Modèle de traitement d'incinération des déchets TS75 (PLC)

Moyen 50 -100 kilogrammes / heure Taux de combustion


Articles / modèle

TS75 (API)

Principe

Traitement Incinération des déchets

Taux de brûlure

Moyen 50 -100 kilogrammes /heure

Capacité d’alimentation

Moyen 200 -300 kilogrammes /alimentation

Mode de contrôle

PLC (Incinérateur à contrôleur logique programmable)

Peinture à l’huile pour le visage

800

Chambre de combustion

768 Litres ( 0,768M3 )

Dimensions internes

1 200 x 800 x 800 mm

Chambre secondaire

384 Litres ( 0,384M3 )

Chambre de filtre à fumée

Oui

Mode d’alimentation

Manuel

Tension

210 / 240V 50Hz 1P

Pouvoir

1,3 kW

Consommation d’huile (kg / heure)

Moyenne 20,4 (DO)

Capacité thermique (kw / heure)

166-332

Consommation de gaz (m3 / heure)

***

Moniteur de température

Affichage numérique

Cuve à mazout

3000 L

Porte d’alimentation

60x 50 cm

Cheminée

10 mètres

Type de cheminée

Acier inoxydable

1er. Température de la chambre

800 -1000

2ème. Température de la chambre

1000 -1200

Temps de résidence

2,0 sec.

Poids brut

7500 kg

Dimensions extérieures

260 x 160 x 250 cm (sans cheminée)

Nous fournissons une chambre de combustion simple, deux chambres de combustion, trois chambres de combustion et multi-combustion

chambres incinérateurs de déchets pour laboratoire, clinique, hôpital, centre médical, hygiène destruction des déchets cliniques avec médical

jetables, déchets biologiques, déchets plastiques médicaux, déchets dangereux, déchets de sacs rouges, élimination des aiguilles, gaze et bandages,

conteneurs tranchants scellés, déchets pathologiques, déchets de chimiothérapie à l’état de traces, etc.

Notre gamme d’incinérateurs s’adresse aux petites et grandes entreprises liées à la crémation animale, telles que les fermes avicoles, les bovins

fermes, élevages de moutons, élevages de porcs, étables, chenils, laboratoire d’essais, chatteries, crématoriums pour animaux de compagnie.

L’incinérateur brûle les déchets dans la chambre de combustion primaire et brûle à nouveau la fumée de la chambre de combustion primaire pour

Assurez-vous que l’environnement est respectueux de l’environnement, sans fumée noire, sans odeur, réduisez les infections bactériennes pathogènes

Solutions système pour les déchets médicaux environnementaux, y compris l’incinération des déchets, le traitement des émissions de fumée, à haute température

stérilisation, lampe de stérilisation ultraviolette, déchiqueteur de déchets, destructeur d’aiguilles, colis de déchets médicaux, conteneurs tranchants, etc.

La conception humanisée de l’équipement de crémation pour animaux de compagnie avec plate-forme mobile, couvertures de petit espace pour la crémation moderne des animaux de compagnie

propriétaire d’entreprise partout dans le monde.

L’incinérateur mobile conteneurisé monté dans un conteneur ISO avant de quitter l’usine, pré-installation, pas de maison d’incinération

construction de construction, mobile par camion et stérilisation par lampe ultraviolette à l’intérieur.

Nous sommes en croissance de la marque pour le domaine de la protection de l’environnement et de la part de marché avec la plupart des

Afrique, Moyen-Orient, pays d’Asie du Sud-Est et partie de l’Amérique du Nord, territoire de l’Europe. Nous sommes un partenaire de confiance pour le gouvernement

organisations, organisations à but non lucratif, entrepreneurs internationaux, organisations logistiques, militaires, propriétaires d’entreprises de crémation d’animaux de compagnie, etc.

Nous avons une expérience d’exportation dans plus de 40 pays, y compris des zones de guerre comme Irak , L’Afghanistan , Somalie , Soudan du sud .

Nous sommes fabricant, entrepreneur et exportateur d’incinérateurs en Chine. Le fabricant fait un prix raisonnable pour le client de l’incinérateur,

Fournir un incinérateur médical, un incinérateur d’hôpital, des incinérateurs d’animaux, des incinérateurs de porcs, du matériel de crémation pour animaux de compagnie, un petit incinérateur,

incinérateur pour animaux de compagnie, incinérateur pour animaux, incinérateur portable, incinérateur pour petits animaux, pyrolyse des déchets infectieux, laboratoire

incinérateur.

