



Email: [email protected]
r Medical Technology Co.,Ltd.
2020-07-21
Cost to Purchase a Medical Waste Incinerator
Basic Info.
Product Description
Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.
Key Features:
* All models with Dual combustion chamber.
* Stainless Steel chimney/stack, long lifetime. *according to order
* High temperature, long lifetime of incinerator.
* Free or minimum installation on site.
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.
* PLC Control Plane. *according to order
* New Design for pet animal cremation business.
* One year warranty on incinerator and parts in stock.
Application Scope:
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.
3. Community & Sea Port &cremation animal, cremation animale, cremation burner, cremation burners, cremation equipment, cremation equipment china, cremation equipment design, cremation equipment for sale, Station: Municipal Solid Waste, etc.
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
| Items/Model | YD-30 | YD-50 | YD-100 | YD-150 |
| Burning Rate (kgs/Hour) | 30 kgs/Hr. | 50 kgs/Hr. | 100 kgs/Hr. | 150 kgs/Hr. |
| Feed Capacity (kgs) | 60 kgs | 150 kgs | 200 kgs | 300 kgs |
| Equipment Weight | 2300 kgs | 4000 kgs | 4300 kgs | 7000 kgs |
| Primary Chamber (Liters) | 360 | 900 | 1200 | 1500 |
| Secondary Chamber (Liters) | 200 | 200 | 500 | 500 |
| External Dimensions (cm) | 145x90x175 | 200x160x230 | 220x180x360 | 240x170x380 |
| Internal Dimensions (cm) | 100x60x60 | 120x90x85 | 130x100x90 | 150x100x96 |
| Oil Tank(Liters) | 200 | 300 | 300 | 500 |
| Door Opening (cm) | 48 x 60 | 62 x 80 | 55 x 80 | 59 x 81 |
| Chimney (M) | 5 | 5 | 10 | 10 |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Secondary Chamber | YES | YES | YES | YES |
| Mix-Combustion Chamber | YES | YES | YES | YES |
| Smoke Filter Chamber | YES | YES | YES | YES |
| Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Temperature Monitoring | YES | YES | YES | YES |
Incinerator Furnaces for Pet Cremation
Basic Info.
Product Description
Key Features:
* All models with Dual combustion chamber.
* Stainless Steel chimney/stack, long lifetime. *according to order
* High temperature, long lifetime of incinerator.
* Free or minimum installation on site.
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day.
* PLC Control Plane. *according to order
* New Design for pet animal cremation business.
* One year warranty on incinerator and parts in stock.
Application Scope:
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.
2. Slaughter House &esign incinerator sampah, design of medical waste incinerator, design of small medical waste incinerator, designer medical incinerator, destructor incinerator,
Pet Hospital &Farm: Dead Animal, Bio-Waste.
3. Community & Sea Port & Station: Municipal Solid Waste, etc.
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation
Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.
| Items/Model | YD-200 | YD-300 | YD-500 | YD-600 |
| Burning Rate (kgs/Hour) | 200 kgs/Hr. | 300 kgs/Hr. | 500 kgs/Hr. | 600 kgs/Hr. |
| Feed Capacity (kgs) | 400 kgs | 500 kgs | 800 kgs | 1100 kgs |
| Equipment Weight | 7600 kgs | 8300 kgs | 13000 kgs | 16500 kgs |
| Primary Chamber (Liters) | 2000 | 2400 | 4000 | 5500 |
| Secondary Chamber (Liters) | 500 | 1200 | 1500 | 1500 |
| External Dimensions (cm) | 270 x 185 x 380 | 260x220x420 | 320x220x460 | 360 x 220 x 475 |
| Internal Dimensions (cm) | 180 x 115 x 96 | 220x110x100 | 257x147x108 | 300 x 147 x 125 |
| Oil Tank(Liters) | 300 | 500 | 500 | 500 |
| Door Opening (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
| Chimney (M) | 10 | 10 | 14 | 14 |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Secondary Chamber | YES | YES | YES | YES |
| Mix-Combustion Chamber | YES | YES | YES | YES |
| Smoke Filter Chamber | YES | YES | YES | YES |
| Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Temperature Monitoring | YES | YES | YES | YES |
Stoven to Cremated Pets
Basic Info.
Product Description
Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.
Key Features:
* All models with Dual combustion chamber.
* Stainless Steel chimney/stack, long lifetime.
* High temperature, long lifetime of incinerator.
* Free or minimum installation on site.
* High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day.
* PLC Control Plane for Intelligent operation.
* New Design for pet animal cremation business.
* One year warranty on incinerator and parts in stock.
Incinerator is a incineration equipment, direct fire waste by gas medical smokeless incinerators, medical technology manufacture italy, medical waiste furnce, medical wast burner china, medical waste 3000kcal/kg, fuel or oi fuel. As different circumscription, incinerator can be named many words as below:
Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators
Incinerator fuel: Gas incinerator, oil incinerator
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour
| Item | Specification |
| Model | TS50 PLC |
| Main Product List per 01 set | Primary Combustion Chamber |
| Secondary Combustion Chamber | |
| Smoke Filter Chamber | |
| Incinerator PLC Control Case | |
| Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) |
|
| Italyoil/gas burner: 02 units | |
| Oil Tank (if oil fuel): 100Liters |
Waste Clinic Incinerator
Basic Info.
