Tag: Waste Incinerators

portable clinical waste incinerator manufacture business in china

Capability: 20KG/Hr, Temp Variety: 600 Deg. C– 1100 Deg. C

Gas Supply: Natural Gas/Diesel

Dual Burning Chamber Full Scrubbing System (Double

Resultant Gas Washing Machine), Dual Blower, Chimney Elevation: 8m

Electric Supply: 220/240Volt, Single Stage

1. Sort of waste: Garbage
2. Any type of other type:
3. Amount of waste produced daily in kg: (50 Lot per day) SOW
4. Period– burner will certainly be utilized each day: (Minimum 12 hours) SOW
5. Approximate wetness material:
6. Local burner operating as well as exhaust criteria: US-EPA
7. What is the height of the smokeshaft required: Not understood
8. Fuel proposed to be made use of: Deiseal Oil
9. Accessibility of power and also kind: 220 or 110
10. Information of room readily available: Plenty of room
11. Do you call for an automated loading system: [**] Yes [**] No.
12. Do you require a gas scrubbing up system: [**] Yes [] No.
13. Exactly how soon do you require the system to be provided: 30.
14. Any type of other certain demands:.
15. Nature: (Solid/Semi-solid/Liquid)

Incinerator to cut black bag landfill waste

30 August 2013 Last upgraded at 21:18 BST

Five councils in south eastern Wales have created a collaboration to take care of black bag waste in a bid to reduce rubbish going to landfill.

The authorities aim to blaze waste which can not be recycled and convert it into power in a new task which is receiving a ₤ 4m annual give from the Welsh federal government.

Environment contributor Iolo ap Dafydd reports.

Article priced quote from the network QQ图片20160218145327

SHEDDING AND INCINERATION OF SOLID WASTE

Biomedical Waste Any kind of strong or liquid waste which may offer a hazard of infection to people consisting of non-liquid tissue, body parts, blood or blood items and body fluids, research laboratory and also veterinary waste which includes human disease- triggering agents, and discarded sharps (i.e. syringes, needles, scalpel blades).

Base Ash The program non-combustible and also unburned material which remains at the shed site after burning is total. This includes products continuing to be in the burn chamber, exhaust piping as well as air pollution control tools where such tools are used.

Burn Box A huge metal box made use of to shed solid waste. Combustion air is typically provided passively via vents or openings cut above all-time low of package. An exhaust pipe or stack might or may not be affixed.

Industrial Camp A short-lived, seasonal or multi-year facility with a capacity more than 15 individuals and also which has actually been established for study, industrial or commercial purposes. An industrial camp does not consist of a conventional camp or area camp.

Commissioner’s Land Lands that have actually been moved by Order-in-Council to the Federal Government of Nunavut. This includes streets as well as land subject to block land transfers. The majority of Commissioner’s Land is located within municipalities.

Impurity Any type of noise, warmth, resonance or substance and includes such various other substance as the Minister might prescribe that, where released right into the atmosphere,

  • endangers the health, safety or welfare of persons,
  • interferes or is likely to interfere with the normal enjoyment of life or property,
  • endangers the health of animal life, or
  • causes or is likely to cause damage to plant life or to propert

Established Effort The recurring evaluation of chances for decreases and the application of modifications or emission control upgrades that are technically and economically practical as well as which result in on-going reductions in exhausts. Determined initiatives consist of the growth and execution of waste management preparation which is focussed on air pollution avoidance.

De Novo Synthesis The production of complicated molecules from simple molecules.

Setting The elements of the Planet as well as includes

  • air, land and water,
  • all layers of the atmosphere,
  • all organic and inorganic matter and living organisms, and
  • the interacting natural systems that include components referred to in paragraphs (a) to (c) above.

Field Camp A short-lived, seasonal or multi-year center consisting of outdoors tents or other similar short-lived frameworks with a capacity of 15 individuals or less and which has been established for research study, business or industrial objectives. An area camp does not include a conventional camp or industrial camp.

Fly Ash Unburned product that is sent out into the air in the kind of smoke or great particle issue throughout the burning process.

Hazardous Waste A contaminant that is an unsafe great and is no longer wanted or is unusable for its initial designated objective and also is intended for storage space, recycling, therapy or disposal.

Incineration A therapy technology involving the damage of waste by controlled burning at high temperatures.

Incinerator A device or framework planned mainly to incinerate waste for the purpose of lowering its volume, ruining a dangerous material in the waste or ruining an infectious material in the waste. A burner has suggests to regulate the burning and air flow processes.