дешевые инсинераторы

ПЕРЕРАБОТКА ПЛАСТИКОВЫХ ОТХОДОВ (НЕ ПВХ) 218 693
КАРТОН 85 046
ДОКУМЕНТ 4 956
ПВХ 15 115
ОПАСНЫЕ ОТХОДЫ МЕДИЦИНСКИЕ ОТХОДЫ 1084
ТВЕРДЫЕ ОТХОДЫ, ЗАГРЯЗНЕННЫЕ УГЛЕВОДОРОДами 300 680
ФИЛЬТРЫ МОТОРНОГО МАСЛА Б / У 85,423
ЗАГРЯЗНЕННЫЕ УГЛЕВОДОРОДОМ ПОЧВЫ 88 680
ОБЫЧНЫЕ ОТХОДЫ ВОЛОКНА 14 078
ИСПОЛЬЗУЕМЫЕ ВОЗДУШНЫЕ ФИЛЬТРЫ (АВТОМОБИЛЬНЫЕ И АНАЛОГИЧНЫЕ) 23149
СРЕДСТВА ИНДИВИДУАЛЬНОЙ ЗАЩИТЫ (СИЗ), ВКЛЮЧАЯ ЗАГРЯЗНЕННУЮ ОДЕЖДУ И АНАЛОГИЧНЫЙ МУСОР 130 861
Трупы свиней / бродячих собак и более крупные туши животных дешевые мусоросжигательные печи –
Грузоподъемность в диапазоне до 300 кг / сжигание ок. 50 кг в час

Горелка с регулируемой температурой. Мусоросжигательные заводы должны быть спроектированы в соответствии с нормами контроля загрязнения. Технология: Прочный корпус, чтобы быть качественным, прочным, надежным, экономичным мусоросжигательным заводом с соответствующим управлением, простым в эксплуатации и автономным. Устройства должны быть предварительно собраны, смонтированы, смонтированы и протестированы перед транспортировкой / экспортом.

Примечание: аналогичные технологии и / или предложения участников тендера приветствуются.

В рамках консультаций по экологическому оборудованию и технологиям и совместных закупок это Закупочное / Нотариальное бюро приглашает претендентов на предварительный квалификационный отбор с целью первичного отбора способных компаний для участия в вышеуказанном тендере.
Поставка будет включать в себя специальное оборудование для эффективного управления отходами, как упомянуто выше, для новой частной компании по управлению экологическими контрактами с запланированными операциями в 2013 году в Индонезии и Таиланде и в 2015 году в Западной и Восточной Малайзии для оказания этих профессиональных услуг в соответствии с правительственные требования по безопасному удалению отходов животноводства в регионе и соблюдение более высоких технических стандартов в этой конкретной области для защиты населения и сдерживания контагиозных и инфекционных вирусов и болезней, вызываемых животными. Распространение новой болезни свиней, также «вирусной болезни Нипах», впервые проявившейся в 1998 году в Юго-Восточной Азии, которая вызывает болезни и смерть как людей, так и свиней, снова растет; а также внезапная гибель свиноматок и хряков была зафиксирована на свинофермах Малайзии и других районах Юго-Восточной Азии.

Precios del incinerador de cremación de mascotas

Descripción del producto

Nanjing Clover Medical Technology Co., Ltd. es un fabricante líder de incineradores de desechos en China. Somos fabricantes locales y uno de los mayores exportadores de China. El equipo técnico de incinerador pirolítico es el principal tratamiento de desechos en todo el mundo, para desechos médicos, cremación de animales domésticos e incinerador doméstico portátil, incinerador portátil de desechos domésticos, horno portátil para cremación, incinerador portátil de basura en arabia saudita, incinerador portátil de desechos peligrosos, otros desechos sólidos . La capacidad de 10kgs / Hr. Hasta 600kgs / Hr., Hasta 10 toneladas por día.
Actualmente, suministramos diferentes series para los requisitos de los clientes locales y diseñamos un incinerador actualizado con nuestra tecnología líder. La característica de diseño actualizado de nuestra gama de incineradores los convierte en uno de los más rentables del mundo.

Características principales:
* Todos los modelos con doble cámara de combustión.
* Chimenea / chimenea de acero inoxidable, larga vida útil.
* Alta temperatura, larga vida útil del incinerador.
* Instalación gratuita o mínima en obra.
* Alta tasa de combustión, de 10 kg a 600 kg por hora, hasta 10 toneladas por día.
* Plano de control PLC para operación inteligente.
* Nuevo diseño para el negocio de cremación de animales de compañía.
* Garantía de un año en incinerador y piezas en stock.

