Archive: January 3, 2024

Incinerator capable of dealing with in between 300 & & 500 kgs fitted with the wet scrubber system

Automatic filling and refilling with capability of 10 to 12 bunches per day working with gas therapy techniques and gas fuel and also ought to comply with the European Standards.the Federal Government Healthcare Facility for Medical Waste Incinerator with the adhering to Specifications. they are having basic wastes like cells, plastic bottles etc, wastes originating from work camps, to be incinerated, they require, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– Capability: 1000 kg/h
–– Kind waste: industrial waste
–– Other demands: Automatic waste filling system and exhaust therapy system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2 humans resources.
4. Gas consumption: 7 litres per set. Incinerator with the ability of treating in between 300 & & 500 kgs fitted with the wet scrubber system.complete Burner with an ability of 500kgs/ hr with a wet scrubber device. a 10-20Kg per hour of residential waste? Likewise, I would like to understand what is the minimum ability burner you have in instance we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capability as I am in ownership of a huge quantity of mixed/municipal waste (4/5 million tonnes) of the following make-up (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% other). The EU codes of the waste are as complies with: 20 03 01, 19 12 10 and 19 12 12.
Among the vital making a decision aspects of the prospective distributor is the energy usage of the strategy, showed either per hr or daily and also I would certainly appreciate if such information can be made available.

waste burner manufacturer china


waste burner manufacturer china, Waste chamber
Chamber capability 300 kg
Chamber quantity.54 m3.
Chamber dimension (exterior) Dimension: 91cm, Altitude: 86cm Size: 152cm.
Door opening 66 x 76 centimeters.
Elevation to door 84 centimeters.
Height to top of stack 5.4 m.
Suggested piece size (L x W x Density) 1.8 m x 2.4 m x 10 centimeters.
Lost cost: Regarding 45 kg/hr.
Pile:.
2′′ ′ ′ -14 ″ “dia.( 36 centimeters), 14 range( 1.90 mm) aluminized steel, refractory lined.
8′′ ′ ′ -12″″ ″ ″” dia. (30.5 centimeters), 16 range (1.52 ″″″.
” Burners Diesel.
Procedure Guidebook timer.
Electric remedy Demand – – – – 115 volt, 60 HZ, 20 amp.
General Description:.
Main Chamber: Sturdy steel covering.
Premium refractory cellular lining and also insulation.
Huge complete dimension leading bunches door along with fluid retention sill.
1 x diesel oil ended ignition heating units ran on/off.
Ash elimination door.
Chimney: Long lasting stainless steel housing.
1.5 m size.
0.6 m refractory lined pile.
Control Board: Control of 1 heater.
Timer control 0-12 hrs.
Crucial fan timer control.
Temperature surveillance.
Automatic Control.
Cycle time established.
Ancillaries: Operating and maintenance manuals.
Spares list.
Ash Rake.
Containerization: 20 foot delivery container with incinerator fitted.
500 litre gas tank


Sistema de tratamiento de residuos médicos

Sistema de tratamiento de residuos médicos

El sistema de tratamiento de residuos médicos será sin duda respetuoso con el medio ambiente, además de tener la capacidad de
relativo a 200-300 kg por juego, para permitir la terapia de desechos médicos desarrollados en una cama de 160
centro Médico
Si, el equipo requiere ser autovapor creando
Se necesita vapor para el tratamiento de saneamiento.
– Cosas de acero. – Residuos patológicos.
– Compactar los residuos para reducir su cantidad
La descarga de residuos curados será sin duda automática, con aún más centro de trituración
Sin duda, todos los atributos de ejecución estarán libres de riesgos y estarán automatizados
1. Sin duda, todo el ciclo estará informatizado con todos los requisitos operativos importantes asegurados, así como también
contraseña protegida.
2. Habrá un archivo característico del ciclo de tratamiento,
El dispositivo debe tener un modo de funcionamiento práctico en el caso de detener el funcionamiento de los atributos automáticos.
Ciertamente se presentará la adhesión a los criterios:
1. Encendido
2. luz indicadora de esterilización
3. interruptor automático / manual
4. luz de advertencia de puerta abierta
5. presión de vapor
6. registrador de gráfico de ciclo

малый инсинаратор

сверхмощный стальной корпус

Качественная облицовка и изоляция трапезной

1 x дизельные запальные горелки, работающие вкл / выкл

Передняя загрузочная дверца (предохранитель

Отдельная дверца для удаления золы

2.7 БЛОК УПРАВЛЕНИЯ

  1. Полный цикл обработки и совокупный эффект отдельных компонентов инсинератора должны быть

достигается центральным блоком управления.

