Tag: waste-incinerator

infectious waste pyrolysis machine chinalarge animal incinerators

Major components are – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone ,LPG

quote for incinerators for industrial chemical wastes treatment,

1 burning rate must be Average 30kgs/h
2 inside of chamber material must be refractory concrete cement
3 it works in three system diesel oil/ Natural gas or LPG
4 voltage must be 220V

5 inside temperature first must be 1000c  and second must be 1200c
6 pipe length must be 20 M

Our requirements are  for 125 kg/hr and 42 kg/hr, please send quote with catalog for both options
We are currently dealing in Defense Related Equipment, Construction Assistance and Medical Equipment, Modular Solutions

for Hospitals, Waste Management System, CSSD, Hospital Furniture and Services. We are based in the Capital city of

Pakistan i.e. Islamabad ,where there are all the head offices of Military and Govt. institutions. We have the capacity to

Participate in tenders and we also have a strong network of energetic/active dealers and sales staff in Pakistan and

Afghanistan.
5 incinerator 15 kg the specifications High temperature incinerator​99% combustion efficiency Temperature up to 1200°C or

Smoke and smell free Excellent heat retention Electric powered​ Fast heatup times Temperature Up to 1200°C or as required

Capacity​15 Kg Burning Efficiency 98% Noise- <78db Power – Electric Chamber​Single / Dual chamber Safety Alarm Emergency

vent Monitoring device​ Air Pollution Control Device​ CE and ISO Certified

I ‘d like to ask you about a power plant by burning waste. We have many of camps for displaced people in Syria, and we

want to buy a plant to generate electricity by municipal waste incineration Please send me an offer or any details.

portable medical waste incinerator manufacture companies in china

Capacity: 20KG/Hr, Temp Range: 600 Deg. C – 1100 Deg. C

Fuel Supply: Natural Gas/Diesel

Dual Combustion Chamber Complete Scrubbing System (Dual

Resultant Gas Washer), Dual Blower, Chimney Height: 8m

Electric Supply: 220/240Volt, Single Phase

1.    Type of waste: Trash
2.    Any other type:
3.    Quantity of waste generated per day in kg: (50 Ton per day) SOW
4.    Duration – incinerator will be used per day: (Minimum 12 hours) SOW
5.    Approximate moisture content:
6.    Local incinerator operating and emission standards: US-EPA
7.    What is the height of the chimney required: Not known
8.    Fuel proposed to be used: Deiseal Oil
9.    Availability of power and type: 220 or 110
10.    Details of space available: Plenty of space
11.    Do you require an automatic loading system: [**] Yes  [**] No
12.    Do you require a gas scrubbing system: [**] Yes  [ ] No
13.    How soon do you require the system to be delivered: 30
14.    Any other specific requirements:
15.    Nature: (Solid/Semi-solid/Liquid)

medical waste incinerator

Australian combustion engineering proprietary 5 25kg/hour
dual chamber(LPG) incinerator or equal approved. incinerator
casing to be mild steel with 125mm refractory lining including
primary and secondary chamber, insulated draft section above
secondary chamber, package burners, digital temperature control
systems, ash rake and poke, second door in primary chamber,
manual loading chute, semi automated operated counter balanced
loading door with loading tray complete with stainless steel flue
recommended spare parts.

Incinerator to cut black bag landfill waste

30 August 2013 Last updated at 21:18 BST

Five councils in south east Wales have formed a partnership to deal with black bag waste in a bid to cut down on rubbish going to landfill.

The authorities aim to incinerate waste which cannot be recycled and convert it into power in a new project which is receiving a £4m annual grant from the Welsh government.
Environment correspondent Iolo ap Dafydd reports.

Article quoted from the networkQQ图片20160218145327

BURNING AND INCINERATION OF SOLID WASTE

Biomedical Waste                    Any solid or liquid waste which may present a threat of infection to humans including non-liquid tissue, body parts, blood or blood products and body fluids, laboratory and veterinary waste which contains human disease- causing agents, and discarded sharps (i.e. syringes, needles, scalpel blades).
 
Bottom Ash                                 The course non-combustible and unburned material which remains at the burn site after burning is complete. This includes materials remaining in the burn chamber, exhaust piping and pollution control devices where such devices are used.
 
Burn Box                                      A large metal box used to burn solid waste. Combustion air is usually supplied passively through vents or holes cut above the bottom of the box. An exhaust pipe or stack may or may not be attached.
 
