Tag: waste-incinerator

Capacity of destruction in weight 60 Kg/h

Quantity: Two [2] with complete accessories.

Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic

plastics,
– Assumption: general hospital beds 50 percent, surgery beds 50% for the 100 bed hospital instance, while this

ratio is 30-70% for the other cases
* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating

from refractory.
* A secondary shot of air to ensure perfect oxygen content.
6.     The incinerator must avoid the discharge of black smoke and dust that is fine, (Smokeless) during the loadings.
* Burner with fuel, mono-bloc casting guiding type with flat flame, lighting and security of     electronic

ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Carcass in strong sheet steel with support of connection.
Natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
22. Process Filtering system: Scrubber to be cited as optional
– particles that can be easily sorted
* Electro-ventilator distributing the secondary atmosphere, the regulation of the air flow being carried out by valves and

after the control of the automatic cycle.
–  global standards and waste creations assumptions should employ
Would it be possible to give us information on the capacity of incinerator we want

on this island. Incinerator to dispose our daily normal mortality for this size of the farm.1. Can the

100kg/hr burn solid waste/hazardous waste like expired paints,waste oil or chemicals.
19.     A control box ensuring the whole cycle of combustion.

20.     Fan:
23. Emission Standards Compliance: BS 3316 or equivalent standard
– Chemical waste solids and liquids, waste oil and other difficult-to-handle items

The  machines will be certified for operation from PME after passing website investigations.Manual load twin chamber

incinerator for medical waste to burn 50kg/hr on continuous operation, with Main temperature in the area of

800degC minimal and 1200degC or more in the Secondary chamber, complete with charging doorway, Ash doorway, Air and see

vents, auxiliary air system with adjustable dampers, burners and burner control system and ignition device, the whole to

meet NEMA requirements and other global standards. Здравствуйте! Стоимость и доставка до г.Алматы Казахстан

The technical details we care about are:

–          Capacity (burning capacity of waste per hour). 150kg/hour. Incinerator with 300l waste chamber

–          Construct materials, 5mm High quality light steel structure; 100 mm high quality refractory lining.

–          High Temperature paint finish.we have two hospitals,more then 20 dentist offices,and over 50 doctor offices.
5.    
Nature: Calcium
•    The Temperatures of combustion: Minimum will be 850oC and max 1400oC
21.     Controls and regulations:

medical waste incinerator solutions and prices for 100 bed / 500 mattress / 1000 mattress / 3000 bed hospitals.
23.     The installed incinerator must endure a 1 year guarantee.
•    Post combustion: >1100oC.
16.     The supplier must provide  necessary information for the best of  the setup
* Burner of light of waste, with gas, regular mono-bloc casting guiding  plunging flame, lighting and security of

electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
11.     The Inner diameter of the Chimney: Ø 400 and its height: 8 m
13.     The Dimension of the door for loading in cm: 70×70.
* A regulator with digital viewing for the temperature of combustion.
. Nature: 42 percent of Al203
4.     Design Specification : Types A, B, C, D, and E of medical waste
2.     It should be able to operate not less than 10 hours/day
Thickness    : ≥150 mm
* A timer with flexible temporization for the regulation of each burner.
22.     The supplier must give batches of spare pieces of first urgency and consumable of the incinerator.
* A sheath of evacuation of the gases burnt.
23. Capacity to treat Plastic: Not less than 40 percent by weight
•    Nature: Calcium silicate.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium

and insulates bricks to be able to assure a minimum temperature on   the outside sheet metal.
* Electric box.

21. The de- ashing must be done in the base of the combustion chamber or the deashing must be Automatic or manual

batch p ashing.
9.     The incineration should be wholly free from visible smoke in addition to offensive odours.
14.    
.
15.     Fuel : diesel
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
From the mill; it will include curative and preventative maintenance, and using machine, etc

18.     A chamber of post combustion of gases
3.     This incinerator must be able to destruct all combustible wastes produced by hospitals, private practices,

laboratories, institutes, etc…
* A burner of light which the use is restricted to the ignition of waste.
This incinerator with”PYROLYTIC” combustion must have:
Nature: 65% of Al203
8.     It should be able to hold emission in the second burn with gasoline residence of less than two seconds.
2. What about the heat generated during burning,are there windows or air flow into the containers.

–          Consumption of power and fuel. Hospital waste disposal system for a hospital job

–          Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon monoxide.

