of smoke or smell on the surrounding?

 

3.2        INSPECTIONS AND TESTS:

 

  1. General: Demonstrate to the Department of Veterans Affairs that all equipment complies with requirements. The

Contracting Officers Technical Representative (COTR)/Resident Engineer (RE), or their representative shall witness all

tests. Representatives of the pollution control authority that has jurisdiction shall also witness emissions tests.

Provide two weeks advance notice to the COTR/RE of all testing. Pretest all items prior to the final testing that is

witnessed by the COTR/RE.

 

  1. Condition of Equipment after Delivery, Rigging, Placement: After setting equipment on foundations, and prior to

making any connections to equipment, the Contractor and COTR/RE jointly shall inspect interior and exterior for damage.

Correct all damage by repair or replacement to achieve a like new condition.

incinerator type of pyrolytic medical waste incinerator capacity

Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural

– A receiving cage for biomedical waste;

– A combustion chamber with a chimney with a filter to retain the ashes;

Chimney section: about 300 cm; With a minimum height of 6 m

Door size: approximately 50×60 cm

Supplied with a 500 liters fuel tank and all necessary accessories for installation.
–                          INCINERATOR for pharmaceutical waste treatment with                  a scrubbing system

With the following technical data:

1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing

system.

2.      Working hour /day: minimum 10 hours/day.

3.      Capacity: Approximated 150 kg/hr. Over 10 hrs.

4.      Wastes characteristics:

·         BULK density: 70 – 100 kg/ bm³.

·         Calorific value: 2000-3000 kcal / hr.

·         Moisture content: 20-30%by weight.

·         Ash content: 2 – 8 % by weight.

·         Plastic content: 15-20 % by weight.

5.      Two combustion chambers.

6.      Operating temperatures:

·         First chamber: not less than 700 – 800 °c.

·         Second chamber: not less than 1200 °c (during steady operation).

7.      The burners should be automatically switched off if any of the combustion chambers doors is open.

8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel).

9.      Automatic loader and unloader to be provided.

10.     Exhaust gases to be comply with International Environmental code and requirements.

incinerator capacity calculation

Test shall be conducted by factory authorized representative of incinerator manufacturer.

 

  1. Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit.

After termination of manufacturer’s predicted burning period, inspect and weigh the residue.

 

  1. Emissions testing may be deleted if not required by state or local authorities. List all additional tests

required by state and local emission authorities.

 

  1. Emissions:

 

  1. Test shall be conducted by independent testing organization provided by Contractor which has a minimum of three

years experience in emissions testing and which has been approved by the pollution control authority that has

jurisdiction.

 

  1. Conduct tests during the reduction of waste test specified above.

 

  1. Test methods must comply with EPA Reference Method 5, 40 CFR 60, Appendix B, “Determination of Particulate

Emissions from Stationary Sources”.

 

  1. Demonstrate that incinerator complies with specified emission limits.

 

  1. Sound Levels: Demonstrate conformance to sound level limitation.

 

  1. Report: Furnish complete written report (three copies), which includes test data, calculations, results

compared with requirements, list of personnel, and other pertinent information. Furnish report within three weeks of

test date.

incinerators manufacturers china

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An

integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering

strainers shall be provided together with a lockable by-pass across both strainer and meter. The meter shall have a

digital read out in litres and shall record quantities from 1 to 99999 with an accuracy of ±1%.

 

 

Control of the DO feed pumps and associated control valves shall be fully automatic. The PLC system shall control the

DO burners automatically so as to achieve minimum Diesel oil consumption during startup and service.

