Archive: February 8, 2023

Incinerator factory

Key Features:

General Municipal Solid Waste Incinerator, Pet and Animal Cremation, 

Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.
— Single combustion chamber, double combustion chambers, three combustion chambers and 
multi-combustion chambers waste incinerators.
— System solutions for medical waste environmental.
— High burn rate, from 5kgs to 1000kgs per hour.
— New Design for pet animal cremation business.

— HICLOVER, trusted partner with years of experience.

WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

— Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, 

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Tel:  +86-25-8461 0201   

Small Medical Office Waste Incinerators

Product Description

PLC( Programmable Logic Controller), Intelligent and Automatic operation. Set combuston time according to different waste material and incinerator stop combustion itself. Set temperature protection parameter, if the temperature overheat, incinerator stop combustion itself. 

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, refractory, refractory concrete incinerator oil and gas, refractory incinerator, rotary kiln incinerator design, s. A. Incinerator company- fuel capacity sizing to incinerator, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Items/Model TS50(PLC)
Picture  
Burn Rate 50 kg/hour
Feed Capacity 100kg
Control Mode PLC
Combustion Chamber 560L
Internal Dimensions 100x80x70cm
Secondary Chamber 280L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.7Kw
Oil Consumption (kg/hour) 12.1–24
Gas Consumption (m3/hour) 9.9–26.1
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 70x55cm
Chimney 5Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800degree–1000degree
2nd. Chamber Temperature 1000degree-1200degree
Residency Time 2.0 Sec.
Gross Weight 4500kg
External Dimensions 230x130x155cm

Capacité de destruction en poids 60 Kg / h

les solutions d’incinération de déchets cliniques ainsi que les coûts des établissements de soins de 100 lits / 500 lits / 1000 lits / 3000 lits.
– – Hypothèse: lits en établissement médical général 50%, lits d’opération 50% pour la situation en centre de santé de 100 lits, alors que ce

le ratio est de 30 à 70% pour les autres situations
–– les critères globaux ainsi que les hypothèses de production de déchets devraient s’appliquer
INCINÉRATEUR, DIESEL.

CAPACITÉ: Brûleur 150 kg / h.

Montant: 2 [2] avec le total des accessoires.

Sortes de déchets utilisées: DÉCHETS GÉNÉRAUX: polyester, polypropylène, polystyrène, plastique acétate plastique, synthétique

les plastiques,
caoutchouc naturel, caoutchouc synthétique, feuille de polyuréthane et films encombrants, solides et aussi
– – fragments qui peuvent être facilement arrangés
– – Les objets qui se détériorent facilement comme le papier, le bois, le cuir naturel et les ordures
– – Déchets chimiques solides et liquides, huiles usagées et divers autres articles difficiles à manipuler

Les appareils seront certainement autorisés à fonctionner par PME après avoir passé les enquêtes sur site.

brûleur pour les déchets cliniques à fondre 50 kg / h selon une procédure constante, avec un niveau de température principal d’environ

800degC minimum et 1200degC ou même plus dans la chambre supplémentaire, pleine avec porte de facturation, porte de cendres, air ainsi que check-out

ports, système d’air auxiliaire avec registres réglables, brûleurs et système de commande de brûleur et unité d’allumage, le tout pour

répondre aux exigences NEMA ainsi qu’à diverses autres exigences mondiales. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

Les détails techniques que nous respectons sont:

–– Capacité (capacité de combustion des déchets par heure). 150kg / heure. Brûleur avec chambre à déchets 300l

–– Produits de construction, 5 mm Construction en acier léger d’excellente qualité; Revêtement réfractaire 100 mm d’excellente qualité.

–– Finition de peinture à haute température. Nous avons 2 hôpitaux, plus après cela 20 cabinets de dentiste, et aussi plus de 50 postes de travail de médecins.
serait certainement possible de nous donner des informations sur la capacité du brûleur dont nous avons besoin

sur cette île.

–– Environ 150 kg / h. brûleur pour disposer de notre mort régulière au jour le jour pour cette taille du ranch. peut le

100 kg / h font fondre les déchets solides / déchets dangereux comme les peintures périmées, les huiles usagées ou les produits chimiques.
2. Qu’en est-il de la chaleur créée pendant la combustion, y a-t-il des fenêtres ou une circulation d’air directement dans les conteneurs.