Assessor An individual assigned under subsection 3( 2) of the Environmental Protection Act and also consists of the Principal Environmental management Officer.

Changed Burn Barrel A metal drum made use of to burn waste that has been fastened with gadgets or features which supply limited boosted warm generation, heat retention as well as holding time.

Open Burning of waste with restricted or no control of the melt procedure. For clarity, open burning includes burning on the open ground or utilizing a melt box or unmodified or changed burn barrel.

Certified Individual An individual who has an appropriate level of expertise and experience in all pertinent aspects of waste management.

Accountable Party The owner or person in charge, administration or control of the waste.

Smoke The gases, particle matter as well as all other products of combustion produced right into the environment when a substance or product is melted consisting of dust, triggers, ash, soot, cinders and fumes.

Solid Waste Unwanted solid materials discarded from a house (i.e. single or numerous property residences, other similar irreversible or temporary residences), institutional (i.e. institutions, government centers, healthcare facilities as well as health and wellness centres), business (i.e. stores, dining establishments) or industrial (i.e. mineral, oil as well as gas expedition and growth) center. For quality, strong waste does not consist of biomedical waste, hazardous waste or sewage sludge.

Typical Camp A short-lived or seasonal camp used mostly for camping, searching, angling or other typical or social tasks. A typical camp does not include a field camp or industrial camp.

Unmodified Burn Barrel A steel drum made use of to burn waste that has not been affixed with tools or functions which provide for enhanced warm generation, warmth retention as well as holding time.

Unattended Wood Timber that has actually not been chemically fertilized, painted or likewise changed to boost resistance to insects or weathering.

Waste Audit An inventory or research of the quantity as well as type of waste that is generated at a location.

China incinerator

Incinerator Of Burning Capacity 30 kg/hr = 1 No

The Incineration System consists of:

I. Main Burner with

A. Refractory lined Key and Additional Chamber.
B. Refractory lined main charging door and ash cleaning door.

II i. 1 No. completely automatic oil heater for main chamber.
ii. 1 No. completely automated oil burner for additional chamber.

III.Centrifugal forced draft combustion air follower with electric motor.

IV. Circulation dimension tool on the Pri mary & & Additional air ducting.

V. Auto-loading in the type of Dual FDV mechanism with external entrance
handbook and also inner motorized.

VI. Emergency situation stack/ vent.

VII. High pressure Venturi scrubber of SS316 L

VIII. Cyclonic type droplet separator orgasm recirculation container in Mild steel
rubber lined (MSRL) building.

IX. I.D. Follower with MSRL casing & & SS 316 L impeller with electric motor.

X. Recirculation Pump (SS 316) with Electric motor in addition to piping & & valves in
SS 316.

XI. Expenses HDPE Water tank for scrubber in addition to water piping
in between container and scrubber.

XII. Adjoining ducting within the battery restrictions.

XIII. Instruments, valves, dampers and fittings within battery limitations.

XIV. PLC based Control Panel with necessary instruments.

XV. Data recording tool in the form of Printer.

XVI. Oil tank of 500 ltr capability in addition to oil piping, valves & & strainers in between storage tank & & burner.

XVII. Operati ng tools & & tackles like rake, hoe, shovel, 2 teeth scrapper.

XVIII. Caustic dosing system comprising of Tank- Agitator and also pump

XIV. GAS LDO DIESEL.

maker of ha zardous waste burner in china

Burning Capability: 125 kg minimum/time (3-6times/ day), dual chamber, dual combustion system
Imputing door Mouth Width (mm): 760 * 760 (approx.).
Smokeshaft External Size (mm): 300 ± 10.
Combustion Improver Device: 0.11 kw, Fuel intake: 7kg/ hr (max).
Re-Burning Tool: Oil consumption: 5kg/h, 0.37 kw, Oil consumption: 10-20kg/ h.
Voltage: 380v/220v Air Conditioner, Service Warranty: 1 Year, 50 Hz

Per your advertisement for 300 kg.hr. Version– We need to know the rate through return.

The amount of Kg. of Gas would be required for running this Design 10 hrs. day-to-day.

We have our own Freight Forwarding Agent.

