Tag: waste-incinerator

a pet cremator

11
Burners
Fire Brick, Refractoy Block, Concrete

2
Double Burning Chamber with Integrated In Smoke Filter (Dry Scrubber)

6
220/380 Volt A/c 50 Hz.

10
Summary

1
Incinerator Kind
Feed Setting
Premium Quality European CE Qualified Oil Burner

8
Standard PLC Control Panel

9

an animal cremator for our organization in malaysia.currently we’re doing specific personal cremation in addition to mass cremation for animals along with clinical waste.a burner which can shedding between 3 to 5 tonnes daily of mixed waste items, plastics, rubber, combustible putrescible waste, clinical waste, rubber tyres, paper in addition to cardboard, fabrics, eco-friendly timber waste etc.. As a few of the waste products will include non-flammable solids, the burner should be effective at removing those materials possibly using a rotating kiln procedure.

it’s not intended to utilize any type of gasoline, such as oil or diesel, to market the burning of the waste, since the waste products are essential to be incinerated using a free burning procedure. Warm air however from a downstream procedure will be offered to enhance the burner temperature level and burning rate as needed. Very heats from the incinerator are not needed and are not called for.

The burning of the waste products is expected to create hazardous discharges which will be cleaned up by way of other existing downstream processes and also an Article Burning process from the burner is as a result not required.

The burner must be capable of suiting an automatic waste feed process.Incinerator Requirements

S. No.
Non Corrosive/ Rust Resistant Ideally Stainless for longer Life (Height 5-7 Meter)

7
Oil Tank Capability
Burning Chamber
Burning Capacity
Power Supply

9
Power Supply
220/380 Volt A/c 50 Hz.

10
Oil Tank Capability
200 ~ ~ 300 Litre

11
Burning Chamber
Fire Brick, Refractoy Block, Concrete

Install a diesel fired burner

blaze mostly pharmaceuticals (all kinds of dose types … … syrups, tablets, injectables) medical consummabables, in addition to similarly biological fluids …….
1.2 FIELD PAINT.
Handling devices, and the procedure surveillance facilities. Execute testing complete scale for a full- operation cycle, and also monitor performance to confirm compliance with the arrangement needs submit a record on surveillance results. Decrease the waste to a great ash deposit. Comply with typical burnout treatment. Following the incinerator has really cooled down, consider the residue. The weight of the residue will not go beyond 5.0 percent combustible material of the overall fee weight.
– – Fuel syetem: Double gas( both oil and also gas)

– Covering Temperature.
Capacity around 10 kg/ hour. Install a diesel discharged incinerator that can accommodate a set heaps of about 100 kg with a day-to-day burning need of up to 500kg per 8 hour day. Industrial Incinerator to harm.
The pharmaceuticals waste like Alu, PVC, PVDC etc.Installation for burning of pet waste cost, existence, payment terms where it is possible to buy in Russia? I’m aiming to for power in between 200 -400 kg.
– – capability: 300-400 kg/hour.
Preheat the incinerator for 4 hrs to reach the firing temperature of 982degrees C [1800] levels F. Weigh and tape the overall fee weight. Charge the burner at the rated burning capability in kg pounds per hour for a duration of [4] hrs in addition to run according to the maker’s written guidelines. Consist of in efficiency testing the procedure of the mechanical billing centres, the incinerator, the air contamination control tools, the ash.
After clean-out, the incinerator will disappoint any sort of proof of wear and tear, such as shagged or spilling refractory, warping of parts, in addition to stained exterior paint.
Perform painting required for surface areas not otherwise specified, and also surface paint of items only keyed at the mill

1.3 AREA TRAINING.
A. Submit [6] full copies of working instructions laying out the detailed procedures necessary for system startup, operation and also shutdown. Consist of in directions the provider ’s title, version number, service manual, elements list, in addition to quick overview of all devices in addition to their standard operating features. And also [Six] total copies of maintenance instructions supplying regular upkeep treatments, possible breakdowns and also repair services, fixing guides, in addition to streamlined schematic representations for the system as set up.