  1. Панель управления должна состоять из стандартной оболочки из листовой стали с напылением, с дверцами и необходимыми

монтажные опоры и содержат все устройства, такие как реле, таймер, предохранительное устройство, контакторы, регулятор,

устройства отображения, записывающее устройство, селектор, включение, выключение и главный выключатель, а также индикаторные лампы, необходимые для управления,

регулирование и регистрация.

Taux de combustion de grande taille : 150-200 kg / hr Équipement de déchets solides Incinérateur à chambre de combustion primaire et secondaire

Articles / modèle

TS500 (API)

Photo

Principe

Traitement Incinération des déchets

Taux de brûlure

150 -200 kilogrammes /heure

Mode de contrôle

PLC (Incinérateur à contrôleur logique programmable)

Chambre de combustion

2700 L

Dimensions internes

190 x 120 x 120 cm

Chambre secondaire

1300 L

Chambre de filtre à fumée

Oui

Mode d’alimentation

Manuel

Tension

220V

Consommation d’huile (kg / heure)

Moyen 28

Consommation de gaz (m3 / heure)

***

Moniteur de température

Affichage numérique

Protection de la température

Oui

Cuve à mazout

1400 L

Porte d’alimentation

90x 80 cm

Cheminée

10 mètres

Type de cheminée

Acier inoxydable

1er. Température de la chambre

800 -1000

2ème. Température de la chambre

1000 -1200

Temps de résidence

2,0 sec.

Poids brut

15 000 kg

Dimensions extérieures

400 x 210 x 300 cm (sans cheminée)

L’approvisionnement en air doit être contrôlé efficacement;
Le contact de la flamme avec tous les gaz doit être réalisé;
La température de combustion minimale de la chambre primaire ne doit pas être inférieure à 850 ° C;
La chambre de combustion primaire doit être équipée d’un moyen pour fournir une alimentation supplémentaire en carburant liquide.
La chambre primaire doit être un revêtement réfractaire à face froide, d’une épaisseur minimale de 100 mm.
Les conditions suivantes doivent être remplies dans la chambre de combustion secondaire:
L’approvisionnement en air doit être contrôlé efficacement;
Le contact de la flamme avec tous les gaz doit être réalisé;
La taille de la chambre secondaire doit être correctement conçue pour garantir que le temps de rétention du gaz ne soit pas inférieur à 2 secondes;
La chambre secondaire doit être un revêtement réfractaire à face froide, d’une épaisseur minimale de 100 mm;
La chambre doit comprendre des ventilateurs d’air de brûleur de combustion intégrés avec une distribution à commande automatique;
La température du gaz, mesurée contre la paroi intérieure de la chambre secondaire (pas dans la zone de flamme) ne doit pas être inférieure à 1 100 ° C;
HICLOVER – Environnement médical  

Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.

21/03/2020

Capability of destruction in weight 60 Kg/h

clinical waste incinerator solutions as well as costs for 100 bed/ 500 bed/ 1000 bed/ 3000 bed healthcare facilities.
– – Assumption: general medical facility beds 50%, operation beds 50% for the 100 bed health center situation, while this

ratio is 30-70% for the other situations
–– global criteria and also waste productions assumptions ought to apply
INCINERATOR, DIESEL.

CAPABILITY: Burner 150 kg/hr.

Amount: 2 [2] with total accessories.

Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
natural rubber, synthetic rubber, polyurethane sheet, and cumbersome films, solids and also
– – fragments that can be easily arranged
– – Things that easily deteriorate such as paper, timber, natural leather and garbage
– – Chemical waste solids and also liquids, waste oil and also various other difficult-to-handle items

The devices will certainly be licensed for operation from PME after passing site investigations.Manual tons double chamber

burner for clinical waste to melt 50kg/hr on constant procedure, with Main temperature level approximately

800degC minimum and 1200degC or even more in the Additional chamber, full with billing door, Ash door, Air as well as check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to

meet NEMA requirements as well as various other global requirements. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– Capability (burning capacity of waste per hr). 150kg/hour. Burner with 300l waste chamber

–– Build products, 5mm Excellent quality light steel construction; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we require

on this island.

–– Approximately 150 KG/Hrs. burner to dispose our day-to-day regular death for this size of the ranch.1. can the

100kg/hr melt solid waste/hazardous waste like expired paints, waste oil or chemicals.
2. What about the warm created during burning, are there windows or air circulation right into the containers.

–– Intake of power and also gas. medical facility garbage disposal system for a medical facility project

–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE and also marginal carbon discharge.

–– Automatic treating process temperature regulated chamber.Incinerator with 150l waste chamber

–– Second chamber.