 
 
 
Commercial Camp                   A temporary, seasonal or multi-year facility with a capacity greater than 15 people and which has been established for research, commercial or industrial purposes. A commercial camp does not include a traditional camp or field camp.
 
Commissioner’s Land             Lands that have been transferred by Order-in-Council to the Government of Nunavut. This includes roadways and land subject to block land transfers. Most Commissioner’s Land is located within municipalities.
 
Contaminant                             Any noise, heat, vibration or substance and includes such other substance as the Minister may prescribe that, where discharged into the environment,

  • endangers the health, safety or welfare of persons,
  • interferes or is likely to interfere with the normal enjoyment of life or property,
  • endangers the health of animal life, or
  • causes or is likely to cause damage to plant life or to propert

 
Determined Effort                    The ongoing review of opportunities for reductions and the implementation of changes or emission control upgrades that are technically and economically feasible and which result in on-going reductions in emissions. Determined efforts include the development and implementation of waste management planning which is focussed on pollution prevention.
 
De Novo Synthesis                   The creation of complex molecules from simple molecules.
 
Environment                              The components of the Earth and includes

  • air, land and water,
  • all layers of the atmosphere,
  • all organic and inorganic matter and living organisms, and
  • the interacting natural systems that include components referred to in paragraphs (a) to (c) above.

 
Field Camp                                  A temporary, seasonal or multi-year facility consisting of tents or other similar temporary structures with a capacity of 15 people or less and which has been established for research, commercial or industrial purposes.  A field camp does not include a traditional camp or commercial camp.
 
Fly Ash                                          Unburned material that is emitted into the air in the form of smoke or fine particulate matter during the burning process.
 
Hazardous Waste    A contaminant that is a dangerous good and is no longer wanted or is unusable for its original intended purpose and is intended for storage, recycling, treatment or disposal.
 
Incineration                                A treatment technology involving the destruction of waste by controlled burning at high temperatures.
 
 
 
 
Incinerator                                  A device or structure intended primarily to incinerate waste for the purpose of reducing its volume, destroying a hazardous substance in the waste or destroying an infectious substance in the waste. An incinerator has means to control the burning and ventilation processes.
 
Inspector                                     A person appointed under subsection 3(2) of the Environmental Protection Act and includes the Chief Environmental Protection Officer.
 
Modified Burn Barrel              A metal drum used to burn waste that has been affixed with devices or features which provide limited increased heat generation, heat retention and holding time.
 
Open Burning                            Burning of waste with limited or no control of the burn process. For clarity, open burning includes burning on the open ground or using a burn box or unmodified or modified burn barrel.
 
Qualified Person                       A person who has an appropriate level of knowledge and experience in all relevant aspects of waste management.
 
Responsible Party                    The owner or person in charge, management or control of the waste.
 
Smoke                                  The gases, particulate matter and all other products of combustion emitted into the atmosphere when a substance or material is burned including dust, sparks, ash, soot, cinders and fumes.
 
Solid Waste                                 Unwanted solid materials discarded from a household (i.e. single or multiple residential dwellings, other similar permanent or temporary dwellings), institutional (i.e. schools, government facilities, hospitals and health centres), commercial (i.e. stores, restaurants) or industrial (i.e. mineral, oil and gas exploration and development) facility.  For clarity, solid waste does not include biomedical waste, hazardous waste or sewage sludge.
 
Traditional Camp                      A temporary or seasonal camp used primarily for camping, hunting, fishing or other traditional or cultural activities. A traditional camp does not include a field camp or commercial camp.
 
Unmodified Burn Barrel         A metal drum used to burn waste that has not been affixed with devices or features which provide for enhanced heat generation, heat retention and holding time.
 
Untreated Wood                      Wood that has not been chemically impregnated, painted or similarly modified to improve resistance to insects or weathering.
 
Waste Audit                                An inventory or study of the amount and type of waste that is produced at a location.
 