–          Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber

–          Secondary chamber. Have you got plans for above incinerators revealing floor dimensions,height. What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100

(PLC) is Oil( diesel) is that OK?

two ) from the technical specification: petroleum consumption (Kg/hour) is between 14–28) do you mean is liters/hour?

instance the incinerator will be operating for 10 hours per day means the oil consumption will be 140 Liters or more?

3) Chimney type stainless steel. How about main body construction materials?if there are more two option of body

construction materials for greater life

3. Send info about electricity, ventilation, fire protection, exhausts, chimney etc

4. Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500

medical incinerator.

5. We see you have container shelters. Send us price quote for this thing

1.     Capacity of destruction in weight: 60 Kg/h.
– Items that readily degenerate such as paper, wood, leather and garbage
* A regulator with digital viewing for the temperature of post combustion.
25.     The technical training of operators will have to be supplied and given by a technician
17.     A combustion chamber of waste:
7.     It should be able to reduce the volume of wastes by 98%.

18.    A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total re-combustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
•    Refractory concrete :
    Thickness    : ≥150 mm
    Nature: 65% of Al203
•    Insulate in fibrous panel :
    Thickness: ≥85 mm
     Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of     electronic

ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.

20.    Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and

following the control of the automatic cycle.
21.    Controls and regulations:
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of post combustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual

batch de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.    The installed incinerator must bear a one year guarantee.
24.    The supplier shall perform an onsite installation of the incinerator.
25.    The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

HICLOVER Made Waste Incinerators

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.

We provide single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical plastic waste, hazardous waste, red bag waste, needle disposal, gauze and bandages, sealed sharp containers, pathological waste, trace-chemotherapeutic wastes, etc..

      

Our range of incinerators cater for small to large scale animal cremation related businesses, such as poultry farms, cattle farms, sheep farms, pig farms, stables, kennels, testing laboratory, catteries, pet crematoriums.

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.

Incinerator capable of treating between 300 & 500 kgs fitted Using the wet scrubber system

Automatic loading and reloading with capacity of 10 to 12 tons per day working with gas treatment procedures and gasoline fuel and should comply with the European Standards.the Government Hospital for Medical Waste Incinerator with these Specifications. They’re having general wastes like cells, plastic bottles ,wastes coming from labour camps, to be incinerated, they want, 50kg/hr incinerator
2. Temperature
One of the major deciding factors of the potential provider is the energy consumption of the plan, indicated either per hour or per day and I would appreciate if such information can be made available.

Incinerator factory

Key Features:

General Municipal Solid Waste Incinerator, Pet and Animal Cremation, 

Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.
— Single combustion chamber, double combustion chambers, three combustion chambers and 
multi-combustion chambers waste incinerators.
— System solutions for medical waste environmental.
— High burn rate, from 5kgs to 1000kgs per hour.
— New Design for pet animal cremation business.

— HICLOVER, trusted partner with years of experience.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

— Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, 

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Tel:  +86-25-8461 0201   

Animal body parts,other biomedical waste,organs dung

13.     Civil    works,    installation    and
Comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and meals itemsι
bidding document

51. No    Features    $_pecific tions
6.    
11.     Opening lid    Large top open归g lid (Approx. 700 mm x 500mm) for
Model of the incinerator.
Of those quoted  incinerator  must  be  included  in  the
Lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation.
7.     Secondary chamber    Slid heath

HICLOVER Waste Incinerator Front view

— Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.

— System solutions for medical waste environmental.

— High burn rate, from 5kgs to 1000kgs per hour. — New Design for pet animal cremation business.

— HICLOVER, trusted partner with years of experience.

Nanjing Clover Medical Technology Co.,Ltd..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: [email protected]Email: [email protected]  

Tel:  +86-25-8461 0201   
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  

Containerized Mobile Incinerators

Containerized Mobile Incinerator(CA Model)

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transport and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.

Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both international and local ), and is excellent for civil and military camps and remote locations where infrastructure is scarce.

