For incineration, fundamental and likewise pathological burners


Main unit
Application    For incineration, general and pathological
Capacity      50 – 60 kg/h burn rate
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                   Minimum 8 hours daily
Operating temperature        From 850 0C to 1200 0C, Automatic controlled
Residual Ash                       5 to 10%
3.2     Primary Chamber
Construction    Constructed from heavy duty mild or aluminized  steel Or
equal and approved equivalent
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction           Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                             Automatic, Electric type
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
Gratings      Provided
Loading    Manual loading of waste
Primary Burner                           Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted
Blower    Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature    Minimum exit 850 0C
Observation port    To be provided with protective glass type
3.3       Secondary chamber
Construction      Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation    Refractory material lining
Combustion Temperatures           Above 850 0C, controlled electronically
Gas residue or retention Time          > 2 second at minimum 850 0C
Secondary Burner                       Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                  Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                  Flange mounted
Ejector    Provided, Venturi type, for cooling the flue gases
Combustion Air Fan    Provided for supplying combustion and creating a negative drift and turbulences
Temperature    Maximum  1600 0C
3.4       Chimney
Construction      Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material lining
Length    10 m above ground
Bore    about 350mm diameter
Discharge temperatures             About 850 0C
Emissions      To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
Control unit                                    Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
Isolator switch                                  Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10m
Distribution Board    Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
Wiring    Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                       Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                            Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type    Diesel
Fuel Lines                                           Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                        and approved materials
4             Physical characteristics
Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions      About 1.2 x 2.2m (WxD)
5  Operating environment
Power Requirements                       240V,A/C 50Hz, single phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6. Accessories
Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
Spare parts
Burner    1 set
Fuel Filters                                         6 sets
All other spare parts                   required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
Manufacturing standards               NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
Available    Should be available locally
Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
KEMSA    For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing    Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                           On site user training on operation and daily up keep
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                          2 sets
Service manuals                                     2 sets
Drawings    2 sets
15        Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment      Minimum of one year after commissioning on all parts.
Equipment system                                     Nil
17.    Maintenance contract
Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning


Burner of Medical Waste Automatically

Basic Info.

Model NO.:biological incinerator
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What’s kind of waste can utilize in this gear?  A: This gear to medical waste, pet animal, Municipal waste, live squander. Prohibit any explosive and radiation material, liquid waste and gas waste.  GB18484-2001. 

Q: Treatment capacity  A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg a hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average power. 

Clover incinerator utilize time per day up to 24 hours. Between every feed/combustion period, there are approximately 0.5-1 hours cooling period and time to get feeding squander. Actual combustion time per day is about 16 hours. The life of incinerator between 5-10 year according to utilize. 

Generally, we proposition little lab, little clinic use capacity under 20 kgs per hour. If incinerator use in hospital, then please compute the waste output capacity around 2kgs per individuals per day. If there are 200 sickbed at the clinic, that’s mean you need one incinerator capacity around 400kgs per day, change to power per hour is around 30-40 kgs per hour. According the performance time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *How to compute Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Meeting and Testing  A: We supply all files and incinerators simple to installation and functionality. Client can send individuals visit our factory to learn installation and operation. Generally, We do not send engineer to neighborhood site or even request. The dispatch cost is extra according to order. 

Q: Combustion Temperature  A: The first combustion chamber: 800-1000 centi degree.  The second combustion chamber: 1000-1200 centi degree.  PLC mode according to model and order. 

Q: Operation and maintenance costs  A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD annually maintenance according model, utilize situation. 

One person can service 02 device incinerators. The team should have basic electrician incinerator 50 kg, incinerator 500 kg, incinerator animal, incinerator burner, incinerator burner model for cremation croupes, incinerator catalog, incinerator combustion capacity, knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and know risk of medical waste to safeguard worker self with necessary protection component. 

