Tag: wasteincinerators

the three incinerators for burning as well as incineration of medicines as well as harmful compounds

Demands and specs for the process of supply, installation, operation and ensure the three incinerators for burning and incineration of medications and also harmful compounds for customizeds division

Free 3 years warranty for incinerators from shipment day. In addition of complimentary extra components ensure letter ought to be valid for 10 years from the end date of assurance.
Electric device should be delivered with service guidebook in English
Electric capacity need to be 380-220 v 60 Hz for all devices
Provided time asap
Validity of deal ought to be not much less than 6 months
In situation of order, we need two certifications of origin that must be stamped from Saudi consular office in your nation
Business billing (certified from Chamber of Business).
Two initial costs.
Send out a person to fix as well as educate our staff for 5 people in each area.
Send your manuals for installation systems.
Waiting for your excellent reply.
Please offer details for the complying with,.
1-Technical explanation includes technological specifications, scope of job, the needs of the procedure and also upkeep.
2- Technical explanation for service technicians training and heater drivers.
3- Brochures of stove with all the called for specs

The offer cost must include the following;-.
1. Educating for professionals and also drivers for a period not much less than two days at each website and give trainees training certificates.
Files have to include all the info such as pamphlets, technical sources, operating, maintenance guidebooks, as well as pamphlets dealing with the key-board.
2- Letter from the supplier to give three years warranty for incinerators from delivery day. In addition of free spare parts ensure letter should be valid for one decade from the end day of guarantee.
3- Offer certification that the incinerators are environmentally friendly and also attach proof that environmental management companies in the country of Origin and also your product should be discharges cost-free as a result of the level of sensitivity of its global air ports.
4-copmany should committed shipment, procedure, and also setup within 60 days from the date of site jobs detection.
5- Train 5 individuals for two days for each and every device for a duration of two days for installation, operation, and safety. Provide certifications.
GARANTEE.
Supplies operating as well as emergency situation maintenance also provides totally free spare components for 3 from the starting day of the project. The firm needs to make regular upkeep every 3 months as well as raise the upkeep report to the administration of public problem and also Maintenance.
The business must make all the upkeep work also adjustment of the control and defense tools and also filters/ filters detoxify insulation.
Specs of ovens:.
– Mounting a readymade concrete base (Precast) with Elevation 30 cm in the air and also 20 centimeters listed below the surface area of the planet.
– The dimensions of the base are raised by (2 meters) from the side of burners.
– The remainder of the accessories in all the trends even allows the employee directly feeding as well as upkeep job, cleansing and relocate conveniently thinking about the propensities of the base towards the door for water drainage of water.
– The floor finishing should be high-quality epoxy paint.
– Mount anti-rust and warm Umbrella of brick and also steel (pyramid form) of (5) meters elevation above the ground which set up with the edge of the concrete base by thick galvanized columns.
– This umbrella Cover the website heater and also allow bringing the chimney.
– The website is surrounded by an iron fencing (sheet metal) 3 meters elevation from the surface of the planet in order to shield the incinerators from black blizzard.
– The iron fence must have a 5 meters Width entrance.
– Automatic anti-rust as well as heat electrical circuit should be provided.
– The heating systems are very efficient, emissions-free, risk-free, and environmentally friendly as well as have ability of not less than 3,000 kg of materials as well as the price of melting at least 400 kg/ h.
– The approach of feeding the furnace with a side slot or from the leading and also the exhaust of the smoke is entirely stopped.
– a heating system Have to have two spaces, among them is the main space of not much less than the “5” ranges to the process of burning materials and various other secondary area of not much less “2” ovens to shed resulting gas from the first procedure as well as the smokeshaft.
– The primary component of the body of the heating system is stainless steel box, the thickness of not much less than 7 mm with a layer of zinc phosphate layered with aluminium reflector to warm.
– the thickness of the door of 150 mm as well as a hardness of not less than 170 kg/ m 3 to be scorched, automatic detailed remote system.
– Heaters have to be devastating adequate to burn and blaze the material which stated formerly.
– heating systems must have certifications are supported worldwide ventures and government competent for environmental protection In the country of origin or the General Presidency of Meteorology as well as Setting Protection in Saudi Arabia.
– The stove can benefit 24 hr so regarding allow for the burning of materials for a period of not much less than 12 successive hours and the remainder for air conditioning and gives full gas container with a capability of 1000 L to turn on the oven.
– Must have an automatic ignition and diesel is made use of.
– a heating system has the capacity to hold up against severe temperatures as much as “130o c As well as also, it assures constant procedure of which can be used for 1 day with the capacity to get rid of residues throughout the work of the stove, Protecting layer of calcium have to be present in the rooms with Density not much less than 50 mm as well as a wall thickness of 100 mm.
– Isolation of shedding area: the area in between the walls have to be of the “stainless-steel”. Furthermore, shed space has to full of Thermal insulation product.
– Guarantee that the combustion of materials released in the secondary room must be at least two seconds duration as well as the space is lined with high-density ceramic fibbers.
– Incinerators should contain a system for handling (purification) gasses before emission of the smoke.
– Burners have to have the capacity of self-cooling after completion of the daily operating period.
– Incinerators have to have smokeshaft not much less than “4 meters” height from the surface of the oven, additionally, it should be thermally protected and also non-rust able, as well as need to likewise be removable, installment as well as tide default.
– Electrical capacity called for “220/ 380-volt “60 hertz.
– Incinerators have to be fitted with a control board of the digital tricks to monitor all the essential indicators of activation tricks, as well as start-up and switch off so as to be separated inside a steel box with the presence of the following:.
Alarm system Sensor in the event of (accidents “heater” or filtration device or heat leakage or interior connections as well as electrical wiring).
Screens for the temperature level of the rooms.
Aerosols Filter signs/ monitors.
Area temperature level sensors.
Indicators for furnaces as well as index overload.
Timer for Extinguish the stove instantly depending upon the moment called for.
– All devices should be very immune to exterior conditions such as high temperature (50oc).
– All doors have to have unique lock are not allowed non-persons assigned to function.
– Supplying fire extinguisher for each website with an ability of 10 kg at least