–– Prise d’électricité et également de gaz. système d’élimination des déchets d’un établissement médical pour un projet d’établissement médical

–– Odeur d’élimination des cendres. Le brûleur est destiné aux MATIÈRES CONTAMINÉES et aux DÉCHETS SOLIDES ainsi qu’aux décharges de carbone marginales.

–– Chambre de traitement automatique à température régulée. Incinérateur avec chambre de déchets de 150 l

–– Deuxième chambre.

1. Avez-vous des plans pour les incinérateurs ci-dessus révélant les dimensions et la hauteur du plancher. BRULEUR POUR PETITS ANIMAUX ENVIRON 70-

100 KGR / PAR TEMPS

2. Quels produits devraient être utilisés pour le FLOTTEUR, LES MURS, LE SYSTÈME DE TOITURE ETC. 1) Le seul consommable nécessaire au système TS100

(PLC) est le pétrole (diesel) est-ce OK?

2) à partir de vos exigences technologiques: la consommation d’huile (Kg / heure) est comprise entre 14––28) suggérez-vous est en litres / heure?

Par exemple, l’incinérateur fonctionnera pendant 10 heures par jour indique que la consommation d’huile sera d’environ 140 litres ou même plus?

3) Acier inoxydable de type cheminée. juste comment autour de la construction du corps principal et des matériaux de construction? s’il y a beaucoup plus deux alternatives de texte

matériaux de construction et de construction pour une meilleure durée de vie

3. Envoyez des informations concernant l’alimentation électrique, la ventilation, la protection contre les incendies, l’usure, la cheminée, etc.

4. Avez-vous érigé des abris? Installation d’un système d’élimination des déchets (biomédical) capacité de 500 kg, MP 500

incinérateur clinique.

5. Nous voyons que vous avez des abris pour conteneurs. Envoyez-nous un devis pour cet article

1. Capacité d’endommagement en poids: 60 Kg / h.
2. Il doit avoir la capacité de fonctionner pas beaucoup moins de 10 heures / jour
3. Cet incinérateur doit avoir la capacité de détruire tous les déchets combustibles créés par les installations médicales, les installations exclusives,

laboratoires, instituts, etc.
4. Exigences de mise en page: types A, B, C, D et E de déchets cliniques
5. Brûlage «PYROLYTIQUE», en régulant la gazéification des déchets.
6. L’incinérateur doit rester à l’écart du lancement de fumée noire ainsi que de poussières fines (électriques) tout au long des chargements.
7. Il doit avoir la capacité de réduire le volume de déchets de 98%.
8. Il doit être en mesure de maintenir l’échappement dans le 2ème bain de fusion avec la chambre à gaz d’au moins 2 secondes.
9. L’incinération doit être totalement exempte de fumée visible en plus des odeurs désagréables.
10. Le pouvoir calorifique réduit (LCP) de ces déchets sera de 3 500 kcal / kg
– Les niveaux de température de combustion: le minimum sera de 850 ° C ainsi que le maximum de 1400 ° C
– Message de combustion: >> 1100oC.
11. Le diamètre intérieur de l’arbre à fumée: Ø 400 ainsi que son élévation: 8 m.
12. Le volume de la chambre de combustion: 1.200 L.
13. La mesure de la porte pour l’emballage en centimètres: 70 × 1 70.
14. La procédure de chauffage doit être Marche / Arrêt automatique.
15. Carburant: diesel.
16. Le fournisseur doit donner les détails essentiels pour le meilleur de la tranche.
Ce brûleur à combustion «PYROLYTIQUE» doit avoir:.
17. Une chambre de combustion des déchets :.
* Porte parfaitement étanche pour le chargement manuel des déchets. Le chargement doit être Guide, Set Tons.
* Un appareil de chauffage d’éclairage dont l’utilisation est limitée à l’inflammation des déchets.
* Façade de chargement avec joints de porte montés sur charnières, roue de bouchon à vis, joint flexible, ainsi que garniture de protection

