Burnaby garbage incinerator operator sued over pollution concerns

The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby Renewable Energy ULC for Supposedly failing to properly Examine fly ash samples in the district’s waste-to-energy facility in Burnaby.

Non-hazardous fly ash is accepted and disposed of in the Cache Creek landfill, the claim states. Samples analyzed by Maxxam in the summer and autumn in 2012, however, came back indicating high levels of cadmium that exceeded acceptable levels permitted for disposal in the landfill.

The results, the district claims,”called into question the power of the treatment of fly ash” at the center, forcing the plaintiff to incur charges by requiring greater sampling and testing, investigating the origin of the high cadmium levels and locating another disposal site for fly ash in Alberta. After the Ministry of Environment hit on the district using an advisory letter of non-compliance, the plaintiff hired”consultants, experts and legal counsel” to assist investigate.

An audit of Maxxam’s laboratory found that it did not follow appropriate methods, called the”Toxic Characteristic Leaching Procedure” and the”United States Environmental Protection Agency Method 1311″ to test the fly ash, according to the lawsuit. The Ministry of Environment’s evaluation found Maxxam’s results unreliable because of improper testing procedures and also discovered that”Covanta’s quality control and quality assurance protocols in the WTEF [Waste-to-Energy Facility] were not sufficiently developed to determine if leachability was happening or if a problem with the treated fly ash or the treatment system was happening,” the claim states. Additionally, the ministry discovered that Covanta could not readily”provide assurance that the treated fly ash fulfilled the toxic waste requirements under the Hazardous Waste Regulation.”

The district expects damages for negligence, misrepresentation, negligent operation of a service and breach of contract. The allegations have not been proven in court and the defendants hadn’t filed responses to the promise by press time.

by: http://prod-admin1.glacier.atex.cniweb.net:8080/preview/www/2.2551/2.2759/2.2742/1.1493460#

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ

 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام 
توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة  
إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف 
تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى 
توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة 
توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً 
توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات 
 
 
BIO MEDICAL INCENERATOR 
BIO MEDICAL INCENERATOR  PLANT
Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc.
CAPACITY :- 200BEDS.
Operation and Maintenance Manual
As built Drawing in 3 set hard copy + Soft copy in Cad
Testing and Commissioning
 Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site 
Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health 
make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation 
 supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems 
Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EXHAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles   
Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter  
Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories 

PRINCE SALMAN UNIVERSITY HOSPITAL (MINISTRY OF EDUCATION) @ AL KHARJ

 ملاحظة: المخططات المقدمة هي بغرض التسعير وعلى المقاول تقديم مخططات متكاملة  طبقا لتوصيات الشركة المصنعة وبما يلزمها من ملحقات لعمل الوحدات بصورة سليمة، ويتم التنسيق مع الوزارة لتحديد مكان الوحدة بالموقع العام 
توريد وتركيب واختبار محرقة نفايات طبيه بسعة 75  كجم / الساعة تعمل بالغاز ( LPG ) كاملة بجميع مشتملاتها وملحقاتها مع المدخنة طبقاً للمواصفات الفنية والشروط الصحية العامة  
إنشاء غرفه خاصة بالمحرقة تتسع لثلاث محارق كما فى البند 3-1-1 وملحق بغرفة المحرقة مخزن للنقايات يستوعب نفايات لمدة  سبعة أيام وتكون جميع الانشاءات من الخرسانة المسلحة مع تجهيز مبنى المحرقة والمخزن بجميع أعمال التوصيلات والكهربائية والاضاءة وأنظمة التغذية بالمياه والصرف 
تزويد مبنى المحرقة ومستودع النفايات بنظام اطفاء حريق بالرشاشات يعتمد على مصدر المياه من شبكة الموقع العام وكذلك نظام إنذار حريق يحتوى على حساسات للحرارة والدخان ويكون هذا النظام مرتبط مع أنظمة إنذار الحريق بالمستشفى 
توريد وتركيب واختبار نظام تهوية جبرية لغرفة المحرقة والمستودع بواسطة مراوح مركزية ROOF TOP EXHAUET FANS مع تزويدها بفلاتر عالية الكفاءة ( HEPA FILTER  تركب على سحب المراوح مع اخذ معدل تغيير الهواء 5 مرات فى الساعة مع مجارى وجربلات الهواء المطلوبة 
توريد وتركيب وإختبار وحدة تكييف منفصلة لمستودع النفايات DUCTED SPLIT UNITES وبسعة كافية للمحافظة على درجة الحرارة الداخلية عند 14 درجة مئوية صيفاً وشتاً 
توريد وتركيب وإختبار مخزن تبريد من الحوائط المعزولة سابقة التحهيز بداخل غرفة النفايات وبسعة 35 متر مكعب لحفظ النفايات الطبية في درجة حرارة صفر مئوي لحين حرقها شاملة لوحدة التبريد وجميع الملحقات 
 
 
BIO MEDICAL INCENERATOR 
BIO MEDICAL INCENERATOR  PLANT
Fabricating, supplying, installing and commissioning including all assosaries such as controling and measuring devices, all civil works as needed either in concrete or masonary as the case may be necessary room stack height etc as per the indicated requirment in the specification. if any thing is left out, the bidder is required to include the same to make the system complete for treating biomedical waste generated in hospital having bed of 250nos. etc.
CAPACITY :- 200BEDS.
Operation and Maintenance Manual
As built Drawing in 3 set hard copy + Soft copy in Cad
Testing and Commissioning
 Note: The drawings  are provided for the purpose of pricing and the contractor has to provide an integrated drawings in accordance with the manufacturer’s recommendations and with the necessary addendums  to the work of the units properly, and be coordinated with the ministry to locate the unit place in the general site 
Supply, installation and testing of medical waste incinerator with a capacity of 75 kg / hr gas (LPG) complete with all accessories and consequently with the chimney in accordance with the technical specifications and conditions of public health 
make a room for the incinerator that  accommodate three incinerators as in item 3.1.1 and attached to the  incinerator room   waste store that accommodate waste for a period of seven days and all the constructions of reinforced concrete with  preparingg  incinerator building  and store with all the work of wiring, electrical and lighting systems, water supply and sanitation 
 supply incinerator building and the waste warehouse with   a fire extinguish sprinkler system depends on the source of the water from network of teh general site , as well as a fire alarm system contains sensors for heat, smoke and  this system is linked with the hospital fire alarm systems 
Supply, installation and testing of the ventilation system of the  incinerator room and the warehouse with  fans ROOF TOP EXHAUET FANS providing them with filters with high efficiency (HEPA FILTER ride to pull fans with taking the air change rate of 5 times per hour with streams and air required grilles   
Supply, installation, testing separate conditioning unit for  waste repository DUCTED SPLIT UNITES and capacity sufficient to maintain the internal temperature at 14 degrees Celsius in summer and winter  
Supply, installation, testing  of the cooling store of  insulated  prefabricated walls   inside the waste  room with a capacity of   35 cubic meters to save the medical waste at a temperature of zero Celsius till  burning  including the  cooling unit and all accessories