One person can service 02 unit incinerators. The staff should have basic electrician incinerator 50 kg, incinerator 500 kg, incinerator animal, incinerator burner, incinerator burner model for cremation croupes, incinerator catalog, incinerator combustion capacity, knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

maker of ha zardous waste heater in china


Burning Capability: 125 kg minimum/time (3-6times/ day), twin chamber, double burning system
Assigning door Mouth Size (mm): 760 * 760 (approx.).
Smokeshaft External Size (mm): 300 ± 10.
Combustion Improver Tool: 0.11 kw, Fuel intake: 7kg/ hr (max).
Re-Burning Tool: Oil intake: 5kg/h, 0.37 kw, Oil usage: 10-20kg/ h.
Voltage: 380v/220v Air Conditioning System, Service Guarantee: 1 Year, 50 Hz

Per your promotion for 300 kg.hr. Version– – We require to know the rate with return.

The amount of Kg. of Gas would be needed for running this Style 10 hrs. everyday.

We have our own Products Forwarding Agent.

We had an Agreement for Waste Keeping an eye on before their Civil Fight for 120 Tons/Day for one Town in North Africa.
Medical Waste Heater

Double Chamber (Key & & & & Secondary) with insulation pieces (totally insulated internal refractory lining) in addition to

managed air blower for each chamber

Insulation/ Refractory Density: ≥ 100mm

Chamber plate thickness: ≥ 6mm

Fuel Kind: Gas based upon losing gas in combustion chambers

Waste Capacity: ≈ 150 Kg/Day

Incineration capability: ≈ 25 Kg/Day (Various waste invoicing in addition to waste elimination doors)

Heaters: At the very least with (02) heaters of automated start as well as give up functions

Combustion performance: > > 97%

Temperature level: programmable temperature level with temp monitoring system

Home time: 2 second in secondary chamber

Home heating value: 4000 Kcal

Temperature Level Selection: ≈ minutes 800ºC to max 1200ºC

Electrical supply: 220V with solitary phase

Smokeshaft Plate Density: ≥ 5mm

Water scrubber: Rubbing making use of reagent like lime & & & & must constructed from SS 10 scale of non-corrosion residential properties as well as painted

exteriorly by devices quality heat repellent enamel

Chimney Elevation: in between 15-25 feet


Épurateur par voie humide modèle TS20 (PLC) d'incinération de déchets médicaux (tour Water Spary)

Téléphone: + 86-13813931455 (whatsapp / wechat)
Site Internet: http://www.hiclover.com/  
Nanjing Clover Medical Technology Co., Ltd.

Articles / modèle

TS 2 0 (API)

Photo

Principe

Incinération de déchets médicaux  

Taux de brûlure

Moyenne 2 0 kg / heure

Capacité d’alimentation

Moyenne 4 0kg / alimentation

Mode de contrôle

PLC (Incinérateur à contrôleur logique programmable)

Chambre de combustion

21 0 L

Dimensions internes

65x65x50cm

Chambre secondaire

1 1 0L

Filtre à fumée

Crubber W et S ( tour d’ eau)

Mode d’alimentation

Manuel

Tension

38 0V

Pouvoir

5 Kw

Consommation d’huile (kg / heure)

7,8–16,3

Consommation de gaz (m3 / heure)

8–15,7

Moniteur de température

Affichage numérique

Protection de la température

Oui

Cuve à mazout

100 L

Porte d’alimentation

45 x 40 cm

Cheminée

5 mètres

Type de cheminée

Acier inoxydable

1er. Température de la chambre

800 –1000

2ème. Température de la chambre

1000 -1200

Temps de résidence

2,0 sec.

Poids brut

40 00kg

Dimensions extérieures

160x110x130cm (incinérateur)





Solution HICLOVER pour lutter contre le COVID-19, incinérateur de déchets médicaux