Artículo Especificación
Modelo PLC TS50
Lista de productos principal por 01 juego Cámara de combustión primaria
Cámara de combustión secundaria
Cámara de filtro de humo
Caja de control del PLC del incinerador
Chimenea: 5.0 metros
* (actualización a acero inoxidable, costo gratuito)
Quemador de gasoil / gas: 02 unidades
Tanque de aceite (si es combustible de aceite): 100 litros

Minimum Setup Incinerator

Product Description

From year 2010, we negotiated with upgraded technology from Europe and America manufacturers and establish cooperation relationship in the territory of China market. Unfortunately, competition in other countries market, country discrimination and anxieties of intellectual property medical waste incinerator house, medical waste incinerator in china, medical waste incinerator in georgia, medical waste incinerator italy, rights trigger failure eventually. Presently, we investment more effort, capital and technology advancement in our brand, we’re to be one of the largest incineration equipment in the world. Nanjing Clover Medical Technology Co., Ltd. 

Incinerator is a incineration gear, direct fire squander by gasoline fuel or oi fuel. As different circumscription, incinerator can be termed many words 

As under: 

Treatment ability: Small scale incinerator, big scale incinerator and incineration pant. 

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators 

Incinerator fuel: Gas incinerator, petroleum incinerator 

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 

Incinerator Manufacturer: China incinerator producer, UK incinerator producer, USA incinerator producer, India incinerator manufacturer. 

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

Tel: +86-25-8461 0201  Fax: +86-25-8461 0406

Item Customer Request Example
Application Scope  
 
 
 
Hospital, Pet Crematory, Slaughter House, Laboratories, School, Community, etc. if for animal/pet, indicate animal size like: cat, dog, cattle, etc
What kind of waste?  
____, _____%
____, _____%
____, _____%
 
 
Medical waste, dead animal, Municipal Waste, etc(detail name) or nature percent
if for animal/pet, indicate animal size like: cat, dog, cattle, etc
Quantity Request    
01.02.03^…unit
 
Budget    
$US Dollar.
 
 
Operating Time    
The staff work Hours per day.
Our incinerator can work up to around 18 hours per day.
Realization Date of project In ___ year  
Waste Output Capacity per Day?  
 
1000kgs Per Day^
Request waste burn rate   Capacity: 100kgs Per hour^
Request waste feed capacity   Capacity: 100kgs per feed^
Whether Natural Gas Supply Local?   Yes or No.
Local Power   If 380V and 220V valid?
Product Installation Destination  
 
Country or City name
DestinationSeaport name?   To check sea freight charge.
 
Customer    
End-Customer, Agent, Government.
 
Method of contract   Tender or Negotiation
Date of Tender limit    
How did you know our company?    
Other request or information  
 
 
 

incinerator manufacturer in china

1. Is the residence time more than 2 seconds?
2. Is the primary and secondary air preheated?
3. Could it be provided as a continuous system?
4. Is there a monitoring system for operational parameter? (temperature)
5. Is there a data logging system?
6. Does it provide for control interventions to adjust waste feed, grate speed, and temperature, volume and distribution

of primary and secondary air?
7. Does it include auxiliary burners?
8. Does it include system that automatically stops waste feeding when combustion parameters are not appropriate?
9. Is it possible to have an automatic bottom ash unloading system?
1. Is the primary and secondary air preheated?
2. Could it be provided as a continuous system?
3. Is there a data logging system?
4. Does it provide for control interventions to adjust waste feed, grate speed, and temperature, volume and distribution

of primary and secondary air?
5. Does it include auxiliary burners?
6. Does it include system that automatically stops waste feeding when combustion parameters are not appropriate?
7. Is it possible to have an automatic bottom ash unloading system?
Incinerator
Rated Capacity: 100/KG/Hr
Type of Design: Double Chambered
Mode of Heating: Heating Elements

Incinérateur de déchets d'une capacité de 250 kg par heure

Incinérateur modèle TS250 PLC, vue d’ensemble

Ce modèle est un équipement d’incinération de déchets à petite échelle pour la production de petits déchets. Construction

est une chambre de combustion double / double avec brûleur à mazout de 02 unités, équipement d’incinération de charge par lots.
La chambre d’alimentation des déchets est de 1800 litres ( 1,8 m 3 , Automate TS250). Chambres de combustion primaire et secondaire
et chambre de filtre à fumée. Charge par lots au fond de la chambre. Combinaison de contrôle de panneau de PLC d’incinérateur pour l’opération locale.

