Archive: January 12, 2024

LOCAL STRONG WASTE INCINERATORS

a certain type to utilize at a crematorium. Something that allows particularly for ash collection etc.cremation option to the deceased’s family members. Is this item ideal, are ashes easily collected and so on a cremator, for pet facility, can you introduce and also all detail of sales, tax obligation, environtment.-Plastic. 500Kg/hr and to be utilized optimal 6 times, is this implies it will give only 3 tons per day? Keeping in mind that job documents requires 10 tons/day
Plastic container-.
– Rags & & oiled.
Glass containers as well as aluminum-.
– Oils.
Fat-.
Filter, tires, belts.
– Chemicals, paint.
Household waste-.
Municipal incinerators with a 10-metric ton/24-hour capacity, full with Heaps, control board and also all accessories, complying with 01015 par. 5.16.1.
GREAT DEAL.
2.0

Medical incinerator with a 10 kg/hour (15 lbs/hour) ability shall be built on the site, total with Heaps, control board as well as all devices, abiding by 01015 the same level. 5.16.2.
MUNICIPAL STRONG WASTE BURNERS

Local waste incinerator amounts and capabilities will be made for 24-hour 7-day-a-week constant operation.

Incinerators shall be capable of processing both damp and also dry material and also operating on either diesel fuel, JP-8 gas,

or waste oil; see Plumbing for gas storage system needs. The complying with will be provided as a minimum:

Strengthened concrete placing foundations, feed or charging hoppers (or loaders), main combustion chambers

with ash cleanout doors, secondary combustion chambers with ash cleanout doors, cyclone air filters (or separators),

and also compelled air exhaust heaps (or chimneys).

The billing system will contain, as a minimum, a receptacle for top feeding as well as mechanically operated hydraulic

charging ram or augur. To stop warpage or extreme thermal expansion, a battery charger cooling system making use of either

air or water will be offered.

Primary combustion chamber will be either the rotary- or fixed fixed-hearth (or kiln) type incinerator. Burner

and also combustion air controls shall be fully automatic including, as a minimum, digital ignition as well as all

required interlocks and also safety tools to offer secure operation. The chamber as well as burner will be created to

keep a minimum burning temperature of at the very least 700 to 870 C (1300 to 1600 F), yet will not to go beyond 980

C (1800 F). The ash-removal system will include the automated continuous removal of the ash into an ashquench

pit where cooled down by water as well as gotten rid of by conveyor.

Additional combustion chamber shall be either the rotary- or stationary-hearth (or kiln) kind burner designed to

oxidize (or burn) the organic vapors as well as gases. Burner as well as combustion air controls shall be totally automatic

comprising of, as a minimum, electronic ignition and also all needed interlocks and safety and security gadgets to provide safe

operation. The chamber and burner will be designed to preserve a minimal combustion temperature of a minimum of

930 to 980 C (1700 to 1800 F), but will not to exceed 1150 C (2100 F). The ash-removal system shall consist of, as

a minimum, the straight guidebook removal into a completely dry

Cyclone air filters will be offered to eliminate the bigger particulates. Cyclone air separators may be provided with

powered followers to enhance the rate of the gases inside the cyclone to enhance the collection effectiveness for smaller sized

bits.

5.16.2 MEDICAL WASTE INCINERATORS

Medical waste burners will be especially designed by the supplier to dispose of all medical wastes. All devices shall be made for 8 hrs

per day of continuous procedure as well as be rated in quantity per hr (i.e. kg/hr or lbs/hr).

Burner packing or billing of medical waste will be batched-fed by hand.

Primary burning chamber shall be the stationary fixed-hearth (or kiln), multiple-chamber, retort type or bigger

ability rotary-hearth (or kiln) kind. Heater as well as burning air controls will be completely automated including, as a

minimum, digital ignition and all necessary interlocks as well as safety tools to give safe procedure. The

chamber as well as burner will be designed to maintain a minimal burning temperature of at the very least 760 to 870 C

(1400 to 1600 F). The ash-removal system shall include the automatic continual elimination of the ash right into an ashquench

pit where cooled down by water and removed by conveyor.

Second burning chamber will be a solid-walled and also -floored, horizontal, refractory-lined cyndrical tube kind

incinerator developed to oxidize (or shed) the organic vapors as well as gases. Heater and burning air controls will be

completely automatic comprising of, as a minimum, digital ignition as well as all needed interlocks and also safety and security tools to

offer risk-free operation. The chamber as well as burner will be created to preserve a minimum combustion temperature level

of a minimum of 930 to 1200 C (1700 to 2200 F) with a minimum gas house (or dwell) time of 2.0 secs. The ashremoval

system shall contain, as a minimum, the direct manual elimination right into a completely dry collection receptacle.

Cyclone air filters will be given to remove the bigger particulates. Cyclone air separators may be supplied with

powered followers to raise the speed of the gases inside the cyclone to enhance the collection efficiency for smaller

particles.