an animal incinerator for the cremation of dogs

We have a 70 bed medical facility in namibia. There is a potential of getting customers from various other regional doctors.
a little burners (ex. please see attached) for some empty chemical bags. Can you please supply me with some details info about these sort of incinerators (small range). a pet incinerator for the cremation of pets and pet cats. It will certainly be solitary use of each animal seperately.Initially we are planning to start this Pilot Task with the National Medical facility, to convince the Ministry Officials as well as on its success to take this project to the Teaching Hospitals, Area and Base Hospitals in the Country.municipality requirement 4 crematory machine for bodies. I require some info regarding cost, kine of power for activation, harmful exhaust, The incinerator we are looking must be with the benefits of Warm recycling system, usage of hot water, and so on. Capability– 150-200 kgs/hr and with International standards.get more details about the Family pet Cremation Tools, specifically for canines as well as felines.

incineration Heater for burning patalogical

incineration Heater for burning patalogical (such as human tissue or blood) as west

The weight of this west materials is 700 kg per month and also we require an isolated heating system

Without fume as well as any kind of damaging gas

. INCINERATOR SPECIFICATION

# Summary Specification

1 Burning Capacity – – 400 kg/time and also must not be much less than 300 kg/time. Optimum combustion time need to be 6 times/day

2 Smokeshaft outside diameter – – 300 to 400 mm

3 Fan power – – Need to not exceed 1.1 kw

4 Voltage – – 220V

5 Oil consumption – – Have to not surpass 14kg/h

6 Feeding door diagonal dimension (mm) – – Not less than 500mm 7 Incineration Temp. (⁰ C) – – 800 or above 8 Exhaust

Carbon Monoxide – – Must not go beyond 100 mg/m3

SO2 – – Need to not go beyond 400 mg/m3

HF – – (Hydrogen fluoride) Must not surpass 9.0 mg/m3

NO2 – – Should not exceed 500 mg/m3

Smoke dirt – – Need to not exceed 100 mg/m3

9 Elevation of the Burner – – Not much less than 10m over ground level

10 Maker’s Service warranty – – Not less than 1 year

11 Electrical Connection – – From closest circulation box using 25mm2 electrical cord and also all relevant connections and circuitry

Animal body components , other biomedical waste , body organs dung

51.No    Features    $_pecific tions
1    (Incinerator)
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2.    Load capacity    300 – 4∞Kg (maximum)
3.    Bum capacity    100 Kgjhr (minimum)
4    Fuel    Diesel (LDOjHSD)
5.    Type of Bumer operation    Automatic diesel fired
6.    Primary chamber    Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7.    Secondary chamber    Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8.    Temperature control    Digital temperature control and display
Temperature monitoring and thermostatic control
9.    Power supply    220V for control Box
10    Size    Compact design preferred
11.    Opening lid    Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12.    Fuel tank    100-150 L

