Archive: July 26, 2024

Supply of Inclinators for Interim Arrival Domestic Terminal Project



CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as Annexure
Design, Manufacture, Supply, delivery to site, installation, testing & commission of All weather proof Passenger Inclinators in accordance to the Scope and outline specifications mentioned in Annexure
Spesifikasi Incinerator 100kg/jam

Spesifikasi dan Daftar Material

Dimensi dan Power Capacity

Nama Barang                                : INCINERATOR
Type / Model                 : PWR-INC-KMN 10
Kapasitas                                 : 100kg/Jam (1 m3)
Length                               : 288 cm  
Width                                : 147 cm  
Height                                    : 163 cm  
Height of Chimney std            : 700 cm  
TOTAL WEIGHT                   : 8000 kg 
Panel – timer                 : Digital Included Auto Alarm
Finishing                            : Hot endured paint 
Fuel tank                           : 200 Liter 
Covering Element from steel   : 3-8mm 
Banyaknya Burner                   : 2 pcs  
Banyaknya Blower               : 2 pcs 
Max. Fuel consumption           : 15-30 Liter/Jam 
Max. Elektric consumption   : 1100 Watt  
Bahan bakar               : Kerosene / Diesel (solar)  
Voltage                              : 220 V / 1 phase / 50 Hz  

Material 

1. PANEL CONTROL

Type                       : Digital 
Buatan                    : Local KAMINE ( Panel dan Incinerator satu Merek)
Voltage                   : 220 V / 1 phase / 50 Hz  
Safety operator       : Emergency Stop 
System                    : Microkontroller 
Pengoperasian         : Semi Automatic
Temperatur control  : Digital Coupler Type
Control panel : Manual dan automatic
Tipe : Self Standing Type / Wall Mounted Type
Material  : Mild steel
Thermocontrol : 2 (Dua)  1200 ºC
Set of timer : 0- 2 jam
Tombol saklar : on/off

2. CONTRUCTIONS
    
Fire Brick                  : SK 34
Castable                          : R 16
Castable                    : R 14
Isolator                   : Insulating Brick serat tahan panas Keramik 1.450 ⁰ C
Element from steel     : 3-8 mm
Finishing                     : Cat Fetalit coating, Epoxy Resin (hot-endured paint)
Total berat keseluruhan     : 8.000 kg
Ketebalan Dinding Dalam : 21 Cm

3.DIMENSION OF CHAMBER (Dimensi Ruang Bakar)

Chamber 1 Ruang Bakar Utama : 100 x 100 x 98 cm = 980.000 cm3 = 0.98 m3
Chamber 2  Ruang Bakar Kedua: 40 x 100 x 98 cm = 392.000 cm3= 0.39 m3

4. EXHAUST STACK (Chimney)
         –     Diameter (inch): Ø 10″, 8″
-Panjang: 700 cm (7 m) dari permukaan tanah 
-Cerobong pertama dengan system Cor tipe MWHT
-Material Mild steel ( Baja Hitam )

5. INSTRUMENTATION & KONTROL
                      1. Suhu Control: Optimal
                           – Model: Digital
                           – Jumlah (unit): 2 (dua) unit
                           – Kontrol Mode: On-Off
                      2. Power Supply (volt / fase / herts): 15A / 220 V / 1 Phase / 50 Hz
                      3. Panel kandang: Mild Steel + powder coating
                      4. Thermocouple: K
                           – Jumlah: 2 (dua) unit
                           – Bahan: Stainless Steel + Ceramic
                      5. Timer: 0-2 Jam
                      6. De-ashing: Manual
          7. System pembuangan Abu 2 unit 
6. PINTU 
Pintu    : Baja ringan dan Linning dengan castable 
System : Double lock system ( penguncian ganda )

7. AIR SUPPLY SYSTEM 
Model / Type: fan sentrifugal 3 “
Kapasitas (m3/minute): 3.000 m3/mnt
Statis Tekanan (mmAq): 98 mmAq
Power : 200 watt/unit
Jumlah (unit): 2 (dua)

8. FUEL SYSTEM
 Pembakaran Burner:
Type: Gun type OM 2N
Bahan Bakar: Diesel Oil / Kerosene
Konsumsi Bahan Bakar: 10-18 ltr / jam
Power : 250 watt
Jumlah unit : 1 unit 