5.16.3 INCINERATOR HEAPS (OR CHIMNEYS)

Heap dimension will be in accordance with the manufacturer’s recommendations. Stacks shall be the forced-air kind and also

completely independent and also unattached to nearby structures. As a minimum, pile heights will lessen

downwash of stack discharges because of wind resistant impacts from close-by frameworks and be determined in accordance

with DoD 4715.05-G, Overseas Environmental Standard Assistance File. Heaps shall be provided with

corrosion-resistant steel climate caps.”

cheap incinerators

RECYCLABLE WASTE    PLASTIC (NON-PVC)     218,693
CARDBOARD     85,046
PAPER     4,956
PVC     15,115
HAZARDOUS WASTE    MEDICAL WASTE     1,084
SOLID WASTE CONTAMINATED WITH HYDROCARBONS     300,680
USED ENGINE OIL FILTERS     85,423
HYDROCARBON-CONTAMINATED SOILS     88,680
ORDINARY WASTE    FIBERS     14,078
USED AIR FILTERS (AUTOMOTIVE AND SIMILAR)     23,149
PERSONAL PROTECTIVE EQUIPMENT (PPE), INCLUDING CONTAMINATED CLOTHING AND SIMILAR DEBRIS     130,861
Pig corpses / stray dogs and larger animal carcasses cheap incinerators –
Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour

Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export.

Note: Similar Technology and / or Tenderers Proposals are welcome.

Within the framework of an environmental equipment & technology consultation and joint purchasing, this Procurement / Notary Bureau invites applicants for pre-qualification in the aim of primarily selecting capable companies to bid for the above tender.
The supply will comprise the special equipment for effective waste management as mentioned above for a new private environment contract management company with planned operations 2013 in Indonesia and Thailand, and 2015 in West & East Malaysia to carry out those professional services in order to comply with the governments safety disposal requirements for animal waste in the region and to meet the higher technical standard in this particular field in order to protect the public and contain contagious & infectious viruses and animal caused diseases. The spread of a new disease of pigs, also the ‘Nipah Virus Disease’, first evident in 1998 in S.E.Asia, which causes illness and death in both humans and pigs, is on the rise again; as well as the sudden death of sows and boars was recorded in pig farms in Malaysia and other areas in S.E. Asia.

CRIBADO DEL QUEMADOR Y TAMBIÉN PUESTA EN MARCHA

Se construirá un conducto de humos de 15.000 mm de largo y también de 560 mm de chapa de acero, con revestimiento, amortiguador y también cono de protección contra el agua. El pozo de humo ciertamente estará revestido con hormigón de diatomeas de grado moldeable combinado con hormigón con alto contenido de alúmina de acuerdo con BS 4076: 1989.

El amortiguador definitivamente logrará el cierre de la puerta a no menos del 85%. El montón es permitir que el aire fresco en la base del suministro se asegure de que los gases de combustión se lancen al estancamiento después de 4000 C, lo que la descarga cumple con la Ley de Aire Limpio Británico, la Ley de la Agencia Nacional de Gestión de Ambientes (NEMA) o varias otras leyes importantes.

1.1.4 FUENTE DE ALIMENTACIÓN

El subcontratista ciertamente proporcionará herramientas apropiadas para operar una fuente de energía eléctrica de 415V, 3 etapas, 50HZ o 240V, fase solitaria, 50HZ.

1.1.5 ALMACENAMIENTO DE ACEITE Y TAMBIÉN SUMINISTRO ANUAL

El sistema incluirá un tanque de almacenamiento masivo de petróleo, un tanque de almacenamiento diario, una bomba de gas manual y una tarea de tubería adicionalmente vinculada. El aceite del tanque de masa se suministrará a un tanque de almacenamiento diario de alto nivel ubicado en el área del calentador mediante el uso de una bomba manual de transferencia y una bomba eléctrica automática.

1.1.6 GUÍA DE GUÍA GUARDADA Y TAMBIÉN GUSTA

El licitador debe presentar junto con su oferta una lista del suministro inicial sugerido de repuestos junto con sus precios. Una parte de los repuestos de calentador que se explican a continuación, las tarifas de repuestos no se deben incluir, por lo general, la rutina de recapitulación de precios debe ser separada y se muestra para ser ordenada más adelante si así como también cuando termina siendo necesaria además de práctico para el cliente. Las conservas del sistema de calefacción cuyos precios se van a contener en general resumen de plan de gastos (BQ) son: –

i) 1No. Desarrollo de controles de seguridad y protección.
ii) 1No. Válvula de solenoide
iii) 1No. Sistema de encendido de aceite
iv) 2No. Células fotoeléctricas

Además, es necesario proporcionar 2 colecciones de manuales de funcionamiento y mantenimiento (tanto para el incinerador como para los calentadores). Esto incluye 2 colecciones de representaciones esquemáticas de control para todos los controles y también circuitos.

1.1.7 TANQUE DE ALMACENAMIENTO MASIVO DE ACEITE

El tanque de almacenamiento de aceite a granel con capacidad nominal de 10.200 litros y adicionalmente cumpliendo con BS 799 elemento 5: 1975 se colocará sobre 3 cunas de hormigón.

Las obras consistirán en el suministro, distribución, montaje, montaje, pruebas, puesta en marcha y preparación para su funcionamiento. El contenedor debe ser de acero ligero encuadernado con un formato de ansiedad de 40KN / m2 así como una temperatura del espacio de almacenamiento de 240 C. Se ubicará al lado del quemador así como de la caldera de calefacción central de la vivienda.