1. Do you have plans for above incinerators revealing flooring dimensions, height. BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2. What products should be utilized for the FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The only consumable needed for the system TS100

(PLC) is Oil( diesel) is that OKAY?

2) from your technological requirements: oil intake (Kg/hour) is between 14–– 28) do you suggest is liters/hour?

example the incinerator will be operating for 10 hours daily indicates the oil usage will be ~ 140 Litres or even more?

3) Chimney type stainless steel. just how around main body building and construction materials?if there are a lot more two alternative of text

building and construction materials for better lifetime

3. Send out information concerning electrical power, ventilation, fire protection, wears down, chimney etc

4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capability design, MP 500

clinical incinerator.

5. We see you have container shelters. Send us value quote for this item

1. Capability of damage in weight: 60 Kg/h.
2. It must have the ability to operate not much less than 10 hours/day
3. This incinerator should have the ability to destruct all combustible wastes created by medical facilities, exclusive facilities,

laboratories, institutes, etc.
4. Layout Requirements: Types A, B, C, D, as well as E of clinical waste
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to stay clear of the launch of black smoke as well as fine dust, (Electric) throughout the loadings.
7. It must have the ability to reduce the volume of wastes by 98%.
8. It ought to be able to hold exhaust in the 2nd melt with gas house of not less than 2 seconds.
9. The incineration must be totally devoid of visible smoke in addition to offensive odours.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
– The Temperature levels of burning: Minimum will be 850oC as well as max 1400oC
– Message combustion: >> 1100oC.
11. The Inner diameter of the Smokeshaft: Ø 400 as well as its elevation: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13. The Measurement of the door for packing in centimeters: 70×× 70.
14. Heater procedure should be Automatic On/Off.
15. Fuel: diesel.
16. The supplier has to give essential details for the very best of the installment.
This burner with “PYROLYTIC” burning should have:.
17. A burning chamber of waste:.
* Flawlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Tons.
* A heater of illumination which the usage is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, as well as packing protecting

out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium

and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.

18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc

ห้องอาบน้ำคาร์โก้แบบประตูอัตโนมัติ

2019-05-13 อุปกรณ์ฟอกอากาศ 355 views

การแนะนำสินค้า

ฝักบัวลมเป็นอุปกรณ์สำหรับฟอกอากาศคนและป้องกันไม่ให้อากาศเสียเข้าสู่พื้นที่สะอาดใช้กระแสลมสะอาดความเร็วสูงเพื่อขจัดฝุ่นละอองบนพื้นผิวของเสื้อผ้าหรือวัสดุบนบุคลากร ในขณะเดียวกัน ยังทำหน้าที่เป็นห้องล็อกอากาศเพื่อป้องกันไม่ให้อากาศภายนอกสร้างมลพิษให้กับห้องสะอาดหรือห้องสะอาดระดับต่ำถึงระดับสูง

ประเภทมุมรูปตัว L เหมาะสำหรับการประชุมเชิงปฏิบัติการที่ปราศจากฝุ่นและพื้นที่กันชนไม่อยู่ในตำแหน่งเส้นตรงเดียวกัน และ จำเป็นต้องมีการเชื่อมต่อรูปตัว L ซึ่งสามารถประหยัดพื้นที่ ทำให้เส้นทางเดินราบรื่นขึ้น และปรับปรุงการจราจร ประสิทธิภาพ

คุณสมบัติของสินค้า:

อากาศในห้องอาบน้ำแบบใช้ลมถูกพัดเข้าสู่กล่องแรงดันสถิตโดยพัดลมผ่านตัวกรองหลัก กรองอากาศให้บริสุทธิ์ด้วยตัวกรองประสิทธิภาพสูง และขับออกจากหัวฉีดด้วยความเร็วสูง จึงเป่าฝุ่นที่ติดอยู่กับตัวเครื่องและ พื้นผิวของวัตถุที่บรรทุกและป้องกันอากาศที่ไม่บริสุทธิ์ เข้าสู่พื้นที่การทำให้บริสุทธิ์

ห้องอาบน้ำบรรทุกสินค้าแบบประตูอัตโนมัติได้รับการออกแบบมาเป็นพิเศษสำหรับรถยกและสินค้าขนาดใหญ่เพื่อเข้าและออกโดยสามารถเปิดและปิดประตูอัตโนมัติ (และการควบคุมด้วยตนเอง) เมื่อเข้าและออกซึ่งสะดวกในการเข้าและออกและปรับปรุงประสิทธิภาพการทำงาน . ในขณะเดียวกันก็มีฟังก์ชั่นเชื่อมต่อแบบอิเล็กทรอนิกส์และสามารถใช้เป็นห้องบัฟเฟอร์ของห้องเก็บฝุ่นได้หลายระดับ ป้องกันการปนเปื้อนที่เกิดจากบุคลากรและสินค้าเข้าและออก