Liste de produits principale par 01 set

Chambre de combustion primaire

Chambre de combustion secondaire

Chambre de filtre à fumée

Boîtier de contrôle de PLC d’incinérateur

Cheminée: 10,0 mètres

* (mise à niveau vers l’acier inoxydable, coût gratuit)

Italie brûleur fioul / gaz: 02 unités

Réservoir d’huile (si carburant d’huile): 300 litres








Articles / modèle

TS200 (API)

Photo

Principe

Traitement Incinération des déchets solides

Taux de brûlure

Moyenne 250 kilogrammes /heure

Capacité d’alimentation

Moyenne 350 kg /alimentation

Mode de contrôle

PLC (Incinérateur à contrôleur logique programmable)

Chambre de combustion

1800 L

Dimensions internes

150 x 110 x 110 cm

Chambre secondaire

750 L

Chambre de filtre à fumée

Oui

Mode d’alimentation

Manuel

Tension

220V

Pouvoir

0.9Kw

Consommation d’huile (kg / heure)

Moyen 28

Consommation de gaz (m3 / heure)

Moyen 33,6

Moniteur de température

Affichage numérique

Protection de la température

Oui

Cuve à mazout

300 L

Porte d’alimentation

80x 60 cm

Cheminée

10 mètres

Type de cheminée

Acier inoxydable

1er. Température de la chambre

800 -1000

2ème. Température de la chambre

1000 -1200

Temps de résidence

2,0 sec.

Poids brut

8500 kg

Dimensions extérieures

300 x 160 x 190 cm

Le fonctionnement du brûleur doit être marche / arrêt automatique

Carburant: diesel

Le fournisseur doit fournir les informations nécessaires pour le meilleur de l’installation

Cet incinérateur à combustion «PYROLYTIQUE» doit avoir:

;

Béton réfractaire:

§ . Épaisseur : ≥100 mm

§ . Nature: 42% d’Al203

Isolez dans des panneaux fibreux:

§ . Épaisseur: ≥75 mm

Nature: silicate de calcium.

* Brûleur d’allumage de déchets, à combustible, coulée mono-bloc standard guidant la flamme plongeante, éclairage et sécurité d’allumage électronique, ventilation permanente, vanne électromagnétique de régulation et vanne d’isolement.

* Plaque de combustion en Carborundum, évitant la fixation du verre et des scories.

Une chambre de post-combustion des gaz

* Un brûleur de combustion de gaz,

* Un dispositif d’injection d’air permettant une recombustion totale des gaz,

* Un dispositif d’entrée d’air de refroidissement des gaz résiduaires,

* Une gaine d’évacuation des gaz brûlés.

* Carcasse en tôle d’acier solide avec support de connexion.

* Composition du réfractaire;

Béton réfractaire:

§ Épaisseur : ≥150 mm

§ Nature: 65% d’Al203

Isolez en panneau fibreux:

§ Épaisseur: ≥85 mm

Nature: Calcium



BURNER SCREENING AND ALSO COMMISSIONING


A flue smokeshaft, 15,000 mm extensive and also 560mm size will be constructed from steel sheet, complete with lagging, damper and likewise water defense cone. The smokeshaft will certainly be lined with castable grade diatomaceous concrete combined with high alumina concrete according to BS 4076: 1989.

The damper will definitely manage the closing of the door to not less than 85%. The heap is to allow fresh air at the supply’s base to make sure that the flue gases are launched at stagnate afterwards 4000 C which the discharge satisfies the British Clean Air Act, the National Setting Management Agency (NEMA) Act or various other significant acts.

1.1.4 POWER SUPPLY

The sub-contractor will certainly supply tools which appropriate for operating a 415V, 3 stage, 50HZ or 240V, solitary phase, 50HZ electric power supply.

1.1.5 OIL STORAGE AND ALSO LIKEWISE SUPPLY

The system will include a mass oil storage tank, daily storage tank, move hand gas pump as well as additionally linked pipe task. Oil from the mass tank will be supplied to a high level daily storage tank located in the heater area by use of a transfer hand pump as well as automated electric pump.

1.1.6 SAVES AND ALSO LIKEWISE GUIDEBOOKS

The tenderer is to submit with his tender a listing of suggested initial supply of spares together with their prices. A part from the heater spares explained right here below, the spares rates are not to be included generally wrap-up of prices routine yet is to be separate and are shown to be ordered later on if as well as also when it ends up being needed as well as practical to the customer. The heating system conserves whose prices are to be contained generally summary of expenses schedule (BQ) are:-

i) 1No. Develop of safety and security controls
ii) 1No. Solenoid valve
iii) 1No. Oil ignition system
iv) 2No. Photo-electric cells

2 collections of operating as well as upkeep handbooks (both for the incinerator in addition to heaters) need to furthermore be provided. This include 2 collections of control schematic depictions for all the controls and also circuitry.

1.1.7 MASS OIL STORAGE TANK

The bulk oil storage tank nominal capacity of 10,200 litres and additionally complying with BS 799 element 5: 1975 shall be put on 3 concrete cradles.

