Tag: waste-incinerator

N.D. could receive Ebola waste from Calif.



FARGO, N.D. — California health officials have given notice that North Dakota is one of six states that could receive Ebola medical waste in the event the state has any material to incinerate.

In a notice posted last week, the California Department of Public Health listed North Dakota as one of six states where California sends medical waste to be incinerated when onsite disposal is not available at medical centers.

Healthcare Environmental Services Inc., located at an industrial park at 1420 40th St. N. in Fargo, operates a medical waste incinerator that also accepts waste from other locations.

Calls to Healthcare Environmental Services on Tuesday afternoon were not returned.

The company is owned by Sanford Health. A Sanford spokeswoman said it could not immediately comment on the possible incineration of Ebola waste from California at the Fargo facility.

So far, California has no known Ebola cases, according to the state health department, which spelled out its interim guidelines for safe handling of medical waste in an alert to providers and others.

In another development, public health officials are monitoring two North Dakota residents who recently returned from countries in West Africa that are battling the Ebola epidemic.

Neither of the two residents is running a temperature or showing any symptoms of an Ebola infection, which can include diarrhea, joint and muscle aches and abnormal bleeding.

“They’ve just recently traveled to the area,” said epidemiologist Michelle Feist of the North Dakota Health Department. “They pose no risk to the community.”

Health officials are not releasing information about where the two people reside.

Public health officials in Minnesota and South Dakota also are monitoring residents in those states who have recently visited Guinea, Liberia or Sierra Leone in West Africa, where an outbreak of Ebola has killed about 5,000.

State health officials are contacted by the Centers for Disease Control and Prevention when someone is entering the United States from those countries through five major international airports.

“We are doing monitoring,” said Sam Brungardt, a public information officer for the Minnesota Health Department.

On Monday, Minnesota health officials announced that they were monitoring one resident who had traveled to West Africa, but the list of people to monitor is growing.

“It has grown, and it will continue to grow as we get reports from the CDC,” Brungardt said. “There’s people who are returning from these three West African countries every day.”

So far, none of those being monitored for signs of fever with twice-daily temperature checks show any sign of infection, he said.

As a precaution, however, they will continue to be checked during the 21-day observation period, generally regarded as the incubation period for the Ebola virus.

South Dakota health officials also are monitoring someone who recently returned from West Africa, but is not showing symptoms.

by: http://bismarcktribune.com/news/state-and-regional/n-d-could-receive-ebola-waste-from-calif/article_10e0e242-5f2c-11e4-8ff8-8ba8bab48ce3.html



Controlled air medical waste incinerator designed for incineration of bio-medical waste



Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc. )

Operational Specs Physical Specs
Combustion Chamber Volume (m3) 8.80m3
Burn Rate* up to 1,500kg per hour
Average Fuel Consumption 65 kg per hour or more (7 diesel burners)
Operational Temperature 850 – 1320°C
Gas Retention in Secondary Chamber Large secondary chamber
Temperature Monitoring Yes
Average ash residue (%) 3%
Thermostatic Device Yes
1000l diesel flue tank
Venture gas scrubber
Hydraulic Ram Feeding System
Diesel Powered Large Incinerator
Minimum Specification Required

Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion
7) Burn rate: 15 – 20 Kg/h
8) Capacity: not less than 130 L
9) Concentrations of most pollutants in stack gases below detection limits
10) Diesel fuel
11) Electronic system control
12) Easy to operate and minimal training
13) Any accessory or dedicated device necessary to the proper functioning and utilization of the equipment included

PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION



Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc. )

Operational Specs Physical Specs
Combustion Chamber Volume (m3) 8.80m3
Burn Rate* up to 1,500kg per hour
Average Fuel Consumption 65 kg per hour or more (7 diesel burners)
Operational Temperature 850 – 1320°C
Gas Retention in Secondary Chamber Large secondary chamber
Temperature Monitoring Yes
Average ash residue (%) 3%
Thermostatic Device Yes
1000l diesel flue tank
Venture gas scrubber
Hydraulic Ram Feeding System
Diesel Powered Large Incinerator
Minimum Specification Required

Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion
7) Burn rate: 15 – 20 Kg/h
8) Capacity: not less than 130 L
9) Concentrations of most pollutants in stack gases below detection limits
10) Diesel fuel
11) Electronic system control
12) Easy to operate and minimal training
13) Any accessory or dedicated device necessary to the proper functioning and utilization of the equipment included

PLEASE REFER TO BROCHURES ATTACHED FOR DETAILED SPECIFICATION

waste incinerator manufacturer china



waste incinerator manufacturer china

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.
System solutions for medical waste environmental, including waste incineration, smoke emission treatment, high-temperature sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers, etc.

Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combined Water Treatment
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Nanjing Clover Medical Technology Co., Ltd..

Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:Nanjing
Production Capacity:1000 Sets Per Year

Product Description

2011 year is an important base for us. We reach developed country market and stabilize our older customers. Our incinerator use in Southeast Asia, Central Asia, Europe, small scale garbage incinerator, small scale gas incinerator, small scale incenaration, scale incineration, small scale incinerator cost, small scale incinerator designs, Middle East, Africa and Australia, etc.. Clover Incinerator has become one of the famous and biggest incinerator supplier all over the world. 

Merchandise Main Application:  1. Medical waste incineration treatment.  2. Pet/Animal cremation business.  3. Municipal waste and other solid waste treatment. 

We can supply different model & design incinerator products for different market request. Our large capacity incinerator(300/500kgs per hour) accept by customers and market finally.

Animal Carcass Incinerator

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime. *based on order  * High fever, long lifetime of incinerator.  * Free or minimal installation on site.  * PLC Control Plane. *based on order  * New Design for pet animal cremation business.  * One year warranty on incinerator and components in stock. 

Presently, we provide different series for local customer requirements and design upgraded incinerator with our leading technology. Animal iacinerator, creature incincerator pricing, animal incineration, animal incineration emerging technologu, animal incineration equipment in china, animal incineration equipment  Costs, The updated design feature of our assortment of incinerators make them one of the most cost effective in the world.

Items Specification
YD Model YD-30 / YD-50 / YD-100 / YD-150 / YD-200 / YD-300 / YD-500 / YD-600
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

New Courtice incinerator hits further delays

CLARINGTON — Clarington’s new energy-from-waste facility will be delayed a second time since the boilers are not operating properly and the continuing startup period could cost Durham Region an extra $1 million.

“I’d rather see it delayed and done right than rushed,” said Clarington Mayor Adrian Foster.

The Durham York Energy Centre facility, located in Courtice, was scheduled to be fully operational on Dec. 14, 2014. Now the Durham York Energy Centre is not expected to be in full working order before the last quarter of 2015.

The significant systems of the EFW facility have been analyzed. The boiler temperature is high enough for the combustion process but the steam temperature isn’t high enough, and officials are not sure what the issue is, says Durham’s works commissioner, Cliff Curtis.

The steam temperature needs to be high enough to drive the turbine-generator. If the steam is too cool it may damage the turbine.

“It’s like running a car without oil,” said Mr. Curtis.

Covanta, the business building and operating the facility for Durham and York regions, has taken down the boilers for alterations, according to Mr. Curtis. It’s expected to take three weeks for the repairs and alterations. Then there’ll be a four-week demonstration period, followed by a 30-day acceptance test.

“We are not getting the temperature we expected out of the boiler. “It’s Covanta’s problem to provide us the product that performs the way they said, so they’re going to take the time they require.”

The delay means added consultant costs for construction management, legal advice and baseline ambient air monitoring. A Durham Region works report stated Durham’s share of the extra costs is $1 million, which can be provided by a temporary draw on the solid waste management reserve fund.

“What’s the last cost going to look like?” Stated Clarington Regional Councillor Joe Neal, who added that he still has concerns about the emissions meeting the Ministry of Environment rules.

