Tag: waste-incinerator

Incinerators at three facilities to process healthcare waste

a. 2.5 metric tons per day healthcare waste incinerator

b. 1.5 metric tons per day healthcare waste incinerator

c. 300 kg per day healthcare waste incinerator

Our preferred technology is double-chamber incineration, but if you recommend another technology, that is acceptable also.

We request information on the following for all the aforementioned requirements:

1. Capital cost (delivered price in Oman)

2. Operation and maintenance costs (per year)

3. Number of operators required

4. Product specifications (dimensions, temperatures, residence time, cycle time etc)

5. Other auxiliary equipment that is required or recommended by you

medical waste PYROLYTIC INCINERATOR

Parameter Compliance
Type of Waste To treat medical waste, categories A,B,C,D,E
Type of Incinerator Pyrolytic
Nominal Burn rate 50 t0 60 kg/ hr at 3500Kcal/Kg
Loading Manual, Batch Load
De Ashing Automatic or Manual batch de ashing
The incinerator must avoid the release of black smoke and fine dust during the loading
Primary chamber capacity 2-3 m³
The insulation   of the combustion chamber should be composed   of refractory bricks, having a higher content of aluminium and insulates,
The plate of combustion in carborundum avoiding the fixing of glass and slags
Hours of operation /Day >10 hrs
Max Operating Temperatures 1400 °C
Normal Operating Temperatures(Primary) >850 °C
Operating Temperature(Secondary) >1100 °C
It should have digital temperatures regulator( Temperatures regulator in digital watch)
Carbon content of ashes <2%
The installation should be completely free from visible smoke as well as offensive odours
Residence time in second chamber 2 second minimum
The internal diameter of the Chimney :Ø 400
Height of stack >8m
Burner operation Automatic On/Off
Fuel Diesel
Fuel consumption at raed capacity >7kg waste /ltr
Electricity consumption <2kW at rated capacity
Operating Voltage 220 – 240V AC 50Hz
Spare parts Supply for 1 year quoted as option
Consumables Supply for 1 year of operation to be mentioned as option
Warranty Parts and service support: 1 year minimum post comissioning
Service support <72 hours
Emission standard Compliance BS3316 or equivqlent standard
Process filtering system Scruber to be mentioned as option
CE Manufacturing Compliance BS EN 746-2-1997
Design Specification Type A,B,C,D,and E of medical waste
Installation and Comissioning Included in condition of supply
Training in preventive and curative maintenance and use of the incinerator Operator training inclusive in offer
Capacity to treat Plastic Not less than 40% by weight

TECHNICAL SPECIFICATIONS: PYROLYTIC INCINERATOR

Dual Combustion Chamber Containerized Mobile Incinerator Family Pet Dog&Cat Cremation Installation and Commissioning

Double Combustion Chamber

All waste incinerator design with double combustion chamber. High Temperature, Smoke Treatment,No black smoke, Environmentally friendly.

Containerized Mobile Incinerator

The incinerator mounted in ISO Container before depart mill, free-installation, no incineration house build structure,movable by truck.

Family Pet Dog&Cat Cremation

Special design with movable platform, combustion chamber material and custom made for pets crematory business.

Installation and Commissioning

Clover’s engineers instal,train for most of the area and free-cost train within our factory.

Waste incineration industry momentum is fierce level of related facilities to be Enhanced

[China] Solid Waste Environmental online waste incineration industries development momentum is fierce, and the cleverest of capital chasing even appear many times in the last year the price of handling fee diving, industry raised concerns about the vicious competition. “Thirteen Five” during garbage construction market investment space at 1000 billion yuan; the growing garbage incineration capacity of the performance of this facility, the regulatory level challenges. Many industry companies said in easy incineration links, market competition is too fierce, competitive professional enterprises should play in the sphere of business models and technological invention.

