Archive: June 30, 2025

Incinerator



Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

2011 year is an important foundation for us. We reach to developed country market and stabilize our old customers. Our incinerator use in Southeast Asia, Central Asia, Europe, small scale garbage incinerator, small scale gas incinerator, small scale incenaration, scale incineration, small scale incinerator cost, small scale incinerator designs, Middle East, Africa and Australia, etc. Clover Incinerator has grown to be one of the famous and biggest incinerator supplier all over the world. 

Product Main Application: 
1. Medical waste incineration treatment. 
2. Pet/Animal cremation business. 
3. Municipal waste and other solid waste treatment. 

We now can supply different model & design incinerator products for different market request. Our large capacity incinerator(300/500kgs per hour) accept by customers and market finally.

Китай обещает скоординировать действия по мере роста вируса



ВОЗ объявляет вспышку международной чрезвычайной ситуации в области общественного здравоохранения

В пятницу Китай пообещал сотрудничать с международным сообществом в обеспечении региональной и международной безопасности в области здравоохранения и подтвердил, что у него есть уверенность и возможности выиграть битву с эпидемией нового коронавируса, которая по состоянию на четверг унесла жизни 213 человек по всей стране.

Обещание было сделано после того, как Всемирная организация здравоохранения заявила в четверг, что вспышка представляет собой чрезвычайную ситуацию в области общественного здравоохранения, имеющую международное значение, или PHEIC, после экстренного совещания в Женеве, Швейцария.

По состоянию на четверг количество подтвержденных случаев нового коронавируса на материковой части Китая выросло до 9692, среди которых в провинции Хубэй – эпицентре вспышки – зарегистрировано 5806 подтвержденных случаев заражения. Специальные административные районы Гонконг и Макао, а также Тайвань сообщили о 28 подтвержденных случаях заболевания по состоянию на четверг. Вирус также распространился на несколько других азиатских стран, а также достиг Австралии и Европы.

Центры по контролю и профилактике заболеваний в Соединенных Штатах заявили в четверг, что женщина из Иллинойса, которая недавно вернулась из Китая, передала коронавирус своему мужу – первый известный случай распространения патогена между людьми в США.

Пресс-секретарь министерства иностранных дел Хуа Чунин заявила в онлайн-заявлении в пятницу, что с момента вспышки Китай поддерживает тесные связи и сотрудничество с ВОЗ. «Китай продолжит сотрудничество с ВОЗ и другими странами для обеспечения региональной и глобальной безопасности общественного здравоохранения», – сказал Хуа.

Заявив, что китайское правительство принимает самые всесторонние и строгие меры профилактики и контроля для здоровья и безопасности людей, Хуа добавил, что многие из этих мер выходят далеко за рамки требований Международных медико-санитарных правил.

«У нас есть полная уверенность и способность победить в этой борьбе с эпидемией», – сказала она.

Также в пятницу Национальная комиссия здравоохранения призвала международное сообщество понять и поддержать усилия Китая по предотвращению и контролю эпидемии.

Комиссия надеется, что страны всего мира будут работать с Китаем над совместным предотвращением и сдерживанием болезни в соответствии с Международными медико-санитарными правилами, а также рекомендациями ВОЗ в целях обеспечения региональной и глобальной безопасности общественного здравоохранения, говорится в опубликованном заявлении. комиссией на своем веб-сайте.

Генеральный директор ВОЗ Тедрос Адханом Гебрейесус, который недавно завершил свой визит в Китай, сказал, что это заявление не было вотумом недоверия Китаю. Скорее, это необходимо, потому что случаи инфицирования людей подтверждены в других странах.

«Как я неоднократно говорил после своего возвращения из Пекина, следует поздравить правительство Китая с чрезвычайными мерами, которые оно предприняло для борьбы со вспышкой, несмотря на серьезное социальное и экономическое воздействие, которое эти меры оказывают на китайский народ», – сказал Тедрос. на пресс-конференции после закрытого заседания ГКЧП.

Тедрос сказал, что ВОЗ не рекомендует ограничивать торговлю и передвижение и выступает против любых ограничений на поездки в отношении Китая.

«К настоящему времени мы увидели бы гораздо больше случаев заболевания за пределами Китая и, вероятно, смертельные случаи, если бы не усилия правительства и прогресс, которого они достигли в защите своего собственного народа и людей всего мира», – сказал Тедрос.

«Скорость, с которой Китай обнаружил вспышку, изолировал вирус, секвенировал геном и поделился им с ВОЗ и миром, очень впечатляет и не поддается описанию. Так же как и приверженность Китая прозрачности и поддержке других стран. Во многих отношениях Китай фактически устанавливает новый стандарт реагирования на вспышки, и это не преувеличение », – добавил он.