13.    Civil    works,    installation    and
comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite  demonstrationjperformance  test  and  adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate   Annual    Maintenance    Contract   would    be drawn with the supplier at a later stage.
14.    Catalogue    Catalogue containing detail pictures and spec迁ications
of  the  quoted  incinerator  must  be  included  in  the
bidding document

Incinerator capable of dealing with in between 300 & & 500 kgs fitted with the wet scrubber system

Automatic filling and refilling with capability of 10 to 12 bunches per day working with gas therapy techniques and gas fuel and also ought to comply with the European Standards.the Federal Government Healthcare Facility for Medical Waste Incinerator with the adhering to Specifications. they are having basic wastes like cells, plastic bottles etc, wastes originating from work camps, to be incinerated, they require, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– Capability: 1000 kg/h
–– Kind waste: industrial waste
–– Other demands: Automatic waste filling system and exhaust therapy system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2 humans resources.
4. Gas consumption: 7 litres per set. Incinerator with the ability of treating in between 300 & & 500 kgs fitted with the wet scrubber system.complete Burner with an ability of 500kgs/ hr with a wet scrubber device. a 10-20Kg per hour of residential waste? Likewise, I would like to understand what is the minimum ability burner you have in instance we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capability as I am in ownership of a huge quantity of mixed/municipal waste (4/5 million tonnes) of the following make-up (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% other). The EU codes of the waste are as complies with: 20 03 01, 19 12 10 and 19 12 12.
Among the vital making a decision aspects of the prospective distributor is the energy usage of the strategy, showed either per hr or daily and also I would certainly appreciate if such information can be made available.

Capability of destruction in weight 60 Kg/h

clinical waste incinerator solutions as well as costs for 100 bed/ 500 bed/ 1000 bed/ 3000 bed healthcare facilities.
– – Assumption: general medical facility beds 50%, operation beds 50% for the 100 bed health center situation, while this

ratio is 30-70% for the other situations
–– global criteria and also waste productions assumptions ought to apply
INCINERATOR, DIESEL.

CAPABILITY: Burner 150 kg/hr.

Amount: 2 [2] with total accessories.

Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
natural rubber, synthetic rubber, polyurethane sheet, and cumbersome films, solids and also
– – fragments that can be easily arranged
– – Things that easily deteriorate such as paper, timber, natural leather and garbage
– – Chemical waste solids and also liquids, waste oil and also various other difficult-to-handle items

The devices will certainly be licensed for operation from PME after passing site investigations.Manual tons double chamber

burner for clinical waste to melt 50kg/hr on constant procedure, with Main temperature level approximately

800degC minimum and 1200degC or even more in the Additional chamber, full with billing door, Ash door, Air as well as check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to

meet NEMA requirements as well as various other global requirements. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– Capability (burning capacity of waste per hr). 150kg/hour. Burner with 300l waste chamber

–– Build products, 5mm Excellent quality light steel construction; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we require

on this island.

–– Approximately 150 KG/Hrs. burner to dispose our day-to-day regular death for this size of the ranch.1. can the

100kg/hr melt solid waste/hazardous waste like expired paints, waste oil or chemicals.
2. What about the warm created during burning, are there windows or air circulation right into the containers.

–– Intake of power and also gas. medical facility garbage disposal system for a medical facility project

–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE and also marginal carbon discharge.

–– Automatic treating process temperature regulated chamber.Incinerator with 150l waste chamber

–– Second chamber.

1. Do you have plans for above incinerators revealing flooring dimensions, height. BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2. What products should be utilized for the FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The only consumable needed for the system TS100

(PLC) is Oil( diesel) is that OKAY?

2) from your technological requirements: oil intake (Kg/hour) is between 14–– 28) do you suggest is liters/hour?

example the incinerator will be operating for 10 hours daily indicates the oil usage will be ~ 140 Litres or even more?

3) Chimney type stainless steel. just how around main body building and construction materials?if there are a lot more two alternative of text

building and construction materials for better lifetime

3. Send out information concerning electrical power, ventilation, fire protection, wears down, chimney etc

4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capability design, MP 500

clinical incinerator.