The works will consist of supply, distribution, putting together, erection, testing, commissioning and preparing to function. The container is to be of bound light steel kind with a format anxiety of 40KN/m2 as well as storage space temperature of 240 C. It is to be located beside the burner as well as central heating boiler home.

The container shall be round with dished end as well as be created of 6mm thick block modest steel plates according to BS 1966. Top premium galvanized materials will not be used.Welded building components shall be sprayed.

E-4

The tank will certainly be pressure examined with a general head of water or matching, evaluated from the base of the container, as well as also equal to 1 1/2 times the amount of:

(i) The elevation of the container and likewise

The stress will be elevated slowly as well as steadily up until the defined examination stress is gotten to which pressure will be maintained for a period adequate time to allow a thorough exam to be made to make certain that the tank is audio enough as well as discloses no leakages or excessive distortion.

The storage container will after that be cleaned on the surface area and also provided with rust preventing guide prior to utilizing 2No.

The storage tank will be supplied with the following:-

(i) 450mm bolted exam covers with liquid and vapour limited joint made with a gasket of gas immune materials.
( ii) 75mm (3″″) vent socket screwed B-SP as well as pipeline at the higher end of the storage tank with an unloading device to avoid the rise in storage space tank stress over the style stress and anxiety. The air vent pipe shall be empty of bends as well as will have a continual rise while being as quick as problem-free.
( iii) 65mm size filling up pipe with tube combining link
( iv) 50mm dimension evaluating connection with lockable cap.
( v) 50mm size supply pipe
( vi) 25mm size water drain-off worth

The tenderer will certainly give hydrostatic oil materials gauge (level indication) or a.
correctly adjusted stick (of dip tape) and get to ladder to the top of the storage tank.

The packing pipe shall be expanded inside the container to within 150mm of storage tank base,.
complete with anti-siphoning device.

The following details shall be entirely and additionally simply marked on the container on the.
centre line near the electrical outlet link.

– – Gross capacity in litres.
– – Test anxiety.
– – Day of examination. – Optimum allowed working stress.
– – Manufacturer’s name of occupation mark.
– – Year of manufacture.
– – The selection of British need as well as likewise type of storage tank

The container will be mounted with a 25mm loss in the direction of the water drain-off touching factor. The supply outlet will be increased inside the container to stay clear of accessibility of water in the supply line. The major service provider will certainly develop container assistances and also bund wall surface areas to information illustrations generated by the sub-contractor. A valued drain off from one of the most cost effective component of the container will be provided complete with tail pipe and likewise a specification for tube pipeline link.

E-5

1.1.8 TRANSFER HAND PUMP

A semi rotating hand pump will be offered filling the day storage tank from the oil drum. It will be set up complete with all the needed pipelines installations and devices.

1.1.9 DAILY SERVICE CONTAINER

A day-to-day storage tank of tiny capability 1,800 Litres will be positioned at 2.5 metre high level in the heater room. Storage tank will be made from 6mm thick pushed steel plates of 1220mm x 1220mm black light steel sheet, complete with bolted cover and likewise adequate venting. The storage tank will certainly satisfy BS 799 part 5 1995 in addition to be offered with a materials watch tube. The container will be lagged with 50mm thick fibre glass insulation of 0.4 W/m2 thermal conductivity as well as also finished with 20SWG galvanized sheets cladding.

The container will certainly be analyzed for any kind of sort of leaks of which if any type of type of is determined will certainly be made great prior to the tank is painted on the surface with corrosion preventing paint. Storage tank to be securely bolted.

1.1.10 AUXILLIARY TOOLS

All pipework made use of in the oil storage space systems will be to B.S. 1387 heavy grade. Joints shall be screwed, and likewise adequate unions should be offered to allow basic removing the equipment.

A 25mm size fire shutoff of the quick activity bar ran dead weight type will be installed, in the oil blood circulation line. This will certainly be kept in the job opportunity by a light scale steel wire linked to a fusible web link. The fusible link will be positioned directly over the heater. The relaxing heater oil feed pipeline from the high degree day container will be warmed by an electrical mapping tape effectively twisted around the pipeline. The pipe shall then be shielded with 25mm thick fiber glass insulation as well as completed with scale 22swg galvanized steel sheet.

The supply pipeline from the mass oil tank to the high degree day has actually been set up by others nonetheless the tenderer shall allow web link to the high level day container. The tenderer will additionally supply and additionally set up high ability filters along the supply pipe as well as the heater feed pipeline.