Waste incineration industry momentum is fierce level of related facilities to be enhanced

“Twelve Five” is a fast-growing garbage incineration five years. According to relevant statistics, in 2015, the national city and county has gathered garbage incineration capacity of about 233,000 tons / day. Waste incineration industries development momentum is fierce, and the cleverest of capital chasing even appear many times in the last year the price of handling fee diving, industry raised concerns about the vicious competition. Which is still employed as the primary way of landfill waste, largely due to the local government responsible for managing the operations, the sector isn’t high, stay “low key. ”

The future will continue to heat a cold do?

In this regard, some experts pointed out that, on the one hand, waste incineration will continue to grow, but the amount of accumulation and qualitative improvement of equal significance, especially waste incineration emissions formal implementation of new standards for operation of the facility and set higher requirements; on the other hand landfill as an indispensable and irreplaceable resource, is still dealing with the mainstream. But to find out the remaining storage capacity, make good use of good management will become crucial; at the exact same time, non-canonical transformation landfill, pollution, etc. also brought closure to repair the appropriate market opportunities.

According to the deputy director of the Research Center for Environmental Health Engineering Department of Housing and General Workers Liujing Hao debut, facility upgrades are the next five years, important content. “China’s solid waste disposal facilities (landfill, incineration plant) structure and development is extremely fast, there are a number of construction and operation of this facility has a large room for improvement. There are lots of old landfills need to maintain and update, so as to not pollute the surrounding environment. Some of the early construction of incineration plants need to be updated or reset. ”

Incineration facilities remains rising

“Thirteen Five” during garbage construction market investment space at 1000 billion yuan; the growing garbage incineration capacity of the performance of this facility, the regulatory level challenges.

‘Facilities’ next five’ plan basically completed the goal. “China Urban Environmental Health Association and vice president, director of the Research Center for Environmental Health Engineering Department of Housing and Xu Wenlong said that according to” the “next five” national urban national garbage treatment facility construction plan, “clearly incineration project the complete size of 307,200 tons / day. Even though the end of 2015, the national total incineration capacity of 233,000 tons / day, but the size of this project currently under construction there of about ten tons / day, and basically complete the planning and construction scale. Construction and operation of waste incineration facility has become one of the sections of capital chasing the parties, following the project in a continuous increase to fierce “struggle. ”

The next five years, incineration facilities building market is still significant? “In the construction of garbage ‘Thirteen Five’ period, likely in the investment market space, building space is at 100 billion yuan. ”

Xu Wenlong considers that new marketplace does still have a better chance. Currently, the majority of the city and the majority of the county’s garbage can be efficiently collected and treatment and disposal in sanitary landfill and incineration plants. But still there are gaps in waste disposal facilities, the new facility remains one of the main tasks of the present and the upcoming five-year plan. By then, China’s demand for incineration facilities will reach a relatively stable condition. ”

Accumulation from the continued qualitative improvement started. From January 1 this year, new nation, has been running garbage incinerator must carry out a new “crap burning pollution control standards” (GB18485-2014) (hereinafter referred to as the new standard) of emission limits. New standards for conventional pollutants, dioxin contamination in comparison to the prior standard have more stringent requirements.

Accumulation in the continued qualitative improvement already started. From January 1 this year, all new country, has been running garbage incinerator must perform a new “garbage burning pollution control standards” (GB18485-2014) (hereinafter referred to as the new standard) of emission limits. New standards for conventional pollutants, dioxin contamination compared to the previous standard have more stringent requirements.

(Source: China Association of gravel)
Article Links: China Environmental Protection online http://www.hbzhan.com/news/detail/105016.html 635925914052780791754

Waste Management Planning

If burning and incineration is used, the equipment selected ought to be designed and sized to accommodate the waste produced, minimize fire hazard and result in the complete combustion of the waste.

The generator of a waste is responsible for its safe management from cradle-to-grave. Using raw materials efficiently and reducing the amount of waste created is the most significant step in waste management planning.  By way of example, through improved waste management planning, it may be possible to reduce or eliminate the need to burn or incinerate waste altogether.  Undertaking a waste audit can help to identify the type and amount of waste being created, the prices of current management options and analyze opportunities for better managing the waste. This information will also enable the generator to implement a waste management regime that is tailored to its own unique needs, location and conditions.