El contenedor debe ser redondo con un extremo abombado y estar hecho de placas de acero modestas de bloque de 6 mm de espesor de acuerdo con BS 1966. No se utilizarán materiales galvanizados de primera calidad. Los componentes soldados del edificio deben rociarse.

E-4

Ciertamente, el tanque será examinado a presión con una carga de agua general o equivalente, evaluado desde la base del contenedor, y también será igual a 1 1/2 veces la cantidad de:

(i) La elevación del contenedor e igualmente

La tensión se elevará lenta y constantemente hasta que se alcance la tensión de examen definida, a la cual se mantendrá la presión durante un período de tiempo adecuado para permitir que se realice un examen completo para asegurarse de que el tanque es lo suficientemente audible y revelador. sin fugas ni distorsión excesiva.

Después de eso, el contenedor de almacenamiento se limpiará en el área de la superficie y también se le proporcionará una guía para prevenir la oxidación antes de utilizar 2No.

El tanque de almacenamiento se suministrará con lo siguiente: –

(i) Cubiertas de examen atornilladas de 450 mm con junta limitada por líquido y vapor fabricadas con una junta de materiales inmunes a los gases.
(ii) Toma de ventilación de 75 mm (3 ″ ″) atornillada B-SP, así como tubería en el extremo superior del tanque de almacenamiento con un dispositivo de descarga para evitar el aumento en el estrés del tanque de espacio de almacenamiento sobre el estrés y la ansiedad del estilo. La tubería de ventilación de aire debe estar vacía de curvas y también tendrá un aumento continuo y, al mismo tiempo, será tan rápida como sin problemas.
(iii) Tubo de llenado de 65 mm de tamaño con enlace de combinación de tubo
(iv) Conexión de evaluación de dimensión de 50 mm con tapa bloqueable.
(v) Tubo de suministro de 50 mm
(vi) Drenaje de agua de tamaño de 25 mm

El licitador sin duda proporcionará un indicador de materiales de aceite hidrostático (indicación de nivel) o a.
palo correctamente ajustado (de cinta de inmersión) y llegar a la escalera hasta la parte superior del tanque de almacenamiento.

La tubería de empaque se expandirá dentro del contenedor a 150 mm de la base del tanque de almacenamiento.
completo con dispositivo anti-sifón.

Los siguientes detalles deberán estar completa y adicionalmente simplemente marcados en el contenedor en el.
línea central cerca del enlace de la toma de corriente.

– – Capacidad bruta en litros.
– – Examen de ansiedad.
– – Día del examen. – Estrés laboral óptimo permitido.
– – Nombre del fabricante de la marca de ocupación.
– – Año de fabricación.
– – La selección de necesidades británicas, así como también el tipo de tanque de almacenamiento.

El contenedor se montará con una pérdida de 25 mm en la dirección del factor de contacto de drenaje de agua. La salida de suministro se incrementará dentro del contenedor para evitar el acceso al agua en la línea de suministro. El principal proveedor de servicios sin duda desarrollará ayudas para contenedores y también agrupará las superficies de las paredes con ilustraciones de información generadas por el subcontratista. Se proporcionará un valioso drenaje de uno de los componentes más rentables del contenedor completo con tubo de escape y también una especificación para el enlace de tubería.

E-5

1.1.8 BOMBA DE TRANSFERENCIA DE MANO

Se ofrecerá una bomba manual semi-rotativa para llenar el tanque de almacenamiento diario desde el tambor de aceite. Se configurará completo con todas las instalaciones y dispositivos de tuberías necesarios.

1.1.9 CONTENEDOR DE SERVICIO DIARIO

Un tanque de almacenamiento diario con una capacidad mínima de 1.800 litros se colocará a un nivel de 2,5 metros de altura en la sala de calefacción. El tanque de almacenamiento estará hecho de placas de acero empujadas de 6 mm de espesor de chapa de acero negro claro de 1220 mm x 1220 mm, completo con tapa atornillada y ventilación igualmente adecuada. El tanque de almacenamiento sin duda satisfará la norma BS 799 parte 5 de 1995, además de ofrecerse con un tubo de reloj de materiales. El contenedor estará revestido con un aislamiento de fibra de vidrio de 50 mm de espesor de conductividad térmica de 0,4 W / m2, así como también con un revestimiento de chapa galvanizada 20SWG.

El contenedor será analizado para detectar cualquier tipo de fugas, de las cuales, si se determina algún tipo de fuga, se mejorará antes de pintar el tanque en la superficie con pintura anticorrosiva. Tanque de almacenamiento para atornillar de forma segura.

1.1.10 HERRAMIENTAS AUXILIARES

Todas las tuberías que se utilicen en los sistemas de espacio de almacenamiento de petróleo serán de grado pesado BS 1387. Las juntas se atornillarán, así como se ofrecerán las uniones adecuadas para permitir el desmontaje básico del equipo.

