Tag: Waste Incinerators

A MOBILE MEDICAL WASTE INCINERATORS

Main Product List

Primary Combustion Chamber

Secondary Combustion Chamber

Mix-Combustion Chamber

Smoke Filter Chamber

Incinerator Control Case

Chimney:5.0Meters *(upgrade to Stainless Steel, free cost)

Italy oil burner: 02 sets

Oil Tank: 150Liters

Mobile Trailer for Incinerator

















Model

YD-50C

Burning Rate (kgs/Hour)

Average 20-50 kgs/hour

Feed Capacity (kgs)

Average 80 kgs/feeding

Equipment Weight

2500 kgs(Incinerator)

Primary Chamber (Liters)

400

Secondary Chamber (Liters)

140

External Dimensions (cm)

180x160x200

Internal Dimensions (cm)

70x70x85

Oil Tank(Liters)

150

Door Opening (cm)

45×55

Chimney (M)

5

Chimney Type

Stainless Steel

Secondary Chamber

YES

Mix-Combustion Chamber

YES

Smoke Filter Chamber

YES

Combustion Fuel

Oil

Residency Time

2.0 Sec.

Temperature Monitoring

YES

1st. Chamber Temperature

800℃–-1000℃

2nd. Chamber Temperature

1000℃-1200℃

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

Afterburner Preheat Incinerator

PRIMARY CHAMBER

Heavy-duty steel casing

High quality refractory lining and insulation Large full size top load counterbalanced door
1 x oil/gas fired ignition burners operated on/off

SECONDARY CHAMBER

Heavy-duty steel casing

High quality refractory lining and insulation 2 second gas residence time
1 x oil/gas fired ignition burners operated on/off

CHIMNEY

Heavy-duty stainless steel casing

CONTROL PANEL

Control of primary and secondary burners Temperature Monitoring with 4 digit display Thermostat control device for burner (fuel saver) Timer control 0- 12 hours

Integral fan timer control

Technical Specifications

Fuel
Diesel

Capacity
900kg (1.35m³)

Burn Rate
150kg/h

Avg Ash Residue
3%

Avg Fuel Consumption p/hr
20ltr

Operation
Min. Operating Temperature    950°C
Max. Operating Temperature    1320°C
Residency Time in Secondary Chamber    2 Seconds
Temperature Monitoring    YES

ANCILLARIES

Operating and maintenance manuals Spares list

KEY FEATURES

•Afterburner Preheat

•Incineration temperatures in excess of 1300°C

•5mm steel casing and fully insulate

•Dense refractory concrete lining rated to 1600°C

GENERAL SPECIFICATIONS FOR INCINERATORS

Primary and secondary burners: Separate electrically spark-ignited primary burners and secondary burners with automatic control shall be used to achieve the specified temperature requirements in the primary and secondary chambers. The flames  of the primary and secondary burners shall not impinge on the incinerator walls or floor.
The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels.
Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently

Ensure minimum exit temperature is not less than 850oC

Air supply: Air supply in the primary and secondary chamber should be regulated between 30%-80% and 170%- 120% of stoichiometric amount respectively. Suitable flow measurement devices shall be provided on the primary and secondary air ducting. The combustion air shall be supplied through a separate forced draft fan after accounting for the air supplied through burners.The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.

4.    Ensure flame contact with all gases is achieved.

5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

lnsulation: lnsulation to be used for masonry, reinforced concrete, or non-combustible material shall prevent damage to the foundation from excessive heat and shall be of a thickness to limit the outer casing to a maximum temperature of 66°C in an ambient temperature of 21°C when the incinerator is operating at full capacity.

Refractory: Refractory shall be #super duty# and heat-resistant to a minimum of 1100°C in the primary chamber and 1250°C in the secondary chamber. Refractory shall also be abrasion resistant in the prlmary chamber, constructed of plastic or castable type refractory, designed to prevent bulging and destruction due to heat stress, capable of supporting more than twice the hourly burning rate and preventing leakage of fluids, and with a minimum thickness of 11O mm for walls and hearths

Incinerator YD-100 for Iraq

 There are 03 sets Model YD-100 delivery to Iraq between year 2013 to 2014. The incinerator use for local several construction sites and all fuel type is diesel oil.