Во время телефонного разговора с министром иностранных дел Канады Франсуа Филипом Шампань в пятницу государственный советник и министр иностранных дел Ван И выразил надежду, что Оттава будет уважать рекомендации ВОЗ объективным и справедливым образом для обеспечения торговых обменов и поездок людей между Китаем и Канадой. не поддаваться влиянию.

Шампань сказал, что Канада высоко ценит решительные меры Китая, открытость и прозрачность его действий по предотвращению и борьбе с инфекцией, а также полностью уверена в своих силах в борьбе с эпидемией.

Главный посланник Китая при Организации Объединенных Наций Чжан Цзюнь призвал международное сообщество проявить «солидарность» в борьбе со вспышкой. Обращаясь к новостному собранию в штаб-квартире ООН в Нью-Йорке в четверг, Чжан сказал, что рекомендации ВОЗ «должны быть серьезно рассмотрены» и «нет причин для мер, которые без надобности мешают международным поездкам и торговле».

Он призвал все страны занять ответственную позицию, работать вместе для борьбы с вирусом и избегать чрезмерной реакции.

С момента начала эпидемии лидеры зарубежных стран и международных организаций заявили о своей поддержке и высокой оценке усилий Китая по сдерживанию распространения вируса.

Ангус Макнейс из Лондона и Хун Сяо из Нью-Йорка внесли свой вклад в создание этой истории.


Медицинская экология  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

incinerador de residuos médicos económico

Apilar:
Tipo: Cable soportado
MOC: acero dulce de ISstd
Altura: 3 metros o más
• PROCESE AL MENOS 1 TONELADA MÉTRICA DE RESIDUOS POR DÍA
• PUEDE OPERAR POR 1 PERSONA, SIN REQUERIR CAPACITACIÓN
• EL MANTENIMIENTO REGULAR PUEDE SER COMPLETADO POR 1 PERSONA CON CAPACITACIÓN LIMITADA
• EL MANTENIMIENTO REGULAR NO DEBE EXCEDER 1 HORA POR DÍA
• CUMPLE CON LOS ESTÁNDARES DE EMISIONES EURO / O EPA DE EE. UU.
• HABILIDAD PARA INCINERAR RESIDUOS DE PETRÓLEO, ACEITES Y LUBRICANTES
• LAS TEMPRATURAS DURANTE EL PROCESO DE COMBUCIÓN DEBEN EXCEDER 1,500 ° F DURANTE AL MENOS 1 HORA
• SE PUEDE TRANSPORTAR HACIA Y DESDE LA UBICACIÓN DE DESPLIEGUE EN UN CONTENEDOR ISO DE ENVÍO DE 20 PIES O MÁS PEQUEÑO
• CAPAZ DE 24 HORAS DE USO CONTINUO
• SISTEMA DE CARGA AUTOMÁTICA
• SISTEMA AUTOMATIZADO DE EXTRACCIÓN DE CENIZAS
• SISTEMA DE FREGADO A GAS
• REDUCCIÓN DEL 95% DE RESIDUOS SÓLIDOS
• FUNCIONA CON DIESEL, JP8 O ACEITE COMBUSTIBLE
• CAPAZ DE QUEMAR 4 UNIDADES DE RESIDUOS POR UNIDAD DE COMBUSTIBLE
• CAPAZ DE INCINERAR RESIDUOS COMBUSTIBLES PARA INCLUIR: PAPEL, PLÁSTICO, CARTÓN, ALIMENTOS, ACEITES USADOS, LODOS, TRAPOS ACEITOSOS Y

PALETS DE MADERA.
• NO SE REQUIERE TRATAMIENTO PREVIO DE RESIDUOS
• REPARACIÓN DEL PROVEEDOR OFRECIDA EN EL PUNTO DE ENVÍO
• GARANTÍA DE COMPONENTES DE CINCO (5) AÑOS A PARTIR DE LA FECHA DE ACEPTACIÓN
Somos una empresa de fabricación de aerosoles. Nuestros productos incluyen desodorantes, desodorantes antitranspirantes, ambientadores,

Asesinos de insectos, etc.

TECHNOLOGICAL INCINERATORS SPECIFICATIONS FOR 2 hospitals in Kenya

TECHNICAL INCINERATORS SPECIFICATIONS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications
           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
  NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank need to be attached to the incinerator at a greater degree to enable free-flow of diesel from the storage tank to the incinerator. The connecting pipeline has to be a black pipe of accepted gauge as well as diameter. Include various other coming with accessories and installations

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

Give lifting gears as forklift, gantry, rollers, as well as raising jacks and also setting burner.