Se instalará un cierre contra incendios de 25 mm de la barra de actividad rápida con peso muerto, en la línea de circulación de la sangre de aceite. Sin duda, esto se mantendrá en la oportunidad de trabajo mediante un cable de acero de escala liviana vinculado a un enlace web fusible. El enlace fusible se colocará directamente sobre el calentador. La tubería de alimentación de aceite del calentador relajante desde el contenedor de día de alto grado se calentará con una cinta de mapeo eléctrico efectivamente enrollada alrededor de la tubería. Luego, la tubería se protegerá con un aislamiento de fibra de vidrio de 25 mm de espesor y se completará con una hoja de acero galvanizado escala 22swg.

La tubería de suministro desde el tanque de aceite masivo hasta el día de alto nivel ha sido instalada por otros, sin embargo, el licitador permitirá el enlace web al contenedor de día de alto nivel. El licitador también suministrará y colocará filtros de alta capacidad a lo largo de la tubería de suministro y la tubería de alimentación del calentador.

1.1.11 SOPORTES DE TUBERÍA

La variedad y el tipo de ayudas se mantendrán al mínimo y también su estilo será tal como para publicitar la revisión y la gestión segura para combinar con piedra de hormigón o madera. Al desarrollar ayudas para el mantenimiento de la pérdida de tubería preferida, así como la restricción de los movimientos de la tubería solo en direcciones axiales longitudinales, pendtag

Se utilizará la consideración.

El subcontratista proporcionará y preparará todo el trabajo de acero, lo que forma parte de la configuración de asistencia de la tubería, y también se encargará de solucionar cualquier tipo de problema para los proveedores de servicios relacionados con la instalación de la función de los contratistas.

Los tramos de tubería ciertamente estarán asegurados por clips conectados a colgadores de tubería, aparatos dentales de superficie de pared o soportes de tipo trapecio. Los tornillos en “U” ciertamente no se utilizarán para clips sin la autorización previa del Diseñador.

El subcontratista enviará su propuesta completa para los soportes de la tubería al Ingeniero para su autorización antes de que comience cualquier tipo de trabajo de montaje.

1.1.12 OBRAS ELÉCTRICAS

Todos los circuitos intermedios, la planta y los controles serán aplicados por el licitador. El licitador deberá proporcionar orientación suficiente para asegurarse de que los enlaces eléctricos estén correctamente conectados a todos los productos de herramientas, así como a los controles proporcionados por él, todo a satisfacción del Jefe de obra / Diseñador.

E-6

1.1.13 PANTALLA DEL QUEMADOR ADEMÁS DE LA PUESTA EN MARCHA

El licitador comprobará y también nombrará el quemador en la existencia del ingeniero. El licitador también ofrecerá aceite adecuado para un mínimo de 2 (2) horas. El licitador deberá encargar el quemador, así como comprobar la existencia del Diseñador y, además, validar que el quemador funcione de acuerdo con las especificaciones establecidas aquí, así como en los folletos junto con las guías de los proveedores del incinerador. El examen de eficiencia se realizará de conformidad con BS3316: componente 4: 1987. Si es necesario identificar cualquier tipo de problema, sin duda se corregirá y el procedimiento de prueba se duplicará a satisfacción del supervisor de trabajo.

1.1.14 ALERTA DE INSTRUCCIONES DE INCENDIO

Continuar y adquirir y colocar también como se indica a continuación;

Imprima las instrucciones de fuego en la placa Perspex, color blanco de 3 mm de cierre.
Fondo que determina la dimensión de 510 mm de longitud x 380 mm de la siguiente manera;

1.1.5 ALMACENAMIENTO Y SUMINISTRO DE ACEITE

incinerator plant specification

1) Power Supply:
( a) Keys Supply:
( i) Solitary Phase supply; 220– 240V, 50Hz
( ii) Three Stage supply; 380– 415V, 50Hz
( iii) The power supply electrical outlet (sockets) for single phase supply system in the hospital is three pins and also complies with BS1363.

(b) Change:
( i) Mains change is an usual issue, the efficiency needs to be influenced by this problem a tolerance of ± 15% or more in both the nominal voltage ought to be permitted.
( ii) Keys Cut-off (black out) is a typical issue. Where necessary, Uninterrupted Power Supply (UPS) System must be included to avoid damages of equipment as an outcome of abrupt disturbance in power supply.
( iii) There are spikes not necessarily from the keys supply however results when certain plants or devices started.
( iv) Vendors must consequently verify to make sure that their power supply systems will not be affected by the above conditions.

2) Supply Of Water
a) Top quality: the mains supply is tough water. The vendor needs to check/modify their equipment with filters or descalers where required.
b) Stress: this varies and associated with frequent cut off. Where required, the provider ought to include boosters or pumps to conquer this issue.
c) Where required, distributors should consist of water distillers

2-83 Area VI. Demands

3) Temperature level: ambient temperature arrays in between 21– 450 C or even more in poorly ventilated areas. The hottest month of the year is March. Environmental temperature level can be such that inferior rubber and also plastic products can conveniently melt or warped. Prospective buyers must make certain all products will have the ability to endure such temperatures

4) Humidity: moisture is normally high concerning 65– 90%. Electronic devices must be secured to prevent the effect of condensation.