Type: Gun type OM 2N
Bahan Bakar: Diesel Oil / Kerosene
Konsumsi Bahan Bakar: 10-18 ltr / jam
Power : 250 watt
Jumlah unit : 1 unit 

9. THERMOCOPLE
Ruang bakar pertama dan kedua
Tipe : K
Protective tube : Stainless steel + ceramic
Max. temperature : 1200 ºC
Jumlah : 2 unit
Sistem pemberian umpan : Manual
Sistem pengeluaran hasil : Manual

10. TANGKI BAHAN BAKAR
Material : Mild steel
       Kapasitas : 200 liter

Horizontal Autoclave 155 Liters
Sterilizing chamber:  Steam-heated via double back wall with integrated steam generator
Door and lock:  Hinged door with quick lock and safety lock
Door seal: Blow-out design, even closure, automatic return without vacuum system
Temperature measurement technology: 2 independent sensors for controlling the steam generator + 1 sensor for sterilizing chamber
Preheating key
Security key switch saves program settings
Sterilization phase  indicators
Pressurized-air supply: integrated Compressor for door control circuit and pneumatic set valves
Feed water consumption per batch 0.7 to 5.6 liters
Cooling water consumption per batch for spent-steam condenser 10–25 l at temperatures 15 °C
Water-level control:  Within the double back wall
Low-water safety fuse: Heater Over temperature monitor
Sterile venting:  Membrane filter 0,2um, 0.1 m² hydrophobic, steam-sterillisable, retention  99.5%
Control circuits: separate for heater and door seal, process control and monitoring
Timer Program start by date and time
Selectable Acoustic alarm at program end
Transport security device for door 
Three Autoclave able (Polypropylene or stainless steel) Pans 5-10L 



30kgs medical waste incinerator Model TS30 PLC

30kgs per hour(average) medical waste incinerator, design dual 
combustion chambers(primary chamber and secondary chamber), 
smoke filter chamber, PLC auto. control system, 0.33m3(330liters)
primary combustion chamber, italy oil or gas fuel burner. for small 
hospital medical waste treatment.
Buy waste incinerator, find hiclover

Items/Model

TS30 PLC

Principle

Waste Incineration

Burn Rate

Average 30kgs/hour

Fuel Type

Diesel Oil/Natural Gas

Control Mode

Programmable Logic Controller(PLC) Panel

Primary Combustion Chamber

0.33 m3

Internal Dimensions(Primary)

750x750x600 mm

Secondary Combustion Chamber

0.18 m3

Internal Dimensions(Secondary)

400 x 750 x 600 mm

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

0.5Kw

Oil Consumption

10.2―20.0 kgs/hour

Gas Consumption

9.8―20.0 m3/hour

Temperature Monitor

Digital Display

Temperature Protection

PLC Control

Time Setting

PLC Control, 0-120 Minutes

Oil Tank

100 Liters

Waste Feed Door

550x500mm

Chimney

5.0 Meter

Chimney Type

Stainless Steel

Primary Chamber Temperature

800–1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

3000kgs

External Dimensions

1750x1200x1400 mm


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator
Medical Environmental 

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

clinical incinerators


● Able to drop 25-30kg per hour
● Contain 2 chambers to ensure significant decline in exhaust
● Be capable of temperature degree in series of 800c to 1000c
● Low upkeep style
● Has to be Fuel
● Required greater than 15amp 220- 250V power
● kW Intake power use to be specified
● Onboard or built-in gas storage room tank & & & & ought to use no above 12L of die el per hr to drop 25-30kg of waste
● Solid waste reduction in range of 90-97% (should certainly be frequently acquired).
· General wastes developed every day include paper, plastic, all-natural items, boxes, plastic containers, leaves, etc;

· Total waste produced every day: 10-12 tonnes;

· Hrs of Operation: 10 hrs a day;

· Gas need: Diesel or waste oil selected yet LP gas will certainly be thought about;.
Gas choices Oil.
Gas usage (diesel) 10 litre/hour.
Common Capability 900kg.
Diamention: Size (mm).
Dimension (mm).
Elevation Excl. Flue (mm).
Door Opening (mm) 2570.
1120.
1340.
1000 × 1670.
Inside Chamber Dimen:.
Dimension (mm).
Dimension (mm).
Altitude Incl Flue (mm).
2200.
790.
790.
Operation:.
Minutes. Procedure Temprature.
Max. Treatment Temprature.
Home Time in Second Chamber.
Temprature Monitoring.
950.
1320