 

China incinerator

Incinerator Of Burning Capacity 30 kg/hr = 1 No
The Incineration System comprises of:
I. Main Incinerator with
A. Refractory lined Primary and Secondary Chamber.
B. Refractory lined main charging door and ash cleaning door.
II i. 1 No. fully automatic oil burner for primary chamber.
ii. 1 No. fully automatic oil burner for secondary chamber.
III.Centrifugal forced draft combustion air fan with motor.
IV. Flow measurement device on the Pri mary & Secondary air ducting.
V. Auto-loading in the form of Double FDV mechanism with outer gate
manual and inner motorized.
VI. Emergency stack / vent.
VII. High pressure Venturi scrubber of SS316 L
VIII. Cyclonic type droplet separator cum recirculation tank in Mild steel
rubber lined ( MSRL) construction.
IX. I.D. Fan with MSRL casing & SS 316 L impeller with motor.
X. Recirculation Pump (SS 316) with Motor along with piping & valves in
SS 316.
XI. Overhead HDPE Water tank for scrubber along with water piping
between tank and scrubber.
XII. Interconnecting ducting within the battery limits.
XIII. Instruments, valves, dampers and fittings within battery limits.
XIV. PLC based Control Panel with necessary instruments.
XV. Data recording device in the form of Printer.
XVI. Oil tank of 500 ltr capacity along with oil piping, valves & strainers
between tank & burner.
XVII. Operati ng tools & tackles like rake, hoe, shovel, two teeth scrapper.
XVIII. Caustic dosing system comprising of Tank- Agitator and pump
XIV. FUEL LDO DIESEL.

manufacturer of ha zardous waste incinerator in china

Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system
Imputing door Mouth Width (mm): 760*760 (approx.)
Chimney External Diameter (mm): 300 ± 10
Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max)
Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h
Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz
Per your advertisement for 300 kg.hr. Model – We need to know the price via return.
How many Kg. of Fuel would be required for running this Model 10 hrs. everyday.
We have our own Freight Forwarding Agent.
We had a Contract for Garbage Management before their Civil War for 120 Tons/Day for one Municipality in North Africa
Medical Waste Incinerator
Dual Chamber (Primary & Secondary) with insulation slabs (fully insulated internal refractory lining) along with
controlled air blower for each chamber
Insulation / Refractory Thickness: ≥ 100mm
Chamber plate thickness: ≥ 6mm
Fuel Type: Natural gas based on burning fuel in combustion chambers
Waste Capacity: ≈ 150 Kg/Day
Incineration capacity: ≈ 25 Kg/Day (Separate waste charging and waste removal doors)
Burners: At least with (02) burners of automated start and stop functions
Combustion efficiency: > 97%
Temperature: programmable temperature with temp monitoring system
Residence time: 2 second in secondary chamber
Heating value: 4000 Kcal
Temperature Range: ≈ min 800ºC to max 1200ºC
Electrical supply: 220V with single phase
Chimney Plate Thickness: ≥ 5mm
Water scrubber: Scrubbing using reagent like lime & should made of SS 10 gauge of non-corrosion properties and painted
exteriorly by equipment grade heat resistive enamel
Chimney Height: between 15-25 feet

Mobile Small Scale Medical Waste Incinerator with Trolley or Wheel

Mobile Small Scale Medical Waste Incinerator with Trolley(E-Power) or Wheel
Model YD-30 
Picture

 
Burning Rate  average 30 kgs/hour
Feed Capacity average 40 kgs
Paimary Combustion Chamber 200 Liters
Secondary Combustion Chamber 100 Liters
Mix Combustion Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.59Kw
Fuel Type Diesel Oil
Burner Italy Original
Oil Consumption (Diesel Oil) average 13.3 kg/hour
Gas Consumption (Natural Gas) ***
Internal Dimensions 80 x 50 x 50cm (paimary chamber)
External Dimensions 125 x 90 x 180cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 60 Liters
Door Opening 40 x 40cm
Chimney Length 1.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 1500/1700 kgs

1 INCINERATOR BURNER 1N 230V, 50/60Hz , 0.32 KW, IP 40, Brand: BALTUR , Made in Italy (Attached Per Name Plate and specification ) Complete Set Set 1 
2 INCINERATOR BURNER 1N 230V, 50/60Hz , 0.15 KW,IP 40, Brand: BALTUR , Made in Italy (Attached Per Name Plate and specification ) Complete Set Set 1 
3 INCINERATOR BURNER , 220V, 50 Hz, 119 KW, CX 10 , Brand: CAREER (Attached Per Name Plate and Photo Specification) Complete Set Set 1 
4 INCINERATOR BURNER, 220V, 50Hz, 172 KW, CX 14, Brand: CAREER (Attached Per Name Plate and Photo Specification) Complete Set Set 1 
5 Controller for incinerator , Model: LOA24.171B2BT, Brand: SIEMENS, 220-240VAC , 50/60 Hz, 3 VA, Made in Germany (Attached Per Photo Specification) Each 1 
6 Controller for incinerator , Model: LMO14.111 C2BT, Brand: SIEMENS, 230VAC, 50/60 Hz, TSA Max: 10s , Made in Germany (Attached Per Photo Specification) Each 1 
7 Temperature Contorl Unit for incinerator, Brand: XMT , Made in CHINA (Attached Per Photo Specification) Each 1 
8 Timer for incinerator (Super Timer Multi -Range Type, Type: ST3P A-F, Input: 200-220 VAC, 50/60 Hz, Contact Rating : AC 200V IND Load, Making : 3A with Base, Made in CHINA (Attached Per Photo Specification) Each 2 
9 Ignition Transformer for incinerator, Type : TC2STCSF, Code : 15910662, Primary : 220-240V, 30VA, 50/60 Hz, Secondary: 2X12KV, 20 mA, AB 100% T60 H , Made in ITALY (Attached Per Photo Specification) 
For medical and animal waste