5. We see you have container shelters. Send us value quote for this item

1. Capability of damage in weight: 60 Kg/h.
2. It must have the ability to operate not much less than 10 hours/day
3. This incinerator should have the ability to destruct all combustible wastes created by medical facilities, exclusive facilities,

laboratories, institutes, etc.
4. Layout Requirements: Types A, B, C, D, as well as E of clinical waste
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to stay clear of the launch of black smoke as well as fine dust, (Electric) throughout the loadings.
7. It must have the ability to reduce the volume of wastes by 98%.
8. It ought to be able to hold exhaust in the 2nd melt with gas house of not less than 2 seconds.
9. The incineration must be totally devoid of visible smoke in addition to offensive odours.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
– The Temperature levels of burning: Minimum will be 850oC as well as max 1400oC
– Message combustion: >> 1100oC.
11. The Inner diameter of the Smokeshaft: Ø 400 as well as its elevation: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13. The Measurement of the door for packing in centimeters: 70×× 70.
14. Heater procedure should be Automatic On/Off.
15. Fuel: diesel.
16. The supplier has to give essential details for the very best of the installment.
This burner with “PYROLYTIC” burning should have:.
17. A burning chamber of waste:.
* Flawlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Tons.
* A heater of illumination which the usage is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, as well as packing protecting

out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium

and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.

18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc

HIGH TECH PYROLYTIC MEDICAL WASTE BURNER

ADVANCED PYROLYTIC MEDICAL WASTE BURNER

1. Ability of damage in weight: 60 Kg/h.
2. It should have the ability to operate not much less than 10 hours/day
3. This burner needs to have the ability to demolish all flammable wastes produced by health centers,
private centers, research laboratories, institutes, etc…….
4. Design Spec: Types A, B, C, D, as well as E of clinical waste.
5. PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to prevent the launch of black smoke as well as fine dust, (Smokeless) during the.
loadings.
7. It should be able to minimize the quantity of wastes by 98%.
8. It should be able to hold exhaust in the second burn with gas residence of not much less than 2 seconds.
9. The incineration should be entirely devoid of visible smoke in addition to offending odours.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
– The Temperature levels of combustion: Minimum will be 850 ° C and also max 1400 ° C. – Message combustion: > > 1100 ° C.
11. The Inner diameter of the Chimney: Ø 400 as well as its elevation: 8 m.
12. The Quantity of the combustion chamber: 1.200 L.
13. The Measurement of the door for packing in cm: 70×× 70.
14. Heater procedure need to be Automatic On/Off.
15. Fuel: diesel.
16. The vendor has to provide necessary information for the very best of the installation This incinerator.
with “PYROLYTIC” combustion should have:.
17. A burning chamber of waste:.
* Perfectly tight door for the hand-operated loading of waste. The loading ought to be Guidebook, Set.
Tons.
* A heater of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals increased on hinges, wheel of screw plug, adaptable joint, and also.
packing protecting out of refractor.-.
* The insulation of the combustion chamber must be made up of refractory bricks,.
having a high material of aluminium and shields blocks in order to ensure a minimum.
temperature outside sheet steel.
* Structure of the refractory;
– Refractory concrete:.
> > Thickness: > > 100 mm “.
> > Nature: 42% of A1203.
– Protect in fibrous panels:.
> > Thickness: > > 75 mm.
> > Nature: Calcium silicate.
* Heater of illumination of waste, with gas, conventional mono-bloc casting leading plunging.
flame, lighting and also safety and security of electronic ignition, permanent air flow, electro-magnetic sluice.
gateway of regulation and isolating valve.
* Plate of burning in Carborundum, preventing the dealing with of glass as well as slags.

18. A chamber of article burning of gases.
* A heater of burning of gases,.
* A gadget of shot of air permitting a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of evacuation of the gases charred.
* Carcass in strong sheet steel with assistance of connection.
* Structure of the refractory;.
– Refractory concrete:.
> > Thickness: > > 150 mm.
>> Nature: 65% of A1203.
– Insulate in fibrous panel:.
>> Thickness: > > 85 mm.
>> Nature: Calcium.
* Heater with fuel, mono-bloc spreading guiding kind with straight fire, illumination and also safety of.
electronic ignition, long-term ventilation, electromagnetic sluice entrance of guideline and also separating.
valve.
* An additional shot of air to make sure excellent oxygen web content.

19. A control box making sure the complete cycle of combustion.

20. Fan:.
* Electro-ventilator dispersing the secondary air, the guideline of the air flow being.
carried out by valves as well as following the control of the automatic cycle.