 

2.6  Site Conditions:

 

 

Location:

 

 

 

Port Louis, Mauritius

Ambient Temperature:      18-35 °C

Relative Humidity:    74 – 95%

Other:    Corrosive environment due to proximity with the

sea

2.7  MANUFACTURING & FACTORY  TESTS

 

 

The successful Bidder shall carry out a ‘factory acceptance’ testing of the incinerator set within its premises /

laboratory to verify the guaranteed figures The Bidder`s test procedure, test facilities and test results shall be

verified and certified by an international accreditation body approved by CEB.incinerator is for use in the hospital

for burning hazardous waste and chimicals, minimum Capacity 300 per hour. I will be reselling to my client?. Below is

the information I was given and nothing else. The hospital incinerator for use in the clinical waste as required by

international environmental management. Minimum 300 Kg capacity/hr, Fuel fired, refractory lined, chimney and sampling

prot. Minimum temperature of 1100 degree Celsius kindly quote me best price for resale.

medcial incinerator manufacturer

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests

so as to enable sending of one CEB Engineer for witnessing  of  the  factory  tests.    A  ‘Factory  Acceptance  Test

’  schedule  shall  be

 

mutually agreed between the successful Bidder and the CEB Engineer.

NOTE: All charges inclusive of air tickets, food & hotel accommodation, local transportation and other living expenses

for the CEB Engineer shall be borne by the successful Bidder.

The successful Bidder shall submit to the CEB Engineer the following documents prior to shipment of the incinerator

set.

 

 

?     Certificate of Conformity inclusive of the clause ‘We certify that, subject to exceptions or concessions

listed here after, the supplies detailed above were manufactured in accordance with the technical specifications of the

contract, order and that, all inspections and tests having been completed, the supplies comply in every aspect with the

relevant particular specifications, drawings, and relevant standards and regulations in force’.

?     Factory Acceptance Test(FAT) Certificates

?     Bill of Material (BOM)

?     Three(3) Complete Sets of As-Built Drawings

?     Installation and commissioning procedure for the incinerator set.

?     Program of works for carrying the installation and commissioning

?     Labour  and  logistic  requirement  for  carrying  the  installation  and commissioning.

?     All electrical drawings and wiring diagrams

Type of Waste: To treat medical waste, categories A, B, C, D,E

Type of incinerator: Pyrolytic

Nominal Burn Rate: 50 to 60 Kg/hrat  3500Kcal/Kg

Loading: Manual, Batch Load

De ashing: Automatic or manual batch de ashing

The incinerator must avoid the release of black smoke and

fine dust, during the loadings

Primary Chamber Capacity: 2 -3 m3

The insulation of the combustion chamber should be composed of

refractory bricks, having a high content of aluminium and insulates,

The plate of combustion in carborundum avoiding the fixing of

glass and slags

Hours of operation/day: >10 hrs

Max operating Temperature : 14000C

Normal Operating Temperature (Primary): >8500C

Operating Temperature (Secondary): >11000C

It should have temperature regulators in digital watch:

Carbon Content of Ash: <2%

The installation should be completely free from visible smoke as well

as offensive odours.

Residence Time in Second Chamber: 2 seconds minimum

The Internal diameter of the Chimney : Ø 400

Height of Stack:  >8 m

Burner operation: Automatic On/Off

Fuel: Diesel

Fuel Consumption at rated capacity: >7 Kg waste/ltr

Electricity Consumption: <2kW at rated capacity

Operating Voltage: 220-240VAC 50 Hz

Spare Parts: Supply for 1 year quoted as option

Consumables: Supply for one year of operation to be mentioned

as option

Warranty: Parts and service support: 1 year minimum post

commissioning

Service Support: <72 hours.

Emission Standards Compliance: BS 3316 or équivalent standard

Process Filtering system: Scruber to be mentionned as option

CE Manufacturing Compliance: BS EN 746-2-1997

Design Specification: Types A, B, C, D, and E of medical waste

Installation and Commissioning: Included in conditions of supply

Training in preventive and curative maintainance and use

of the incinerator: Operator training inclusive in offer

Capacity to treat Plastic: Not less than 40% by weight

Shed of the incinerator

Shelter of the incinerator inclusive in offer (the shelter must have

facilities for hand washing and firefighting).