3.6. Efficiency.

– Covering Temperature.
Operate the incinerator under normal lots problems for not less than 6 hours. After 6 hrs, temperature readings of the external covering, taken at not much less than 5 arbitrary places, will not exceed the temperature level constraint of paragraph furnace building.
– – capability: 300-400 kg/hour.
– – Fuel syetem: Double gas( both oil and also gas)

50 to 60kg/hr as well as 100 to 120kg/hr diesel powered incinerator

50 to 60kg/hr and 100 to 120kg/hr diesel powered burner.1. 2. Needed Blazing Capacity:
Around 4,500 loads annually. The incinerator has to efficient in blazing form of waste any mixes thereof at a cost of 3 heaps per hour. The system will be made to compete at least five consecutive times non-stop if needed.
3. Incinerator Layout Requires:
The system ought to be simple in design and process, with marginal electronic components.
The incinerator and connected air pollution control modern technology will certainly be:
a.Low used of encouraging fuel;
b.Low in electric power usage;
c.Require hardly any pre-processing of Local strong waste;
d.The air pollution system shall adhere to EU Waste Incineration Regulation 2000/76 and also creates component of the entire incinerator arrangement.
3.1 Particular Data that must be Given with the Design 3.1.1 Incinerator Information:
a.Batch Lots Capability;
b.Primary chamber style (density, diameter, length, insulation, cellular lining, quantity hearth place, weight); c. Second chamber design (thickness, diameter, length, insulation, lining, quantity hearth place, weight);.
C.Exhaust stack design (density, diameter, liner variety of segments, overall heap size, height above base, weight);.
D.Type and assortment of supporting gas heaters;.
E.Fuel needs – type, quantities;.
F.Electrical power usage;.
G.Electrical services called for;.
H.Water requirements– amounts;.
I.Any various other input demands and also consumables;.
K.Residence time to guarantee ideal devastation of waste as well as comply with needed air pollution control standards;.
L.Potential weight reduction (percent) of waste;.
M.Options to instantly and also continually display and document information such as days, time of day, batch sequential number;.
N.A temperature or decorative sign to demonstrate warmth status of gear; and also.
O.Details on visuals screens as well as/ or computer system recording gadgets. A.The sort of air pollution control apparatus selected will follow EU WID Waste Incineration.
b.Directive 2000/76;.
C.Details on the gas cleanup systems to improve the elimination of great pieces, acid fumes and also hefty.
d.metals;.
E.Details on elements, such as:.
quencher;.
condenser/ absorber;.
entrainment separator and.
Electrical power usage;.
F.Any various other input demands as well as consumables (e.g. lime);.
G.Details on graphic displays as well as/ or computer recording apparatus;.
H.Environmental needs – – The machine would certainly have the ability/ skill to abide by pertinent air quality criteria; i.e.EU Waste Incineration Regulation 2000/76. (or similar standards as well as requirements acceptable to the Australian Commonwealth Federal Government Department of the Setting);.
I.Specify air contamination parameters that are kept an eye on.
3.1.3 Site Demands for the Incinerator.
B.Infrastructure needed (supply of water, power supply water drainage); and.
C.Any particular ecological or climatic/meteorological facets that requires consideration.
3.1.4 Housing Needs and also Style.
A.Details on needs for a protected unit for the burner and connected air pollution control system. The room will surely be designed to achieve job-related health and security needs such as: a. Free space is readily available on all sides as well as warm radiation is kept at a minimum giving the operators .
B.easy viable environment and also venting;.
C.There are safe storage space facilities for waste;.
D.There are measures to stay clear of vermin as well as pests;.
E.The materials will be of adequate architectural depth for security and to hold up against sea rust.
4. Training, Upkeep And Direction Manuals.
Supply information on maintenance demands, such as:.
A.General cleaning as well as upkeep– regularity, skills/ technical expertise required;.
B.Expected life span of elements as well as the system as a whole;.
C.Expected regularity of the requirement for substitute of components;.
D.Availability of parts as well as location of vendors;.
E.Frequency of requirement for significant overhauls; and .
F.Estimated down time needed for general upkeep as well as significant overhauls.an incinerator for our deceased pets in the ranch especially poultry.

3.1.2 Air Pollution Control System Information.
a.The sort of air pollution control devices selected will follow EU WID Waste Incineration.
b.Directive 2000/76;.
c.Details on the gas cleansing systems to improve the elimination of great bits, acid gases and also hefty.
d.metals;.
e.Details on elements, such as:.
quencher;.
condenser/ absorber;.
venturi scrubber;.
entrainment separator and.
emissions pile( s).
Electrical power usage;.
f.Any various other input demands as well as consumables (e.g. lime);.
g.Details on graphic displays as well as/ or computer recording devices;.
h.Environmental needs – – The system would certainly have the ability/ ability to abide by pertinent air quality standards; i.e.EU Waste Incineration Regulation 2000/76. (or similar standards as well as requirements acceptable to the Australian Commonwealth Federal Government Department of the Setting);.
i.Specify air contamination parameters that are kept an eye on.
3.1.3 Site Demands for the Incinerator.
a.Total land area dimentions;.
b.Infrastructure needed (supply of water, power supply water drainage); and.
c.Any particular ecological or climatic/meteorological aspects that requires consideration.
3.1.4 Housing Needs and also Style.
a.Details on needs for a protected unit for the burner and connected air contamination control system. The room will certainly be designed to attain job-related health and safety needs such as: a. Free space is readily available on all sides as well as warm radiation is kept at a minimum giving the operators an:.
b.easy workable environment and also ventilation;.
c.There are safe storage space centers for waste;.
d.There are measures to stay clear of vermin as well as pests;.
e.The materials will be of adequate architectural thickness for security and to hold up against sea corrosion.
4. Training, Upkeep And Direction Manuals.
4.1 Upkeep Handbooks.
Supply information on maintenance demands, such as:.
a.General cleaning as well as upkeep– regularity, skills/ technological experience required;.
b.Expected life span of components as well as the system as a whole;.
c.Expected regularity of the requirement for substitute of components;.
d.Availability of parts as well as location of vendors;.
e.Frequency of requirement for significant overhauls; and also.
f.Estimated down time needed for general upkeep as well as significant overhauls.an incinerator for our dead pets in the ranch particularly poultry.