5) Dirt: this is a major issue specifically throughout the dry period. Dust enter equipment and clogs up filters. Extra security needs to be supplied where essential as well as where suitable extra filters provided to last not much less than 5 years constant use.

6) Vermin: these are also offered as well as sometimes participate in equipment to chew cable televisions as well as pee on boards to create short circuit. This can be stopped by offering vermin guard where needed to avoid entrance of such devastating animals.
7) The proposed tools has to adapt the present appropriate international criterion such as ISO; CE; IEC, ANSI and/or BS

8) Language:
a) All tags as well as markings on the tools need to be in English language. b) All software application programs in the suggested devices should remain in English
language
c) All manuals have to be in English language.

9) Each of the devices supplied need to be provided with customer and also technical handbooks. Guidelines on their usage, storage space and also solution must be clearly indicated in the manuals and also where necessary, on the devices.

10) Where appropriate the following will apply:
a) Electrical Safety
i) The device needs to be given with a line (power) cord of acceptable toughness, quality, length, and ampacity and also needs to be protected with appropriate stress reliefs.
ii) The device should include, or the bidder or distributor must offer, power plugs that are sufficient for the maximum voltage and also current of the unit.
iii) The framework needs to be based and grounding resistance needs to not go beyond 0.15 ohm.
iv) If the system is dual protected, it ought to be so labeled.
v) Electrical leakage current from the framework of the device must not exceed
500µA per IEC 601-1 b) Effects of Fluids

Area VI. Needs 2-84

i) Individual and also operator safety and security as well as system performance need to not be detrimentally impacted by fluid spills.
ii) If the unit is impacted, it needs to fall short safely.

c) Overcurrent Security
i) Loss of power to various other devices on the exact same branch circuit due to internal equipment mistakes need to be prevented by using integrates or breaker that are plainly labeled as well as easy to replace or reset.
ii) If merges are made use of, a spare fuse must be provided in an identified holder located alongside the primary fuse holder. Long-term markings near each fuse holder should indicate fuse scores.

d) Line Voltage Variation
i) The device must operate satisfactorily at line voltages from -12.5% to +8%.
of the small line voltage of 220Volts.
ii) The system must not be harmed by voltages from -21% to +12.5% of the small line voltage of 220Volts.

e) Electromagnetic Disturbance (EMI).
i) The device’s performance must not be influenced by EMI emitted or conducted with the high-voltage line from one more tool.
ii) If the system is impacted, it should fail securely.

f) Alarms.
i) The unit needs to have visual or audible alarm systems to advise drivers of any kind of system fault that may trigger harmful or erroneous results.
ii) Audible and/or aesthetic indications ought to trigger when the screen reading gets to and stays at the alarm system restriction.
iii) All alarms must be totally explained in the driver’s handbook.

g) Audible Alarms.
i) Audible alarms need to be distinct as well as easily identified.
ii) Distinct alarm systems must be enabled when the unit is activated (i.e., the default volume need to not be set to OFF) as well as should be clearly audible at any kind of quantity setting.
iii) If the alarm system quantity is flexible, it should not be possible to turn the volume down so reduced that it is not most likely to be heard.
iv) Although an audible-alarm silence is acceptable, the alarm should reoccur automatically if the condition is not remedied.
v) If an alarm is silenced, a visual display ought to plainly indicate which alarm system is handicapped.

h) Visual Alarm systems.
i) Visual alarm systems ought to be simple to recognize.

2-85 Area VI. Requirements

ii) The aesthetic alarm must specify to the trouble and remain on up until the alarm system problem is fixed; it must not be possible to shut off the aesthetic alarm.

i) Building and construction Top quality.
i) The system must have no sharp edges.
ii) All external parts ought to be securely mounted.
iii) The system ought to be protected as well as provide appropriate defense versus relocating and electrically stimulated components.
iv) The system ought to be well constructed with durable products to stand up to common misuse and cleaning.
v) Switches, handles, as well as other controls must be designed for conditions of heavy usage.
vi) Wiring and also tubing ought to be nicely organized as well as packed, if ideal. vii) Mechanical, electrical, as well as pneumatic terminators, connectors, outlets, as well as.
solder joints should be developed to prevent liquid infiltration, inaccurate links, and also mismating of suitable as well as couplings.
viii) Connections must be safe to withstand unintended disconnection and should preserve sterility, when ideal.

j) Controls.
i) The controls (i.e., switches over, knobs, and so on) need to be visible as well as plainly determined, and also their features must be self-evident.
ii) Tool style ought to avoid misconception of display screens and also control setups.
iii) Buttons and also controls ought to be shielded against unexpected setup modifications (e.g., because of a person cleaning versus the panel).
iv) Controls needs to be sealed versus penetration of liquids.

k) Classifying.
i) Labels as well as markings ought to be clear and also readable.
ii) Labels and also markings must be resilient enough to endure regular cleaning and also regular wear.
iii) Proper caution legends ought to be supplied on the unit.