We had a Contract for Rubbish Monitoring prior to their Civil Battle for 120 Tons/Day for one Town in North Africa.
Medical Waste Burner

Twin Chamber (Main & & Secondary) with insulation pieces (completely insulated inner refractory lining) in addition to

regulated air blower for each chamber

Insulation/ Refractory Thickness: ≥ 100mm

Chamber plate thickness: ≥ 6mm

Fuel Kind: Natural gas based on shedding fuel in combustion chambers

Waste Ability: ≈ 150 Kg/Day

Incineration capacity: ≈ 25 Kg/Day (Different waste billing as well as waste elimination doors)

Burners: At the very least with (02) burners of automated begin and quit functions

Combustion efficiency: > > 97%

Temperature: programmable temperature with temp monitoring system

Residence time: 2 2nd in secondary chamber

Heating value: 4000 Kcal

Temperature Level Variety: ≈ min 800ºC to max 1200ºC

Electrical supply: 220V with solitary stage

Smokeshaft Plate Thickness: ≥ 5mm

Water scrubber: Rubbing making use of reagent like lime & & must made of SS 10 gauge of non-corrosion properties and painted

exteriorly by tools grade heat repellent enamel

Chimney Height: in between 15-25 feet

diesel oil fired medical waste incenerator

Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Additional Chamber

(dual chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single

phase 50-60Hz Minimum operating temperature level 1200 oC One year spare parts bundle for complete maintainability 10m pipe

pipeline. 1100 litre fuel Storage tank +pipeline system Containerised (the container will certainly act as housing) Added chimney expansion

1 metre high One (1) year guarantee.

Burner of 20 Kg: 03 Devices

Electrically controlled burner.

Two-compartment burner with an ability of 20 kg/ hour.

Incinerator with reduced upkeep and operating costs; Geared up with an automatic control panel as well as very easy to make use of with

electro-magnetic locking of the door.

A main waste decrease chamber of 900 ° C. A blog post second burning chamber of gases created in the main chamber

at the very least 1100 ° C.

Carbon residues in ash much less than 5% by weight in accordance with European Directive 2000/76/ EC.

With refractory cellular lining in products of higher quality
1/ Cost of a 200kgs/Hr medical waste burner.
2/ (CIF Term) Price of delivery from manufacturing facility to PAPUA NEW GUINEA port of LAE, Morobe province
3/ Price of 2 Clover engineers to Supervise, Installation, Training our engineers and appointing the medical; waste

incinerator.

incinerator sort of pyrolytic medical waste incinerator ability

Including:Incinerator: Structure to be specified
The mark to be specified
Water temperature: 800 to 1000 ° C;
Refractory
Temperature of more than 1100 ° C + obtained;
Capacity: 20-50 kg / hour
Fireplace: 4 to 6 meters high;
Dimension 70 cmx70 crn
Height: 1.10 meters
Fuel: coal;
Aspiration: natural

– A receiving cage for biomedical waste;

– A combustion chamber with a chimney with a filter to retain the ashes;

Chimney section: about 300 cm; With a minimum height of 6 m

Door size: approximately 50×60 cm

Supplied with a 500 liters fuel tank and all necessary accessories for installation.
–                          INCINERATOR for pharmaceutical waste treatment with                  a scrubbing system

With the following technical data:

1.      One pharma solid waste incinerator unit containing two combustion chambers and based on steel base with scrubbing

system.

2.      Working hour /day: minimum 10 hours/day.

3.      Capacity: Approximated 150 kg/hr. Over 10 hrs.

4.      Wastes characteristics:

·         BULK density: 70 – 100 kg/ bm³.

·         Calorific value: 2000-3000 kcal / hr.

·         Moisture content: 20-30%by weight.

·         Ash content: 2 – 8 % by weight.

·         Plastic content: 15-20 % by weight.

5.      Two combustion chambers.

6.      Operating temperatures:

·         First chamber: not less than 700 – 800 °c.

·         Second chamber: not less than 1200 °c (during steady operation).