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Provide a smokeshaft with scrubber (for purification)

Provide raising equipment to hoist, set up as well as mount chimney, and give assistances slings as needed. Enable cutting of tree branches to facilitate the exercise.

The chimney shall be repainted with approved warmth immune paint after installment.

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

EXAMINATION CRITERIA

Analysis will be performed in 4 phases particularly preliminary examination of files for uniformity with compulsory demands, technical assessment, site check out and also commercial examination.

Stage One: Initial Assessment

– – Initial Evaluation under special condition of the tender. These are required requirements.

This shall include confirmation that a bidder has followed the unique problem of tender over.

Failing to satisfy any kind of among the above needs stated in the special conditions of the contract will cause automated incompetency.

Stage 2: TECHNICAL ASSESSMENT (70 MARKS)

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
  The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The storage tank must be linked to the burner at a greater degree to make it possible for free-flow of diesel from the tank to the burner. The connecting pipe must be a black pipe of approved gauge and also diameter. Include other going along with accessories as well as installations

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Offer lifting gears as forklift, gantry, rollers, and also lifting jacks and placement burner.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

Provide a chimney with scrubber (for filtration)

Give lifting gear to lift, erect and also mount chimney, as well as provide assistances slings as essential. Enable cutting of tree branches to help with the exercise.

The chimney will be painted with authorized warmth resistant paint after installment.

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

100

 

Pass mark for technical analysis is 70/100 marks

Stage Three: Website Browse Through

The assessment committee will check out the properties of the prospective buyers who are receptive to technological evaluation phase to confirm the authenticity of legal file sent; establish the precision of the info given in the tender records, examine company’s ability, place, to name a few.

The Tenderer will be immediately disqualified where incorrect or deceptive Info is discovered to have been provided.

Stage 4 Business Analysis

Bids that pass the above 3 (3) stages will be contrasted on the basis of costs/ cost estimated and the most affordable valued will certainly be taken into consideration the lowest examined bid and also consequently advised for award. Prevailing market prices will be used to identify the price responsiveness of the prospective buyers.

AREA V– TIMETABLE OF CRITERIA

ITEM

NO

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form

мусоросжигательная установка на ферме DUCK

установка для сжигания отходов на ферме DUCK, нам необходимо купить установку для сжигания биологических отходов среднего размера, а точнее крематорий для домашних животных DUCK в Ирландии. Оборудование Двухкамерная установка для сжигания медицинских инфекционных отходов Производительность 10-30 кг в час Характеристики отходов
В основном шприцы и иглы от плановой иммунизации и кампаний. Однако учитываются следующие средние характеристики *:

теплота сгорания выше 2000 ккал / кг (8370 кДж / кг); содержание горючего вещества более 60%; содержание негорючих твердых веществ ниже 5%; содержание негорючей мелочи ниже 20%; влажность ниже 30% по весу

Характеристики сжигания: установка для сжигания медицинских отходов должна быть способна преобразовывать отходы в золу, не превышающую 10% от общих горючих зарядов.

Наружная установка. Установка для сжигания медицинских отходов будет установлена на открытом воздухе. Все компоненты инсинератора должны подходить, но не ограничиваться, для наружной установки в тени, включая электродвигатели, быть устойчивыми к коррозии, влажности и связанным с ними погодным условиям.

не могли бы вы переслать мне некоторую информацию. подходящий инсинератор для сжигания масла, опасных пластиковых отходов, шламов, опасных фильтров и т. д.

waste burner supplier in china

  1. Burning rate: 250 Kg/hr.
  2. It should be able to Operate not Less than 10 hours/day
  3. This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
  4. Design Specification: Types A, B, C, D, and E of medical waste
  5. “PYROLYTIC” combustion, by controlling the gasification of waste.
  6. The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
  7. It should be able to reduce the volume of wastes by 98%.
  8. It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration must be entirely free from noticeable smoke along with offending smells.

  1. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
  • The Temperatures of combustion:Minimum will be 850oC and max 1400oC
  • Post combustion: >1100o
  1. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter
  2. The Volume of the combustion chamber: Not Less Than 2.3 M³
  3. Burner operation should be Automatic On/Off
  4. Fuel : diesel, LPG, Natural Gas, Bio fuel
  5. The supplier must provide  necessary information for the best of  the installation

This incinerator with “PYROLYTIC” burning should have:

  1. A combustion chamber of waste:

* Completely tight door for the manual loading of waste.The loading need to be Handbook, Set Lots,

* A burner of lighting which the use is limited to the ignition of waste.