l) Ease of Usage and upkeep.
i) The system must be basic to learn to utilize, operate, and also keep.
ii) The system must have abbreviated operating directions included on or with the unit (e.g., on a laminated card attached to the unit).
iii) The device needs to be simple to clean, sanitize, and/or decontaminate, as ideal. iv) The unit ought to be created for simple accessibility to serviceable components.

m) Special upkeep tools, spare-parts as well as consummables.
i) Where needed or needed, the provider has to consist of any kind of special devices required for the maintenance of the suggested devices.
ii) Each devices should be provided with the suggested spare-parts

Area VI. Demands 2-86

required for precautionary upkeep for 5 years and also where necessary consist of supply of advised spare-parts for rehabilitative maintenance.
n) Training.
i) The supplier is needed to supply adequate training on each devices on the appropriate usage and procedure of the tools.
ii) Similarly, distributors are required to provide adequate supplier’s training on the installation and also maintenance( both preventative and restorative).
o) Packaging and also Storage Space Problems of Tools.
i) The devices and elements should stand up to temperature and also moisture extremes most likely to be experienced throughout storage space and also transportation.
ii) The maker should advise treatments for storage of the equipment.

производитель медицинских инсинераторов

Победитель торгов должен проинформировать CEB в письменной форме не менее чем за три (3) недели до проведения заводских испытаний.

чтобы можно было послать одного инженера CEB для наблюдения за заводскими испытаниями. Заводские приемочные испытания

расписание должно быть

по взаимной договоренности между победителем тендера и инженером CEB.

ПРИМЕЧАНИЕ. Все сборы включают авиабилеты, питание и проживание в отеле, местный транспорт и другие расходы на проживание.

Инженер CEB несет победивший участник торгов.

Победивший участник торгов должен представить инженеру CEB следующие документы до отгрузки установки для сжигания отходов.

набор.

? Сертификат соответствия, включающий пункт «Мы подтверждаем, что с учетом исключений или уступок.

перечисленные ниже, указанные выше расходные материалы были изготовлены в соответствии с техническими характеристиками

контракта, заказа и что, после завершения всех проверок и испытаний, поставки соответствуют во всех аспектах

соответствующие конкретные спецификации, чертежи и соответствующие действующие стандарты и правила ».

? Сертификаты заводских приемочных испытаний (FAT)

? Спецификация материалов (BOM)

? Три (3) полных комплекта рабочих чертежей

? Порядок монтажа и ввода в эксплуатацию инсинерационной установки.

? Программа работ по проведению монтажных и пусконаладочных работ.

? Требования к рабочей силе и материально-техническому обеспечению для выполнения установки и ввода в эксплуатацию.

? Все электрические чертежи и схемы подключения

Тип отходов: для обработки медицинских отходов категорий A, B, C, D, E

Тип инсинератора: пиролитический

Номинальная скорость сжигания: от 50 до 60 кг / час 3500 ккал / кг

Загрузка: ручная, пакетная загрузка

Удаление золы: автоматическое или ручное удаление золы партиями

Инсинератор должен избегать выброса черного дыма и

мелкая пыль, при нагрузках

Объем первичной камеры: 2-3 м3

Изоляция камеры сгорания должна состоять из

огнеупорный кирпич с высоким содержанием алюминия и утеплителей,

Пластина горения в карборунде без фиксации

стекло и шлаки

Часы работы / день:> 10 часов

Максимальная рабочая температура: 14000 ° C

Нормальная рабочая температура (первичная):> 8500 ° C

Рабочая температура (вторичная):> 11000 ° C

В цифровых часах должны быть регуляторы температуры:

Содержание углерода в золе: <2%

Установка также должна быть полностью без видимого дыма.

как неприятный запах.

Время пребывания во второй камере: минимум 2 секунды.

Внутренний диаметр дымохода: Ø 400

Высота штабеля:> 8 м

Работа горелки: автоматическое включение / выключение

Топливо: Дизель

Расход топлива при номинальной мощности:> 7 кг отходов / л

Потребление электроэнергии: <2 кВт при номинальной мощности

Рабочее напряжение: 220-240 В переменного тока, 50 Гц

Запасные части: Поставка на 1 год указывается как опция

Расходные материалы: Поставка на один год эксплуатации.

как вариант

Гарантия: Запчасти и сервисная поддержка: минимум 1 год после отправки

ввод в эксплуатацию

Сервисная поддержка: <72 часов.

Соответствие стандартам излучения: BS 3316 или эквивалентный стандарт

Система фильтрации технологического процесса: скруббер следует указать в качестве опции

Соответствие производственным требованиям CE: BS EN 746-2-1997

Технические условия на проектирование: типы медицинских отходов A, B, C, D и E

Монтаж и ввод в эксплуатацию: включены в условия поставки

Обучение профилактическому и лечебному уходу и использованию

установки для сжигания отходов: обучение операторов включено в предложение

Способность обрабатывать пластик: не менее 40% по весу

Сарай мусоросжигательного завода

Укрытие мусоросжигательного завода включено в предложение (в укрытии должно быть

средства для мытья рук и пожаротушения).