2 combustion chambers type burner

Load Capacity minimum:  1500 kg

Ability each day around 8-10 kg wastage/day. ·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment?

·         For the incinerator, can you suggest (and of therefore please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr? What is your minimum and maximum size available?

·         As we aren’t so expertise in incineration process, can you tell us which type of waste can go into the incinerator and respecting international environmental regulation?

·         Can you armed your incinerator with filters? If so which one and they’re following which standard?

·         Can you provide exhaust pipe from incinerator to the roof, and then whirly bird to prevent the rain water to go in the pipe?

Gasified incineration for melting medical wastes incinerator

Gasified incineration for burning clinical wastes.

Gas kind: Natural Gas
–– 30-50 kg/time
Temperature Monitoring: Both for primary and secondary chambers.
–– Daily 3-6 times

Burner size: max 2000x1200x3200 mm
Charging price:.
Burning room volume:
Capacity (Cubic Mtr): 1.65 M3 or more.
Waste destruction efficiency:> 90% by weight.
–– Gasification space max 0.7 m3,
– Waste collection Trolleys.
–– Additional burning area max 0.5 m3 ,

Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER).
Filter: Ceramic or various other equal filters in order to lower the induction of unsafe air pollutants, particulates, carbon monoxide, dioxin/furane into the environment.
– Civil functions.
– Main as well as secondary chamber temperature introduced and listed (optional).
– As much as 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
– Pipes.
– Vertical cost door on key chamber.
Ash Door Opening (mm): 475×× 900 or much better.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature signals and also cost recorder. Modulating control for gas as well as air decreases gas consumption.
Height Incl. Flue (mm): 7700 or far better.
Max, Operating Temperature: 1350 degree centigrade.
Ave Ability: 100kg per hr.
Burning Capacity:
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Filling SystemManual/semi-automatic.
Additional Chamber Capacity (CubicMtr):3.88 or more.
Width (mm): 1280 or better.
– Pneumatic or hydraulic ram charging system.
Residency time in Second Chamber: 2 sec.
Minimum installment and also launch time.
Weight: max 5000 kg

Medical Waste Incinerator Trailer Mounted

*Double combustion chambers
*Smoke filter chamber and S.Steel chimney
*Italy Riello Oil burner and PLC Auto. control
*Heavy duty mobile trailer with safe parts 
*Minimal installation
*Mobile by truck tractor 
1. Should be Trailer mounted Trailer Type
2. Be able to burn Medical waste 100-200kgs per hour
3. Diesel diesel oil type
4. 220 V single phase
5. Incinerating temperature range 800-1200 degree Celsius  

Items/Model

TS100(PLC) (Mobile Type)

Picture

 

Principle

Medical Waste Incineration Treatment

Burn Rate

Average 100-200 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V

Power

0.9Kw

Oil Consumption (kg/hour)

average 20.4

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

200L

Feed Door

80x60cm

Chimney

3Meter

Chimney Type

Stainless Steel

1st.

Diesel/LPG/LNG burning key burning chamber/primary combustion incinerator

Main burning

Item 5.
Burn Price – – 150kg/hour minimal.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Control box which can be separated as well as mounted on different rack at least 1.5 meters from incinerator at approximately 1.6 meter

elevation.
Temperature Warnings.
One year Spare Components Bundle for full maintainability.
Diesel/LPG/LNG burning main burning chamber/primary combustion zone.
One year Spare Parts Bundle for total maintainability
General

* Automatic ash/ leftovers elimination as initial part of the unit.

* Water Resistant System to control the temperature>

* Flue gas filtering system abiding by EU.

* Continual discharge tracking and recording system.