2 sec.
NATURALLY.
Secret Attributes.
– – Vehicle ignition. – Automatic control and temprature.
– – Upto 250 kg per human resources.
– – Thick refratory lining ranked to 1600 deg C in main chamber retain warmth, increase efficiency.
– – Warm immune 5 mm steel.
– – Stainless-steel pile.
-12 cm of refractory mobile lining- steel enhanced.
-12 month or 1000 hrs waranty.
– – Cozy recuperation system.
– – Wide door for ash removal.
– – Massive leading opening lid for easy filling


HICLOVER Medical Facility Сжигатель медицинских отходов на складе для 2019-nCoV SARS-CoV, sars, коронавирус, новый коронавирус

Модель Емкость / скорость сжигания Для больничной койки № Тип топлива Кол-во Готов к отправке Новое производство Объем доставки Вес с упаковкой Адрес доставки
TS30 в среднем 30 кг в час В среднем 150 больничных коек Дизельное топливо 1 комплект 5 дней 20 комплектов / 2 недели 5 м3 3000 кг Шанхайский порт
TS50 в среднем 50 кг в час В среднем 250 больничных коек Дизельное топливо 1 комплект 7 дней 20 комплектов / 2 недели 7м3 4500 кг Шанхайский порт
TS100 в среднем 100 кг в час В среднем 500 больничных коек Дизельное топливо 1 комплект 7 дней 15 комплектов / 2 недели 10м3 6000 кг Шанхайский порт
TS150 в среднем 150 кг в час В среднем 750 больничных коек Дизельное топливо 5 комплектов 7 дней 15 комплектов / 2 недели 13м3 7500 кг Шанхайский порт
10 ярдов в среднем 10 кг в час В среднем 50 больничных коек Дизельное топливо 2 комплекта 7 дней 20 комплектов / 2 недели 3м3 1200 кг Шанхайский порт
YD20C в среднем 20 кг в час В среднем 100 больничных коек Дизельное топливо 2 комплекта 7 дней 20 комплектов / 2 недели 6м3 2000 кг Шанхайский порт
YD50C в среднем 50 кг в час В среднем 250 больничных коек Дизельное топливо 2 комплекта 7 дней 20 комплектов / 2 недели 7м3 2300 кг Шанхайский порт
30 ярдов в среднем 30 кг в час В среднем 150 больничных коек Дизельное топливо 1 комплект 5 дней 20 комплектов / 2 недели 5м3 2300 кг Шанхайский порт
YD30 Малый в среднем 30 кг в час В среднем 150 больничных коек Дизельное топливо 2 комплекта 5 дней 20 комплектов / 2 недели 3м3 1500 кг Шанхайский порт
50 ярдов в среднем 50 кг в час В среднем 250 больничных коек Дизельное топливо 2 комплекта 5 дней 20 комплектов / 2 недели 8м3 4500 кг Шанхайский порт
100 ярдов в среднем 100 кг в час В среднем 500 больничных коек Дизельное топливо 1 комплект 10 дней 15 комплектов / 2 недели 13м3 6000 кг Шанхайский порт
150 ярдов в среднем 150 кг в час В среднем 750 больничных коек Дизельное топливо 1 комплект 10 дней 15 комплектов / 2 недели 17м3 7500 кг Шанхайский порт
300 ярдов в среднем 300 кг в час В среднем 1500 больничных коек Дизельное топливо 10 комплектов / 2 недели 20м3 9000 кг Шанхайский порт
500 ярдов в среднем 500 кг в час В среднем 2500 койко-мест Дизельное топливо 5 комплектов / 2 недели 27м3 13000 кг Шанхайский порт
CA 50 Mobile в контейнерах в среднем 50 кг в час В среднем 250 больничных коек Дизельное топливо 2 комплекта 15 дней 10 комплектов / 2 недели 28м3 7000 кг Шанхайский порт


HICLOVER – Медицинское окружение  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

2020-04-03

INCINERATOR TESTING AND COMMISSIONING

A flue chimney, 15,000mm long and 560mm diameter shall be constructed from steel sheet, complete with lagging, damper and rain water protection cone.  The chimney shall be lined with castable grade diatomaceous concrete mixed with high alumina cement in accordance with BS 4076: 1989.