Even with improved waste reduction measures in place there’ll be waste generated.  Waste by its nature is usually a combination of different unwanted materials. The segregation and diversion of different types of waste is an effective means to decrease the quantity of waste requiring costly handling, storage, treatment and disposal. Segregation also enables the reuse of certain types of waste for another purpose.  Reuse activities could be undertaken either on-site or off-site.

Treatment and disposal is the last step in effective waste management and should be undertaken only after all other practical reduction and reuse options have been examined.  A wide variety of treatment and disposal options exist and each must be examined before deciding on a last method, regardless of whether waste is to be treated and disposed of on-site or off-site. If burning and incineration is the technique of choice, equipment must be designed and sized accordingly to accommodate the type and amount of waste being produced. As described in the next section, open burning is capable of safely destroying a limited number of types of waste. While incinerators are capable of safely destroying a wider range of waste, many types of waste must nevertheless be diverted. As a result of this, on-site segregation remains a critical component of any waste management program.

Overall, the following principles should be used to direct responsible solid waste management planning:

Know your waste by conducting a waste audit.

hazardous and biomedical waste

uniform heating value near the design stage of the incinerator.
Externally supplied fuel and electricity are necessary for the burners and forced air ventilation. A correctly functioning dual-

chamber controlled air system will reduce problems with animal attraction since the production of bottom and fly ash and smoke

is minimized.

Section 2.3.2 is intended to provide the reader with a succinct introduction to incinerators. It is not intended to provide

information acceptable for the design, selection or operation of an incineration system. Any person considering purchasing

an incineration system should first consult the system’s manufacturer or other qualified persons with expertise in the

incineration of solid waste.

The role of municipal governments is important in the correct community management of solid waste. Local environmental and security

standards are determined, in part, by how the land is designated under municipal government development plans (i.e. land use

zoning).  Solid waste may be deposited into municipal landfill sites only with the permission of the local authorities. The neighborhood

fire department may also be called upon if a fire or other public safety issue is identified. Properly designed and operated incinerators are able to effectively and safely

ruin a wide assortment of waste.  Only incinerators designed for burning mixed municipal solid waste are discussed in the

guideline. The incineration of

hazardous and biomedical waste and sewage sludge requires specific equipment, operational controls and training which are

beyond the reach of the present document.

There are four basic kinds of incinerators. They vary based upon the amount of burn they have, the amount of air

provided to each chamber and how waste is fed into the primary burn chamber.

hazardous waste, biomedical waste

Dual-Chamber Starved    The primary burn chamber receives less air than is needed to achieve full
Incinerator    incinerator operates without interruption throughout the operating hours of the facility by having waste

continually added to the primary burn chamber.

Batch Feed Incinerator    An incineration process that’s not in a constant or mass burning cycle.  A batch feed incinerator

is billed with a different quantity or single load of waste at the start of the burn cycle. Although they are generally considered to have the greatest qualities of all the incinerators and open

burning methods mentioned, they must be designed for the type and quantity of waste to be burnt. Too little heat and holding

time won’t permit waste to burn properly; too much heat will harm the incinerator.

Figure 5 illustrates the design of a typical batch feed dual-chamber controlled air incinerator. The principal characteristics of this

kind of incinerator are:

Batch operation allows better control of temperature and air throughout the burn process. Air turbulence can be reduced in

the primary chamber so fewer particulates are released into the air from the stack.
Air System    combustion. Gases from this incomplete combustion then pass into another burn chamber where adequate air

is injected and complete combustion is achieved.

Single Chamber Excessive More than a sufficient amount of air (as much as 50% more than the amount
Air System    of air required ) is injected into the single burn chamber to achieve complete combustion of the waste.

Continuous Feed    An incineration process that’s in a constant burn cycle.  A continuous feed

is minimized.