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-30

30kgs rate 60kgs feed oil and gas burner small waste incinerator

30kgs rate 60kgs feed oil and gas burner small waste incinerator for Afghanistan

Machine Working mode

Oil or Gas + Power

Voltage

220V

Oil consumption (lit/hour)

Average 13.3lit/hour/chamber

Gas consumption (NG) (m3/hour)

16.0 (m3/hour) (NG)

Gas consumption (LPG) (m3/hour)

11.7 (m3/hour) (LPG)

Burning rate

Average 30kg/hour

Feed mode

Manual

Primary Combustion chamber

360 Liters

Secondary Combustion chamber

200 Liters

Combustion Chamber Material

Refractory Concrete Cement+firebrick

Internal dimensions

Yes (Primary chamber)

External dimensions

210x120x210cm(without chimney)

Door opening

48X60 cm

Fuel Type

Diesel Oil/ Natural Gas /LPG

Burner

Original

Chimney length

13.0 Meters

Smoke filter chamber

Yes

Temperature monitor

Two figure Digital Display

Temperature protection

Yes

Oil tank

200L

Burning Efficiency

>98%

Chimney type

Stainless steel

1st. chamber temperature

800c1000c

2nd.chamber temperature

1000c1200c

Residency time

2.0 sec.

Gross weight

4000kg

Electrical Plastic and glasses Shredder

Yes

Scrubber

Yes

Warranty Period

1.year

Primary combustion chamber

Yes

Secondary combustion chamber

Yes

Incinerator control case

S. steel

Incinerator chimney

Original

Fuel Burner

Yes

Oil Tank capacity

Yes

Oil Stand support

Yes

Dry Smoke Filter Chamber

Yes

Air Fan

Yes

Total waste incineration capacity/time

Minimum 60KG

for Ministry of Public Health, Kabul, Afghanistan

animal incinerator for poultry usage 
burning rate around 150 kg/hr 
load capacity around 350 kg .
Municipal waste incinerator for waste production rate of 50 ton/day
Medical waste incinerator for waste production rate of 200 kg/day
Medical waste incinerator for waste production rate of 500 kg/day
Medium Unit – to handle an average waste production of 500 kg/day and meet the capacity
Automatic PLC controller incinerator plant with Dual heat burners and dual chamber.
Burning capacity up to 30 Kg per hour.
Water showering cyclone air cleaner 
Stain less steel 304 grade sheet for water scrub chamber 
Time up to 250 mints.
Fully automatic electric control circuit with timers
Primary temperature up to 850 deg C
Secondary temperature up to 1100 deg C
Manual/automatic loading /unloading
Automatic start at power fail during process 
Fast temperature rise control automatic detects fast burning materials and save burner fuel consumption by turn off /on burner automatically.
Suitable for waste of hospitals
Number of burner   2 Nos
Voltage  440 V 50 Hz
Operational enjoinment          5 C 60 C Humidity 10 C 90%
Fuel type               Natural gas Number of chamber      02 Nos 

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-30

Pre-assembled containerized type Incinerator

Pre-assembled, containerized type Incinerator

Model

CA100

Picture

Waste Treatment

Medical Waste Incineration Treatment

Feed Capacity

Average 100-200 kgs per feed

Burning Rate

Average 100-120 kgs per hour

Burning Time per Feed

Average 1-2 hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Voltage

220V

Power

1.0Kw

Fuel

Diesel oil

Burner

Italy Burner

Feed Mode

Manual

Temperature Monitor

Digital Display

Fuel consumption (Oil)

Average 20.4 Kgs/Hour

Internal Dimensions

100x80x70cm (Primary Combustion Chamber)

External Dimensions

230 x 130 x 155cm (main body)

Waste combustion chamber

560Liters

Post Combustion Chamber

280Liters

Oil Tank Capacity

200 Liters

Door Opening

70 x 50cm

Chimney

5.0M

Gross Weight

4500kgs

Chamber Material

Firebrick ,Refractory Concrete

Max. Heat Value

166,000Kcal/Hr.