This material and equipment must include in the shed of the

incinerator:

*   Foundation in rubble stone,

*   Isolation roofing against humidity;

* Elevation with brick of 20 cm (bloc cement), continuing lintel

(linteau) in reinforced concrete;

*  Steel frame (charpente en metal);

* Roofing in sheet B.C.A. 28 BG (Toiture en tôle),metal gutter,

*  Sanitary installation (wash basin, soak way pit of 20 m of depth);

*  Ash pit of 30 m3,

* Electrical installation;

* Concreteslab for fixing the incinerator;

* Chanel for evacuation of rain water or waste water

*  Wiremesh for aeration up the lintel;

* smoothrougtcasting of walls (interior and outside);

* plinth with cement;

*  2 metal doors ;

*  Enemail paintings inside and latex paintings outside the shelter

on walls and on doors;

*  Roofing limit (planche de rive);

*  Measures for this specification will depend on the size of the

incinerator which will determine the size of the shed of the incinerator.

Hiclover bio waste incineration


HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.
Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce.

※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3— — — — Mobile Incinerator, Requirement delivery containers, Easy to move/transport system— — — — Free Installment, Pre-installed heater, Suitable for camps— — — — Ultraviolet light sanitation inside

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Equipment Double chamber medical infectious waste incinerator Capacity 10-30 kg per hour Characteristics of waste
Mainly syringes and needles from immunization routine and campaign activities. However, the following average characteristics are considered*:
heating value above 2000 kcal/kg (8370 kJ/kg); content of combustible matter above 60%; content of non combustible solids below 5%; content of 
non-combustible fines below 20%; moisture content below 30% by weight
Combustion performance: The medica waste incinerator shall be capable of reducing waste to ash not exceeding 10% of the total combustible 
charges.
Outdoor installation. The medical waste incinerator will be installed outdoors. All incinerator components shall be suitable for but not 
limited to outdoor shaded installation, including electric motors, be resistent to corrosion, moisture and related weather elements.

Products of building and building and construction: The burner will certainly not have any type of asbestos, asbestos-containing products, mercury thermostats, as well as mercury switches. Refractory products will have the ability to meet appropriate standards under ISO TC33 and likewise CEN/TC 187.

Kinds of incinerator style appropriate: Dual-chamber controlled air incinerator or double- chamber pyrolytic burner


WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Nanjing Clover Medical Modern Technology Co., Ltd.

Tel: +86 -25 -8461 0201 Site: www.hiclover.com Email: [e-mail       secured] Email: [e-mail       secured]


msw incinerator manufacturers

standard type, 11m long ,self supporting

Capacity-220kgs/hr

refuse-hospital waste

average moisture-15-20% on fist time

DIMENSIONS

height: 2710mm

length: 2840mm

Width; 2450mm

loading door opening: 610mm x 610mm

Grate/Heath Area: 2.0(square meters)

Primary chamber volume: 2.4(cubid  meters)

secondary chamber volume :2,72(cubid meters0

total volume: 5,12(cubid meters)

minimum stack diameter :560mm

 

  1. 300 kg per day healthcare waste incinerator

 

 

 

Our preferred technology is double-chamber incineration, but if you recommend an alternative technology, that is

acceptable as well.

 

 

 

We request information on the following for each of the above requirements:

 

 

 

  1. Capital cost (delivered cost in Oman)

 

 

 

  1. Operation and maintenance costs (per year)

 

 

 

  1. Number of operators required

 

 

 

  1. Product specifications (sizes, temperatures, residence time, cycle time etc)

 

 

 

  1. Other auxiliary equipment that is required or recommended by you

 

 

 

  1. Any other information and inputs that can facilitate the project and add value

 

 

  1. Would this mean that the plant would operate only 12 hours per day? Normally operating the station 24 hours

per day should be able to valorize 12 tons per day for an installation with a capacity of 500 kgs/hr.

pet animal cremation equipment

A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total recombustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with support of connection.

* Composition of the refractory;

Refractory concrete :

Thickness : ≥150 mm

Nature: 65% of Al203

Insulate in fibrous panel :

Thickness: ≥85 mm

 Nature: Calcium

* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition,

permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* A secondary injection of air to ensure perfect oxygen content.