Section 2.3.2 is intended to provide the reader with a brief introduction to incinerators. It is not intended to provide

information suitable for the design, selection or operation of an incineration system. Any person considering the purchase of

an incineration system should first consult the system’s manufacturer or other qualified persons with expertise in the

incineration of solid waste.

Smokeless Medical Waste Incinerator HICLOVER Model YD-30M

Model YD-30M
Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator  Control Case
Stainless Steel Chimney: 1.5 Meter
Italy oil/gas burner: 02 sets
Oil Tank (if oil fuel): 100Liters

Video material: https://twitter.com/i/status/1279030799182905345 

Model YD-30M 
Picture
Burning Rate  average 20 kgs/hour
Feed Capacity average 40 kgs/feeding
Paimary Combustion Chamber 200 Liters
Secondary Combustion Chamber 100 Liters
Mix Combustion Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.59Kw
Fuel Type Diesel Oil/Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) average 8.4 kg/hour
Gas Consumption (Natural Gas) average 10.1 m3n/hour
Internal Dimensions 80 x 50 x 50cm (primary chamber)
External Dimensions 160*110*230cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 100 Liters
Door Opening 40 x 36cm
Chimney Length 1.5 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 1700 kgs
Operation Technical Specifications
Primary Chamber Temperature 800–1000
Secondary Chamber Temperature 1000-1200
Residency Time 2.0 Sec.
Burning Efficiency 98%
Waste Lower Calorific Power 3000Kcal

• Burning Waste: Medical Waste

• Fuel: diesel kind, or gas type(natural gas or lpg), or both(exhcange oil-gas burner)

• Processing Capacity: 15 — 20 kg/hr  

• Door Size: 400mm x 360mm   

• Body Size: 1600*1100*2300mm(without chimney)

• Operating Temperature: 800 — 1200 deg. C   

• Dual Chamber: Primary and Secondary Chambers   

• Internal liner:refractory cement

• Tracking Center for:  

• Supplied complete with chimney   

• Power Supply: 220-240V, 50Hz, 0.25kW

 


HICLOVER – Medical Environmental, WWW.HICLOVER.COM, Waste Incinerators, 
Medical Waste Incinerator,Pet Animal Cremation, Solid Waste Incinerators

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator(Containerized Mobile Incinerator)

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.



 

Dual heat burners and Double chamber incinerator Burning capacity up to 30 Kg per hour with wet scrubber

Dual heat burners and dual chamber incinerator Burning capacity up to 30 Kg per hour
Main Product List
Primary Combustion Chamber(Main body stainless steel)
Secondary Combustion Chamber(Main body stainless steel)
Mix-Combustion Chamber
Wet Scrubber( Washing Tower)(Main body stainless steel)
Incinerator Control Case
Chimney:5.0Meters  Stainless Steel
Italy gas burner: 02 sets
Oil Tank (if oil fuel): 100Liters

Model

YD-30C

Feed Capacity

Average 50 kgs per feeding

Burning Rate

Average 30 kgs per hour

Burning Time per Feed

2 hours

Voltage

380V

Power

6 Kw

Gas

Natural Gas

Burner

Italy Burner

Feed Mode

Manual

Fuel consumption (Oil)

10.2-20.0 Kgs/Hour

Fuel consumption (Gas)

12.2-24.0m3/Hour

External Dimensions

170 x 140 x 190cm (main body)

Internal Dimensions

55 x 55 x 85cm(Main Chamber)

Waste combustion chamber

250Liters

Post Combustion Chamber

140Liters

Oil Tank Capacity

100 Liters

Door Opening

38 x 48cm

Chimney

5.0M

Gross Weight

3300kgs

Chamber Material

Refractory Concrete

Max.

200,000Kcal/Hr.