28/07/2020

2 combustion chambers type heater


Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof
and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules
in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage.
3.1              Main unit
3.1.1
Application      For incineration, general and pathological
3.1.2                                            Capacity       100 – 120 kg/h burn rate
3.1.3
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4         Operating time                   Minimum 8 hours daily
3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled
3.1.6          Residual Ash                       5 to 10%
3.2     Primary Chamber
3.2.1
Construction    Constructed from heavy duty mild or aluminized  steel
Or equal and approved equivalent
3.2.2
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5          Door Lock                             Automatic, Electric type
3.2.6
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
3.2.7                                    Gratings       Provided
3.2.8                                            Loading    Manual loading of waste
3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type
Flange mounted
3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11    Temperature    Minimum exit 850 0C
3.2.12                               Observation port    To be provided with protective glass type
3.3    Secondary chamber
3.3.1
Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2                                            Insulation    Refractory material lining
3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically
3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C
3.3.5    Secondary Burner    Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases
3.3.7
Combustion Air Fan                      Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8                                         Temperature    Maximum  1600 0C
3.4       Chimney
3.4.1
Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent
Refractory material lining
3.4.2                                                    Length    10 m above ground
3.4.3                                                        Bore    about 350mm diameter
3.4.4            Discharge temperatures             About 850 0C
3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
3.5.1    Control unit                                           Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
3.5.4
Wiring       Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6    Fuel System
3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type    Diesel
3.6.2
Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m
Fuel pipe material    Special copper pipes or similar and approved materials
4. Physical characteristics
4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions    About 2.5 x 2.8m (WxD)
5.  Operating environment
5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6             Accessories
6.1             Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
7. Spare parts
7.1                                                      Burner        1 set
7.2              Fuel Filters                                         6 sets
7.3
All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
8.2
Manufacturing standards               Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
9.1                                                         Available    Should be available locally
9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
10.1                                                        KEMSA    For inspection and verification
10.2
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
11    Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13            Training
13.1
User training                                           On site user training on operation and daily up keep
13.2
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14    Technical Documentations
14.1         User manuals                                          2 sets
14.2         Service manuals                                     2 sets
14.3                                                     Drawings    2 sets
15        Commissioning
15.1    Testing and Commissioning of the machine to the satisfaction of the user
16    Warranty
16.1                                                  Equipment      Minimum of one year after commissioning on all parts.
16.2       Equipment system                                     Nil
17.    Maintenance contract
17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?

·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?

·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?

·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?

·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?

·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )


3-х камерный инсинератор

Первичная камера:
Сверхпрочный корпус из мягкой стали, высококачественная огнеупорная футеровка и изоляция 01 x газовые горелки (автоматические) 01 x точек датчика температуры с внутренними вентиляторами в сборе.
Вторичная камера:
Прочный корпус из мягкой стали, высококачественная огнеупорная футеровка и изоляция. 01 горелки для природного газа (автоматические) с внутренними вентиляторами 01 в сборе. 02 сек. Время пребывания газа.
Третья палата:
Прочный корпус из низкоуглеродистой стали, высококачественная огнеупорная футеровка и изоляция. 01 газовая запальная горелка (автоматическая) с внутренними вентиляторами в сборе. 02 сек. Время пребывания газа.
Встроенная двойная промывочная машина для гриппа:

Полученные газы проходят через двойную систему фильтрации газов для максимально чистого выброса. Он также оснащен цепными фильтрами.
Камин:
Прочный корпус из нержавеющей стали толщиной 5 мм и более Корпус из мягкой стали.
Колпачок / искрогасители.
Панель управления:
А. Мониторинг температуры с 4-значным дисплеем.
б) Устройство управления термостатом горелки (экономия топлива)
c. Контроль температуры 0-12 часов.
D. Встроенное управление таймером вентилятора

Incinérateur de déchets médicaux avec système intégré de gestion des déchets solides

Téléphone: + 86-13813931455 (whatsapp / wechat)
Site Internet: http://www.hiclover.com/  
Nanjing Clover Medical Technology Co., Ltd.