21. Controls as well as guidelines:.
Control box watertight to dirt, including:.
* A button breaker for every engine (ventilators and heaters).
* A timer with adjustable temporization for the policy of each heater.
* A regulator with watch for the temperature level of combustion,.
* A regulatory authority with watch for the temperature of postcombustion.
* Electric box.

21. The de- ashing needs to be performed in all-time low of the burning chamber or the deashing.
ought to be Automatic or hand-operated set de ashing.

22. Refine Filtering system: Scruber to be mentionned as optional

23. Discharge Standards Compliance: BS 3316 or comparable conventional

23. Ability to treat Plastic: Not much less than 40% by weight

24. CE Production Conformity: BS EN 746-2-1997

22. The supplier should give sets of extra parts of very first necessity as well as consumable of the.
incinerator.

23. The installed burner has to birth a one year warranty.
24. The supplier will perforn an onsite installation of the burner.

25. The technical training of drivers will need to be provided and also provided by a professional from the.
manufacturing facility; it will certainly consist of medicinal as well as precautionary maintenance, and making use of equipment, etc

NB.; Civil works as well as any various other relevant solutions for the installment as well as training of drivers need to be included in the burner’s rate.

Requirements for the shelter of the burner:

House of the incinerator comprehensive in deal (your house must have toilet as well as hand washing centers and also firefighting). The dimension of the shelter shall measure 4 meter by six meter and shall be offered with appropriate air ventilation.

This material as well as equipment must include in the shed of the burner: foundation in debris rock, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel framework (charpente en metal); roof covering in sheet B.C.A. 28 BG

cytotoxic waste

Our passion is for disposing primarily cytotoxic waste, specifically out of date or out of specs cytotoxic drugs. Various other wastes for which we wish to get rid of in addition to the cytotoxic waste includes outdated or out of specs psychotropic pharmaceuticals (but not always narcotics), sharps (needles) and so on.

It is additionally really important for us to understand if the device is qualified to deal with cytotoxic waste and also the characteristics as well as disposal of therapy deposits. Furthermore, operational requirements in regards to energy and also gas intake, along with particularly the off-gas therapy system applied, birth considerable value, as meeting the needs of Guideline 2010/75/EC is normally necessary.

The quantity of disposal is about 100 kg per day as minimum. Bigger capabilities approximately 500-600 kg/d are likewise of terrific interest to us. Hence, please send us your proposition for both aforementioned day-to-day abilities.

BIO WASTE INCINERATOR

50 kg/  hour  capacity incinerators

·        Burning Rate: 50kos/hr

·        Feed Capacity:  150kqs

·        Primary  Combustion  Chamber:  900 liters

·        Secondary  Combustion  Chamber:  300 liters

·        Mix Combustion  Chamber:  Yes

·        Smoke Filter Chamber:  Yes

·        Feed Mode: Manual

·        Power: 0.7Kw

·        Fuel Type: Diesel Oil/ Natural Gas/LPG

·        Internal Dimensions:  120 x 90 x 85cm (primary  chamber)

·        External  Dimensions:  200 x 160 x 310cm (without  chimney)

·        Burning  Efficiency:  >98%

small  scale medical waste  incinerators.The required burning capacity of those incinerators are 10 kg and 15 kg/hr .The fuel oil using for those incinerator is diesel oil .

Refractory Concrete Incinerator

2 medical waste incinerators model YD-50, 150 kg feed capacity, 220/380 V, 50 Hz c/w 5 mtr. chimney.
Bio-medical waste management plant requirements:

Disinfecting/sterilizing the contaminated medical wastes, main combustion chamber, post combustion chamber, heat exchanger, ash removal units and flue gas treatment systems, with the following details:

Hourly capacity of the system:           from 250 up to 500 Kgs/ hour

Duration of operation:                        from 14 up to 18 hrs/ day

Fuel type to be used:                         Diesel or alternative

Calorific value of the waste:               3500 up to the maximum limit kcal/ Kg

Minimum operating temperature of primary chamber: 1000 degrees celcius

a smaller  capacity of 150 to 250  kg/feed capacity
will be good for comparison. Our main byproducts are the slaughtered unwanted carcass.

•             Using diesel as fuel

•             Capacity 50kg per hour

•             chambers material: Refractory Concrete

•             Number of chambers: Two

•             Manual feed
solicito un horno crematorio para mascotas, de una capacidad de 80 kl, aprox. solo una unidad, especificaciones tecnicas, totalmente industrial, atte. erika martinez peru