Tag: waste

pet incinerator is a equipment for deal pet or animal cremation. family pet is people’s friend and we want to cremation our pet after they died. some pet cremation business supply ash for the pet owner.

the pet incinerator function like other incinerator, but there are also some difference, some key point is door opening(we can feed the pet), oil or gas operation cost, moveable feeding door, smoke enviromental friendly, if we can collect ash, easy to use it, good service from pet incinerator manufacturer,etc.

most of the pet incinerator is small size, the combustion chamber from 300liters to 900liters. we have model A360, A600 and A900 and also TS50 PLC, which is famous in market.

model A360 for most of small pet, the combustion chamber size is 360liters. model A600 with 600liters combustion chamber. both the model A360 and A600 design with traditional feeding door but model A900 design movable platform door, see photo below

good pet incinerator means burn the pet to be white ash, not black waste, see below picture from a dog cremation.

Items/Model A360 A600 A900
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs
Primary Chamber (Liters) 360 600 900
Secondary Chamber (Liters) 200 200 300
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85
Oil Tank(Liters) 200 200 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80
Chimney (M) 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber YES YES YES
Mix-Combustion Chamber YES YES YES
Smoke Filter Chamber YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES
1st. Chmaber Temperature 800℃–1000℃ 800℃–1000℃ 800℃–1000℃
2nd. Chmaber Temperature 1000℃-1200℃ 1000℃-1200℃ 1000℃-1200℃

SIEMENS Control Unit for OIl Burner LOA24.171B27 Spare Parts for Incinerator Burner

SIEMENS Control Unit for OIl Burner  LOA24.171B27  Spare Parts for Incinerator Burner
What can be burned in an incinerator?
A material commonly associated with waste incineration is municipal solid waste (MSW). 
This type of waste is typically general waste such as household waste, food waste, 
cardboard, and paper. All of these are safe to incinerate.
What is incinerator use for?

What are the key products of incineration process



Items/Model

TS800

Picture

 

Principle

Animal Waste Incineration Treatment

Burn Rate

Average 300-450 kg/hour

Feed Capacity

Average 1200kg/feeding

Control Mode

Electric Control

Combustion Chamber

3000Liter

Internal Dimensions

300*100*100 cm

Secondary Chamber

***

Feed Mode

Manual/Forklift

Voltage

220V/380V

Power

5.0Kw

Oil Consumption (kg/hour)

***waste to Power plants cost

Gas Consumption (m3/hour)

Ave.22.8m3n/hr

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

***

Feed Door

200x100cm(Electric Opening)

Chimney

3Meter

Chimney Sort

Stainless Steel

1st.

Three Combustion Chambers(Optional)

3 Ranked for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For additional creature incineration

what would be the main products of incineration process

Maximum load of the camera (kg)


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

1200

Nanjing Clover Medical Technology Co.,Ltd.

1200kgs

Overall dimensions (without burner), (mm)

2823x1970x1724

500x220x190cm(without chimney)

2823x1970x1724 room Volume, m3

2.5 m3

300*100*100 cm, 3.0m3

EXT.main camera size

(d)2392x (b)1140

???

Size of loading opening, (mm)

(W)1152x (l)1425

W.1000*L.2000mm

Combustion temperature (C0)

650° – 1100°

800℃–1200℃

Weight (kg)

4500

7000kg

Weight of residues after combustion (kg)

no more than 5 percent

no more than 5 percent

Opening the hatch using a winch

accessibility

power-driven

The method of loading

the vertical

Top Feeding Door

Burners

Gas burners

Gas burners

Fire-resistant gasket,why is medical waste an issue

Z-blok fire-resistant gasket

Fire Brick and Refractory castable

Pipe dimensions (diameter, length) (mm)

1420×3000

???

Benefits of fire-resistant gaskets

Yes

yes

Temperature properties of the gasket (C0)

1650°

1700°C

Lining layer (fireclay brick)(mm)

114

114mm

Temperature properties of the liner (C0)

1650°

1700°C

burner gas (m3 / h)

9.9-17 m3 / h

22.8m3n/h max.

Burn rate (kg / h)

300-450

300-450

Electricity (volts/Hz)

220/50 Hz

220/50 Hz

Auto-ignition

Auto-ignition Yes

Auto-ignitio

Temperature sensor

accessibility

accessibility

Automatic control panel

the presence of

yes

Burn time at full load (hour)

4-8h

yes

Compliance of MPV and MPC emissions

contrasts to

China Standard

Painting

heat-resistant enamel

yes

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Typical )

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.


Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Electricity

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm

2021-02-23

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm



A heat exchanger to pre-heat air destined for the primary chamber is not compulsory but recommended.
The combustion air systems and fans shall be designed to ensure high combustion efficiency and avoid a reducing (corrosive) atmosphere, incomplete burnout of the flue gases and related problems. It should also be possible to heat the primary air from 10°C to approximately 145°C, depending on the waste composition and moisture content.
“The incinerator shall be designed and equipped to be installed, commissioned and operated in such a way as to prevent emissions into the air giving rise to significant ground-level air pollution; in particular, exhaust gases shall be discharged in a controlled fashion by means of a stack the height of which is calculated in such a way as to safeguard human health and the environment.
 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

 

2021-02-23



a.) incinerator for waste. VS pet cremation equipment for animals
b.) incineration to be ash and clean it. VS cremation and collect ash into pet cremation urns.
c.) waste stack disorderly.VS pet in chamber individual.
d.) waste material complicated. VS pet is body.
e.) waste incineration is public affairs. VS pet cremation equipment is personal business more.
f.) waste incinerator with small-large scale capacity. VS pet cremation equipment with regual pet size or weight
g.) waste incinerator feeding door small or big. VS pet cremation equipment feeding door match with pet size
h.) waste material with or without fat. VS pet body with fat.
i.) waste incinerator with or without exchange feeding door. VS pet cremation equipment better with exchange feeding door.

Special offer in Sept 2021 only, How much cost 30kgs to 50kgs per hour capacity medical waste incinerator, average 200 beded hospital?

How much cost 30kgs to 50kgs per hour capacity medical waste incinerator, average 200 beded hospital?
small scale hospital waste incinerator, for small hospital, for Covid 19 waste and PPE waste 2021
Special offer in Sept 2021 only, $7000usd per set(Diesel Oil Fuel), EXW factory term.  Contact with us with further information

Steps of waste management



Item

Specification

Model

A1500

Internal Dimensions

150 x 100 x 96cm

Suit for Animal

Cat – yes

Dog – yes

Pig – yes

Cow – Little

Main Product List

Main Combustion Chamber

 

Secondary Combustion Chamber

 

Mix-Combustion Chamber

 

Wet Scrubber( Washing Tower)

 

Incinerator Control Case

 

Chimney:10.0Meters *(Update to Stainless Steel, free Price )

 

Italy oil burner: 03 sets

 


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Oil Tank: 500Liters

Nanjing Clover Medical Technology Co.,Ltd.

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration

hospital waste management ppt 2018


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm


brick incinerator design,The control system shall include an electronic performance monitoring and logging system. The system shall be capable of monitoring and logging chamber temperatures at regular intervals (not less than once per minute, with the capacity to vary the logging frequency). The system shall include the capacity to download the performance data by USB connection.
All the measuring devices attached with the incinerator should have digital display and should have provision of connecting to the recording system, which should include fuel meter and separate energy meter.
The temperature shall be determined against the inside wall of the combustion chambers. An audible and visible alarm shall be installed to warn the operator when the secondary temperature drops to below the required temperature.
The primary chamber must meet or exceed the following criteria:
“• Heavy steel construction.
• Fixed hearth geometry and starved air gasification operational mode. 
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm. 
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. 
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints.
• Multiple electric ignition fuel burners designed to use automotive diesel fuel.
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame. 
• The unit shall prevent leakage of the hot flue gas and any backfire. 
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber walls away from the fuel burner.
• A differential air pressure gauge connected to an electronic datalogger

 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

450x210x300cm

 



The other day at the waste incineration plant

From waste is made electricity for 250,000 individuals

And this is the highlight. The heat produced during combustion is used. On the one hand, to heat the nearby Ford plant. But this is just a nice side effect. The majority of the heat is converted into electricity by generators. And even that the power consumption of 250,000 individuals can be fulfilled. The waste incineration plant Cologne is hence essentially a power plant also provides a quarter of the town of Cologne with electricity. That sounds amazing. And as you might find the notion it is not too bad when a lot of garbage is produced — as it is used so nicely…

After combustion bottom ash, hot exhaust gas and residue remain. These chemicals are largely used again useful: The ash is chilled with water and stored in an ash bunker before it is processed at a bottom ash treatment plant and then used in road, landfill and landscaping. Residues from sorting and residues from the domestic and tight waste are distributed to the daily waste bunker on separate chambers. The bulky waste is pre-sorted and smashed. Just the non-recoverable parts are processed from the incinerator.