Product Description
Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Medica waste incinerator, medical burner, medical burners, medical disposal incineration plant, medical equipment for pet cremations, medical equipment incineration, Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.
A Model animal crematory burning rate from 20-400kgs per hour. Heavy duty combustion chamber and suit for large animal cremation.
Secondary Chamber & Mix-Combustion Chamber. Residency time 2.0 sec. In post combustion chamber. Virtually smoke and smell free.
Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burning.
Italy original oil or gas burner, quality reliable. It suit for diesel oil, natural gas, LPG gas.
User guider, full installation and operation document for customer.
| Items/Model | A360 | A600 | A900 | A1200 |
| Burning Rate *animal | 20 kgs/Hr. | 20 kgs/Hr. | 30 kgs/Hr. | 60 kgs/Hr. |
| Feed Capacity *animal | 30 kgs | 50 kgs | 80 kgs | 100 kgs |
| Equipment Weight | 2300 kgs | 3000 kgs | 4000 kgs | 4300 kgs |
| Primary Chamber (Liters) | 360 | 600 | 900 | 1200 |
| Secondary Chamber (Liters) | 200 | 200 | 300 | 500 |
| External Dimensions (cm) | 145x90x175 | 175 x 100 x 180 | 200x160x230 | 220x180x360 |
| Internal Dimensions (cm) | 100x60x60 | 130 x 70 x 65 | 130x100x90 | |
| Oil Tank(Liters) | 200 | 200 | 300 | 300 |
| Door Opening (cm) | 48 x 60 | 50 x 60 | 62 x 80 | 55 x 80 |
| Chimney (M) | 5 | 5 | 5 | 10 |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Secondary Chamber | YES | YES | YES | YES |
| Mix-Combustion Chamber | YES | YES | YES | YES |
| Smoke Filter Chamber | YES | YES | YES | YES |
| Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Temperature Monitoring | YES | YES | YES | YES |
Moving Forward on Open Waste Burning
The permit that allows the Radford Army Ammunitions Plant to burn hazardous waste from firearms outdoors is up for renewal. Community activists see an opportunity to address environmental and health concerns about the open burning – and state regulators see a chance to explore new technology to solve an old problem.
Just a handful of people turned at the Blacksburg Public Library on a recent afternoon for a meeting of the Environmental Patriots of the New River Valley.
“Is there anything we could post to get more people involved? Yes, petitions, a letter campaign… When the EPA was pushed to the wall in Louisiana, they said ‘Uncle.’ So, we want you Senator Kaine and you Senator Warner to do just what Senator Vitter did in Louisiana and write to the EPA and ask them, ‘How is this not a violation of the clean air act?’”
Devawn Oberlender is looking to take a pager from the book of a far away town, where citizen protestors succeeded in stopping outdoor burning explosives of arms and weapons waste at the Louisiana Army Ammunition Plant.
“The opportunity that we have right now only comes up very ten years, because the permit is good for ten years, so what we need to replicate is what they did in north western Louisiana at Camp Minden.
There they formed a “Stop the Burn” movement that ultimately brought together elected officials, state and local regulators and the army for a plan to give up open burning and use a modern indoor incinerator to dispose of the toxic materials. Now, with the open burning permit at the Radford Arsenal up for renewal, the Virginia Department of Environmental Quality is exploring that idea for the first time. William Hayden is spokesman for DEQ in Virginia.
“We have not reached any conclusions yet but that is something that would be looked at as we move forward. We have asked the Arsenal to come up with alternatives to open burning and we do expect to have some options that go beyond the idea of just burning it the open.”
Brian Salvatore is a professor of Organic chemistry at Louisiana State University who argued for using contained incineration.
“This is what we fought for here at camp Minden. And yes it added another 15million dollars and almost doubled the cost of the contract but this was something that, the EPA was willing to go to bat for us for. So I’m glad that the people in the EPA and in the state worked together here and they worked with the Army as well to find the additional money. And we’re quite satisfied here that this alternative — which, in the beginning of this we didn’t know all the details of what these modern incinerators can do. We’re quite confident here that this is going to do the job and the amount of material that’s going to be released total will be on the order of tens of grams as opposed to tons of these emissions.”
A spokesman for the Environmental Protection Agency’s Region 3, which includes Virginia, said it could not comment on the possibility of incinerators like that being adopted at the Radford site, but a spokesperson for BAE Systems, the contractor in charge of the arsenal, confirmed it is “looking for viable alternatives to its current methods of waste disposal.”
The department of Environmental Quality has asked BAE to conduct an environmental impact study on its current open burning practice. William Hayden says it’s the first time DEQ has asked for one.
“Because we’re getting in to an issue that has generated a lot of public interest in the Radford area we knew that the more information we had, the better. People from the public have been asking for us information; they’ve been asking Radford (the arsenal) for information.”
And one of them is Oberlender who says, “We’ve been burning waste out there, open burning it since 1941. You know, it’s not going away.”
And neither are the environmental patriots of the new river valley. Taking another page from the story of Camp Minden Louisiana’s successful effort to get its outdoor burning moved indoors. They’re scheduling meetings with state and federal officials to keep the pressure on. The first is this Friday with U.S. Representative Morgan Griffith who sits on the Committee on Energy and Commerce, which has oversight of the EPA. The group is looking to make a national issue out of one that has for so long been so local and one of the few places where open burning of hazardous waste from explosives is still allowed.
Info from: http://wvtf.org/post/moving-forward-open-burning