Capacité: moyenne   30 0 kg par heure


Modèle

YD 30 0

Photo

Taux de combustion

Une moyenne de 30 0 kg / heure

Capacité d’alimentation

Une moyenne de 5 00 kg / alimentation

Pr imary chambre de combustion

24 00 Litres

Chambre de combustion secondaire

12 00 litres

Mélanger la chambre de combustion

Oui

Chambre de filtre à fumée

Système d’épurateur humide (type à 3 sections)

Mode d’alimentation

Manuel

Tension

38 0V

Pouvoir

12,0 Kw

Type de carburant

Huile diesel / gaz naturel / GPL

Brûleur

Italie Original

Consommation d’huile (gasoil)

Une moyenne de 33 kg / heure

Consommation de gaz (gaz naturel)

***

Dimensions internes

220 x 110 x 100 cm (chambre primaire)

Dimensions extérieures

260 x 220 x 420cm (sans cheminée / épurateur humide )

Moniteur de température

Oui

Capacité du réservoir d’huile (si carburant d’huile)

500 litres

Ouverture de porte

90 x 110 cm

Longueur de la cheminée

10,0 mètres

Type de cheminée

Acier inoxydable

Poids brut de l’équipement

14 000 kilogrammes

Spécifications techniques de fonctionnement

P r imary température Chambre

800 –1000

Température de la chambre secondaire

1000 -1200

Temps de résidence

2,0 sec.

Efficacité de combustion

98%

Déchets de puissance calorifique inférieure

3000Kcal



Déchets pathologiques: organes, tissus, échantillons chirurgicaux, fluides corporels prélevés lors d’une intervention chirurgicale ou d’une autopsie.

Solution HICLOVER pour lutter contre le COVID-19, incinérateur de déchets médicaux

2020-07-27

ตัวกรองตาข่ายโลหะ

2019-05-16 กรอง อากาศ 384 views

คุณสมบัติของสินค้า:

l    โครงด้านนอก: โครงสังกะสี, โครงอลูมิเนียมอัลลอยด์หรือโครงสแตนเลส

l    ความหนาของกรอบ: 10, 15, 21, 25, 46 มม. เป็นต้น

l    วัสดุกรอง: ตาข่ายอลูมิเนียมฟอยล์ขยาย ตาข่ายสแตนเลส ฯลฯ ซึ่งสามารถทำความสะอาดซ้ำ ๆ ซึ่งประหยัดมาก

l    อุณหภูมิสูงสุด: สูงกว่า 250 ℃

l    ความชื้นสูงสุด: 99%

l    ประสิทธิภาพ: G2, G3 (EN779)

การใช้งาน:

l    การกรองแบบหยาบของเครื่องปรับอากาศในอาคารทั่วไป

l    การกรองเบื้องต้นของอุปกรณ์ระบายอากาศอุตสาหกรรม

l    ระบบระบายอากาศที่ต้องการความทนทานต่อกรดและด่าง ความแข็งแรงสูง และทนต่ออุณหภูมิสูง

l    กรองห้องพ่นสีในโรงงานประกอบรถยนต์

เส้นโค้งความสัมพันธ์ของปริมาตรความต้านทานอากาศเริ่มต้น

ข้อกำหนดทั่วไปและพารามิเตอร์ประสิทธิภาพ

พิมพ์    จำนวน

ขนาด

จัดอันดับความเร็วลม

(นางสาว)

ปริมาณลมที่กำหนด

(ม. 3 / ชม.)

แรงดันตกคร่อมเบื้องต้น

(ภา)

กว้าง × ยาว × หนา (มม.)

WM-20×10×2

492×238×46

2.5

1050

15

WM-20×16×2

492×390×46

1720

WM-20×20×2

492×492×46

2170

WM-24×24×2

594×594×46

3170

WM-25×16×2

619×390×46

2170

WM-25×20×2

619×492×46

2740

1. ในกรณีที่มีการเปลี่ยนแปลงคุณสมบัติและโครงสร้าง ข้อมูลล่าสุดที่บริษัทให้ไว้จะมีผลเหนือกว่า

2. บริษัทฯ รับคำสั่งซื้อผลิตภัณฑ์กรองนอกเหนือข้อกำหนดตามตาราง

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

Gasified incineration for melting medical wastes burner


Gasified incineration for shedding medical wastes.