7.      The burners should be automatically switched off if any of the combustion chambers doors is open.

8.      The burners of the first and second combustion chambers are selected for burning diesel oil (light fuel).

9.      Automatic loader and unloader to be provided.

10.     Exhaust gases to be comply with International Environmental code and requirements.

lab incinerator china manufacturer

Incinerator double chamber with ability 1.5 m3/batch or 6 m3/ day, electronic thermocontrol range 0‐1200

C, thermocouple, air supply capacity 10m3/ minute, power usage 1.2 kWH/ hour, power 3

stage with netral, cooling water sprinkler capacity 5L/ minute, finished with refractory (insulation,

castable, ceramic covering) and PLC

SUPPLY, INSTALLATION As Well As COMMISSIONING OF WASTE BURNER– TECHNICAL SPECS

The Waste Incinerator is created to burn Type IV of pathological waste as well as contagious, infected “red bag,” surgical

dressings, plastic examination devices and also various other wastes.
General Specs
Burner: 2 heaters (primary heater as well as second heater).
Fuel: Oil.
Capacity (Cubic Mtr): 0.65.
Ave Capacity: 60 kg per hour.
Gas Intake (ltrs/ hr):13.
Outside Dimensions.
Size (mm): 2300.
Size (mm): 1220.
Elevation Incl. Flue (mm) 7000.
Door Opening (mm) 610 x 710 610 x 710.
Operation.
Minutes. Operating Temperature level: 950.
Max. Operating Temperature: 1320.
Residency Time in Second Chamber: 5 sec.
Temperature Level Monitoring: YES.
Various other information.
Easy and safe operation.
Huge counter-balanced fill door with electrical lockout.
Automatic control system gives preset melt times and shut down.
Reload light indicates to driver when it is time to reenergize.
Be required for exhaustion of last charge.
Low power usage degrees.
Programmable electronic temperature controls preserve temperature level, assuring complete combustion while conserving fuel.
Stress blower with regulating air control creates disturbance as well as disperses burning air to additional chamber.
Second heater with temperature triggered modulating control offers fast preheat and sustains high temperature

efficiency at low power usage degrees.
Charging price

hospital incinerator supplier

Up to 600kgs per ten-hour day of Kind IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch

packing twice daily.
Burner, 20 kg/hr Burn Ability (min. 1200 kgs. Waste Feed Ability each day) (4-6 hrs procedures) (Power Supply

380V, 50Hz, 3Ph).
Capacity: 30 kg/hr.

Number product: 01 system

Can you please send us cataloge information for Pet Cremation of dogs, pet cats.

– – Please services call for: General concerning Cremation system which is suitable.
for your items, technical transfer and also training for operators.
Containerized Incinerators Operational Capabilities – PROCEDURE 1+ TONS/ DAY – RAN WITH LIMITED TRAINING – REGULAR

MAINTENANCE CONTAINER BE FINISHED WITH RESTRICTED TRAINING – COMPLIES WITH EURO/ OR US-EPA DISCHARGE REQUIREMENTS – CAPABILITY TO MELT

SQUANDERED LUBRICANTS (POL) – HANDLE ORGANIC SOLIDS (TO CONSIST OF RMW) – DEPLOYABLE – MOBILE – 24 HUMANS RESOURCES OF CONTINUOUS USE –

AUTOMATIC LOADING SYSTEM – AUTOMATED ASH REMOVAL SYSTEM – GAS SCRUBBING SYSTEM – 95% DECREASE OF SOLID WASTE – RUN

OFF DIESEL OR FUEL OIL – EFFICIENT IN BURNING 4 DEVICES OF WASTE EACH OF GAS – ABLE TO TAKE ALL COMBUSTIBLE WASTE TO

INCLUDE: PAPER, PLASTIC, CARDBOARD, FOOD, USED OILS, SLUDGE, OILY RAGS, TIMBER PALLETS. – NO PRE-TREATMENT OF WASTE

REQUIRED – VENDOR REPAIR WORK OFFERED AT FACTOR OF SHIPMENT – 5 (5) YEAR ELEMENT SERVICE WARRANTY FROM DATE OF ACCEPTANCE

Technical Requirements – PROCEDURE GUIDEBOOK As Well As TRAINING MANUAL FOR EACH INCINERATOR – ESTABLISH As Well As SETUP

USER’S MANUAL – BLUE PRINT/ SCHEMATIC OFFERED THAT DETAILS THE PHY SICAL CAPACITIES OF THE 20′ INCINERATORS –

INCINERATORS MADE UP WITH HEAVY DUTY BONDED BUILDING – OPERATED AND ALSO CARRIED IN 20′ INCINERATORS (CONTAINERS) –

FULL FRONT As Well As OPTIONAL REAR GAIN ACCESS TO – PRIMARY/ SECONDARY TEMPERATURE MANAGES – COMBUSTION AIR DAMPER – VAPOR LIMITED

LIGHT FIXTURES & & 120V ELECTRICAL OUTLET – OUTDOOR PLU-IN RECEPTABLE FOR ELECTRICAL RESOURCE – OUTDOOR FUEL TRAIN WITH SHUT-OFF – LOAD