19.A control box ensuring the complete cycle of combustion.

 

20.Fan:

* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and

following the control of the automatic cycle.

21.Controls and regulations:

Control box watertight to dust, including:

 

* A switch circuit breaker for each engine (ventilators and burners).

* A timer with adjustable temporization for the regulation of each burner.

* A regulator with digital watching for the temperature of combustion.

* A regulator with digital watching for the temperature of postcombustion.

* Electric box.

 

  1. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual

batch de ashing.

  1. Process Filtering system : Scruber to be mentionned as optional
  2. Emission Standards Compliance: BS 3316 or équivalent standard
  3. Capacity to treat Plastic: Not less than 40% by weight
  4. CE Manufacturing Compliance: BS EN 746-2-1997

22.The supplier must give batches of spare parts of first urgency and consumable of the incinerator.

23.The installed incinerator must bear a one year guarantee.

24.The supplier shall perforn an onsite installation of the incinerator.

  1. The technical training of operators will have to be provided and given by a technician from

the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

diesel oil fired medical waste incenerator

High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber

(double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single

phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose

pipe. 1100 litre fuel Tank +pipe system Containerised (the container will serve as housing) Additional chimney extension

1 metre high One (1) year warranty.

Incinerator of 20 Kg : 03 Units

Electrically controlled incinerator.

Two-compartment incinerator with a capacity of 20 kg / hour.

Incinerator with low maintenance and operating costs; Equipped with an automatic control panel and easy to use with

electromagnetic locking of the door.

A main waste reduction chamber of 900 ° C. A post secondary combustion chamber of gases generated in the primary chamber

at least 1100 ° C.

Carbon residues in ash less than 5% by weight in accordance with European Directive 2000/76 / EC.

With refractory lining in materials of higher quality
1/ Cost of a 200kgs/Hr medical waste incinerator.
2/ (CIF Term) Cost of shipping from factory to PAPUA NEW GUINEA seaport of LAE, Morobe province
3/ Cost of 2 Clover engineers to Supervise, Installation, Training our engineers and commissioning the medical; waste

incinerator.

small home incinerators

Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of

equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings.

 

  1. Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident

Engineer.

 

  1. Fuel Oil System: Coordinate set pressure of house fuel oil system with requirements of burner mounted pumps. Do

not exceed inlet pressure limitations (typically 14 kPa or 2 psi or less), or suction lift capabilities of burner

mounted pumps.

1.Capacity of destruction in weight: 60 Kg/h.

2.It should be able to operate not less than 10 hours/day

3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics,

laboratories, institutes, etc…

4.Design Specification : Types A, B, C, D, and E of medical waste

5.“PYROLYTIC” combustion, by controlling the gasification of waste.

6.The incinerator must avoid the release of black smoke and fine dust, during the loadings.

7.It should be able to reduce the volume of wastes by 98%.

8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

9.The incineration should be completely free from visible smoke as well as offensive odours.

10.The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg

The Temperatures of combustion: Minimum will be 850oC and max 1400oC

Post combustion: >1100oC.

11.The Internal diameter of the Chimney: Ø 400 and its height: 8 m

12.The Volume of the combustion chamber: 1.200 L

13.The Dimension of the door for loading in cm: 70×70.

14.Burner operation should be Automatic On/Off

15.Fuel : diesel

16.The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” combustion must have:

17.A combustion chamber of waste:

* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load

* A burner of lighting which the use is limited to the ignition of waste.

* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating

out of refractory.

* The insulation of the combustion chamber should be composed of refractory bricks, having a

high content of aluminium and insulates bricks in order to assure a minimum temperature on

the outside sheet metal.

* Composition of the refractory;

 

Refractory concrete :

. Thickness      : ≥100 mm

. Nature: 42% of Al203

Insulate in fibrous panels :

. Thickness: ≥75 mm

Nature: Calcium silicate.

* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of

electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.