 

Items/Model YD-100
Burning Rate (kgs/Hour) 100 kgs/Hr.
Feed Capacity (kgs) 200 kgs
Equipment Weight 5300 kgs
Primary Chamber (Liters) 1200
Secondary Chamber (Liters) 500
External Dimensions (cm) 220x180x360
Internal Dimensions (cm) 130x100x90
Oil Tank(Liters) 300
Door Opening (cm) 55 x 80
Chimney (M) 10
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200
Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

Incinerator YD-30 for Australia

Incinerator Model YD-30 for Australia Melbourne customer. From year 2011 to 2013, we delivery 02 different model for this customer, one is model SYC-50 (now updated to Model TS50 PLC) and one model YD-30. Both two model is gas fuel type and these incinerator for local family pet cremation business.

Items/Model YD-30
Burning Rate (kgs/Hour) 30 kgs/Hr.
Feed Capacity (kgs) 60 kgs
Equipment Weight 2300 kgs
Primary Chamber (Liters) 360
Secondary Chamber (Liters) 200
External Dimensions (cm) 145x90x175
Internal Dimensions (cm) 100x60x60
Oil Tank(Liters) 200
Door Opening (cm) 48 x 60
Chimney (M) 5
Chimney Type Stainless Steel
Secondary Chamber  YES
Mix-Combustion Chamber YES
Smoke Filter Chamber YES
Combustion Fuel Oil/Gas
Residency Time 2.0 Sec.
Temperature Monitoring YES
1st. Chmaber Temperature 800–1000
2nd. Chmaber Temperature 1000-1200


Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

China vows coordination as virus grows



WHO declares outbreak constitutes international public health emergency

China vowed on Friday to work with the international community to uphold regional and international health security, and reiterated it has the confidence and capability to win the battle against the novel coronavirus epidemic, which has claimed 213 lives throughout the country as of Thursday.

The pledge came as the World Health Organization declared on Thursday that the outbreak constitutes a public health emergency of international concern, or PHEIC, following an emergency meeting in Geneva, Switzerland.

The number of confirmed cases of novel coronavirus rose to 9,692 on the Chinese mainland as of Thursday, among which, Hubei province ― the epicenter of the outbreak ― reported 5,806 confirmed infections. The Hong Kong and Macao special administrative regions as well as Taiwan reported 28 confirmed cases of the disease as of Thursday. The virus has also spread to several other Asian nations and reached Australia and Europe as well.

The Centers for Disease Control and Prevention in the United States said Thursday that an Illinois woman who recently returned from China had transmitted the coronavirus to her husband ― the first known case of persontoperson spread of the pathogen in the US.

Foreign Ministry spokeswoman Hua Chunying said in an online statement on Friday that since the outbreak, China has been in close communication and cooperation with the WHO. “China will continue working with the WHO and other countries to safeguard regional and global public health security,” Hua said.

Saying the Chinese government has been taking the most comprehensive and rigorous prevention and control measures for people’s health and safety, Hua added that many of the measures go well beyond the requirements of the International Health Regulations.

“We have full confidence and capability to win this fight against the epidemic,” she said.

Also on Friday, the National Health Commission called on the international community to understand and support China’s efforts in preventing and controlling the epidemic.

The commission hopes countries from around the world will work with China to jointly prevent and contain the disease in line with the International Health Regulations as well as the recommendations of the WHO in order to safeguard regional and global public health security, according to a statement issued by the commission on its website.

WHO DirectorGeneral Tedros Adhanom Ghebreyesus, who recently wrapped up his visit to China, said the declaration was not a vote of no confidence in China. Rather it is necessary because humantohuman infections have been confirmed in other countries.

“As I have said repeatedly since my return from Beijing, the Chinese government is to be congratulated for the extraordinary measures it has taken to control the outbreak, despite the severe social and economic impact those measures are having on the Chinese people,” Tedros said at a news conference after a closeddoor meeting of the Emergency Committee.

Tedros said that the WHO does not recommend limiting trade and movement, and opposes any travel restrictions against China.

“We would have seen many more cases outside China by now, and probably deaths, if it were not for the government’s efforts and the progress they have made to protect their own people and the people of the world,” Tedros said.

“The speed with which China detected the outbreak, isolated the virus, sequenced the genome and shared it with WHO and the world are very impressive and beyond words. So is China’s commitment to transparency and supporting other countries. In many ways, China is actually setting a new standard for outbreak response, and this is not an exaggeration,” he added.

During a telephone conversation with Canadian Foreign Minister FrancoisPhilippe Champagne on Friday, State Councilor and Foreign Minister Wang Yi expressed hope that Ottawa will respect the recommendations of the WHO in an objective and fair manner to ensure trade exchanges and travel of people between China and Canada will not be influenced.

