Category: waste

Incinerator Yd-500



Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, incinerator manufacturers, chinese, incinerator manufactures usa? , incinerator manufacturing company, incinerator medical china, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Model YD-500
 Burning Rate 
500 kgs/hour
Feed Capacity 800 kgs
Primary Combustion Chamber 4000 Liters
Secondary Combustion Chamber 1500 Liters
Mix Combustion Chamber Yes
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V/380V
Power 2.24Kw
Fuel Type Diesel Oil/ Natural Gas/LPG
Burner Italy Original
Oil Consumption (Diesel Oil) 31–59.1 kg/hour
Gas Consumption (Natural Gas) 19.2–64.2 m3/hour
Internal Dimensions 257 x 147 x 108cm (primary chamber)
External Dimensions 320 x 220 x 460cm (without chimney)
Temperature Monitor Yes
Oil Tank Capacity(if oil fuel) 500 Liters
Door Opening 108 x 128cm
Chimney Length 14.0 Meters
Chimney Type Stainless Steel
Equipment Gross Weight 13000 kgs
Operation Technical Specifications
Paimary Chamber Temperature 800degree–1000degree
Secondary Chamber Temperature 1000degree-1200degree
Residency Time 2.0 Sec.
Burning Efficiency >98%
Waste Lower Calorific Power 3000Kcal

Smallest Incinerator 30kgs

Average 30kgs per hour

***Primary chamber(200Liters)

*** Secondary chamber

*** Mix combustion chamber

*** Stainless steel chimney(1meter)

*** Italy made oil burner(2sets)

*** Dry Scrubber

*** Weight 1.7T(can reduce to 1.0Ton)

Main Spare Parts(Standard for incinerator, and price include already):

*** 2 sets Italy Oil Burner

*** 2sets Temperature Probe

*** 1 set Control Case

*** 1 set Air Fan

*** 1 set Diesel Oil Tank

*** 1 set Maintain Material



HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-06-24

Gran quemador de residuos general Precio de quemado hasta 250 kg por hora

Artículos / Modelo

TS300 (PLC)

Principio

Tratamiento de incineración de residuos

Precio de quemado

Estándar 250 kg / hora

Modo de control

PLC (Incinerador de controlador lógico programable)

Cámara de combustión

2000L

Dimensiones interiores

El 170x120x100cm

Cámara alta

1000L

Cámara de filtro de humo

Configuración de alimentación

Manual

Voltaje

220 V

Energía

2,5 kilovatios

Consumo de aceite (kg / hora)

Promedio 28 (DO)

Consumo de gas (m3 / hora)

***

Monitor de nivel de temperatura

Pantalla digital

Defensa de temperatura

Tanque de almacenamiento de aceite

1000L

Puerta de alimentación

Los 80x60cm

Pozo de humo

10 metros

Tipo de humo

Acero inoxidable

1er. Nivel de temperatura de la cámara

800 ℃ –– -1000 ℃

2do. Temperatura de la cámara

1000 ℃ -1200 ℃

Tiempo de residencia

2,0 seg.

Peso bruto

11000 kg

Dimensiones externas

400x210x300cm (sin humo)

HICLOVER – Ambiental médico  

Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

2020-03-22

incinerator manufacturers

1. SCOPE OF WORK The work specified in the contract will include.
1. Supply, install and commission an incinerator as provided in the technical specifications
2. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this tender.
3. Assessment and preparation and construction of a standard incinerator shed with one waste storage room ( see the design )

4. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and instructions.

5. Fuel oil storage tank- Mild steel1500 liters capacity

6. Onsite training for operation and maintenance staff.

IMPORTANT
incinerator manufacturers To enable the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with commissioning and maintenance instructions for the Incinerator they intend to supply, install and commission. Tenderers who fail to comply with this requirement fully shall have their tenders rejected. 2. TECHNICAL SPECIFICATIONS OF THE REQUIRED INCINERATOR

2.1 General Description

The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to:
1. Overall plant layout
2. Feed chamber/charging
3. Primary combustion chamber
4. Particulate scrubbers
5. Acid gas scrubbers.
6. The stack/chimney.
7. Minimum capacity of primary chamber = 0.18 cubic metres
8. Burn rate (rate of waste incineration) = a least 20 kg per hour
9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
Supply, Installation and Commissioning of An Incinerator in Eastern Hydros [ Page 28

2.2 Feeding and Charging
Controlled hygienic mechanical feeding that does not negatively influence the air temperature in the primary and secondary chambers of the incinerator shall be used.
2.3 Primary Combustion Chamber.

a) This chamber should be equipped with burners that use low sulphur fuel.
b) The chamber should ensure a minimum exit temperature of 850 degrees centigrade.