Gas kind: Gas
Developed to melt disposables that can as well as should certainly be destroyed on-site. Theses wastes include also contaminated and infectious “red bag.” Surgical dressings, plastic assessment tools as well as different other wastes.
Quick, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature level indications and also cost recorder. Modulating control for gas along with air lowers gas consumption.
Minimum installation as well as also launch time.
Aluminized steel coat lined with refractory and firebrick. Screens recorders as well as likewise various other accessory equipment should be available.
Payment system:.
– – Upright price door on crucial chamber.
– – Pneumatically-driven or hydraulic ram charging system.
– – Car folded of the door after billing.
– – Main as well as additional chamber temperature offered and videotaped (optional).
Charging cost:.
– – As long as 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Gas:- Gas.
Capacity (Cubic Mtr): 1.65 M3 and even a lot more.
Ave Capability: 100kg per hr.
Added Chamber Capability (CubicMtr):3.88 or even more.
Size (mm): 1880 or much better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or much better.
Ash Door Opening (mm): 475×× × × 900 or much better.
Minutes. Running temperature level: 90 level centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Secondly Chamber: 2 sec.
Temperature Tracking: Both for additional and main chambers.
Filling SystemManual/semi-automatic.
Waste devastation effectiveness: > > 90% by weight.
Filter: Different or ceramic other equivalent filters in order to decrease the induction of unsafe air pollutants, particulates, carbon monoxide gas, dioxin/furane right into the setting.
De ashing system: Manual/semi-automatic.
– Civil features. – Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg

Burner size: max 2000x1200x3200 mm
Burning room volume:
–– Gasification space max 0.7 m3,
–– Additional burning area max 0.5 m3 ,

Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER).
Created to burn disposables that can as well as ought to be ruined on-site. Theses wastes consist of transmittable and also infected “red bag.” Surgical dressings, plastic examination tools as well as various other wastes.
Rapid, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature signs and also cost recorder. Modulating control for gas as well as air decreases gas consumption.
Minimum installment and also launch time.
Aluminized steel jacket lined with refractory and firebrick. Screens recorders and also other accessory equipment must be available.
Billing system:.
– Vertical cost door on key chamber.
– Pneumatic or hydraulic ram charging system.
– Auto closed down of the door after billing.
– Main as well as secondary chamber temperature presented and recorded (optional).
Charging price:.
– As much as 100kgs per hour of waste or red bag waste ranked at 2200 BTU’s per kg.
Fuel:- Natural Gas.
Capacity (Cubic Mtr): 1.65 M3 or even more.
Ave Ability: 100kg per hr.
Additional Chamber Capacity (CubicMtr):3.88 or more.
Size (mm): 1880 or far better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or far better.
Ash Door Opening (mm): 475×× 900 or much better.
Min. Running temperature level: 90 degree centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Second Chamber: 2 sec.
Temperature Monitoring: Both for main and secondary chambers.
Filling SystemManual/semi-automatic.
Waste destruction efficiency:> > 90% by weight.
Filter: Ceramic or various other equal filters in order to lower the induction of unsafe air contaminants, particulates, carbon monoxide, dioxin/furane into the environment.
De ashing system: Manual/semi-automatic.
The System needs to be priced estimate total with:-.
– Pipes.
– Electric panels.
– Civil functions.
– Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg


Incinerador de desechos vs Cremador de mascotas

a.) incinerador de residuos. VS cremator para animalesanimal-cremation

b.) incineración para convertirla en ceniza y limpiarla. VS cremación y recoger las cenizas en urnas de cremación para mascotas.pet-cremation-urns

c.) pila de desechos desordenada.VS mascota en cámara individual.

d.) material de desecho complicado. VS mascota es cuerpo.

e.) la incineración de residuos es un asunto público . La cremación de mascotas VS es más un asunto personal.265_00066_23SEPT.jpg

f.) incinerador de residuos con capacidad a pequeña y gran escala. VS cremación de mascotas con tamaño o peso regular de mascotas

g.) Puerta de alimentación del incinerador de residuos pequeña o grande. La puerta de alimentación del crematorio para mascotas VS coincide con el tamaño de la mascota

h.) material de desecho con o sin grasa. VS cuerpo de mascota con grasa.cremation-ash

i.) incinerador de residuos con o sin puerta de alimentación de intercambio. Cremador de mascotas VS mejor con puerta de alimentación de intercambio.pet-cremation-in-incinerator-chamber