1.1.11 PIPE SUPPORTS

The array and kind of assistances will be kept to a minimum as well as also their style will be such as to advertise review along with safe managing to match concrete stonework or wood. When developing aids to the upkeep of preferred pipeline loss as well as the restraining of pipeline movements to a longitudinal axial directions only, pendtag

Consideration will be used.

The sub-contractor shall provide as well as set up all steel work creating part of pipeline assistance settings up as well as also will certainly be in charge of making good any kind of kind of problems to service providers function connected with contractors function installment.

Pipe runs will certainly be secured by clips connected to pipeline hangers, wall surface dental braces or trapeze type maintains. ‘‘ U’ screws will certainly not be made use of for clips without previous authorization of the Designer.

The sub-contractor will send his whole proposal for the pipeline supports to the Engineer for authorization before any type of erection job begins.

1.1.12 ELECTRICAL WORKS

All circuitry in between things, plant in addition to controls will be applied by the tenderer. The tenderer shall give enough guidance to make certain that electric links are properly made to all products of tools as well as controls provided by him, all to the Work Manager’s/ Designer’s satisfaction.

E-6

1.1.13 BURNER SCREENING In Addition To COMMISSIONING

The tenderer will certainly check and likewise appoint the burner in the existence of the Engineer.The tenderer will certainly additionally offer adequate oil to last a minimum of 2 (2) hours. The tenderer shall commission the burner as well as test in the existence of the Designer and additionally validate that the burner is working according to the specifications laid here-in as well as in the brochures along with guidebooks from the suppliers of he incinerator.The burner efficiency examination will be performed in conformity to BS3316: component 4:1987. Need to any type of issue be identified, it will certainly be corrected and the testing procedure duplicated to the Job Supervisor’s satisfaction.

1.1.14 FIRE INSTRUCTIONS ALERT

Continue and also acquire as well as likewise place as listed below;

Print fire instructions on the Perspex plate, 3mm close White Colour.
Background determining 510mm lengthx380mm dimension as follow;