2.4 Secondary Combustion Chamber (After burner)

a) Should be fitted with burners that use low sulphur fuel.
b) Ensure secondary air supply is controlled.
c) Ensure residence time is not less than two seconds.
d) Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees centigrade.
e) Ensure the emitted oxygen content of the emitted gases is not less than 11%
f) Ensure both primary and secondary combustion temperatures are maintained until all waste is completely combusted.

2.5 Particulate Removers

A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:
a) Cyclone separator
b) Electrostatic precipitators
c) Fabric filters
2.6 Chimney/Stack

l) The chimney should have a minimum height of 10 metres above ground level and clear the highest point of the building by not less than 3 metres for all roofs. The topography and height of adjacent buildings within 50 metres radius should be taken into account.
m) The chimney should be visible to the operator from the feeding area.
n) The minimum exit velocity should be 10 metres per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.
o) The point for measurement of emissions shall be provided.

2.7 Instrumentation

a) Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.
b) An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required temperature.
c) A carbon monoxide and oxygen meter/recorder should be provided

d) A smoke density meter/recorder should be provided.
e) A solid particulate meter/recorder should be provided.
f) Any other instrument that may be considered necessary.

2.9 Emission Limits

a) Combustion efficiency (C.E) shall be at least 99.00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
b) The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
c) The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack gas.
d) Opacity of the smoke must not exceed 20% viewed from 50 metres with naked eyes.
e) All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and droplets.
f) A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x 100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.
g) The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

– Manual technical monitoring is shipped with the hardware with all explanations of failures and resolutions
Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day

Burning temperature – over 12000C

Two chambers – minimum

Emissions – dioxin and heavy metaly – better then Kyoto protocol

Emission – monitoring system

Waste unloiding – directly from waste track to incinerator

Quemador móvil en contenedor Quemador de desechos médicos modelo CA50

HICLOVER – Incinerador móvil en contenedor Incinerador de desechos médicos modelo CA50


Versión

CA50

Imagen

Terapia de residuos

Terapia de incineración de desechos médicos

Capacidad de alimentación

Ordinario 100 kg por alimentación

Precio ardiente

50 kg típicos por hora

Tiempo de combustión por alimentación

Promedio 2 horas

Modo de control

PLC (Incinerador de controlador de razonamiento programable)

Voltaje

220 V

Energía

1,0 kilovatios

Gas

Gasóleo

Calentador

Quemador de Italia

Configuración de alimentación

Manual

Pantalla de nivel de temperatura

Pantalla digital

Consumo de combustible (aceite)

Promedio 16,9 kg / hora

Dimensiones interiores

100x80x70cm (cámara principal)

Dimensiones externas

230 x 130 x 155 cm (texto)

Cámara de combustión de residuos

560Litros

Cámara ardiente de mensajes

280 litros

Capacidad del contenedor de aceite

200 litros

Puerta abierta

70 x 50 cm

Pozo de humo

5,0 M

Peso bruto

4500 kg

Material de la cámara

Ladrillo refractario, hormigón refractario

Max. Valor cálido

166.000 Kcal / Hr.

Especificaciones técnicas del procedimiento

Temperatura de la cámara sólida

8000C -10000 C

Temperatura de la cámara de gas

10000C -12000 C

Cámara Anti-Tasa

17500C

Tiempo de residencia

2,0 seg.

Eficacia ardiente

> 98%

Desperdicio de poder calorífico inferior

3000Kcal


Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

2020-03-24

Melt blown Production Line 400mm and 1600mm and ES Fiber Production Line and N95 Mask Machine and Disposable Mask Machine

1. N95 and Disposable Mask Machine

 

2. 400mm and 1600mm Melt blown Production Line

3. ES Fiber Production Line

 

 

 

N95 Face Mask Machine Production Line

Melt blown Production Line

 

A.)Optional Capacity: 1600mm

Efficiency: 95-97%

FOB Term Price: USD per set

Price Valid: 5days.

Ave.60 Days ready for shipping.

In stock Price: USD per set

 

 

B.)Optional Capacity: 400mm

Efficiency: 40-50% .

FOB Term Price: USD per set

Price Valid: 5days.

Ave.20 Days ready for shipping.

Payment: TT 70% In advance, TT 30% before leave factory

Shipping: 1*20′ container per set, Ave. 2000Kgs.