คุณสมบัติของสินค้า:

* โครงสร้างผลิตภัณฑ์แข็งแรงและติดตั้งง่าย
* ระบบควบคุม PLC มีความเสถียร และมีประสิทธิภาพ หากไฟฟ้าดับ ประตูห้องอาบน้ำจะปลดล็อคโดยอัตโนมัติ
* การกรองแบบสองขั้นตอนที่มีประสิทธิภาพสูงเริ่มต้นประสิทธิภาพสูงถึง 99.99% ประสิทธิภาพที่ 0.3um

* หัวดูดสแตนเลสปรับความเร็วลมได้ 360 องศา

* ง่ายต่อการเปลี่ยนอุปกรณ์เริ่มต้นและมีประสิทธิภาพ
* ติดตั้งไฟฟอกเฉพาะสำหรับห้องคลีนรูม
* ปรับเวลาเป่าได้ (10-99 วินาที)
* ด้วยประตูแบรนด์เยอรมันที่ใกล้ชิด

* ฟังก์ชั่นเชื่อมต่อที่เชื่อถือได้
* พร้อมปุ่มหยุดฉุกเฉิน

ภาพวาดมาตรฐาน

พารามิเตอร์ทางเทคนิค

รุ่นข้อมูลจำเพาะ

EA-1D-2800

EA-2D-2800

EA-1D-3200

EA-2D-3200

EA-3D-3200

ขนาด

W(W1)mm

2800(1200)

2800(1200)

3200 (1500)

3200 (1500)

3200 (1500)

D(D1)มม

1800 (1500)

2200(1900)

1800 (1500)

2200(1900)

2700(2400)

H(H1)mm

2200(2000)

2200(2000)

2200(2000)

2200(2000)

2200(2000)

วัสดุ

วานิชอบแผ่นเหล็กรีดเย็นหรือ SUS304#

ประตู

วานิชอบแผ่นเหล็กรีดเย็นหรือหน้าต่างกระจกนิรภัย SUS304 พร้อมตัวปิดประตู

แสงสว่าง

12W×1

12W×1

12W×2

12W×2

12W×2

จำนวนหัวฉีด

สแตนเลส/ ชนิดหมุนอัตโนมัติ 360 ° (แบบฝัง)

18

22

18

22

36 เท่านั้น

ตัวกรองประสิทธิภาพสูง

ประสิทธิภาพการกรอง 570×570×70 มม. 99.99% (0.3um)

2

2

2

2

4

ตัวกรองหลัก

570×570, G3

2

4

2

4

4

ความเร็วลม

25~30m/วินาที

การจัดการปริมาณอากาศ

18CMM

22CMM

18CMM

22CMM

36CMM

แฟน

พัดลมพิเศษสำหรับแรงดันสถิตย์สูงและปริมาณอากาศขนาดใหญ่

ปริมาณ

2

2

2

2

4

ควบคุม

การควบคุมอัตโนมัติของ PLC, แผงสัมผัส, เวลาในการเป่าของจอแสดงผล LED พร้อมข้อความแสดงข้อผิดพลาด

ฟังก์ชันประสานอิเล็กทรอนิกส์

อำนาจ

1520W

1520W

1520W

1520W

3040W

แหล่งจ่ายไฟ

3Φ380V

แสดงรายละเอียด

หัวฉีดสแตนเลสปรับทิศทางได้ 360 องศา

บานประตูแบรนด์ดังของเยอรมัน

มอเตอร์แรงดันสถิตย์สูงและปริมาตรอากาศสูง large

U.S. HV นำเข้ากระดาษกรองกรองประสิทธิภาพสูง filter

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

производитель установки для сжигания опасных отходов в Китае

Мощность горения: минимум 125 кг / раз (3-6 раз / день), двухкамерный, система двойного сгорания
Входная ширина горловины двери (мм): 760 * 760 (прибл.)
Внешний диаметр дымохода (мм): 300 ± 10
Устройство улучшения горения: 0,11 кВт, Расход топлива: 7 кг / час (макс.)
Устройство дожигания: Расход масла: 5 кг / ч, 0,37 кВт, Расход масла: 10-20 кг / ч
Напряжение: 380/220 В переменного тока, Гарантия: 1 год, 50 Гц

По вашему объявлению за 300 кг.ч. Модель – нам нужно знать цену при возврате.