1.1.5 OIL STORAGE As Well As ALSO SUPPLY


Pour incinération, incinérateurs généraux et pathologiques

Unité principale
Demande d’incinération, générale et pathologique
Capacité de 50 à 60 kg / h de vitesse de combustion
Type Deux chambres de combustion; air de combustion primaire et secondaire, contrôlé / forcé avec une unité de lavage des gaz de combustion
Durée de fonctionnement Minimum 8 heures par jour
Température de fonctionnement De 850 0C à 1200 0C, contrôle automatique
Cendres résiduelles 5 à 10%
3.2 Chambre primaire
Construction construite en acier doux ou aluminisé résistant ou
équivalent égal et approuvé
Matériau isolant Doublure en matériau réfractaire similaire ou égal au calcium
Combinaison de silicate et de face chaude de maçonnerie résistante
Construction interne Type de foyer fixe avec grilles, fond concave
et porte de chargement, revêtue de matériau réfractaire
Porte de chargement Convient pour le chargement manuel des déchets et avec
Cher équivalent des joints en céramique avec charnières.
Serrure de porte automatique, type électrique
Porte de retrait des cendres Fournie, pour éliminer les restes de cendres résiduelles de la chambre primaire
Réseaux fournis
Chargement Chargement manuel des déchets
Brûleur primaire Entièrement automatique, avec commandes de carburant, de température et de vitesse avec système d’allumage, détecteur de flamme, ventilateur d’air complet avec dispositifs de sécurité, échec de flamme, type d’injecteur de carburant diesel et montage sur bride
Souffleur fourni. Pour fournir un excès d’air de combustion à travers le système de distribution avec système de contrôle de vitesse
Température de sortie minimum 850 0C
Orifice d’observation À équiper d’un type de verre de protection
3.3 Chambre secondaire
Construction Construit en acier doux ou aluminisé résistant ou équivalent et équivalent approuvé
Isolation Doublure en matériau réfractaire
Températures de combustion supérieures à 850 0C, contrôlées électroniquement
Résidu de gaz ou temps de rétention> 2 secondes à au moins 850 0C
Brûleur secondaire fourni, au diesel, entièrement automatique, avec commandes de carburant, de température et de vitesse, avec système d’allumage, détecteur de flamme, ventilateur à air, complet avec dispositifs de sécurité, échec de flamme Type d’injecteur de carburant diesel. Bride montée
Éjecteur fourni, type Venturi, pour refroidir les fumées
Ventilateur d’air de combustion Fourni pour alimenter la combustion et créer une dérive négative et des turbulences
Température maximale 1600 0C
3.4 Cheminée
Construction Construit à partir d’acier doux ou aluminisé résistant ou équivalent et approuvé Revêtement en matériau réfractaire équivalent
Longueur 10 m au-dessus du sol
Alésage d’environ 350 mm de diamètre
Températures de décharge Environ 850 0C
Émissions Pour se conformer aux normes de la section 9 de la troisième annexe du règlement de gestion des déchets, 2006.
3.5 Système électrique
Unité de contrôle Entièrement automatique avec unité de contrôle à microprocesseur (PLC) automatisant toutes les opérations de l’incinérateur. Capable de surveiller tous les paramètres de l’incinérateur Avec grand écran LCD ou similaire pour l’affichage de tous les progrès
Paramètres c.-à-d. Température des chambres primaires et secondaires, turbulence et temps
Avec voyant d’état
Avec l’utilisateur de cycles de fonctionnement programmés définis et différés pour différents types de charges / conditions
Avec verrouillages de sécurité, affichage des erreurs et alarmes visibles et sonores.
Système de surveillance continue des émissions
Interrupteur d’isolateur Fournir et installer l’interrupteur d’isolement 240 V, 100 A pour l’unité d’incinération, y compris tous les câbles nécessaires 10 m
Tableau de distribution Fournir et installer le tableau de distribution. 100 A, complet avec MCB adaptés à la puissance de l’incinérateur et des équipements associés. Câblage à réaliser conformément aux réglementations IEE.
Câblage Prenez des dispositions pour câbler l’interrupteur d’isolement, l’unité de commande du tableau de distribution à l’incinérateur et tout l’équipement associé à l’intérieur de la salle de l’incinérateur. Longueur de travail 20m. Câblage à réaliser à l’aide d’un câble à gaine en PVC sur des conduits en acier et des camions et conformément aux réglementations IEE
Système d’alimentation en carburant Fournir et installer le réservoir de stockage de carburant à l’intérieur de la salle de l’incinérateur à une position élevée (environ 1,5 m au-dessus du sol)
Réservoir de carburant Capacité du réservoir, 400 litres, construit à partir d’un matériau métallique approprié préférable ou d’un matériau résistant aux hautes températures
Type de carburant Diesel
Conduites de carburant Fournir et installer les conduites de carburant, avec filtres à carburant, pompe, voyant, niveau de carburant et tous les autres dispositifs de sécurité et connecter du réservoir de carburant à l’incinérateur.
Longueur de travail, 20m
Matériau du tuyau de carburant; Tuyaux en cuivre spéciaux ou matériaux similaires et approuvés
4 Caractéristiques physiques
Unité principale Montage au sol, autonome, type à sole fixe
Dimensions Environ 1,2 x 2,2 m (LxP)
5 Environnement d’exploitation
Exigences d’alimentation 240 V, A / C 50 Hz, monophasé, avec PE
Température ambiante 10 0C à 40 0C
Humidité relative 40% à 90%
6. Accessoires
Rack, 2 m de long 1 pièce
Chariot à déchets, acier inoxydable 1 pièce
Des pièces de rechange
Ensemble de brûleur 1
Filtres à carburant 6 ensembles
Toutes les autres pièces de rechange nécessaires pour le remplacement pendant et après 12 mois d’exploitation. 2 pièces de chaque
8 Normes de qualité
Normes de fabrication NEMA Kenya Act, 1999
Avis juridique n ° 121 du 29 septembre 1999 sur la réglementation de la gestion des déchets
Directive européenne sur les incinérateurs de déchets – CE 76/2000
BS 3316
Normes d’émission de l’OMS
Normes d’émission de la Banque mondiale
ou toute autre norme reconnue internationalement
Conformité aux normes marquées CE ou à tout autre document internationalement reconnu
9 Service de sauvegarde local
Disponible Devrait être disponible localement
Capacité à entretenir l’équipement Le fabricant / agent doit disposer des installations adéquates, des pièces de rechange, du personnel technique qualifié et qualifié pour offrir un service de maintenance complet et la vente de pièces de rechange pour la durée de vie de l’incinérateur
10 Point de livraison
KEMSA Pour l’inspection et la vérification
Moi Voi, Makindu
Hôpitaux Maragua, Eldama Ravine et Isiolo Pour l’installation, les tests, la certification NEMA et la mise en service
Travaux de pré-installation
Fournir le socle de fondation, les travaux de plomberie nécessaires, les travaux de tuyauterie de carburant, le réservoir de stockage de carburant diesel surélevé, les travaux électriques, y compris le câblage, les goulottes et les commutateurs nécessaires pour installer l’incinérateur et tous ses accessoires conformément aux normes IEE requises
Installation et test Installation complète et mise en place de l’incinérateur à l’endroit désigné selon les instructions du fabricant
Fournir du carburant et tester l’incinérateur pendant 3 heures par jour pendant 7 jours
Formation
Formation des utilisateurs Formation des utilisateurs sur site à l’utilisation et à l’entretien quotidien
Formation à la maintenance Formation à la maintenance sur site sur la maintenance préventive, la réparation et le dépannage
Documentations techniques
Manuels d’utilisation 2 sets
Manuels de service 2 jeux
Dessins 2 ensembles
15 Mise en service
Test et mise en service de la machine à la satisfaction de l’utilisateur
garantie
Équipement Minimum d’un an après la mise en service de toutes les pièces.
Système d’équipement Néant
17. Contrat de maintenance
Service complet de prévention et de réparation Fourni un contrat de service complet de prévention et de réparation de 12 mois comprenant les pièces de rechange et le matériel à compter de la date de mise en service

