Tag: Waste Incinerators

Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model

TS50(PLC)

Picture

Principle

Solid Waste Incineration

Burn Rate

30-45 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 13.3

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

800L

Feed Door

70x55cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

4500kg

External Dimensions

230x130x155cm

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-21

MEDICAL BIOLOGICAL WASTE INCINERATOR

It should  be  a three chambered incinerator
The load capacity of 250 kg
The housing for the incinerator should be able to withstand the temperatures and other operational requirements.
The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc.
It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan.
The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion.
In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere.
A system for continuous emission Monitoring and Environmental Monitoring.
A mechanism with which to treat the waste water before discharge into the sewerage system.
Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation.
Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney).
High power electricity and emergency generator connection for automated ignition purposes.
The chimney should be tall enough and be at least one meter above the tallest building in the vicinity.
The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250.
Other Requirements
Training of all the personnel involved in health care waste (HCW) management.
The Automatic Feeding system of the Incinerator
Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber.
An Automatic bottom ashes discharge system.

hiclover waste incinerator spare parts

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.
Refractory cement,Ignition transformer – Secondary burner,Ignition transformer – Primary burner,Emergency push button,Temperature thermos couple with Locknut – 1600oC,Temperature thermos couple with Locknut – 1300oC,Temperature display controller – Secondary Chamber,Temperature display controller – Primary Chamber (Parameter – Digital Adjust Instrument),Burner Lighting Sensor (Photo Cell) PBT/PC
Circuit board (LM44.255C2BT) High Stage Secondary,Circuit board (LOA24.171B2BT) Primary
Fire proof flange gasket,Fire proof flange gasket
CA50-600,EB14HPM,26-48-3371T JT04,K1600,k1300,XMT – 3000,XMT – 2000 QRB1,LM44.255C2BT,LOA24.171B2BT,SN834457 8023020001,SN834451,3713798,AS47B,FO03,BTL20,SPARK35
Ignition electrode with leads(for burner BTL20/SPARK35),Solenoid(for burner BTL20/SPARK35),Burner fuel pump(for burner BTL20/SPARK35),Fuel filter(for burner BTL20/SPARK35)
Burner – Baltur,Burner – Baltur,Solenoid,Burner fuel pump
Ignition Cable,Ignition Switch -(Control Box),Photo Cell
HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-06

INCINERATOR DIESEL FIRED

Incinerator 20 Kg
Incinerator electrically operated
including:
 A cage for receipt of biomedical waste;
 A combustion chamber with fireplace with a filter to retain ashes;
 A cover;
 An air supply;
A turbine  allowing supply air.
 Combustion temperature: 1800 ° C.
Comes with all accessories.     ▪      The incinerator should be a modern waste disposal unit, designed
to bum medical waste in a clean and environmentally efficient
manner. It should employ a temperature based logic control system
to provide optimum control of the operating conditions and
incorporate a high capacity thermal oxidizing secondary chamber.
It should be designed to retain the exhaust gases, for at least 2
seconds to ensure the unit’s effective destruction of the combustion
products.
▪      All the incinerators to be supplied and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and in particular 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
procedure for installing and operating incinerators.
▪      The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪      The incinerator shall be run on a three-phase power supply
(mains).
▪      For the technical evaluation, not only the treatment plant but
the entire system will be considered. It will be the responsibility
of the Bidder to supply a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪      The system offered shall be designed to operate normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪      The Bidder must provide a warranty for one year.
▪      All text, parameter etc. on all control operating interfaces as
well as on information displays and on print-outs shall be in
English language.
▪      The Bidder is responsible for all permits and approvals for
importation. The Bidder shall provide all the necessary
documentation in order to facilitate the legal requirements for the
installation and putting into use of the equipment.

▪      Period of Execution is 90 days from contract signature for
delivery to site and completion of all verification operations
required for the issuance of provisional acceptance.
▪      Representatives of the Contracting Authority and the
Beneficiary, together with the Bidder’s representative, shall
carry out the controls, testing and initial approval for provisional
and final acceptance. The provisional and final acceptance shall
take place at the final destination.
▪     After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is authorized by
the Manufacturer, and which is able to rapidly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year warranty period. In
fulfillment of this requirement with their offer, bidders must
submit a statement signed by the manufacturer or representative
of the manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair centre is able to rapidly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪      The Bidder will be responsible to deliver and install all
equipment supplied to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time schedule over
the complete construction and assembling period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall ensure that all parts of
the plant transported by sea shall not be shipped as “deck
cargo”.
▪      It is expected that the Bidder cooperates closely with the
contractor for the new waste handling building/ housing and will
make available all needed technical information, drawing, etc. to
the contractor.
▪      The Bidder shall supply and install the incinerator with the
following attached specifications