* Leading Loading loading with door seals gone up on joints, wheel of screw plug, flexible joint, and also packing shielding out of refractory.

* The insulation of the combustion chamber should be composed of refractory blocks, having a high material of aluminum and shields blocks in order to assure a minimum temperature level on the outside sheet steel.

* Make-up of the refractory;

  • Refractory concrete :
    • . Thickness : ≥100 mm
    • . Nature: 42% of Al203
  • Insulate in fibrous panels :
    • . Thickness: ≥75 mm
  • Nature: Calcium silicate.

* Burner of illumination of waste, with gas, standard mono-bloc spreading directing plunging flame, illumination and safety of digital ignition, irreversible air flow, electromagnetic sluice gate of guideline and isolating valve.

* Plate of combustion in Carborundum, preventing the repairing of glass as well as slags.

  1. Load Method: Top Loading
  1. A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of shot of air enabling a complete recombustion of gases,

* A gadget of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases scorched.

* Carcass in solid sheet steel with support of connection.

* Composition of the refractory;

  • Refractory concrete :
    • Thickness : ≥180 mm
    • Nature: 65% of Al203
  • Insulate in fibrous panel :

CALENTADOR EN CONTENEDOR PARA INCINERAR RESIDUOS PELIGROSOS Y TAMBIÉN NO PELIGROSOS

QUEMADOR EN CONTENEDOR PARA INCINERAR RESIDUOS PELIGROSOS Y NO PELIGROSOS (AMBOS DOMÉSTICOS ADEMÁS DE INDUSTRIALES) A UN COSTE MÍNIMO DE 300KG / HORA CON EL CUMPLIMIENTO DE LAS DEMANDAS:

Ø VOLUMEN CÁMARA PRIMARIA 7,2 M³

Ø CAPACIDAD DE QUEMADURA 300Kgs / hr.

Ø NIVEL DE TEMPERATURA DE LA CÁMARA PRIMARIA 850 ⁰ C Y TAMBIÉN NIVEL DE TEMPERATURA DE LA CÁMARA SECUNDARIA 1100 ⁰ C

Ø ESPESOR REFRACTARIO 225MM; REFRACTARIO RESISTENTE A TEMPERATURA 1400 ⁰ C

Ø CAPACIDAD CARGADORA RAM 0,75 M³; CICLOS FUNCIONALES TODOS LOS DÍAS 8-16 Recursos humanos.

Ø GAS DIESEL / GAS NATURAL; GAMA DE QUEMADORES PRIMARIOS & & & & RATING: 2 @ 250kw

Ø VARIEDAD DE QUEMADORES SECUNDARIOS & & & & POSICIÓN: 2 @ 400kw; ALIMENTACION ELECTRICA 230V 60Hz

Ø VOLQUETE DE CONTENEDOR, SISTEMA DE SEGUIMIENTO, SISTEMA DE LIMPIEZA

Ø LIMPIEZA DE GAS Y ADICIONALMENTE MONITOREO DE GAS Los incineradores de desechos médicos generales MSW1000 derriten el precio aproximadamente 100 kg / h
Los incineradores de desechos de animales domésticos / aves A2400 derriten una velocidad de hasta 200 kg / h. Sistema de seguimiento de residuos de laboratorio
01. Sistema de purificación de agua licuada.
02. 03.
Área asignada momentáneamente para el sistema de purificaciones: 30 × × × × 20.
El siguiente requisito para estar sugiriendo en el documento de licitación.
1. Estrategia de eliminación de drenaje tratado.
2. Técnica de tratamiento de los lodos.
Duración de la edificación y construcción.
5. Para toda la tarea.
6. Período de garantía además del mantenimiento.

Вирус Ухань: Китай мобилизует медицинские бригады для борьбы с новым коронавирусом


УХАНЬ (Бернама): Китай мобилизует медицинский персонал для помощи Ухани, центру вспышки нового коронавируса (2019-nCoV), поскольку страна сообщила о 830 подтвержденных случаях пневмонии, вызванной вирусом, и 25 смертельных исходах к концу четверга ( 23 января).

К полуночи четверга в провинции Хубэй в центральном Китае было зарегистрировано 549 кумулятивных подтвержденных случаев новой коронавирусной пневмонии, из них 495 – в Ухане, столице провинции. По всей стране 29 регионов провинциального уровня зарегистрировали подтвержденные случаи.