The damper will control the closing of the door to not less than 85%.  The stack is to allow fresh air at the stock’s base so that the flue gases are discharged at not move then 4000 C and that the discharge conforms to the British Clean Air Act, the National Environment Management Agency (NEMA) Act or other relevant acts. .

1.1.4    POWER SUPPLY

The sub-contractor shall supply equipment which are suitable for running on a 415V, 3 phase, 50HZ or 240V, single phase, 50HZ electric power supply.

1.1.5   OIL STORAGE AND SUPPLY

The system shall consist of a bulk oil storage tank, daily tank, transfer hand fuel pump and associated pipe work.  Oil from the bulk storage tank will be delivered to a high level daily tank situated in the incinerator room by use of a transfer hand pump and automatic electric pump.

1.1.6    SPARES AND MANUALS

The tenderer is to submit with his tender a list of recommended initial stock of spares together with their prices.  A part from the burner spares mentioned here below, the spares prices are not to be included in the main summary of prices schedule but is to be separate and are meant to be ordered later if and when it becomes necessary and convenient to the client.  The burner spares whose prices are to be included in the main summary of prices schedule (BQ) are:-

i)     1No. Set of safety controls
ii)    1No. Solenoid valve
iii)    1No. Oil ignition system
iv)    2No. Photo-electric cells

Two sets of operating and maintenance manuals (both for the incinerator and burners) must also be supplied. This include two sets of control schematic diagrams for all the controls and wiring.

1.1.7   BULK OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and complying with BS 799 part 5: 1975 shall be positioned on three concrete cradles.

The works shall include supply, delivery, assembling, erection, testing, commissioning and setting to work.  The tank is to be of welded mild steel type with a design pressure of  40KN/m2 and storage temperature of 240  C.  It is to be located adjacent to the incinerator and boiler house.

The tank shall be cylindrical with dished end and be constructed of 6mm thick block mild steel plates in accordance with BS 1966.  Number one quality galvanised materials shall not be used.Welded construction parts shall be sprayed.

E-4

The tank shall be pressure tested with a total head of water or equivalent, measured from the base of the tank, and equal to 1½ times the sum of:

(i)     The height of the tank and
(ii)    The design head above the top of the tank that is 3.5m of water.

The pressure shall be raised slowly and steadily until the specified test pressure is reached and that pressure shall be maintained for a period long enough to permit a thorough examination to be made to ensure that the tank is sound enough and shows no leaks or undue distortion.  Welded joints shall be radiographed and a certificate issued.  Should any defects be found, they shall be made good and the test procedure repeated until the tank is certified to be sound.  The tests shall be carried out in the presence of the Engineer and subsequently, the sub-contractor will provide the Engineer with the test certificate.

The tank shall then be cleaned externally and provided with rust inhibiting primer before applying 2No. coats of bituminous paint.  The inside shall also be cleaned and purged of any foreign matter before setting to work.

Ladders and platforms shall be thoroughly cleaned and freed from rust and scale and painted with a priming coat of approved paint.

The tank shall be provided with the following:-

(i)    450mm bolted inspection covers with liquid and vapour tight joint made with a gasket of fuel resistant materials.
(ii)    75mm (3”) vent socket screwed B-SP and pipe at the higher end of the tank with an unloading device to prevent the rise in tank pressure above the design pressure.  The vent pipe shall be free from bends and shall have a continuous rise while being as short as convenient.  It shall terminate in open air in a position where it cannot be tampered with.  The open end shall be turned down and fitted with an open mesh wire cage.
(iii)    65mm diameter filling pipe with hose coupling connection
(iv)    50mm diameter gauging connection with lockable cap.
(v)     50mm diameter supply pipe
(vi)     25mm diameter water drain-off value

The tenderer shall supply hydrostatic oil contents gauge (level indicator) or a
properly calibrated stick (of dip tape) and access ladder to the top of the tank.

The filling pipe shall be extended inside the tank to within 150mm of tank bottom,
complete with anti-siphoning device.

The following information shall be permanently and clearly marked on the tank on the
centre line near the outlet connection.

•    Gross capacity in litres
•    Test pressure
•    Date of test
•    Maximum allowable working pressure
•    Manufacturer’s name of trade mark
•    Year of manufacture
•    The number of British standard and type of tank

The tank shall be installed with a 25mm fall towards the water drain-off tapping point.  The supply socket shall be extended inside the tank to prevent ingress of water in the supply line.  The main contractor shall construct tank supports and bund walls to detail drawings produced by the sub-contractor.  A valued drain off from the lowest part of the tank shall be provided complete with tail pipe and a provision for hose connection.

E-5

1.1.8    TRANSFER HAND PUMP

A semi rotary hand pump shall be provided for filling the day storage tank from the oil drum.  It shall be installed complete with all the necessary plumbing fittings and accessories.

1.1.9   DAILY SERVICE TANK

A daily storage tank of nominal capacity 1,800Litres shall be mounted at 2.5 metre high level in the incinerator room.   Tank shall be manufactured from 6mm thick pressed steel plates of 1220mm x 1220mm black mild steel sheet, complete with bolted cover and adequate venting.  The tank shall conform to BS 799 part 5 1995 and be provided with a contents sight tube. The tank shall be lagged with 50mm thick fibre glass insulation of 0.4W/m2 thermal conductivity and finished with 20SWG galvanized sheets cladding.

The tank shall be tested for any leaks of which if any is detected will be made good before the tank is painted externally with rust inhibiting paint. Tank to be securely bolted.

1.1.10  AUXILLIARY EQUIPMENT

All pipework used in the oil storage systems shall be to B.S. 1387 heavy grade.  Joints shall be screwed, and sufficient unions must be provided to allow easy dismantling the equipment.

A 25mm diameter fire valve of the quick action lever operated dead weight type shall be installed, in the oil flow line.  This shall be held in the open position by a light gauge steel cable attached to a fusible link.  The fusible link shall be mounted directly over the burner.  The warm burner oil feed pipe from the high level day tank shall be heated by an electric tracing tape properly wrapped around the pipe.  The pipe shall then be insulated with 25mm thick fibre glass insulation and finished with gauge 22swg galvanized steel sheet.

The supply pipe from the bulk oil storage tank to the high level day has been installed by others but the tenderer shall allow for connection to the high level day tank.  The tenderer shall also supply and install high capacity strainers along the supply pipe and the burner feed pipe.

1.1.11   PIPE SUPPORTS

The variety and type of supports shall be kept to a minimum and their design shall be such as to facilitate guide and secure fixing to match concrete masonry or wood.

Consideration shall be given when designing supports to the maintenance of desired pipe fall and the restraining of pipe movements to a longitudinal axial direction only.

The sub-contractor shall supply and install all steel work forming part of pipe support assemblies and shall be responsible for making good any damage to builders work associated with builders work installation.

Pipe runs shall be secured by clips connected to pipe hangers, wall brackets or trapeze type supports.  ‘U’ bolts shall not be used for clips without prior approval of the Engineer.

The sub-contractor shall submit his entire proposal for the pipe supports to the Engineer for approval before any erection work commences.

1.1.12   ELECTRICAL WORKS

All wiring between items, plant and controls shall be executed by the tenderer. The tenderer shall provide adequate supervision to ensure that electrical connections are correctly made to all items of equipment and controls supplied by him, all to the Project Manager’s / Engineer’s satisfaction.

E-6

1.1.13    INCINERATOR TESTING AND COMMISSIONING

The tenderer shall test and commission the incinerator in the presence of the Engineer.The tenderer shall also provide sufficient oil to last at least two (2) hours.  The tenderer shall test and commission the incinerator in the presence of the Engineer and verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues and manuals from the suppliers of he incinerator.The incinerator performance test shall be carried out in accordance to BS3316: part 4:1987.Should any defect be detected, it shall be rectified and the testing process repeated to the Project Manager’s satisfaction.

1.1.14    FIRE INSTRUCTION NOTICE

Proceed and procure and install as below;

Print fire instruction on the Perspex plate, 3mm thick with White Colour
Background measuring 510mm lengthx380mm width as follows;

incinerador de mascotas en venta

  • Estamos ante un incinerador simple que debería encenderse con botellas de GLP domésticas. Otras fuentes de

La ignición también se puede considerar, pero debemos mantenerlo simple.

Sección VI. Requisitos 2-86

necesarios para el mantenimiento preventivo durante cinco años y, cuando sea necesario, incluir existencias de repuestos recomendados para

mantenimiento correctivo.