en réfractaire.
* L’isolation de la chambre de combustion doit être composée de briques réfractaires à haute teneur en aluminium

et isole également les briques afin d’assurer une température minimale sur la tôle extérieure.
* Composition du réfractaire;.
– Béton réfractaire:
. Densité: ≥ 100 mm
. Nature: 42% d’Al203.
– Bouclier en panneaux fibreux:
. Épaisseur: ≥ 75 mm.
– Nature: silicate de calcium.
* Brûleur de lumières de déchets, avec combustible, coulée mono-bloc standard dirigeant la flamme de plongée, lumières et sécurité de

allumage numérique, flux d’air irréversible, vanne électromagnétique de loi ainsi que coupure de séparation.
* Plaque de combustion en Carborundum, évitant le traitement du verre et des scories.

18. Une chambre d’article brûlant des gaz.
* Un brûleur de combustion de gaz ,.
* Un outil d’injection d’air permettant une recombustion globale des gaz ,.
* Un gadget d’entrée d’air de climatisation des gaz résiduaires.
* Une gaine d’évacuation des gaz brûlés.
* Carcasse en tôle d’acier solide avec support de maillon.
* Composition du réfractaire;.
– Béton réfractaire:.
Épaisseur: ≥ 150 mm.
Nature: 65% d’Al203.
– Protéger en panneau fibreux:.
Épaisseur: ≥ 85 mm.
Nature: Calcium.
* Chauffage à gaz, type de guidage de coulée mono-bloc avec flamme horizontale, éclairage ainsi que sécurité numérique

allumage, débit d’air à long terme, entrée électromagnétique de la vanne de régulation et d’isolement.
* Une injection secondaire d’air pour garantir une excellente teneur en oxygène.
19. Un boîtier de commande assurant le cycle total de combustion.

20. Suiveur :.
* Electro-ventilateur distribuant l’air secondaire, la politique de circulation d’air étant exécutée par des vannes et aussi

suite au contrôle du cycle automatique.
21. Contrôles et politiques :.
Boîtier de commande étanche à la saleté, composé de:

* Un disjoncteur pour chaque moteur (ventilateurs et aussi brûleurs).
* Une minuterie avec temporisation flexible pour la loi de chaque brûleur.
* Un régulateur avec surveillance numérique de la température de combustion.
* Une autorité de régulation avec surveillance de la température de post combustion du blog.
* Boîte électrique.

21. Le décendrage doit être effectué dans le bas de tous les temps de la chambre de combustion ou le décendrage doit être automatique ou pratique

set de cendres.
22. Système de filtrage de procédé: l’épurateur doit être indiqué comme facultatif.
23. Conformité aux spécifications de décharge: BS 3316 ou exigence comparable.
23. Capacité à traiter le plastique: pas beaucoup moins de 40% en poids.
24. Conformité de fabrication CE: BS EN 746-2-1997.
22. Le fournisseur doit fournir des lots de pièces de rechange de première urgence ainsi que des consommables du brûleur.
23. L’incinérateur monté devrait donner naissance à une garantie d’un an.
24. Le fournisseur effectuera une installation sur place de l’incinérateur.
25. La formation technologique des conducteurs devra certainement être proposée et également assurée par un professionnel.
de l’usine; il consistera en un entretien médicinal et préventif, et en utilisant un appareil, etc.

Animal body parts,other biomedical waste,organs dung

13.     Civil    works,    installation    and
Comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and meals itemsι
bidding document

51. No    Features    $_pecific tions
6.    
11.     Opening lid    Large top open归g lid (Approx. 700 mm x 500mm) for
Model of the incinerator.
Of those quoted  incinerator  must  be  included  in  the
Lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation.
7.     Secondary chamber    Slid heath

small scale medical waste incinerator

Toxic and dangerous wastes,
Medical pharmaceutical and hospitable liquids  Wastes
Domestic garbage
Electric and electronic wastes
Industrial wastes
In General, all type of wastes and garbages
Capacity 50-60Kg/h