The household waste is sorted in a perforated drum to dimension and then passes on large conveyor belts so-called magnetic seperators. They remove ferrous scrap. Another ferrous metallic deposition in addition to an automatic non-ferrous deposition take place after combustion. They have been processed in external sorting, and therefore they may be used right to the domestic and bulky waste. The various waste streams are mixed completely, because this homogenization ensures a top quality, a uniform as possible burnout and a fantastic quality ash.

Recently a dream came true for me personally. That may seem odd. Sometimes I catch myself when I get stuck on documentary programs about recycling methods from the (rare) zapping through the TV stations. Obviously this subject fascinates me. Because I am also very interested in the subject Generation Y, I could kill two birds with one stone. The hot exhaust gas is used for electricity generation. It heats preheated water , which matches at a temperature of 400 degrees Celsius and a pressure of 40 bar to a turbine. This pushes the downstream generator by which is produced electric power. For own use just a small part of the energy is needed. The greater part is given in external electricity supply networks. The amount of energy created in the incinerator is sufficient to power more than 100,000 families.

In the combustion and the subsequent exhaust gas purification residual substances like salts and dust remain in addition to ashes from the boiler. These substances are collected and used as backfill material for the backfilling of salt mine . Gypsum can also be a waste substance, which is obtained as a reaction product from the exhaust gas purification and contains construction material quality.

Emission control: the exhaust gases are almost completely neutralized from the method used in the Cologne incinerator. There is not any waste water, in addition to the legal requirements are clearly undercut. As a neutral auditor, the county government receives the real exhaust gas readings permanently by direct line.

Rethinking at waste management businesses

After the guided tour, I had the chance to talk to the press officer of AVG. In this conversation it became apparent how much the thinking has changed in the sphere of waste management in recent decades and years. Even during the 1960s into the 1990s crap was piled up completely unsorted in landfills and then abandoned, at the new millennium they’ve recognized the value of the waste. Climate change and CO2 emissions have long pushed as important issues accountable for the residual waste processing. The heat generated during combustion is converted into electricity. Resources are recovered, as far as is technically possible. Notably metal, wood and plastics. The recovered plastic out of residual waste is used such as fuel for cement plants.

Waste incineration plant are now equatable to electricity plants, even when fuel value is not quite equivalent to the traditional fuels like coal, gas and oil. As an increasing number of municipalities have come to generate their own electricity by means of residual waste incineration, the major electricity suppliers get in significant difficulties.

In the conclusion of the tour I was really impressed. That what’s put from the residual waste in private families in addition to the industrial waste is, after all, still god to supply 100,000 families with electricity in Cologne.

And in precisely the same time it’s scary, what incredible tonnes of waste we all produce. Blue and orange ton even come in addition to that.

Consumer society offers garbage

Waste incineration plants producing electricity for us and making us less dependent on fossil fuels, are the logical consequence of our society. But incinerators aren’t built primarily to generate electricity. But to become master of the hills of waste we produce continuously as a society. Luckily, with modern incinerators, a method was shown to constitute the stinking problem a fresh thing. But the cause, our consumption, is the real problem.

for those operators of the incineration plant, so it is essential that enough waste is delivered. Garbage is their merchandise. The more they could get, the better for your machine’s capacity. For then it’ll work cost-effectively, which in turn has a positive influence on the urban garbage fees. Since waste is added from adjoining areas.

But the consumer society provides those masses of garbage. Goods are produced in large quantities, bought, used or consumed and eventually discarded. The 2aste incineration plant gets food — in 2013 there were 707,000 tons in Cologne. And provides us even with electricity (282 million kWh in 2013 in Cologne). Truly an ideal cycle, so one might think. If not with this”but” are. Since our conventional consumption goes at the expense of other countries, to the detriment of the environment, fair working conditions; Resources are wasted, the transportation around the globe has influence on the climate, manufacturing facilities in the Far East poison the local surroundings and so forth.