Operation Technical Specifications

Solid Chamber temperature

8000C -10000C

Gas Chamber temperature

10000C -12000C

Chamber Anti-Rate

17500C

Residency time

2.0 Sec.

Burning efficiency

98%

Waste Lower Calorific Power

3000Kcal

Pre-assembled, containerized type do not included chimney installation,containerized  mobile type.
 Burning rate: 100 – 120kg / hour
 Minimum operating temperature: 800-1000 degree
  (Primary combustion)
Maximum operating temperature: 1000-1200 degree  (afterburner chamber)
Secondary Burning capacity: Compulsory.
Density insulation: 50mm high
Refractory casting: minimum 114mm
Heavy duty refracting lining to withstand 1750 degree
Average burn out time: maximum 1-2 hours
Fuel type: fuel oil (diesel)
Fuel consumption in L/hr: average 20.4 liter/Hr.
Residency time in secondary chamber: 2 secs.
Residue ash post 100kg Max 3.8 kg
Installation period Maximum 7days.
State: Anambra Sites:
General Hospital Onitsha
General Hospital Enugwu Ukwu
General Hospital Ekwulobia
Orumba General Hospital
II. State: Benue Sites:
North East Senatorial zonal waste collection site (zone A): EPI Office Katsina-Ala LGA
North West Senatorial zonal waste collection site (zone B): EPI Office Gboko LGA
Benue South zonal waste collection site (zone C): EPI Office Otukpo LGA
Benue State Capital: Central Medical Store, Makurdi
III. State: Kogi Sites:
University Teaching Hospital, Anyigba, Dekina LGA
General Hospital Obangede, Okehi LGA
General Hospital Mopa-Muro LGA
IV. State: Ebonyi Sites:
General Hospital Ezzango, Ebonyi North Zone
 General Hospital Onueke, Ebonyi Central Zone
External L= 3235, W=1150, 1950/3825,Internal L=1600, W=675, H=700;Chamber volume(m3)=0.76;Weight(appox tonne)=3.6,max load capacity (kg) 300, Nominal burn rate uk(kg/hr.)=<50,Thermal capacity(kw) =390, power supply 50/60Hz =220-250v,Door Apertune = 67×550; Hot earth principle = double pass, Fuel type Diesel; Control Panel = Al, Insulation board 25 mm super wool, insulation fire brick =grade E23, Fire brick(Alumina) =42.5%
incinerator capable of a load of upto 50kg/hr.
Twin chamber and should be diesel fuel fired complete with automatic temperature controller upto 900` Celsius.
incinerator (2 equipment) 500kg/hr for face mask disposables.
Automatic smoke free incinerator of capacity 150-200kg/hr for industry. The waste cab be comprises of following types:-
         i.            Wet waste.
       ii.            Plastic wrappers,
      iii.            Solid waste(wood, papers, cartoon box and others).
V. State: Imo Sites:
 Nwabosi Health Center, Nwabosi settlement Isiekenesi ward 2, Ideato South LGA
 Comprehensive Health center, Umuezeala Owerre ward, Ehime Mbano LGA
 Nnenasa Health Center, Umugba settlement, Umueze ward Njaba LGA
General Hospital Owerri Umuguma settlement, New Owerri ward 1
VI. State: Oyo Sites:
State cold store Jericho, South-West LGA, Ibadan
Oyo East Local Government Secretariat, Oyo East LGA
Adebayo Alata Primary Health Care Center (PHC), Ogbomosho South LGA
Itesiwaju NPI Office, Out Itesiwaju LGA
Saki West NPI Office, Saki West LGA
Ibarapa Central NPI Office, Ibarapa Central LGA
VII. State: Kwara Sites:
Ifelodun LGA
Ilorin West LGA
VIII. State: Enugu Sites:
Nsukka District Hospital, Nsukka Town, Nsukka LGA
Agbani District Hospital, Agbani Town, Nkanu West LGA
Udi District Hospital, Udi Town, Udi LGA
IX. State: Enugu MSites:
Odukpani LGA
Obubra LGA
Boki LGA


HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-30