Since Jan. 16, Durham has been charging Covanta a $10,000-a-day late fee for each day the EFW facility is not fully operational. The invoice was sent to Covanta, but it hasn’t been paid yet, according to Mr. Curtis.

In mid-February, the incinerator started burning its first haul of curbside garbage. It was a part of a testing phase before the centre opens completely.

Durham cancelled landfill contracts and started sending crap to the Courtice facility. Some garbage was burned at the EFW plant during the evaluation phase, without generating power to the grid. Covanta has also been sending the trash to its incinerator in New York state, or landfills in the Niagara region.

Until the EFW facility is up and running, the Region only pays Covanta half cost of the agreed upon per-tonne fee. However, Durham isn’t earning any money until the plant is fully operational and selling electricity back on the grid.

“We are still on budget. I’d rather be getting electricity sales on the grid,” said Mr. Curtis.

The plant construction is coming in slightly under budget, according to the works commissioner.

There are a few loose ends that could wind up costing Durham Region more cash. There’s still debate with former property owners on the value of the land expropriated for the center, and a ruling is not expected until fall of next year. The final cost for the utility construction and connection costs is expected in coming months. The baseline ambient air monitoring runs until the EFW facility is operational, so the delay in opening signifies an ongoing monitoring cost.

“There’s some small cost over-runs on a few of the smaller items but generally we’re financially on track to bring this on budget and we look forward to having it on line by the end of the year,” said Mr. Curtis.

HOW THIS IMPACTS YOU

The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to electricity between 10,000 and 12,000 houses. A vital part of the financial case for the energy-from-waste facility is dependent upon it generating electric power revenue.

from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine

1. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Capacity: 1600mm

Efficiency: 95-97percent

FOB Term Cost: USD per set

Price Valid: 5days.

Ave.60 Days ready for shipping.

In stock Price: USD per set

 

 

B.)Optional Capacity: 400mm

Efficiency: 40-50%.

FOB Term Cost: USD per set

Price Valid: 5days.

Ave.20 Days ready for shipping.

Payment: TT 70% In advance, TT 30% before leave factory

Shipping: 1*20′ container per set, Ave. 2000Kgs.

 

Main Parts: Extruder, mold, winder, oven, ultrasonic

Daily Capacity:100-150Kgs/24Hours

Screw extruder:100-150Kgs

Motor power: 15KW frequency conversion speed regulation Reducer speed ratio: 1:10 or 1:16 Screw length to diameter ratio: 30: 1 Screw diameter: 50mm Winding machine diameter: £ 630mm Winding machine drive motor power: 0.55kw speed ratio of winder drive reducer (if any): 1:71 Air heater power: 15kw Power of vacuum calciner: 12kw The magnitude of vacuum calciner: 500 × 300 × 200 Ultrasonic power: 1800, frequency 28kHZ Ultrasonic sink size: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 

2020-04-20


 

Tel: +86-25-8461 0201
Email3: [email protected]
Wechat: 008613813931455
Email1: [email protected]
Twitter ID: @hiclovercom
Website1: www.hiclover.com
Email2: [email protected]
WhatsApp: 008613813931455
Website2: www.clover-incinerator.com

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20

Incinerator A4000

Basic Info.

Model NO.:A4000
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd..

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

Key Features:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High fever, long life of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.  * PLC Control Plane. *based on order  * New Design for pet animal cremation business.  * One year warranty on incinerator and components in stock.

Waste Incinerators

Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER
Origin:China
Production Capacity:1000 Sets Per Year

Product Description

First, we are one manufacturer in China. We are in this field from year 2005 and at that time, we create trading company to oversea. Under support of our customer, like our agent in Egypt, Mr. Ibrahim, solid waste incinerator boiler manufacturers, solid waste incinerator diesel, solid waste incinerator korea, solid waste incinerator manufacturer new hampshire, we start to enlarge our incinerator business. We have our own workshop in Nanjing city liuhe economic zone and we have 20-30 workers. Up to now, oversea market is own main market and from year 2011, we’ll dig China market.