Combustion supporting materials
Coal oil, diesel oil

Temperature inside
800-10000C

1000-12000C

Burning efficiency
>98%

Power consumption
1.3KW

Noise
<78dB

Index of let smoke and waste gas
Ringelman’s smoke index< level 1

Smoke concentration
Oil
45.5

(mg/m3)
Gas
25.5

(mg/m3)

SO
Oil
0.176
Gas
0.065

NOX
Oil
0.031
Gas
0.038

H2S
Oil
0.016
Gas
0.008

CO
Oil
8.32
Gas
35.64

small scale medical waste incinerator Requirements
Incombustible and explosive materials not allowed in

Process manner
Two combustion cabinets (wetness drying, high temperature dust removal)

Combustion / Burner
Good Quality made in Italy

Blower
Good Quality made in China

Control Electrical
Good Quality made in China

Capacity 50 Kg/h

Working Voltage
220 V

Power
1000 W

Applied For
200 beds

Input Fashion
Manual

Medical Incinerator, 24 kg/hr
Medical Incinerator, 24 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner

Medical Incinerator, 12 kg/hr
Medical Incinerator, 12 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner

Medical Incinerator, 6 kg/hr
Medical Incinerator, 6 kg/hr including panel board, controls and accessories
Furnace gate
Chimney
Blower
Combustion burner

Pet Incinerator

Basic Info.

Model NO.:pet incinerator manufacturers
Export Markets:Global

Product Description

TS version PLC incinerator is latest layout for waste treatment, include health care waste, animal cremation and other solid waste. This equipment quality structural for types of site, such as hospital, environmental division, animal cremation services, etc… CLOVER diesel incinerator, diesel incinerator 50 kg/hr, diesel livestock cremator, diesel medical incinerator, diesel medical incinerator provider in usa, diesel medical incinerators, Incinerator supply updated models with dual combustion space and smoke filter room having refractory lines, and the combustion room temperature up to 1200 deg C. 

Key Features:  * All versions with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *according to sequence * High fever, long lifetime of incinerator.  * Free or minimum installation on site.  * High burn rate, from 10kgs to 500kgs per hour, up to 6ton daily.  *according to order  New Design for pet animal cremation business.  * One year guarantee on incinerator and components in stock.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

潔凈棚

2019年05月10日 空氣凈化設備 493 views



產品簡介

    潔凈棚是最快速最方便建立的一座簡易潔凈房,以工業鋁材(或不鏽鋼、冷板方管)做框架,採用自帶風機過濾機組(FFU)送風,四周用防靜電軟簾(或亞克力板)圍擋,內部凈化級別可達百級到十萬級。

    適用於車間內對潔凈度要求高的局部區域,如流水線作業區域,高精度產品組裝區。 

工作原理:

    風機將空氣從FFU頂部吸入,經初效、高效過濾,過濾后的潔凈空氣在出風面勻速送至潔凈棚內,形成均流層,氣流呈單向流,從而保證了工作區內所要求的潔凈度的安全。

產品特性:

     *組裝式設計,安裝方便,大大縮短了交貨周期;

  *移動方便,可安裝靜音萬向輪;

  *適用於建造小面積的潔凈區域;

  *模塊化結構,提高凈化級別容易,擴展性強,且重複利用價值高;

  *相對超凈工作台,內部可用有效空間大;

*相對傳統無塵室,成本低、施工快、且對樓層高度不限。 

產品配置: 

        1、規格:本產品無定型規格,完全按照客戶的需要來做

2、框架:鋁型材(穩固、美觀、不生鏽、不產塵)

        3、靜電垂簾:0.5mmT網格(防靜電效果好、透明度高、網格清晰、柔韌度好、不變形、不易老化、防塵防靜電)

        4、凈室頂蓋板採用3mmT鋁塑板

        5、局部採用凈化室專用凈化燈具

        6、濾網機組FFU:採用AC 交流離心風機,規格1175*575*250mm,初效高效雙級過濾系統,過濾效率99.99%(0.3um),風速可調,最大風量:1200m3/h);具有長壽命、低噪聲、免維護、震動小、可無級變速等特性,風機質量可靠,工作壽命長加上獨特的風道設計,大大提高了風機的效率、降低了噪聲

        7、頂部間隔排布FFU風機過濾器單元,以達到萬級凈化級別 

標準圖紙

更多內容 網址: www.ecolead.cn 電話: 025-57138032

HICLOVER Waste Incinerator Front view

— Full range incinerator with Economized Small Scale incinerator, Standard Small-Large Scale incinerator, General Municipal Solid Waste Incinerator, Pet and Animal Cremation, Containerized Mobile Incinerator, High Efficient Environmental Waste Incinerator.