Champagne said Canada highly appreciates China’s strong measures and the open and transparent manner it has conducted itself in prevention and control of the contagion, and is also fully confident of its capability in dealing with the epidemic.

China’s top envoy to the United Nations, Zhang Jun, called on the international community to exhibit “solidarity” in dealing with the outbreak. Addressing a news gathering at UN headquarters in New York on Thursday, Zhang said the WHO recommendations “should be seriously considered” and “there is no reason for measures that unnecessarily interfere with international travel and trade”.

He called for all countries to adopt a responsible attitude, work together to combat the virus and avoid overreacting.

Since the outbreak of the contagion, leaders of foreign countries and international organizations have voiced their support for, and highly commended, China’s efforts to curb the spread of the virus.

Angus McNeice in London and Hong Xiao in New York contributed to this story.


Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

a DUCK farm incinerator

a DUCK farm incinerator, we need to buy a medium size incinerator for biological waste, more specific DUCKS.a pet crematorium in ireland.Equipment Double chamber medical infectious waste incinerator Capacity 10-30 kg per hour Characteristics of waste
Mainly syringes and needles from immunization routine and campaign activities. However, the following average characteristics are considered*:

heating value above 2000 kcal/kg (8370 kJ/kg); content of combustible matter above 60%; content of non combustible solids below 5%; content of non-combustible fines below 20%; moisture content below 30% by weight

Combustion performance: The medica waste incinerator shall be capable of reducing waste to ash not exceeding 10% of the total combustible charges.

Outdoor installation. The medical waste incinerator will be installed outdoors.    All incinerator components shall be suitable for but not limited to outdoor shaded installation, including electric motors, be resistent to corrosion, moisture and related weather elements.

could you please forward me some information. a suitable Incinerator for Incineration of oil, plastic hazardous waste, sludge waste, hazardous filters etc.

installation of waste disposable incinerator system

installation of waste disposable system in airport.Incinerator with oil burner
Capacity  2 ton/day, Oil tank 300 l  Oil pump 0.4Kw , Burner 0.2Kw
Model : YD Series
Country of Origin : ITALY.-          Diesel incinerator.

–          25Kg/h. It will have mainly paper, cardboard and food, though also it will incinerate medical waste. So the incinerator shall be able to handle organic and hazardous waste.

–          Spare parts for one year.Burning Capacity: 400kg/ Hr ( Maximum Combustion time is 6 times/ Day)
Chimney External Diameter: not more than 400mm
Fan Power: must not exceed 1.1kw
Voltage: 220V
Oil Consumption: Must not exceed 14kg/hr
Feeding Door Width: not less than 1000x1300mm
Incineration Temparature: 800 Degree or above
Emission:
CO- Must not exceed 100mg/m3
SO2- Must not exceed 400mg/m3
HF( Hydrogen Flouride)- Must not exceed 9mg/m3
NO2- Must Not exceed 500mg/m3
Smoke Dust: Must Not exceed 100mg/m3

–          The design should prevent any release of polluting substances into soil, surface water and groundwater.

–          Combustion zone has to reach at least 860 degrees under the most adverse conditions with at least 6% oxygen. Since it will treat hazardous and organic waste, temperature has to reach at least 1100 degrees for at least 2 second.

–          Flue gases must be cooled to 200 degrees or lower before flue gas treatment. The flue gas cleaning equipment maust be at least two-field electrostatic precipitator/ESP, dust <30mgNm3.

–          Thermal efficiency not less than 85%.

–          It should be equipped with filter to reduce and contain pollutants from organic and medical waste.

–          Easy to operate for almost unskilled workers.

50kgs per hour incinerator with two chambers suppliers from china

50kgs per hour incinerator with two chambers suppliers from china
*Aveage 50kgs per hour
*Double chamber and double burner
*900liters primary combustion chamber
*Italy burner
*Stainless steel chimney

Model

YD-50

 Burning Rate

Average 50 kgs/hour

Feed Capacity

Average 150 kgs

Primary Combustion Chamber

900 Liters

Secondary Combustion Chamber

300 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V/380V

Power

0.7Kw

Fuel Type

Diesel Oil/ Natural Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

12.1–23.9 kg/hour

Gas Consumption (Natural Gas)

9.9–26.1 m3/hour

Internal Dimensions

120 x 90 x 85cm (primary chamber)