For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below:
i.    Waste type    Health care waste
ii.    Waste density    125 to 350Kg/M3
iii..    Waste Calorific Value    4000 KCAL/Kg
iv.    Moisture content    10-25%
v.     Estimated ash  residue    5-10%
vi.     Nominal capacity     100Kg/hour batch load
vii.     Secondary chamber    2 seconds @ 1100°C
viii.    Environmental    Environmental Management Coordination Act, 1999 and in particular, Waste management regulations, 2006
2    Equipment
2.1    Primary Combustion Chamber
▪       The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
rolled steel sections. It is carried from the floor level on a
substantial steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face combination of super
duty brickwork or high strength castable.
▪       The primary combustion chamber must ensure minimum exit
temperature is not less than 850°C.
One Manual Load Incinerator comprising:
▪       Manual Loading door (heavy duty steel door with appropriate
refractory lining)
▪       Horizontal solid hearth, refractory lined primary combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪       Full sized bulk load/ash removal door
▪       1 off diesel-fired ignition burner — temperature controlled
▪       1 off combustion air supply fan and distribution system, automatic
control
▪       High capacity secondary combustion chamber with residence time
not less than 2 seconds @ >1100°C
▪       1 off diesel-fired afterburner — temperature controlled
▪       Control panel — automatic operation
▪      Temperature indication primary and secondary chambers 0-
1200°C. Both chambers must be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.
2.2     Throughput
100kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.
2.3    Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4    Quality/Environmental Standards
▪       Environment Management and Coordination Act, 1999
▪       BS3316
2.5    Operating Period
▪      Anticipated daily operating period 8 hours
▪      Maximum operating period 12 hours
2.6    Chamber
▪      Should be refractory lined to the following standard; Hearth and
lower section of chamber walls
2.7    Hot face material
▪      Super duty firebrick
▪      Limiting continuous service limit 1500°C
▪      Thickness 100mm
▪      Thermal conductivity 1.3 W/mk
2.8    Insulation
▪      Calcium silicate
▪      Limiting continuous service limit 1000°C
▪      Thickness 25mm
▪      Thermal conductivity 0.095 W/mk
2.9     Chimney / Stack
▪      Should be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪      Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪      Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as necessary. Allow for cutting of tree
branches to facilitate the exercise.
▪      The chimney shall be painted with approved heat resistant
paint after installation.
2.10     Ignition Burners
Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
·         Maximum rating:            at least 450kW/hour
·         Burner:                            arranged for on/off operation
·         Maximum consumption: at least 6 litres/hour
·         Average consumption:    at least 3 litres/hour
2.11    Afterburner
Fully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating:    at least 450kW/hour
Burner:    arranged for on/off operation
Maximum consumption:    at least 9 litres/hour
Average consumption:    at least 4.5 litres/hour
2.12    Flue gas treatment
▪      Should have particulate remover (scrubbers). A mechanical
particulate collector must be incorporated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13    Diesel Tank
▪      To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪      The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank to the incinerator.
The connecting pipe must be a black pipe of approved gauge
and diameter. Include other accompanying accessories and
fittings
▪      Connect burners to fuel supply.
2.14     Electrical Supply
▪      Three phase 415 V a.c., 50/60 Hz.
3    Documentation:
Operation manual    2 sets
Service/maintenance manual    2 sets
4    Certification
▪      National Environment Management Authority (NEMA)
certification
5    Capacity to service equipment
▪      The agent/supplier shall have adequate facilities, spare parts,
consumables and qualified and skilled technical staff.
Installation works
▪      Provide lifting gears as forklift, gantry, rollers, and lifting
jacks and position incinerator.
6    Commissioning and Training
▪      The Agent will test all set operating parameters

▪     The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7    Commissioning Maintenance Contract
▪     Before the expiry of the warranty/ signing off, the supplier shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly routine maintenance price per quarter
for three (3) quarters.

Maintenance control proposal.
▪      The maintenance contract price includes labour, transport and
accommodation for the attending technicians.

incinerator for medical waste

incinerator for medical waste.Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.). a  diesel  fired  medical  waste  incinerator  with  a  capacity  of  300Kg/hr.  to  be  installed  at  a  waste  disposal  site  away  from  populated  areas.

Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion.Incinerator with Oil Burner .
Require Quantity – 1 complete Unit / Set
Type of Materials To  be Burn –  Solid Waste
Burner Capacity  – 0.2 Kw ( 200 watts )
Capacity   –  2 ton per day
Oil Tank capacity of Burner – 300 Lit
Oil pump capacity   – 0.4 Kw ( 400 watts ).medical waste Incinerators for burning hospital waste
so we are looking for a source

INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY

Use diesel, construction in painted steel resistant aluminium at high temperatures, flame device control indicator, charging indicator, temperature control device, burning capacity of 250 kg / hour in two stages (primary  and secondary camera)
INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY
1. CAPACITY OF WASTE DISPOSAL: 50à60 kg / h
2. CAPACITY OF OPERATION WITHOUT STOPPING: 10h
3. SUITABLE FOR WASTE CATEGORIES A, B, C, D AND E MEDICAL WASTE BY UNEP AND WHO
4. COMBUSTION “PYROLYSIS” by controlling the waste gasification
5. CALORIFIC LOWER (LCP) WASTE OF THESE MUST BE OF 3500 KCAL / H. an incinerator with loading indicator, temperature control functions and with two chambers (primary and secondary).
6. TEMPERATURE MAX 1400oC DESTRUCTION
7. MIN TEMPERATURE OF DESTRUCTION 850oC
8. BURNING ROOM NUMBER: 2 (PRIMARY AND SECONDARY)
9. VOLUME CHAMBER: 1200L
10. DIMENSION OF THE LOADING DOOR: 70CMX70CM
11. FUEL TYPE: DIESEL
12. POWER SUPPLY: 220 V / 380 V
13. CHIMNEY HEIGHT: 40 CM
14. BURNER
15. VANTILLATEUR BLOCK
16. BOX CONTROL AND REGULATION.Diesel medical waste incinerator made of  steel painted in aluminum
and resistente to high temperatures,  device  indicator for flame
control, loading indicator, temperature control device, burning
capacity of 250Kg / 10 hours in 2 stages (primary chamber and
secondary chamber.one should burn 50Kg/hr another 600Kg/hr and another, 1000Kg/hr. I have visited your website and would like to ask the following questions:
1. Are these units fueled by natural gas?
2. Do the units ship fully assembled or in pieces?
3. Are smoke stacks included?
4. Can the units be installed within a city area or should they be outside city limits?
5. What floor area does each unit require?
6. What kind of enclosure is required?
7. What is the typical fuel consumption for each unit?

Medical waste incineration system

Medical waste incineration system of 300 kg/hr burn rate with dual fuel (gas and diesel) type, daily 8-16 hrs operation and a stack height of 15 meter.Primary combustion
i.    The primary combustion chamber shall be accepted as the primary combustion zone;
ii.    The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;

Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;

Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;1.    Capacity of destruction in weight: 60 Kg/h.
2.    It should be able to operate not less than 10 hours/day
3.    This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…
4.    Design Specification : Types A, B, C, D, and E of medical waste
5.    “PYROLYTIC” combustion, by controlling the gasification of waste.
6.    The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings.
7.    It should be able to reduce the volume of wastes by 98%.
8.    It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.
9.    The incineration should be completely free from visible smoke as well as offensive odours.
10.    The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg
•    The Temperatures of combustion: Minimum will be 850oC and max 1400oC
•    Post combustion: >1100oC.
11.    The Internal diameter of the Chimney: Ø 400 and its height: 8 m
12.    The Volume of the combustion chamber: 1.200 L
13.    The Dimension of the door for loading in cm: 70×70.
14.    Burner operation should be Automatic On/Off
15.    Fuel : diesel
16.    The supplier must provide  necessary information for the best of  the installation
This incinerator with “PYROLYTIC” combustion must have:
17.    A combustion chamber of waste:
* Perfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
* A burner of lighting which the use is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on   the outside sheet metal.
* Composition of the refractory;
•    Refractory concrete :
    . Thickness    : ≥100 mm
    . Nature: 42% of Al203
•    Insulate in fibrous panels :
    . Thickness: ≥75 mm
•    Nature: Calcium silicate.
* Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass and slags.

18.    A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total recombustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
•    Refractory concrete :
    Thickness    : ≥150 mm
    Nature: 65% of Al203
•    Insulate in fibrous panel :
    Thickness: ≥85 mm
     Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of     electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.

20.    Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
21.    Controls and regulations:
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of postcombustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.
22. Process Filtering system: Scruber to be mentionned as optional
23. Emission Standards Compliance: BS 3316 or équivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.    The installed incinerator must bear a one year guarantee.
24.    The supplier shall perforn an onsite installation of the incinerator.
25.    The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

Pre-assembled containerized type waste incinerator



Pre-assembled, containerized type

 Burning rate: 100 – 120kg / hour medical waste incinerator
 Minimum operating temperature: 8500c
  (Primary combustion)
Maximum operating temperature: 14500c  (afterburner chamber)
Secondary Burning capacity: Compulsory.
Density insulation: 20 mm high hospital waste incinerators
Refractory casting: minimum 65mm
Heavy duty refracting lining to withstand 15000c
Average burn out time: maximum 3.0 hrs
Fuel type: fuel oil (diesel) cannabis waste management
Fuel consumption in L/hr: 7.5 to 9
Residency time in secondary chamber: 2 secs.
Residue ash post 100kg Max 3.8 kg
Installation period Maximum 7days.