клинический нагреватель ключ цена сгорания

Наша обычная деятельность производит 2-5 партий различных отходов в день, которые варьируются от туши, а также цены на первичное сжигание в медицинских горелках.

прочие отходы, которые необходимо сжигать при температуре дымовых выхлопных газов выше 800 градусов по Цельсию.

медицинские центры, а также помещения для безопасного обращения с инфекционными и патологическими отходами. 50 кг / час – – – –

Горелки должны быть действительно надежными, экономичными по газу с высокой / пониженной стоимостью плавки
Современные технологии:

Система отопления с регулируемым уровнем температуры. Сверхпрочная недвижимость, чтобы стать качественным, прочным, надежным, экономичным медицинским мусором

Горелка с соответствующим управлением, очень проста в эксплуатации и к тому же самонесущая.
Оборудование должно быть предварительно смонтировано, предварительно смонтировано по трубам, предварительно смонтировано и & & & оценено перед транспортировкой / экспортом.

В рамках консультации по экологическому и клиническому оборудованию и современным технологиям, а также совместных закупок, это

Бюро закупок приглашает кандидатов на предварительный квалификационный отбор с целью первичного отбора компетентных компаний для участия в торгах.

для вышеуказанного тендера.
Поставка будет состоять из уникальных устройств для надежного управления отходами, как уже упоминалось для новичка.

бизнес по управлению экологическими контрактами с подготовленными процедурами в 2013 году в Индонезии, помимо Таиланда, а также в 2014 году в Западной и Восточной Европе.

Малайзии предстоит реализовать эти экспертные решения, чтобы удовлетворить потребности федерального правительства в области безопасности и защиты при утилизации.

для медицинских, а также медицинских учреждений, специальных отходов в этой области, а также для выполнения более высоких технических критериев в этом конкретном

полевые. небольшие инсинераторы с фильтром (с наименьшим минимальным загрязнением) для сжигания / сжигания 5 кг / час, 10 кг / час, 15 кг / час,

20 кг / час, от 25 кг / час до 50 кг / час, а также 300 кг / час ТВЕРДЫХ НАТУРАЛЬНЫХ СУХОЙ И ВЛАЖНОЙ НЕОПАСНОСТИ любого типа (включая медицинские учреждения).

отходов) ежедневно или в час. Должен быть без дыма, без дыма, без запаха (запаха), без пыли, без выбросов твердых частиц

бит и с минимально минимальным загрязнением (в пределах страны в дополнение к мировым требованиям). Требуется быть эко

здоровые, а также сбалансированные с приемлемыми мировыми требованиями. Не нужно использовать скрубберы для воды. Зольные материалы после плавления

должно быть 3-4%.

Наша обычная деятельность ежедневно создает 2-5 загрузок различных отходов, которые различаются от туши, а также от основной скорости сжигания медицинских горелок.

FFP2 Breathing mask machine

平面口罩机参数:

Semi-Automatic Mask Machine

Power supply: 3.3KW mono phase

Mask Size: 175mm*80-100mm (two or three layers)

Nonwoven (GMS): 10-50g

Capacity: 120 to 150pcs/min

Dimension(L*W*H):3800mm*500mm*1400mm

Net Weight: about 1000kg

 

焊接机参数:

Welding Machine

Capacity: 5 to 10pcs/min

Power supply: 8.5KW mono phase

Compressed Air connection: 0.5 to 0.7Mpa

Dimension(L*W*H): 900mm*650mm*1380mm

Net weight: approx. 50kg

 

KN95口罩机参数:

N95 Mask Machine

Capacity: 130 to 160pcs/min

Dimension(L*W*H): 1037*855*1780

Power Supply 15.3kw mono phase

Net Weight: approx.: 1500kg


Zhangjiagang Tengxiang Machinery Co., Ltd.
Mobile: 0086-13962221749(whatsapp)
Wechat: chncheumg

Face Mask Machine for Coronavirus Disease COVID-19



HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-06