RAMP – SKID– PLACED GAS TANK – ELECTRICAL AND GAS OIL CONNECTORS – CONTROL PANEL As Well As AIR LOUVER – AIR MANIFOLD

ACCESS As Well As ENERGY BULKHEAD – GALVANIZED DELIVERY COVERS – GAS, WATER As Well As OIL ADAPTER LINES – PRIMARY AND SECONDARY

BURNERS – FULLY INTEGRATED PLC CONTROL SYSTEM – FACTORY EXAMINED, WIRED PRIOR TO DELIVERY – FLEXIBILITY: NO HEAVY LIFT

DEVICES NEEDED FOR SET UP OR TAKE DOWN – HEIGHT RESTRICTED TO THE HIGHEST POINT ON BASE OR UNDER 15FT HIGH

medical facility incinerator manufacturers

SECTION V

  • TECHNICAL SPECIFICATIONS OF THE INCINERATOR
  • General Description

The plant have to have four distinct sections that show three principles of disturbance, home time and temperature retention. The regulated areas may consist of but not limited to:

  1. Overall plant layout
  2. Feed chamber/charging
  3. Primary combustion chamber
  4. Particulate scrubbers
  5. Acid gas
  6. The stack/chimney.
  7. Minimum capacity of primary chamber = 10cubic meters
  8. Burn rate (rate of waste incineration) = 10 kg per hour
  9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
  10. The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.
  • Scope Of Work

The job specified in the agreement will consist of.

  1. Supply, install and commission an incinerator as provided   in the technical specifications
  1. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this
  1. Assessment and preparation  and construction of  a standard incinerator shed with one waste  storage room  ( see the design )
  1. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and
  1. Fuel oil storage tank- Mild steel 1000 liters capacity
  1. Onsite training for operation and maintenance

IMPORTANT

To enable the Company carry out definitive analysis of the tender, tenderers are asked for to submit with their offers the comprehensive requirements, drawings and catalogues with Appointing and maintenance directions for the Incinerator they intend to Supply, mount and also commission.

Tenderers that stop working to comply with this need totally shall have their tender declined.

  1. TECHICAL SPECIFICATIONS OF THE INCINERATOR

3.1 Feeding as well as Charging

Controlled sanitary mechanical feeding that does not negatively influence the air temperature in the primary as well as additional chambers of the incinerator will be made use of.

  • Primary Combustion
  • This chamber should be equipped with burners that use low sulphur
  • The chamber should ensure a minimum exit temperature of 850 degrees
  • This unit should operate at over 1100 deg C to ensure complete
  • This chamber should be equipped with burners that use low sulphur
  • Heavy-duty steel casing
  • High quality refractory lining and insulation
  • Large full size top load door and liquid retention
  • 1 x oil fired ignition burners operated on/off
  • Secondary Combustion Chamber (After burner)
  1. Heavy-duty steel casing
  2. High quality refractory lining and insulation
  3. 1 x oil burner
  4. Should be fitted with burners that use low sulphur
  5. Ensure secondary air supply is controlled.
  6. Ensure residence time is not less than two seconds.
  7. Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
  8. Ensure the emitted oxygen content of the emitted gases is not less than 11%
  9. Ensure both primary and secondary combustion temperatures are maintained until all waste is completely
  • Particulate Removers

A mechanical particulate collector should be incorporated after secondary burning chamber for elimination of particulate contaminants entrained in the flue gas stream. The particle enthusiasts may include any of the following or a combination thereof:

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters
  • Chimney/Stack
  1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  2. The chimney should be visible to the operator from the feeding
  1. The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  2. The point for measurement of emissions shall be
  • Instrumentation
  1. Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
  2. An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
  3. A carbon monoxide and oxygen meter/recorder should be
  4. A smoke density meter/recorder should be
  5. A solid particulate meter/recorder should be
  6. Any other instrument that may be considered
  • Location / Siting of the Incinerator
  1. a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the
  • Emission Limits
  1. Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
  2. The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
  3. The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
  4. Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
  5. All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
  6. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x

100 where Victory = mass feed price of the POHC in the waste stream fed to burner as well as Wout = mass emission rate of POHC in the stack prior to the release to the ambience.