HICLOVER Solution for Fighting COVID-19, with ISO9001:2015/CE(2006/42/EC,2014/30/EU) Certification.
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)

2. Auto Roll Air Filter for Clean Room(Air Purification)

Nanjing Clover Medical Technology Co.,Ltd.
Tel:  +86-25-8461 0201    

Mobile: +86-138139 31455
WhatsApp: 008613813931455
WhatsApp: 008615380948599
Twitter ID: @hiclovercom
Wechat: 008613813931455 (ID: hiclovercom)
Wechat: +8615380948599 (ID: wasteincinerator)

Website1: www.hiclover.com 
Email1:     [email protected]
Email2:    [email protected]    
Email3:   [email protected]  

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Brand HICLOVER HICLOVER HICLOVER HICLOVER
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg
Control Mode PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm
Chimney 3Meter 3Meter 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800–1000

800–1000

800–1000

800–1000

2nd. Chamber Temperature

1000-1200

1000-1200

1000-1200

1000-1200

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm

CE and ISO Certification Pass Incinerators

 

2021-03-02



Various Types of Incinerators

hazardous waste high temperature incinerators for the treatment of hazardous wastes. The waste will be mixed, including medical, oily wastes, woods and laboratory wastes. Primary combustion
Diesel/LPG/LNG burning primary combustion chamber/primary combustion zone
Secondary combustion
Residence time in the secondary chamber not less than 2 seconds
Both primary and the secondary temperatures maintained until all the waste has been completely combusted
Chimney
Chimney with a minimum height of 4 meters above ground level
Minimum exit velocity of the emissions not less than 10 metres/second
Temperature Warnings
Audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature
General
Control box that can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height

Incinerator model A
Burn Rate 65kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Incinerator model B
Burn Rate 150kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Diesel/LPG/LNG, please indicate
Power Supply for Control Box- 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Incinerator model C
Burn Rate 250kg/h minimum
Weight (kg) please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V 50Hz single phase
Minimum operating temperature 920 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
I000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 4 – High Temperature Waste Incinerator
HTW Incinerator model D
Burn Rate – 150kg/hour minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time 2 Seconds
Fuel Diesel/LPG/LNG, please indicate
Power Supply for Control Box 220V-240V, single phase 50-60Hz
Minimum operating temperature 1200°C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 5 – Mobile Incinerator
Mobile Incinerator model E
Burn Rate 50kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 6 – Mobile Incinerator
Mobile Incinerator model F
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 850 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height
Warranty, indicate no of years

Lot 7 – High Temperature Waste Mobile Incinerator
HTW Mobile Incinerator model G
Burn Rate 100kg/h minimum
Weight (kg), please indicate:
Secondary Chamber
Gas Retention Time – 2 Seconds
Fuel – Diesel/LPG/LNG, please indicate
Power Supply for Control Box – 220V-240V 50Hz single phase
Minimum operating temperature 1200 °C, please indicate
One year Spare Parts Package for complete maintainability
10m Hose Pipe, indicate length
1000 Litre Fuel Tank + Pipe System, indicate volume
Additional chimney extension, indicate height

Incinerator for Animal Crematory Pig Farm Model A1200

Incinerator for Animal Crematory Pig Farm Model A1200


*** 3 sets Burners
*** Good for animals or big pets
*** Double Combustion chamber
*** stainless steel chimney
*** Italy made oil burners
*** 1200Liters(1.2m3) big chamber

Model

A1200

Picture

Burning Rate

Average 50 kgs/hour

Feed Capacity

Average 100 kgs/feeding

Primary Combustion Chamber

1200 Liters

Secondary Combustion Chamber

500 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V/380V

Fuel Type

Diesel Oil

Burner

Italy Original

Oil Consumption (Diesel Oil)

Average 34.4 kg/hour

Gas Consumption (Natural Gas)

***

Internal Dimensions

130x100x90cm (primary chamber)

External Dimensions

220x180x360cm (without chimney)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

500 Liters

Door Opening

55 x 80cm

Chimney Length

10.0 Meters

Chimney Type

Stainless Steel

Equipment Gross Weight

7500 kgs

Operation Technical Specifications

Primary Chamber Temperature

800–-1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3000Kcal

Model

A1200

Internal Dimensions

130x100x90 cm

Suit for Animal

Cat – yes

Dog – yes

Pig – small

Cow – no

Main Product List

Primary Combustion Chamber

Secondary Combustion Chamber

Mix-Combustion Chamber

Smoke Filter Chamber(Dry Scrubber)

Incinerator Control Case

Chimney:10.0Meters *(upgrade to Stainless Steel, free cost)

Italy oil burner: 03 sets

Oil Tank : 500Liters

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-02-11