 

※Main Feature:

— Dual Combustion Chamber

— Dual Italy Burner

–Burning Rate: 10-100kgs per hour

–Combustion Chamber: 0.1M3-1.2M3

— Mobile Incinerator, Standard shipping containers, Easy to move/transport system

— Free Setup, Pre-installed incinerator, Ideal for decks

— Ultraviolet lamp sterilization inside

※Optional Function/Parts/Material/Burning Rate:

— Stainless Steel Chimney

— Dry Smoke Filter Chamber

— Chimney Height Custom Made

— Upgrade/Downgrade Burning Rate

a pet incinerator for the cremation of dogs

We’ve got a 70 bed hospital in namibia. However there is a potential of getting clients from other regional doctors.
A tiny incinerators (ex. Please see attached) for a few empty chemical luggage. Can you please provide me with some details information about these type of incinerators (small scale). A pet incinerator for the cremation of dogs and cats. It’ll be single use of each pet seperately.Initially we’re planning to begin this Pilot Project with the National Hospital, to convince the Ministry Officials and on its achievement to take this project to the Teaching Hospitals, District and Base Hospitals at the Country.municipality need 4 crematory machine for cadavers. I need some information regarding cost,  kine of energy for detection,toxic emission,The incinerator we’re looking should be with the advantages of Heat recycling system, utilization of hot water, etc.. Capacity — 150-200 kgs/hr and with International standards.get more information about the Pet Cremation Equipment, especially for dogs and cats.

The three incinerators for burning and incineration of drugs and toxic substances

Requirements and specifications for the process of distribution, installation, operation and guarantee the three incinerators for burning and incineration of drugs and toxic materials for customs department

Free three years guarantee for incinerators from delivery date. Along with free spare parts guarantee letter ought to be valid for 10 years from the end date of guarantee.
•    This umbrella Cover the site furnace and let bringing the chimney
In case of order, we need two certificates of origin that should be stamped from Saudi embassy in your country
•    All gear must be resistant to external conditions like high temperature (50oc)
•    All doors should have special lock aren’t allowed non-persons appointed to do the job.
Commercial statement (certified from Chamber of Commerce)
•    The dimensions of the base are increased by (2 meters) from the edge of incinerators
Send someone to fix and train our employees for 5 people in each location
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
•    Incinerators must have a system for processing (purification) gasses before emission of the smoke.
•    The remaining accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into consideration the tendencies of the foundation toward the doorway for drainage of water.
1-Technical explanation includes technical specifications, scope of work, the demands of the maintenance and operation.
2- Technical explanation for technicians training and furnace operators
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
•    Ensure that the combustion of substances emitted from the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers

The offer price must include the following;-
1. Training for technicians and operators for a period not less than two days at each site and give trainees training certificates
Documents must contain all the information such as brochures, technical resources, operating, maintenance manuals, and brochures dealing with the keyboard
2- Letter from the manufacturer to give three years guarantee for incinerators from delivery date. In addition of free spare parts guarantee letter should be valid for 10 years from the end date of guarantee
3- Provide certificate that the incinerators are environmentally friendly and attach proof that environmental protection organizations in the country of Origin and your product should be emissions free due to the sensitivity of its international air ports.
4-copmany must committed delivery, operation, and installation within 60 days from the date of site projects detection
5- Train five people for two days for each device for a period of two days for installation, operation, and safety. Give them certificates
GARANTEE
Provides operating and emergency maintenance also provides free spare parts for three from the starting date of the project. The company must make regular maintenance every 3 months and raise the maintenance report to the management of public concern and Maintenance.
The company must make all the maintenance work as well adjustment of the control and protection devices and filters / filters purify insulation
Specifications of ovens:
•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth.
•    The dimensions of the base are increased by (2 meters) from the edge of incinerators
•    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
•    The floor coating must be high-quality epoxy paint.
•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns
•    This umbrella Cover the site furnace and allow bringing the chimney
•   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms
•    The iron fence must have a 5 meters Width gate
•    Automatic anti-rust and heat electrical circuit must be provided
•    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
•    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
•    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney
•    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously
•   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
•    Must have an automatic ignition and diesel is used
•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm
•    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.
•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.
•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
•    Electrical capacity required “220/ 380-volt “60 hertz
•    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required.
•    All equipment must be highly resistant to external conditions such as high temperature (50oc)
•    All doors must have special lock are not allowed non-persons appointed to work.
•    Providing fire extinguisher for each site with a capacity of 10 kg at least

WASTE INCINERATOR

 

–          150 KG/HR

–          Compliant with EU rules, Directive 2000/76/EC

–          Fuel type: Diesel

–          Easy management and maintenance

–          Temperatures:

850 deg C for municipal waste

1000 deg C for medical waste

1100 deg C for harmful waste containing halogenated organic substances with content of chlorine or its compounds.