Сколько кг. топлива потребуется для работы этой модели 10 часов. ежедневно.

У нас есть собственный транспортно-экспедиторский агент.

У нас был контракт на управление мусором до гражданской войны на 120 тонн в день для одного муниципалитета в Северной Африке.
Установка для сжигания медицинских отходов

Двойная камера (первичная и вторичная) с изоляционными плитами (полностью изолированная внутренняя огнеупорная футеровка) вместе с

управляемая воздуходувка для каждой камеры

Толщина изоляции / огнеупора: ≥ 100 мм

Толщина плиты камеры: ≥ 6 мм

Тип топлива: природный газ на основе сжигания топлива в камерах сгорания.

Объем отходов: ≈ 150 кг / день

Мощность сжигания: ≈ 25 кг / день (раздельные двери для загрузки и удаления отходов)

Горелки: По крайней мере, с (02) горелками с функциями автоматического пуска и останова.

Эффективность сгорания:> 97%

Температура: программируемая температура с системой контроля температуры

Время пребывания: 2 секунды во вторичной камере

Теплотворная способность: 4000 Ккал.

Диапазон температур: ≈ мин. 800ºC до макс. 1200ºC

Электропитание: 220 В с одной фазой

Толщина плиты дымохода: ≥ 5 мм

Водяной скруббер: Очистка с использованием реагента, такого как известь, и должна быть изготовлена из нержавеющей стали марки SS 10 с антикоррозийными свойствами и окрашена.

снаружи термостойкой эмалью машинного класса

Высота дымохода: от 15 до 25 футов

pet waste incinerator manufacturer


Technical requirements for shedding gadget, animal waste incinerator supplier
1. 2 systems are required to be mounted in the south of the Kingdom of Saudi Arabia. Both systems will be utilized by tailored authority to melt various kind of medications. All need gadgets require to be given.
2. Warranty: booth systems need to be supplied 3 years service warranty from the day of approval. All called for extra components, preventative maintenance repair work as well as likewise corrective upkeep demand to be consisted of in the price as well as supplied to the client.
3. All needed electric in addition to water links need to be offered.
4. Both systems need to be of superior quality as well as must be ecological friendly.
5. The ability of each system need to be up to 100 kg/hr.
6. The system has to have actually automated feeding.
7. Each system needs to includes two melting areas, one primary area for melting the medication and additionally another room for melting the gases that release as an outcome of major burning.
8. The oven should be created from steel that is rust resistance and with density not less than 6 mm.
9. Each system needs to be of high trusted in shedding various kind of medicines, and also should certainly have 99.9% effectiveness for melting natural products.
10. Waste items need to not go beyond 5%.
11. System needs to have automated ignition system.
12. System requires to use diesel (HSD) as gas and should not consume greater than 8 to 10 lt/hr.
13. Each system ought to be given with fuel storage tank of measurement appropriate to run the system for one total day.
14. The temperature level in the primary area must be 850 C ± 50 C. the system require to additionally be qualified to operate as long as 1050 C ± 50 C. the system should can proceeds procedure in addition to needs to be supplied with concrete layer insulator with proper thickness.
15. Stove ought to be offered with cozy insulator to permit simple operation.
16. Gas should certainly stay in the additional location for not above 1.5 second.
17. The primary burning area have to contend the very least 2 heating systems.
18. The 2nd burning location require to have one heating system.
19. Each system must have doors for ash, leave for air to the smokeshaft and also windows to allow looking inside as well as for upkeep.
20. Each system must have filtering system for gas handling with 2 tanks utilizing average water. Each water container need to have capacity of 1000 lt and should certainly be repaired to the system in addition to provided with water degree sign.
21. Each system has to have unique technology for dividing waistline items and additionally humidity after gas handling.
22. Each system requires to have cooling off capability after treatment.
Each system m should be supplied with exhaust pipe with 250 mm size and also 10 m high. The base of the exhaust system ought to be 1000 mm. The exhaust system should be provided with stress indicator.
24. Electric power: require to be 220 volt, 3 phase, 60 Hz, as well as the electric motor needs to not be much less than 15 HP.
25. Each system has to be supplied control panel and also signs as well as required protection devices as well as alarm. The control panel ought to expose at the very least temperature degree in both the secret as well as added locations and additionally injectors of the filters as well as additionally tons.
26. Each system should certainly be provided with safety and security system for any break down or issue of any type of type of part of the system.
27. The following individual safety tools have to be offer:
a.Heat immune garments for 20 people.
b.Heat immune goggles for 20 persons.
28. All elements of each system should be painted with silver color that is warmth resistant.