Как сообщила Национальная комиссия здравоохранения (NHC) в пятницу (24 января), в провинции Хубэй было зарегистрировано 24 случая смерти от инфекции, а один – в северной провинции Хэбэй.

Первая группа из 135 медицинских работников из больниц Шанхая вылетела в Ухань в пятницу вечером. Шанхай направляет в Ухань 405 медицинских работников тремя группами.

Ма Синь, вице-президент больницы Хуашань, входящей в состав Университета Фудань в Шанхае, сказал, что через час после того, как он опубликовал уведомление о приеме на работу в больницу, были созданы три команды, каждая из которых состоит из одного врача и трех медсестер.

Группа помощи, состоящая из 205 опытных врачей и медсестер из девяти больниц в провинции Гуандун, была создана и готова отправиться в Ухань, сказал Тан Линлин, чиновник провинциальной комиссии по здравоохранению.

Врачи, медсестры и специалисты из больниц в других местах, таких как Чжэцзян и Сычуань, были отобраны или вызваны для участия в этой задаче.

В четверг провинциальные органы здравоохранения заявили, что провинция Хубэй сообщила о 105 новых подтвержденных случаях нового коронавируса и об увеличении на семь смертей, связанных с новой болезнью пневмонии.

Общенациональные крупномасштабные мероприятия по празднованию Лунного Нового года, включая храмовые ярмарки, зимние виды спорта и выставки, были отменены, чтобы свести к минимуму большие скопления людей в рамках новой меры по профилактике и борьбе с пневмонией, связанной с коронавирусом.

Знаменитый дворец-музей Пекина, также известный как Запретный город, перестанет принимать посетителей с воскресенья (26 января). В музее заявили, что уведомят общественность о дате возобновления работы.

Провинция Гуандун на юге Китая запретила торговлю дикими животными и сопутствующими товарами в провинции, поскольку географическое распределение случаев заражения в Ухане указывает на тесную связь между вспышкой и незаконной продажей диких животных на рынке.

Подтвержденные случаи заражения вирусом также зарегистрированы в регионах Гонконга, Макао и Тайваня, а также в таких странах, как США, Япония, Республика Корея и Таиланд.

Всемирная организация здравоохранения заявила, что еще слишком рано объявлять вспышку нового коронавируса в Китае чрезвычайной ситуацией в области общественного здравоохранения, имеющей международное значение, при этом предупреждая, что число случаев заболевания может возрасти, поскольку многое о вирусе остается неизвестным, – Бернама
Медицинская экология  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

Incinerator A1500



Basic Info.

Model NO.:A1500
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, hospital incinerators, laboratory incinirator, laboratory smokeless incinerators, laboratory waste, larg capacit incinerators manufacturers china, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items/Model A360 A600 A900 A1200
Burning Rate *animal 20 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 60 kgs/Hr.
Feed Capacity *animal 30 kgs 50 kgs 80 kgs 100 kgs
Equipment Weight 2300 kgs 3000 kgs 4000 kgs 4300 kgs
Primary Chamber (Liters) 360 600 900 1200
Secondary Chamber (Liters) 200 200 300 500
External Dimensions (cm) 145x90x175 175 x 100 x 180 200x160x230 220x180x360
Internal Dimensions (cm) 100x60x60 130 x 70 x 65 120x90x85 130x100x90
Oil Tank(Liters) 200 200 300 300
Door Opening (cm) 48 x 60 50 x 60 62 x 80 55 x 80
Chimney (M) 5 5 5 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

incinerator maker in china

1. Is the house time more than 2 secs?
2. Is the main as well as additional air preheated?
3. Could it be provided as a continuous system?
4. Exists a surveillance system for functional parameter? (temperature).
5. Exists an information logging system?
6. Does it offer control interventions to change waste feed, grate rate, as well as temperature, volume and distribution

of main as well as additional air?
7. Does it consist of complementary heaters?
8. Does it consist of system that immediately stops waste feeding when burning specifications are not appropriate?
9. Is it feasible to have an automated bottom ash discharging system?
1. Is the main and also secondary air preheated?
2. Could it be offered as a continual system?
3. Exists a data logging system?
4. Does it provide for control treatments to adjust waste feed, grate speed, as well as temperature, volume and circulation

of main and secondary air?
5. Does it consist of auxiliary heaters?
6. Does it include system that instantly stops waste feeding when burning parameters are not suitable?
7. Is it feasible to have an automatic base ash dumping system?
Incinerator.
Rated Capacity: 100/KG/Hr.
Type of Layout: Double Chambered.
Mode of Heating: Burner