 

Main Parts: Extruder, mold, winder, oven, ultrasonic

Daily Capacity100-150Kgs/24Hours

Screw extruder100-150Kgs

Motor power: 15KW frequency conversion speed regulation
Reducer speed ratio: 1:10 or 1:16
Screw length to diameter ratio: 30: 1
Screw diameter: 50mm
Winding machine diameter:
630mm
Winding machine drive motor power: 0.55kw
Speed ratio of winder drive reducer (if any): 1:71
Air heater power: 15kw
Power of vacuum calciner: 12kw
The size of vacuum calciner: 500 × 300 × 200
Ultrasonic power: 1800, frequency 28kHZ
Ultrasonic sink size: 800 × 300 × 250

 

 



HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-20

Quemador de desechos para instalaciones médicas móviles premontado tipo contenedor modelo CA100

Artículos / Modelo

CA100

Foto

Concepto

Terapia de incineración de desechos médicos

Velocidad de combustión

Estándar 100 kg / hora

Capacidad de alimentación

Promedio 200 kg / alimentación

Ajuste de control

PLC (Incinerador de controlador de razonamiento programable)

Cámara ardiente

1200L

Dimensiones internas

El 120x100x100cm

Cámara secundaria

600L

Cámara de filtro de humo

Modo de alimentación

Manual

Voltaje

220 V

Energía

1,3 kilovatios

Uso de aceite (kg / hora)

Típico 20,4 kg / hora

Uso de gas (m3 / hora)

***

Pantalla de nivel de temperatura

Show digital

Defensa del nivel de temperatura

Tanque de aceite

200L

Puerta de alimentación

Los 80x60cm

Chimenea

5 metros

Tipo de chimenea

Acero inoxidable

1er. Nivel de temperatura de la cámara

800 ℃ –– -1000 ℃

2do. Temperatura de la cámara

1000 ℃ -1200 ℃

Tiempo de residencia

2,0 seg.

Peso bruto

6000 kg

Medidas exteriores

Los 260x150x180cm

HICLOVER – Ambiental médico  

Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

2020-03-25

medical incinerator manufacturer

1.The double chamber incinerator shall preferably be designed. Air supply in the primary and secondary chamber shall be regulated between 30%-80% and 170%-120% of stoichiometric amount respectively. Flow meter/suitable flow measurement device shall be provided on the primary and secondary air ducting. The combustion air shall be supplied through a separate forced draft fan accounting for the air supplied through burners. Provision shall be made in the primary chamber to measure the water column pressure.
2. Capacity : up to 4000kg      burn not less than 500 kg /hr
3. medical incinerator manufacturer The refractory lining of the chamber shall be strong enough to sustain minimum temperature of 1000dc in the primary chamber and 1200 dc in the secondary chamber. The refractory& insulation bricks shall have minimum 115mm thickness each & conform to IS:8-1983 & IS:2042-1972 respectively.
4. The incinerator shell shall be made of SS/MS plate of adequate thickness (minimum 5mm) and painted externally with heat resistant aluminium paint suitable to withstand temp.of 250 dc with proper surface preparation. Refractory lining of the hot duct shall be done with refractory castable (minimum 45mm thick)& insulation castable(minimum 80mm thick). Ceramic wool shall be used at hot duct flanges & expansion joints.
5.There shall be a separate burner each for the primary & secondary chamber. The heat input capacity of each burner shall be sufficient to raise the temp.in the primary & secondary chambers as 800+/- 50dc and 1050+/-50dc respectively within maximum of 60 minutes prior to waste charging. The burners shall have automatic switching off/on control to avoid the fluctuations of temperatures beyond the required temp.range.
6.Incinerator shall have graphic or computer recording device which shall automatically and continuously monitor and record dates, time of day, batch sequential number,Co,Co2,O2 in gaseous emission shall also be  measured daily.
7. Structural design of the chimney/stack shall be as per IS:6533-1989.The chimney/stack shall be lined from inside with minimum of 3mm thick natural hard rubber suitable for the duty conditions and shall also conform to IS:4682 part I-1968 to avoid corrosion to oxygen and acids in the flue gas.

8.The incinerator must have an emergency vent. The emergency vent shall remain closed ie. it shall not emit flue gaseous during normal operation of the incinerator.

9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room. The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be provided for the following services.

(a) Low level alarm
(b) High level alarm
(c) Low level start of transfer pump
(d) High level stop of transfer pump

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion
– effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg
– Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions?
– The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging?
– The efficiency of process chemicals (after neutralization and detoxification: solids and liquids)
– Is there  microbiological testing especially: the processing efficiency bascillus

Leading Waste Incinerator



Basic Info.

Model NO.:construction of fire brick incinerator
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. China incinetor, china lab waste incinerators, china medical incinerator, china medical incinerators, china waste incinerator, clover incineter, clover medical ltd, The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm