Pyrolytic Double Chamber Incinerator Small Size:Burning Rate:30-45 kg/hr;Maximum Load Capacity:400 kg

Items/Model

TS50(PLC)

Picture

Principle

Solid Waste Incineration

Burn Rate

30-45 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Oil Consumption (kg/hour)

Average 13.3

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

800L

Feed Door

70x55cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–-1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

4500kg

External Dimensions

230x130x155cm

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-21

MEDICAL BIOLOGICAL WASTE INCINERATOR

It should  be  a three chambered incinerator
The load capacity of 250 kg
The housing for the incinerator should be able to withstand the temperatures and other operational requirements.
The chimney should have a strong refractory lining of special type of cement to withstand temperatures more than 1200oc.
It should have a strong base for the machine to keep it stable, firm and secure during its operational lifespan.
The primary (combustion) and the secondary (scorching) chambers to be fitted with burners for effective combustion.
In the third chamber, scrubbers and precipitators will need to be installed as pollution control equipment before emission of gases into the atmosphere.
A system for continuous emission Monitoring and Environmental Monitoring.
A mechanism with which to treat the waste water before discharge into the sewerage system.
Temperature control and monitoring devices (probe thermometer) should be availed to ensure that the right temperatures are attained in the chambers during operation.
Motor (fans) sufficient to induce enough air into the combustion chambers and direct the gases towards the flue 9 chimney).
High power electricity and emergency generator connection for automated ignition purposes.
The chimney should be tall enough and be at least one meter above the tallest building in the vicinity.
The fuel tank (industrial diesel) to be constructed next to but out side the incinerator housing for security purposes and to prevent fire hazards. Capacity of 250.
Other Requirements
Training of all the personnel involved in health care waste (HCW) management.
The Automatic Feeding system of the Incinerator
Automatic waste loading mechanism with conveyor belts. These will lead the waste into the first primary chamber.
An Automatic bottom ashes discharge system.

Incinerators



Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Clover Medical supply medical incinerator, capacity from 10kgs per hour to 500kgs per hour. China clover medical, china companies incinerator, china cremation incinerator, china crematorium manufacturers, china debates over health impacts from waste incineration, 

Key Features: 
* All model with Double combustion chamber (AB chamber). 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate of up to 500kg per hour. 
* Design for medical waste and animal cremation. 
* One year warranty on incinerator.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Quemador tipo contenedor premontado

Incinerador de tipo contenedor premontado

Diseño

CA100

Imagen

Tratamiento de desechos

Tratamiento por incineración de desechos médicos

Capacidad de alimentación

Promedio de 100-200 kg por alimento

Precio ardiente

Ordinario 100-120 kg por hora

Tiempo de combustión por alimentación

Estándar 1-2 horas

Modo de control

PLC (quemador controlador de razonamiento programable)

Voltaje

220 V

Energía

1,0 kilovatios

Combustible

Gasóleo

Quemador

Calentador de Italia

Configuración de alimentación

Manual

Pantalla de nivel de temperatura

Pantalla digital

Uso de gas (petróleo)

Típico 20,4 kg / hora

Medidas internas

100x80x70cm (cámara de combustión primaria)

Capacidades externas

230 x 130 x 155 cm (cuerpo principal)

Cámara de combustión de residuos

560Litros

Entrada de blog Cámara ardiente

280 litros

Capacidad del tanque de almacenamiento de aceite

200 litros

Puerta abierta

70 x 50 cm

Chimenea

5,0 M

Peso bruto

4500 kg

Material de la cámara

Ladrillo refractario, hormigón refractario

Max. Valor cálido

166.000 Kcal / Hr.

Especificaciones técnicas del procedimiento

Temperatura de la cámara sólida

8000C -10000 C

Nivel de temperatura de la cámara de gas

10000C -12000 C

Cámara Anti-Tasa

17500C

Tiempo de residencia

2,0 seg.

Rendimiento ardiente

> 98%

Desperdicio de poder calorífico inferior

3000Kcal

El tipo contenedorizado premontado no incluye la instalación de chimenea, el tipo móvil contenedorizado.
Velocidad de combustión: 100-120 kg / hora
Temperatura mínima de funcionamiento: 800-1000 grados
(Combustión primaria)
Temperatura máxima de funcionamiento: 1000-1200 grados (cámara de postcombustión)
Capacidad de combustión secundaria: Obligatoria.
Aislamiento de densidad: 50 mm de alto
Fundición refractaria: mínimo 114 mm
Revestimiento refractor de alta resistencia para soportar 1750 grados
Tiempo medio de quemado: máximo 1-2 horas
Tipo de combustible: fuel oil (diesel)
Consumo de combustible en L / h: promedio de 20,4 litros / h.
Tiempo de residencia en cámara secundaria: 2 seg.
Poste de cenizas residuales 100 kg Máx 3,8 kg
Período de instalación Máximo 7 días.
Estado: Anambra Sitios:
Hospital General Onitsha
Hospital General Enugwu Ukwu
Hospital General Ekwulobia
Hospital General de Orumba
II. Estado: Benue Sitios:
Sitio de recolección de residuos zonal del noreste del Senado (zona A): Oficina del EPI en Katsina-Ala LGA
Sitio de recolección de residuos zonal del Noroeste Senatorial (zona B): EPI Office Gboko LGA
Sitio de recolección de residuos zonal de Benue Sur (zona C): Oficina EPI Otukpo LGA
Capital del estado de Benue: Central Medical Store, Makurdi
III. Estado: Kogi Sitios:
Hospital Universitario Docente, Anyigba, Dekina LGA
Hospital General Obangede, Okehi LGA
Hospital General Mopa-Muro LGA
IV. Estado: Ebonyi Sitios:
Hospital General Ezzango, Zona Norte de Ebonyi
Hospital General Onueke, Zona Central de Ebonyi
L externo = 3235, W = 1150, 1950/3825, L interno = 1600, W = 675, H = 700; Volumen de la cámara (m3) = 0.76; Peso (tonelada appox) = 3.6, capacidad de carga máxima (kg) 300, Tasa de combustión nominal uk (kg / hr.) = <50, capacidad térmica (kw) = 390, fuente de alimentación 50 / 60Hz = 220-250v, apertura de puerta = 67 × 550; Principio de tierra caliente = doble paso, tipo de combustible Diesel; Panel de control = Al, tablero de aislamiento de 25 mm súper lana, ladrillo refractario de aislamiento = grado E23, ladrillo refractario (alúmina) = 42,5%
incinerador capaz de una carga de hasta 50 kg / h.
Cámara doble y debe ser de combustible diesel completo con controlador de temperatura automático hasta 900` Celsius.
incinerador (2 equipos) 500 kg / h para mascarillas desechables.
Incinerador automático libre de humo de 150-200 kg / h de capacidad para la industria. La cabina de residuos se compone de los siguientes tipos: –
I. Residuos húmedos.
ii. Envoltorios de plástico,
iii. Residuos sólidos (madera, papeles, caja de dibujos animados y otros).
Estado: Imo Sitios:
Centro de salud de Nwabosi, asentamiento de Nwabosi, distrito 2 de Isiekenesi, Ideato South LGA
Centro de Salud Integral, Pabellón Umuezeala Owerre, Ehime Mbano LGA
Centro de salud de Nnenasa, asentamiento de Umugba, distrito de Umueze Njaba LGA
Asentamiento del Hospital General Owerri Umuguma, Pabellón 1 de New Owerri
VI. Estado: Oyo Sitios:
Almacén frigorífico estatal Jericó, LGA suroeste, Ibadan
Secretaría de Gobierno Local de Oyo East, LGA de Oyo East
Adebayo Alata Primary Health Care Center (PHC), Ogbomosho South LGA
Oficina de Itesiwaju NPI, fuera de Itesiwaju LGA
Oficina de Saki West NPI, Saki West LGA
Oficina Central de Ibarapa NPI, Ibarapa Central LGA
VII. Estado: Kwara Sitios:
Ifelodun LGA
Ilorin West LGA
VIII. Estado: Enugu Sitios:
Hospital del distrito de Nsukka, ciudad de Nsukka, LGA de Nsukka
Hospital del distrito de Agbani, ciudad de Agbani, Nkanu West LGA
Hospital del distrito de Udi, ciudad de Udi, Udi LGA
IX. Estado: Enugu MSites:
Odukpani LGA
Obubra LGA
Boki LGA

HICLOVER – Ambiental médico  

Incineradores de residuos
Incinerador de desechos médicos
Cremación de animales domésticos
Residuo sólido   Incinerador

Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing

2020-06-30

hiclover waste incinerator spare parts

We are china incinerator manufacturer, contractor and exporter. Manufacturer make reasonable price for incinerator customer, supply medical incinerator, hospital incinerator, animal incinerators, hog incinerators, pet cremation equipment, small incinerator, pet incinerator, animal incinerator, portable incinerator, small animal incinerator, infectious waste pyrolysis machine, laboratory incinerator. HICLOVER help customer reduce purchase budget, custom made function, quality products and friendly service.
Refractory cement,Ignition transformer – Secondary burner,Ignition transformer – Primary burner,Emergency push button,Temperature thermos couple with Locknut – 1600oC,Temperature thermos couple with Locknut – 1300oC,Temperature display controller – Secondary Chamber,Temperature display controller – Primary Chamber (Parameter – Digital Adjust Instrument),Burner Lighting Sensor (Photo Cell) PBT/PC
Circuit board (LM44.255C2BT) High Stage Secondary,Circuit board (LOA24.171B2BT) Primary
Fire proof flange gasket,Fire proof flange gasket
CA50-600,EB14HPM,26-48-3371T JT04,K1600,k1300,XMT – 3000,XMT – 2000 QRB1,LM44.255C2BT,LOA24.171B2BT,SN834457 8023020001,SN834451,3713798,AS47B,FO03,BTL20,SPARK35
Ignition electrode with leads(for burner BTL20/SPARK35),Solenoid(for burner BTL20/SPARK35),Burner fuel pump(for burner BTL20/SPARK35),Fuel filter(for burner BTL20/SPARK35)
Burner – Baltur,Burner – Baltur,Solenoid,Burner fuel pump
Ignition Cable,Ignition Switch -(Control Box),Photo Cell
HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-06

Clover Medical Medical West Incinerator



Basic Info.

Model NO.:china animal incinerator manufacturer
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. incinerators 150 kg per hour, incinerators 300 kg per hour, large incinerator, medical incinerator design, medical incinerator Italy, According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

INCINERATOR DIESEL FIRED

Incinerator 20 Kg
Incinerator electrically operated
including:
 A cage for receipt of biomedical waste;
 A combustion chamber with fireplace with a filter to retain ashes;
 A cover;
 An air supply;
A turbine  allowing supply air.
 Combustion temperature: 1800 ° C.
Comes with all accessories.     ▪      The incinerator should be a modern waste disposal unit, designed
to bum medical waste in a clean and environmentally efficient
manner. It should employ a temperature based logic control system
to provide optimum control of the operating conditions and
incorporate a high capacity thermal oxidizing secondary chamber.
It should be designed to retain the exhaust gases, for at least 2
seconds to ensure the unit’s effective destruction of the combustion
products.
▪      All the incinerators to be supplied and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and in particular 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
procedure for installing and operating incinerators.
▪      The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪      The incinerator shall be run on a three-phase power supply
(mains).
▪      For the technical evaluation, not only the treatment plant but
the entire system will be considered. It will be the responsibility
of the Bidder to supply a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪      The system offered shall be designed to operate normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪      The Bidder must provide a warranty for one year.
▪      All text, parameter etc. on all control operating interfaces as
well as on information displays and on print-outs shall be in
English language.
▪      The Bidder is responsible for all permits and approvals for
importation. The Bidder shall provide all the necessary
documentation in order to facilitate the legal requirements for the
installation and putting into use of the equipment.

▪      Period of Execution is 90 days from contract signature for
delivery to site and completion of all verification operations
required for the issuance of provisional acceptance.
▪      Representatives of the Contracting Authority and the
Beneficiary, together with the Bidder’s representative, shall
carry out the controls, testing and initial approval for provisional
and final acceptance. The provisional and final acceptance shall
take place at the final destination.
▪     After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is authorized by
the Manufacturer, and which is able to rapidly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year warranty period. In
fulfillment of this requirement with their offer, bidders must
submit a statement signed by the manufacturer or representative
of the manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair centre is able to rapidly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪      The Bidder will be responsible to deliver and install all
equipment supplied to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time schedule over
the complete construction and assembling period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall ensure that all parts of
the plant transported by sea shall not be shipped as “deck
cargo”.
▪      It is expected that the Bidder cooperates closely with the
contractor for the new waste handling building/ housing and will
make available all needed technical information, drawing, etc. to
the contractor.
▪      The Bidder shall supply and install the incinerator with the
following attached specifications

For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below:
i.    Waste type    Health care waste
ii.    Waste density    125 to 350Kg/M3
iii..    Waste Calorific Value    4000 KCAL/Kg
iv.    Moisture content    10-25%
v.     Estimated ash  residue    5-10%
vi.     Nominal capacity     100Kg/hour batch load
vii.     Secondary chamber    2 seconds @ 1100°C
viii.    Environmental    Environmental Management Coordination Act, 1999 and in particular, Waste management regulations, 2006
2    Equipment
2.1    Primary Combustion Chamber
▪       The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
rolled steel sections. It is carried from the floor level on a
substantial steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face combination of super
duty brickwork or high strength castable.
▪       The primary combustion chamber must ensure minimum exit
temperature is not less than 850°C.
One Manual Load Incinerator comprising:
▪       Manual Loading door (heavy duty steel door with appropriate
refractory lining)
▪       Horizontal solid hearth, refractory lined primary combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪       Full sized bulk load/ash removal door
▪       1 off diesel-fired ignition burner — temperature controlled
▪       1 off combustion air supply fan and distribution system, automatic
control
▪       High capacity secondary combustion chamber with residence time
not less than 2 seconds @ >1100°C
▪       1 off diesel-fired afterburner — temperature controlled
▪       Control panel — automatic operation
▪      Temperature indication primary and secondary chambers 0-
1200°C. Both chambers must be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.
2.2     Throughput
100kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.
2.3    Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4    Quality/Environmental Standards
▪       Environment Management and Coordination Act, 1999
▪       BS3316
2.5    Operating Period
▪      Anticipated daily operating period 8 hours
▪      Maximum operating period 12 hours
2.6    Chamber
▪      Should be refractory lined to the following standard; Hearth and
lower section of chamber walls
2.7    Hot face material
▪      Super duty firebrick
▪      Limiting continuous service limit 1500°C
▪      Thickness 100mm
▪      Thermal conductivity 1.3 W/mk
2.8    Insulation
▪      Calcium silicate
▪      Limiting continuous service limit 1000°C
▪      Thickness 25mm
▪      Thermal conductivity 0.095 W/mk
2.9     Chimney / Stack
▪      Should be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪      Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪      Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as necessary. Allow for cutting of tree
branches to facilitate the exercise.
▪      The chimney shall be painted with approved heat resistant
paint after installation.
2.10     Ignition Burners
Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
·         Maximum rating:            at least 450kW/hour
·         Burner:                            arranged for on/off operation
·         Maximum consumption: at least 6 litres/hour
·         Average consumption:    at least 3 litres/hour
2.11    Afterburner
Fully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating:    at least 450kW/hour
Burner:    arranged for on/off operation
Maximum consumption:    at least 9 litres/hour
Average consumption:    at least 4.5 litres/hour
2.12    Flue gas treatment
▪      Should have particulate remover (scrubbers). A mechanical
particulate collector must be incorporated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13    Diesel Tank
▪      To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪      The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank to the incinerator.
The connecting pipe must be a black pipe of approved gauge
and diameter. Include other accompanying accessories and
fittings
▪      Connect burners to fuel supply.
2.14     Electrical Supply
▪      Three phase 415 V a.c., 50/60 Hz.
3    Documentation:
Operation manual    2 sets
Service/maintenance manual    2 sets
4    Certification
▪      National Environment Management Authority (NEMA)
certification
5    Capacity to service equipment
▪      The agent/supplier shall have adequate facilities, spare parts,
consumables and qualified and skilled technical staff.
Installation works
▪      Provide lifting gears as forklift, gantry, rollers, and lifting
jacks and position incinerator.
6    Commissioning and Training
▪      The Agent will test all set operating parameters

▪     The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7    Commissioning Maintenance Contract
▪     Before the expiry of the warranty/ signing off, the supplier shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly routine maintenance price per quarter
for three (3) quarters.

Maintenance control proposal.
▪      The maintenance contract price includes labour, transport and
accommodation for the attending technicians.

Incineradores de residuos clínicos de 30 kg para residuos covid19

P: ¿Qué tipo de residuos se pueden utilizar en estos dispositivos?

R: Este equipo para desechos clínicos, mascotas, animales, desechos municipales, desechos en tiempo real. Prohibir cualquier tipo de producto explosivo y radiactivo, residuos de líquidos y gases.

Artículos / Modelo

TS30 (PLC)

Tasa de derramamiento

Promedio de 30 kg / hora

Capacidad de alimentación

Promedio de 60 kg por alimentación

Modo de control

PLC (quemador controlador de razonamiento programable)

Cámara ardiente

330L

Medidas interiores

Los 75x75x60cm

Cámara alta

180L

Cámara de filtro de humo

Configuración de alimentación

Alimentación manual

Voltaje

220 V

Energía

0,5 kilovatios

Consumo de aceite (kg / hora)

Promedio 13.3

Uso de gas (NG, m3n / hora)

Típico 16

Uso de gas (GLP, m3n / hora)

Ordinario 11,7

Pantalla de temperatura

Cuatro Presente Digital

Protección de temperatura

Tanque de almacenamiento de aceite

200L

Puerta de alimentación

Los 55x50cm

Pozo de humo

5 metros

Tipo de humo

Acero inoxidable

1er. Nivel de temperatura de la cámara

800 ℃ –– 1000 ℃

2do. Nivel de temperatura de la cámara

1000 ℃ -1200 ℃

Tiempo de residencia

2,0 seg.

Peso bruto

3000 kg

Dimensiones exteriores

El 175x120x140cm


HICLOVER – Medical Environmental, WWW.HICLOVER.COM, Incineradores de residuos,
Incinerador de desechos médicos , cremación de animales domésticos, desechos sólidos   Incineradores

Solución HICLOVER para combatir COVID-19, incinerador de desechos médicos (incinerador móvil en contenedores)
Tel: + 86-25-8461 0201
Móvil: + 86-13813931455 (whatsapp / wechat)
Sitio web: www.hiclover.com
Correo electrónico: [correo electrónico protegido]
Correo electrónico: [correo electrónico protegido]
Tecnología médica Co., Ltd. del trébol de Nanjing



2020-07-06

PLC Control Incinerator



Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, animal cremators prices, animal crematory, animal crematory for sale, animal crematory/incinerator, animal diesal cremator, animal equipment china, animal equipment manufacturer china, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

Pequeños incineradores para los dispositivos de desechos sólidos en el patio de monitoreo de desechos

La incineración es la solución más notable para la devastación total de los residuos metropolitanos, evitando todos los riesgos directos e indirectos relacionados con otros métodos de eliminación.

La incineración encaja perfectamente con la moda de tratar los residuos de forma segura y, si es posible, exactamente en la misma zona donde se produjeron para evitar el riesgo de contaminación cruzada y también para mantener los gastos de tratamiento de residuos a un nivel aceptable.

HICLOVER actualmente utiliza una gama completa de sistemas de incineración en contenedores, lo que nos coloca a la vanguardia del transporte actual y también de los patrones industriales. La contenedorización hace posible un rápido monitoreo de desechos, ya que las unidades están preinstaladas y también premontadas. incineración de residuos, incineradores móviles, incineradores de residuos, incineradores de aves, quemador portátil

La contenedorización es la opción más viable y también viable a diferencia de la construcción y construcción de instalaciones en el sitio y estructuras inmobiliarias, eliminando la mano de obra y los gastos que conlleva. El sistema tiene el beneficio adicional de una silla de ruedas total (tanto global como de vecindario), y es excelente para el ejército y también para lugares remotos, así como para campamentos civiles donde las instalaciones son limitadas.