Этот материал и оборудование должны быть включены в сарай

инсинератор:

* Фундамент из бутового камня,

* Изоляция кровли от влаги;

* Фасад из кирпича 20 см (блочно-цементный), продолжающаяся перемычка

(линто) из железобетона;

* Стальной каркас (шарпент в металле);

* Кровля из листа BCA 28 BG (Toiture en tôle), металлический желоб,

* Сантехническая установка (умывальник, колодец глубиной 20 м);

* Зольник 30 м3,

* Электрическая инсталяция;

* Concreteslab для крепления мусоросжигателя;

* Chanel для отвода дождевой или сточной воды

* Wiremesh для вентиляции перемычки;

* гладкое литье стен (внутри и снаружи);

* цоколь с цементом;

* 2 металлические двери;

* Картины изнутри и латексные картины за пределами приюта по электронной почте

на стенах и дверях;

* Предел кровли (planche de rive);

* Меры для этой спецификации будут зависеть от размера

мусоросжигательный завод, который будет определять размер навеса мусоросжигательного завода.

clinical heater key combustion price


Our normal activities produces 2-5 lots of different waste items daily which vary from condemned carcasses, and also medical burner primary combustion price

other wastes all which need to be blazed at above 800Centigrade gauged flue exhaust gas.To be made use of by small

health care centers as well as facilities to securely take treatment of contagious as well as pathological wastes. 50kg/Hour – – – –

Burners to be really trustworthy, gas efficient with high/ decreased capacity melt prices
Modern Technology:

Temperature Level Controlled Heating System. Heavy-duty real estate, to be a quality, sturdy, reliable, budget friendly Medical Waste

Burner with appropriate control, very easy to run as well as likewise self-supporting.
Equipments to be pre-assembled, pre-piped, pre-wired & & & & assessed prior to Transport/ Export.

Within the framework of a ecological and also clinical equipment & & & & modern technology consultation and joint purchasing, this

Purchase Bureau invites candidates for pre-qualification in the objective of primarily selecting competent companies to bid

for the above tender.
The supply will make up the unique devices for reliable waste management as mentioned over for a brand-new individual

environment contract administration business with prepared procedures 2013 in Indonesia in addition to Thailand, as well as 2014 in West & & & & East

Malaysia to accomplish those expert solutions in order to comply with the federal governments safety and protection disposal needs

for medical as well as medical facility, specialist waste in the area and also to fulfill the greater technical criterion in this particular

field.small incinerators with filter (with the really the very least minimum pollution) for burning/combusting 5kg/hr, 10kg/hr, 15 kg/hr,

20kg/hr, 25kg/hr to 50kg/hr as well as also 300kg/hr of SOLID ALL-NATURAL DRY AND DAMP NON-HAZARDUOUS of any type of kind (including health care center

wastes) everyday or per hr. Needs to it be without any smoke, no fumes, no smell (odor), no dust, no emission of solid

bits and with the extremely least minimal contamination (within nationwide in addition to worldwide requirements). Required to be eco

healthy and also balanced along with acceptable with worldwide requirements. Need to not be with water scrubbers. Ash materials after melting

must be 3-4%.

Our normal activities creates 2-5 loads of different waste items daily which vary from condemned carcasses, as well as likewise medical burner major combustion rate


Medical Waste Incinerators

Incinerator but the dimension of chamber > > 2000 x >> 1200 mm. Plan for burn FLUID Waste +/- 20 liter/hr.
Sustained by Heavy OIL Burner.waste disposal incinerator, with the ability of dealing with both wet and completely dry rubbish. That include house hold wastes as well as dry fallen leaves.
The chamber of the incinerator should have the ability to hold about 200 – – 250 kilogram of waste at an offered time. edical Waste Incinerators.
The mobile unit is our top priority then the taken care of devices. Medical Waste Incinerators. The mobile system is our priority after that the fixed systems.
a; Set Capacity for every design, how much tons can we put in one-time. I require tio under stand in term of batch load one-time I can ut in Kgs.
b: Burning capacity per hr, to recognize just how much time it will certainly take to burn one set and what is cooling down timem each.
c: The amount of set can we place in every day basis per 1 day.
d: The majority of systems will certainly be worked on Gas, so I need to understand the needed pressure of gas in psi to run the system without any issue.
e; I do desire to know a typical life of system and after the amount of years we require the repair service of linning etc.

2. What is your minimum ability and maximum capacity incinerator.

3. You do give secodn hand incinerator in good working condition.
4. We require only double chamber dual heater incinerator.
5. Please send us DEFRA and DADR authorization records by accessory, copy of ISO as well as summary of gas emmission report from burners.

Сжигание биологических отходов Hiclover

Теперь HICLOVER предлагает полный спектр контейнерных систем сжигания, что ставит нас в авангарде последних тенденций в области транспорта и промышленности. Контейнерная обработка позволяет незамедлительно управлять отходами, поскольку блоки предварительно собраны и установлены.
Контейнеризация является наиболее осуществимым и жизнеспособным вариантом в отличие от строительства объектов на территории и жилых домов, что исключает необходимость в людских ресурсах и связанных с этим расходах. Система обладает дополнительным преимуществом полной мобильности (как местной, так и международной) и идеально подходит для военных и гражданских лагерей и удаленных мест, где инфраструктура недостаточна.