* It must include installation, testing, and also personnel training. Of filling containers that are sturdy.
General.
Fuel Diesel/LPG/LNG, please reveal.
Gas Retention Period 2 Seconds.
Gas Diesel/LPG/LNG, please reveal.
Smokeshaft.
Product 7.
HTW Incinerator design D.
Chimney
Minimum exit velocity of the emissions less than 10 metres/second.
Diesel/LPG/LNG burning key combustion chamber/primary combustion zone
Home time in the next chamber less than 2 secs
Mobile Incinerator

Item 6.
Extra chimney expansion, indicate height.
Warranty, reveal no of years

Product 3
Mobile Burner version E

Melt Price 50kg/h minimal

Weight (kg), please show:

Secondary Chamber

Gas Retention Time – – 2 Minutes

– Gas – Diesel/LPG/LNG, please suggest

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum running temperature level 850 ° C, please indicate

One year Spare Components Bundle for full maintainability.
Both key and the secondary temperatures preserved up until all the waste has actually been fully ignited
HTW Mobile Burner version G.
Gas Retention Time 2 Secs.
Power Supply for Control Box 220V-240V 50Hz single point.
Incinerator version C.
Added smokeshaft expansion, suggest elevation
Control box that can be separated and installed on different stand a minimum of 1.5 meters from burner at around 1.6 meter

heightItem 1
Second burning.
Audible and/or noticeable alarm system to advise the driver once the extra temperature goes down to below the called for temperature level.
Gas Retention Time – – 2 Seconds.
House time in the next chamber less than 2 seconds.
Mobile Incinerator version F

Melt Rate 100kg/h minimal

Weight (kg), please indicate:

Second Chamber

Gas Retention Time – – 2 Seconds

– Gas – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum working temperature level 850 ° C, please indicate

One year Spare Parts Bundle for full maintainability

10m Pipe Pipe, indicate size

1000 Litre Gas Container + Pipeline System, reveal amount

Added smokeshaft expansion, indicate height

Warranty, indicate no of years.

Second Chamber.
Secondary Chamber.
Weight (kg), please indicate:.
1000 Litre Fuel Tank + Pipeline System, indicate quantity.
Minimum leave velocity of the sparks not less than 10 metres/second
Burn Rate 250kg/h minimal

Weight (kg) please show:.
Second Chamber.
Guarantee, reveal no of years

Melt Rate 65kg/h minimal

Weight (kg), please indicate:

Secondary Chamber

Gas Retention Time – – 2 Secs

– Fuel – Diesel/LPG/LNG, please show

Power Supply for Control Box – 220V-240V 50Hz single phase

Minimum running temperature level 850 ° C, please indicate

One year Spare Components Plan for complete maintainability

10m Tube Pipe, indicate size

I000 Litre Gas Tank + Pipeline System, show volume

Added smokeshaft expansion, indicate elevation

Service guarantee, suggest no of years

Item two
I000 Litre Gas Tank + Pipeline System, indicate quantity.
Minimum running temperature 920 ° C, please indicate.
Weight (kg), please indicate:.
Both main and the secondary temperatures preserved up until all of the waste has been entirely ignited.
Main burning.
Extra chimney expansion, suggest height.
Incinerator design B

Melt Rate 150kg/h minimal

Weight (kg), please indicate:

Added Chamber

Gas Retention Time – – 2 Seconds

Diesel/LPG/LNG, please show

Power Supply for Control Box- 220V-240V 50Hz solitary stage
Chimney with a minimum elevation of 4 meters above ground level.
Minimum working temperature level 920 ° C, please indicate

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum operating temperature level 850 ° C, please indicate

One year Spare Parts Bundle for full maintainability

10m Pipe Pipe, suggest size

1000 Litre Gas Container + Pipeline System, show quantity

Additional smokeshaft extension, indicate height

Warranty, indicate no of years.
Heat Waste Mobile Incinerator.
Product 7.
HTW Mobile Burner version G.
Burn Price 100kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – – 220V-240V 50Hz solitary stage

Minimum operating temperature 1200 ° C, please suggest.
Main burning.
Diesel/LPG/LNG burning main burning chamber/primary combustion zone.
Second burning.
House time in the second chamber not less than 2 seconds.
Both main and the secondary temperatures preserved up until all the waste has been entirely ignited.
Smokeshaft.
Chimney with a minimal elevation of 4 meters above ground level.
Minimum exit velocity of the emissions not less than 10 metres/second.
Temperature Warnings.
Audible and/or noticeable alarm system to advise the driver when the additional temperature goes down to below the called for temperature level.
General.
Control box that can be separated as well as mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter

elevation.
Guarantee, show no of years