  1. n) Entrenamiento
  2. i) Se requiere que el proveedor proporcione una formación adecuada en cada equipo sobre el uso y funcionamiento adecuados del

equipo. · Estilo de laboratorio compacto

  • Dos cámaras de combustión
  • Ecologicamente amigable
  • Hasta 50 kg de residuos / hora
  • Para ser utilizado para animales
  1. ii) Del mismo modo, los proveedores deben proporcionar la formación adecuada del fabricante sobre la instalación y

mantenimiento (tanto preventivo como correctivo)

  1. o) Condiciones de embalaje y almacenamiento de equipos
  2. i) El equipo y los componentes deben resistir las temperaturas y la humedad extremas que se puedan encontrar durante

almacenamiento y transporte.

  1. ii) El fabricante debe recomendar procedimientos para el almacenamiento del equipo.

portable medical waste incinerator manufacture companies in china

Capacity: 20KG/Hr, Temp Range: 600 Deg. C – 1100 Deg. C

Fuel Supply: Natural Gas/Diesel

Dual Combustion Chamber Complete Scrubbing System (Dual

Resultant Gas Washer), Dual Blower, Chimney Height: 8m

Electric Supply: 220/240Volt, Single Phase

1.    Type of waste: Trash
2.    Any other type:
3.    Quantity of waste generated per day in kg: (50 Ton per day) SOW
4.    Duration – incinerator will be used per day: (Minimum 12 hours) SOW
5.    Approximate moisture content:
6.    Local incinerator operating and emission standards: US-EPA
7.    What is the height of the chimney required: Not known
8.    Fuel proposed to be used: Deiseal Oil
9.    Availability of power and type: 220 or 110
10.    Details of space available: Plenty of space
11.    Do you require an automatic loading system: [**] Yes  [**] No
12.    Do you require a gas scrubbing system: [**] Yes  [ ] No
13.    How soon do you require the system to be delivered: 30
14.    Any other specific requirements:
15.    Nature: (Solid/Semi-solid/Liquid)

Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door

Waste Incinerator Door: Side/Front Opening Door VS. Top Opening Door

Items

Side Loading Door

Top Loading Door

Reference

Cost

Cheap

High cost

Manufacture Tech.

Easy

A litter difficult

Safty

safe

safer

Incinerator Shape

L/ I

L

Loading

manual

big door can be by Forklift

Land occupation

small

big

Ash door

same with feeding door or alone

alone

market share

Most-CHINA/USA/INDIA

Few- UK/USA

Dooring open type

Manual

Pry bar/Hydraulic pressure

Dooring Open size

small

big

Better for

medical bag waste

animal waste

open when burning

safer, can feed waste, few smoke

not safe, cannot feed waste, most smoke


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

Инсинератор для медицинских отходов 100 кг Design TS100

производитель инсинераторов, медицинских инсинераторов, малых инсинераторов, мазутных инсинераторов

Предметы / Модель

TS100

Цена сарая

Обычные 100 кг / час

Емкость подачи

В среднем 200 кг / корм

Режим управления

ПЛК

Камера сгорания

1200L

Внутренние измерения

120x100x100 см

Вторичная камера

600 л

Камера дымового фильтра

да

Режим подачи

Руководство по эксплуатации

Напряжение

220В

Мощность

0,7 кВт

Потребление масла (кг / час)

14–28

Забор газа (м3 / час)

10– 32,2

Монитор уровня температуры

да

Температурный уровень защиты

да

Емкость для масла

200л

Дверца подачи

80×60 см

Дымовой вал

10 метров

Вид дымового вала

Нержавеющая сталь

1-й. Температура камеры

800 ℃ – -1000 ℃

второй. Температура камеры

1000 ℃ -1200 ℃

Время проживания

2.0 сек.

Вес брутто

6000кг

Внешние измерения

260x150x180 см



HICLOVER – Медицинское окружение  

Установки для сжигания отходов
Установка для сжигания медицинских отходов
Кремация домашних животных
Твердые отходы   Мусоросжигатель

Телефон: + 86-25-8461 0201
Мобильный: + 86-13813931455 (WhatsApp / WeChat)
Сайт: www.hiclover.com
Электронная почта: [электронная почта защищена]
Электронная почта: [электронная почта защищена]
Наньцзин Клевер Медицинские Технологии Лтд.

2020-04-06