※ Основное качество: – – – – – Двойная камера сжигания – – Двойная горелка Италия – – Стоимость сжигания: 10–100 кг в час–– – – Камера сжигания: 0,1 м3–1,2 м3 – – – – Мобильная инсинератор, контейнеры для доставки требований, Легко перемещать / транспортировать систему – – – – Бесплатная рассрочка, Предварительно установленный обогреватель, Подходит для кемпинга – – – – Санитарная обработка внутри ультрафиолетового света

Предметы / Модель TS10 (ПЛК) TS20 (ПЛК) TS30 (ПЛК) TS50 (ПЛК) TS100 (ПЛК)
Уровень сжигания калорий (средний) 10 кг / час 20 кг / час 30 кг / час 50 кг / час 100 кг / час
Подача (средняя) 20кг 40кг 60кг 100кг 200 кг
Режим управления ПЛК ПЛК ПЛК ПЛК ПЛК
Камера сгорания 100л 210л 330 л 560 л 1200L
Внутренние размеры 50x50x40 см 65x65x50 см 75x75x60 см 100x80x70 см 120x100x100 см
Вторичная камера 50 л 110л 180л 280L 600 л
Камера дымового фильтра да да да да да
Режим подачи Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации
Напряжение 220В 220В 220В 220В 220В
Мощность 0,5 кВт 0,5 кВт 0,5 кВт 0,7 кВт 0,7 кВт
Расход масла (кг / час) 5,4–12,6 7,8–16,3 10,2–20 12.1–24 14–28
Расход газа (м3 / час) 6,2–11,4 8–15,7 9,8–20 9,9–26,1 10–32,2
Монитор температуры да да да да да
Температурная защита да да да да да
Масляный бак 100л 100л 100л 100л 200л
Дверца подачи 30×30 см 45×40см 55×50см 70×55см 80×60 см
Камин 3 метра 3 метра 5 метров 5 метров 10 метров
Тип дымохода Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь
1-й. Температура камеры 800 –1000 800 –1000 800 –1000 800 –1000 800 –1000
2-й. Температура камеры 1000 -1200 1000 -1200 1000 -1200 1000 -1200 1000 -1200
Время проживания 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек.
Вес брутто 1500 кг 2200кг 3000кг 4500кг 6000кг
Внешние размеры 140x90x120 см 160x110x130 см 175x120x140 см 230x130x155 см 260x150x180 см
Оборудование Двухкамерный инсинератор медицинских инфекционных отходов Производительность 10-30 кг / час Характеристики отходов
В основном шприцы и иглы от плановой иммунизации и кампаний. Однако учитываются следующие средние характеристики *:
теплота сгорания выше 2000 ккал / кг (8370 кДж / кг); содержание горючего вещества более 60%; содержание негорючих твердых веществ ниже 5%; содержание
негорючие штрафы ниже 20%; влажность ниже 30% по весу
Характеристики сгорания: установка для сжигания медицинских отходов должна быть способна преобразовывать отходы до золы, не превышающей 10% от общего количества горючих веществ.
обвинения.
Наружная установка. Установка для сжигания медицинских отходов будет установлена на открытом воздухе. Все компоненты инсинератора должны подходить, но не
ограничивается установкой на открытом воздухе в тени, включая электродвигатели, быть устойчивыми к коррозии, влаге и связанным с ними погодным условиям.

Строительные изделия: в горелке обязательно не будет асбеста, асбестосодержащих продуктов, ртутных термостатов, а также ртутных выключателей. Огнеупорные изделия будут соответствовать стандартам ISO TC33 и CEN / TC 187.

Соответствующие типы инсинераторов: двухкамерная печь для сжигания с контролируемым воздухом или двухкамерная пиролитическая горелка.


WWW.HICLOVER.COM | Установки для сжигания отходов | Автоматические воздушные фильтры

Компания Нанкин Клевер Медицинские Современные Технологии Лтд.

Телефон: +86-25-8461 0201 Сайт: www.hiclover.com Электронная почта: [электронная почта защищена] Электронная почта: [электронная почта защищена]

Medical Waste Incinerator PROPOSAL

1. Technical specifications;

I. Dimension of the Incinerator 4,410 W x 3,037 L x 4,836 H mm

II. Ability of the Incinerator Medical waste 50 kg/hr. set feeding (low level calorie worth: 4,000 5,000 kcal/kg)

III. Utility

Utility problem for the incineration devices operating is the adhering to.

1) Fuel: Light oil or Kerosene

2) Electrical Power

Electric Motor

-0.1– 110kW: AC 220V x 3PH x 50Hz

– – Below 0.1 kW: Air Conditioner 220V x 1PH x 50Hz Control Circuit

– – MCC control: A/C 220V x 1PH x 50Hz

– – Instrument: Air Conditioner 220V x 1PH x 50Hz

– – Switch Over Gear: Air Conditioning 220V x 1PH x 50Hz

2. Door -to-door transportation, Setup, Commissioning and Training

3. Prices quotation

– – Cost requires to be given in Ethiopian Birr (incl. VAT)

– – Cost need to include extra cost elements such as products, insurance, installment and training for essential personnel, until approval obligation where suitable