Operation Technical Specifications

Solid Chamber temperature

8000C -10000C

Gas Chamber temperature

10000C -12000C

Chamber Anti-Rate

13500C

Residency time

2.0 Sec.

Burning efficiency

>98%

Waste Lower Calorific Power

Water showering cyclone air cleaner Stain less steel 304 grade sheet for water scrub chamber

3000Kcal

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

Solid Waste Incinerators

5. The Contractor shall be responsible for all maintenance of the system, regular and periodical maintenance such as cleaning etc. during, upon completion, prior to and after inspection. The maintenance shall be in fully compliance with the authority requirements and satisfaction and shall be deemed included in the Contractor tender price and at no additional cost to the Client. The Contractor must submit to the S.O their proposed system package detail, which includes authority approval and an A4 or A3 preliminary dimensioned system design fitting into area allocated in the plan drawing.

7. For maintenance and services during Defect Liability Period, react interval to any criticism for the Contractor to attend shall be within 24hours

8. The Cremators package shall, inter alia, inclusive the following scope:

– Furnace Chamber and Afterburner

– Combustion System

– Control Panel

– Single refactory lined chimney for two cremators

– Flue Gas Sampling Platform

– Electrical wiring inside the system demands

– Raking Tools

– Ashbox

– Approval from DOE / Local Authority

– Any other scope/works required for the systems

3. All mechanical and eletrical works which includes but limited to supply, deliver and setup of all valves, penstock, screens, pumps, float swithces, flexible connector, pressure pipe works, mill, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, hot dipped galvanised gratings, switch boards, cabling and wirings, lighting, earthing, metering, lighting protection, flow measurement and flow recorders, analyzing & comissioning and all necessary for proper completion and successful operational of the machine.

TOTAL CARRIED TO COLLECTION

Design and Construct approved gas cremation system
21.     Whether the place is a coastal area: [ ]Yes         [X ] No
13.     What’s the height of the chimney required? : No chimney is required. Flue length should be approximately 2-3 metres to connect to a downstream Procedure
19.     How soon do you require the machine to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in roughly Two months
The Contractor shall provide and fully comply with all requirements by the related jurisdiction during design phase, design approval, inspection and after inspection, handing over of the system package whether it is clearly shown or not but deemed necessary for successful completion and satisfaction to the jurisdiction. The Contractor must allow in his tender price all direct and indirect price at no extra cost to the Client for all such compliances.7.     Type of waste: Bio-medical / Hazardous / Municipal / Junk = ALL and Mixed
15.     Availability of power and type: Electricity if required
12.     Local incinerator operating and emission standards : India / EURO / US-EPA  Australia

The Contractor shall provide a Cremation System package for  TWO (02) Cremators and system accepted by related authority, which must fit into the allocated area as shown on the plan drawings. The work shall include but not limited to design preparation, authority layout approval, supply, fabricate, build, commissioning, testing, operational acceptance, provide training and also warranty of the system package. The work shall include all preliminaries, related structural and civil work, mechanical and electrical work and all outside work required for the proper completion and operational of the machine and as follows:The incinerator will be used to get a group of private multi profile hospitals.

The hourly-generated waste is about 100kg per hour, but with 1000kg daily quantity.

Due to the economic situation in Bulgaria now, our researches shows that a 100kg/hour system can fit the needs set from the project.

Please, offer us an Incinerator system that could match the parameters described above. We’re prepared to give information that is more comprehensive if you need such one. In the technical specifications of one merchandise we will need to have complete details of the parameters of exhaust gases, with all certificates you have about the environmental security regarding EU directives. All preliminaries which shall include but not limited to providing work insurances, taxes, mobilisation and demobilisation, contract management and oversight, design and professional fee, authority layout acceptance, operational approval, site preparation, temporary storage, health environmental safety and security, setting out, CIDB levy, duties, deposits, fees, charges, participation but not excluding only the bank guarantee to the jurisdiction JPP which shall be supplied by the Client, progress reporting and other required preliminaries for successful completion of the work.This type of incinerator is exactly what you’ve described as a ‘low temperature thermal decomposition incinerator’.  We can speed up the burning process by using hot air from a downstream process that may be fed back into the incinerator to elevate the burning temperature.

– Raking Tools

– Ashbox

– Approval from DOE / Local Authority

– Any other scope/works required for the systems