External Dimensions

200 x 160 x 310cm (without chimney)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

300 Liters

Door Opening

62 x 80cm

Chimney Length

5.0 Meters

Chimney Type

Stainless Steel

Equipment Gross Weight

5500 kgs

Operation Technical Specifications

Primary Chamber Temperature

800–-1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3000Kcal

Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

INCINERATOR TESTING AND COMMISSIONING

A flue chimney, 15,000mm long and 560mm diameter shall be constructed from steel sheet, complete with lagging, damper and rain water protection cone.  The chimney shall be lined with castable grade diatomaceous concrete mixed with high alumina cement in accordance with BS 4076: 1989.

The damper will control the closing of the door to not less than 85%.  The stack is to allow fresh air at the stock’s base so that the flue gases are discharged at not move then 4000 C and that the discharge conforms to the British Clean Air Act, the National Environment Management Agency (NEMA) Act or other relevant acts. .

1.1.4    POWER SUPPLY

The sub-contractor shall supply equipment which are suitable for running on a 415V, 3 phase, 50HZ or 240V, single phase, 50HZ electric power supply.

1.1.5   OIL STORAGE AND SUPPLY

The system shall consist of a bulk oil storage tank, daily tank, transfer hand fuel pump and associated pipe work.  Oil from the bulk storage tank will be delivered to a high level daily tank situated in the incinerator room by use of a transfer hand pump and automatic electric pump.

1.1.6    SPARES AND MANUALS

The tenderer is to submit with his tender a list of recommended initial stock of spares together with their prices.  A part from the burner spares mentioned here below, the spares prices are not to be included in the main summary of prices schedule but is to be separate and are meant to be ordered later if and when it becomes necessary and convenient to the client.  The burner spares whose prices are to be included in the main summary of prices schedule (BQ) are:-

i)     1No. Set of safety controls
ii)    1No. Solenoid valve
iii)    1No. Oil ignition system
iv)    2No. Photo-electric cells

Two sets of operating and maintenance manuals (both for the incinerator and burners) must also be supplied. This include two sets of control schematic diagrams for all the controls and wiring.

1.1.7   BULK OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and complying with BS 799 part 5: 1975 shall be positioned on three concrete cradles.

The works shall include supply, delivery, assembling, erection, testing, commissioning and setting to work.  The tank is to be of welded mild steel type with a design pressure of  40KN/m2 and storage temperature of 240  C.  It is to be located adjacent to the incinerator and boiler house.

The tank shall be cylindrical with dished end and be constructed of 6mm thick block mild steel plates in accordance with BS 1966.  Number one quality galvanised materials shall not be used.Welded construction parts shall be sprayed.

E-4

The tank shall be pressure tested with a total head of water or equivalent, measured from the base of the tank, and equal to 1½ times the sum of:

(i)     The height of the tank and
(ii)    The design head above the top of the tank that is 3.5m of water.

The pressure shall be raised slowly and steadily until the specified test pressure is reached and that pressure shall be maintained for a period long enough to permit a thorough examination to be made to ensure that the tank is sound enough and shows no leaks or undue distortion.  Welded joints shall be radiographed and a certificate issued.  Should any defects be found, they shall be made good and the test procedure repeated until the tank is certified to be sound.  The tests shall be carried out in the presence of the Engineer and subsequently, the sub-contractor will provide the Engineer with the test certificate.

The tank shall then be cleaned externally and provided with rust inhibiting primer before applying 2No. coats of bituminous paint.  The inside shall also be cleaned and purged of any foreign matter before setting to work.

Ladders and platforms shall be thoroughly cleaned and freed from rust and scale and painted with a priming coat of approved paint.

The tank shall be provided with the following:-

(i)    450mm bolted inspection covers with liquid and vapour tight joint made with a gasket of fuel resistant materials.
(ii)    75mm (3”) vent socket screwed B-SP and pipe at the higher end of the tank with an unloading device to prevent the rise in tank pressure above the design pressure.  The vent pipe shall be free from bends and shall have a continuous rise while being as short as convenient.  It shall terminate in open air in a position where it cannot be tampered with.  The open end shall be turned down and fitted with an open mesh wire cage.
(iii)    65mm diameter filling pipe with hose coupling connection
(iv)    50mm diameter gauging connection with lockable cap.
(v)     50mm diameter supply pipe
(vi)     25mm diameter water drain-off value

The tenderer shall supply hydrostatic oil contents gauge (level indicator) or a
properly calibrated stick (of dip tape) and access ladder to the top of the tank.