  1. The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16
  • Ease of Use
  1. Auto
  2. No pilots to
  3. Automatic control and temperature monitoring
  4. Built-in skid facilitates placement
  • Fuel Efficiency
  1. Rapid incineration means low fuel
  1. Up to 20kgs per hour (dependant on application).
  2. Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing
  • Quality Built to Last
  1. Heat resistant 3mm
  2. Stainless steel
  • Key Features
  1. Low running and maintenance costs
  2. Fully Automatic and simple to operate control panel
  3. Afterburner Preheat
  4. Incineration Temperatures in Excess of 900 degrees C
  5. 3 mm Steel Casing and Fully insulated
  6. Dense Refractory Concrete Lining Rated to 1400 degrees C
  7. Solid Hearth to Allow Maximum Burnout
  8. Large Top Opening Lid For Easy Loading
  9. Stainless Steel Flue as standard
  10. 12 Months or 1000 hours
  11. Optional Stainless Steel Casing
  12. Heat Recovery System option
3.13 Fuel and Capacity  
1. Low sulphur fuel
2. Capacity (Cubic Mtr) .10
3. Average Capacity 40kg
4. Fuel Consumption (ltrs / hr) 3
  • External Dimensions
1. Length (mm)               735  
2. Width (mm)                500
3. Height Incl. Flue (mm) 1960
4. Door Opening (mm) 325 x 325
  • Internal Dimensions
1. Length (mm) 620
2. Width (mm) 390
3. Height 500
  • Operation
  1. Minimum Operating Temperature 950
  2. Maximum Operating Temperature 1320
3. Burn rate per hour 5-20kgs
4. Temperature Monitoring Available
  • Particulate Removers

A mechanical particle collection agency should be incorporated after additional burning chamber for elimination of particle contaminants entrained in the flue gas stream. The particle collectors may consist of any of the complying with or a mix thereof:

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters
  • Chimney /Stack
  • The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  • If possible the chimney should be visible to the operator from the feeding
  • The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
  • The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  • Point for the measurement of emissions shall be
  • Control Panel
  1. Control of 2 burners
  2. Timer control 0- 12 hours
  3. Integral fan timer control
  4. Temperature and thermostatic control

TIMETABLE 2

NO: REQUIREMENTS SUPPLIER’S REMARKS
1. Experience

Previous experience in the supply, installation and commissioning of incinerators

 
2. 1 Year Maintenance Contract  
3. Work rate

at least10kg per day

 
4. Design

Fundamental Plan design to Supply Overall plant layout. With Feed chamber/ charging, Primary Burning Chamber. Secondary Burning Chamber. Particle Scrubbers, Acid Gas Scrubbers, The stack/ smokeshaft.

Gas oil storage tank storage space should be Moderate steel 1000 liters capacity

Chimney Height ought to be of 10 meters above ground level.

Real estate center with one waste storeroom

Offer Housing styles with appropriate cross air flow

Chamber (Afterburner Maximum departure temperature should not be less than 1100oC

 
5. Standard control panel

Security interlock, Follower Beginner, Heater on/ off switch/door safety switch, Car fold button, temperature levels regulate device.

 
6. Combustion Chambers

Key Combustion Chamber Minimum departure temperature level must not be much less than 850oC

Second Combustion Optimum leave temperature level need to be not much less than 1100oC

 

SECTION VII

PRICE SCHEDULE FOR ITEM

Rate schedule for Supply, Installment, Examining as well as Commissioning of an incinerator for Turkwel Power Station

1 2 3 4 5 6
Item Description Unit of sale Quantity Unit price Total price
1. Supply, install, and commission the incinerator as specified. LOT 1    
2. Construct a standard incinerator housing facility as per the drawing and architectural notes provided  

GREAT DEAL

 

1

   
4. Construct one  waste  storage  room (provide specs on room size, construction material etc) LOT 1    
5. Supply / adhere to  the requirement of OSHA 2007 act

49,50,51,60,61,77,78,79,80,81,100

LOT 1    
6. Onsite training of Operation and Maintenance staff. LOT 1    
7. All the key Spares (Attach a separate List) LOT 1    
8. Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. LOT 1    
9. Supply of Operation and Maintenance Manuals.  

WHOLE LOT

1    
10. All other items not specified but necessary to complete the Installation.   A separate list of these items to be attached.  

LOT

1    
11. Fencing of  a compound  of 10 meter length  by 10 meter  width   using Concrete  poles  high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) LOT 1    
  Sub Total        
           
  Discount  (%) if any        
  Applicable Taxes and Duties        
           
  Total Cost in Kshs