Well, I reside in Cologne, a huge town, where surely only a small proportion of residents consider trash, disposal or perhaps waste reduction and also practice this. That may be a negative perspective, but I think that it is realistic. The average normal citizen doesn’t necessarily ask the question what’s actually occurring to that which he throws away in the course of a year. My second wish is to pay a visit to a recycling plant for plastics.

Waste incineration and waste seperation versus waste prevention

Waste separation was yesterday. The latest approach is waste prevention. In its most distinct version it is named Zero Waste. No waste. So far there are just a few leaders, whose videos and reports I read and watch with interest. And in precisely the same time I wonder how to implement this at a typical big-city life. It starts with the truth that — even if you use a togo box, which is compostable, then you do not know where to dispose of it along the way. Would everybody do this?

that I think it’s good if it is possible, to be master of the situation (immense amounts of waste) through a nicely organized disposal system and outside actually to convert this residual waste to a large extent into energy, ie heating and electricity. There is at least a massive improvement as against the stinking landfill out of earlier, in which everything has been thrown into a heap and then covered with the cloak of silence. The following step should be, to decrease the amount of waste in total. And this won’t be possible just from the civic society. Here politics and economy are asked to produce the right framework and to set the operational execution in movement. In a small group, we had been led by the spokesman of the AVG through the respective segments of the garbage incineration plant and the procedures were explained in detail. Originally skeptical, because in previous years there has been so much negative about this facility (excessive construction costs, lack of capacity), the disposition among the participants changed slowly into fascination.

To explain: It is Pretty Much waste. Not about recycle materials like paper, plastics, recycled glass or compostable organic waste.

Truth and cleanliness

What I discovered during the excursion: In the plant, each measure is carefully considered, it is worked with great precision. And even if this sounds paradoxical: it is squeaky clean! Just in the hall where different wastes are mixed onto conveyor belts, there is the typical smell of crap, but also not as bad as originally anticipated.

Amazing for me personally: I did not know that by using residual waste a really large amount of electricity is generated. And reassuring for me personally: tools are obtained even from the previous fall: alloy, material for road construction, plaster at good quality. The proportion of what’s factually left and actually not recycled, seems negligible to low.

From waste to electricity — the process in detail

The remaining waste incinerator from Cologne was set into operation in 1998 and is among the most modern and best facilities in the world. It processes what has landed from the residual waste after the individual selection of private families, in addition to the remains of sorting out of mixed building and industrial waste.

Much of the waste is sent by rail. The railroad containers are filled in two waste transfer stations in the city of Cologne and together have a capacity of about 250,000 tons each year. The rest of the waste is brought by truck.

Waste separation was yesterday. The latest approach is waste prevention. In its most distinct version it is called Zero Waste. No waste. So far there are only a few pioneers, whose reports and videos I read and watch with interest. And at the same time I wonder how to implement this in a normal big-city life. It starts with the fact that – even if you use a togo box, which is compostable, then you do not know where to dispose of it along the way. So take it home and put it in the compost bin? Would everybody do that?

I think it’s great if it is possible, to be master of the situation (immense amounts of waste) through a well organized disposal system and beyond even to convert this residual waste to a large extent into energy, ie electricity and heating. There is at least a huge improvement as against the stinking landfill from earlier, in which everything was thrown into a pile and then covered with the cloak of silence. The next step must be, to reduce the amount of waste in total. And this will not be possible just by the civil society. Here politics and economy are asked to create the right framework and to set the practical implementation in motion.

by: http://blog.upcycling-markt.de/en/blog/muellverbrennungsanlange-waste-incineration-plant.html

HICLOVER Needle Incinerators-Syringe and Destroyer-Needle Destroyer

1. For clinic,lab, small hospital with low waste output capacity, no condition with other medical waste treatment(Underdeveloped country or area, or emergency situations ).
2. Doctor, nurse treat the syringes, needle, infusion set immediately after use, plug to play, no dispersion risk.
3. melting the syringes needle with 1250Celsius high temperature to metal slag, sterilization immediately. Destroy syringes, infusion set, can not use again.
Medical Needle Incinerator: Melt the needle waste, cut off syring tube with needle, cut off the infusion tube.
Model SYC19, Price: $110usd/set, MOQ: 5 sets.
EXW factory term(donot including shipping cost)
Purchase email:  [email protected]
Qustion1: If request 1-4 set only, how to do?
Answer: We will plus $50-$200usd fee per order.
Qustion2: If request more than 5 sets only, any discount?
Answer: We will  supply discount quotation accordingly.