The filling pipe shall be extended inside the tank to within 150mm of tank bottom,
complete with anti-siphoning device.

The following information shall be permanently and clearly marked on the tank on the
centre line near the outlet connection.

•    Gross capacity in litres
•    Test pressure
•    Date of test
•    Maximum allowable working pressure
•    Manufacturer’s name of trade mark
•    Year of manufacture
•    The number of British standard and type of tank

The tank shall be installed with a 25mm fall towards the water drain-off tapping point.  The supply socket shall be extended inside the tank to prevent ingress of water in the supply line.  The main contractor shall construct tank supports and bund walls to detail drawings produced by the sub-contractor.  A valued drain off from the lowest part of the tank shall be provided complete with tail pipe and a provision for hose connection.

E-5

1.1.8    TRANSFER HAND PUMP

A semi rotary hand pump shall be provided for filling the day storage tank from the oil drum.  It shall be installed complete with all the necessary plumbing fittings and accessories.

1.1.9   DAILY SERVICE TANK

A daily storage tank of nominal capacity 1,800Litres shall be mounted at 2.5 metre high level in the incinerator room.   Tank shall be manufactured from 6mm thick pressed steel plates of 1220mm x 1220mm black mild steel sheet, complete with bolted cover and adequate venting.  The tank shall conform to BS 799 part 5 1995 and be provided with a contents sight tube. The tank shall be lagged with 50mm thick fibre glass insulation of 0.4W/m2 thermal conductivity and finished with 20SWG galvanized sheets cladding.

The tank shall be tested for any leaks of which if any is detected will be made good before the tank is painted externally with rust inhibiting paint. Tank to be securely bolted.

1.1.10  AUXILLIARY EQUIPMENT

All pipework used in the oil storage systems shall be to B.S. 1387 heavy grade.  Joints shall be screwed, and sufficient unions must be provided to allow easy dismantling the equipment.

A 25mm diameter fire valve of the quick action lever operated dead weight type shall be installed, in the oil flow line.  This shall be held in the open position by a light gauge steel cable attached to a fusible link.  The fusible link shall be mounted directly over the burner.  The warm burner oil feed pipe from the high level day tank shall be heated by an electric tracing tape properly wrapped around the pipe.  The pipe shall then be insulated with 25mm thick fibre glass insulation and finished with gauge 22swg galvanized steel sheet.

The supply pipe from the bulk oil storage tank to the high level day has been installed by others but the tenderer shall allow for connection to the high level day tank.  The tenderer shall also supply and install high capacity strainers along the supply pipe and the burner feed pipe.

1.1.11   PIPE SUPPORTS

The variety and type of supports shall be kept to a minimum and their design shall be such as to facilitate guide and secure fixing to match concrete masonry or wood.

Consideration shall be given when designing supports to the maintenance of desired pipe fall and the restraining of pipe movements to a longitudinal axial direction only.

The sub-contractor shall supply and install all steel work forming part of pipe support assemblies and shall be responsible for making good any damage to builders work associated with builders work installation.

Pipe runs shall be secured by clips connected to pipe hangers, wall brackets or trapeze type supports.  ‘U’ bolts shall not be used for clips without prior approval of the Engineer.

The sub-contractor shall submit his entire proposal for the pipe supports to the Engineer for approval before any erection work commences.

1.1.12   ELECTRICAL WORKS

All wiring between items, plant and controls shall be executed by the tenderer. The tenderer shall provide adequate supervision to ensure that electrical connections are correctly made to all items of equipment and controls supplied by him, all to the Project Manager’s / Engineer’s satisfaction.

E-6

1.1.13    INCINERATOR TESTING AND COMMISSIONING

The tenderer shall test and commission the incinerator in the presence of the Engineer.The tenderer shall also provide sufficient oil to last at least two (2) hours.  The tenderer shall test and commission the incinerator in the presence of the Engineer and verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues and manuals from the suppliers of he incinerator.The incinerator performance test shall be carried out in accordance to BS3316: part 4:1987.Should any defect be detected, it shall be rectified and the testing process repeated to the Project Manager’s satisfaction.

1.1.14    FIRE INSTRUCTION NOTICE

Proceed and procure and install as below;

Print fire instruction on the Perspex plate, 3mm thick with White Colour
Background measuring 510mm lengthx380mm width as follows;