— System solutions for medical waste environmental.

— High burn rate, from 5kgs to 1000kgs per hour. — New Design for pet animal cremation business.

— HICLOVER, trusted partner with years of experience.

Nanjing Clover Medical Technology Co.,Ltd..

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters

Tel:  +86-25-8461 0201   Website: www.hiclover.com  Email: [email protected]Email: [email protected]  

Tel:  +86-25-8461 0201   
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  

BRÛLEUR DE DÉCHETS MÉDICAUX PYROLYTIQUES HIGH TECH

BRÛLEUR DE DÉCHETS MÉDICAUX PYROLYTIQUE AVANCÉ

1. Capacité d’endommagement en poids: 60 Kg / h.
2. Il doit avoir la capacité de fonctionner pas beaucoup moins de 10 heures / jour
3. Ce brûleur doit avoir la capacité de démolir tous les déchets inflammables produits par les centres de santé,
centres privés, laboratoires de recherche, instituts, etc …….
4. Spécifications de conception: types A, B, C, D et E de déchets cliniques.
5. Brûlage PYROLYTIQUE, en régulant la gazéification des déchets.
6. L’incinérateur doit empêcher le lancement de fumée noire ainsi que de poussières fines (sans fumée) pendant le.
chargements.
7. Il devrait être en mesure de minimiser la quantité de déchets de 98%.
8. Il doit être capable de retenir l’échappement lors de la deuxième combustion avec une résidence de gaz d’au moins 2 secondes.
9. L’incinération doit être entièrement exempte de fumée visible en plus des odeurs désagréables.
10. Le pouvoir calorifique inférieur (LCP) de ces déchets sera certainement de 3 500 kcal / kg.
– Les niveaux de température de combustion: Le minimum sera de 850 ° C et également le maximum de 1400 ° C – Message de combustion:>> 1100 ° C.
11. Le diamètre intérieur de la cheminée: Ø 400 ainsi que son élévation: 8 m.
12. La quantité de la chambre de combustion: 1.200 L.
13. La mesure de la porte pour l’emballage en cm: 70 × 1 70.
14. La procédure de chauffage doit être Marche / Arrêt automatique.
15. Carburant: diesel.
16. Le vendeur doit fournir les informations nécessaires pour le meilleur de l’installation Cet incinérateur.
avec une combustion «PYROLYTIQUE» devrait avoir:.
17. Une chambre de combustion des déchets :.
* Porte parfaitement étanche pour le chargement manuel des déchets. Le chargement doit être Guide, Set.
Des tonnes.
* Un appareil de chauffage d’éclairage dont l’utilisation est limitée à l’inflammation des déchets.
* Façade de remplissage avec joints de porte augmentée sur charnières, roue de bouchon à vis, joint adaptable, et aussi.
emballage protégeant en réfracteur.-.
* L’isolation de la chambre de combustion doit être constituée de briques réfractaires.
ayant un haut matériau en aluminium et des blocs de blindage afin d’assurer un minimum.
température extérieure en tôle d’acier.
* Structure du réfractaire;
– Béton réfractaire:.
>> Épaisseur:>> 100 mm “.
>> Nature: 42% de A1203.
– Protéger dans les panneaux fibreux:.
>> Épaisseur:>> 75 mm.
>> Nature: silicate de calcium.
* Réchauffeur d’illumination des déchets, à gaz, coulée mono-bloc conventionnelle menant à la plongée.
flamme, éclairage et aussi sûreté et sécurité de l’allumage électronique, flux d’air permanent, écluse électromagnétique.
passerelle de régulation et vanne d’isolement.
* Plaque de combustion en Carborundum, empêchant le traitement du verre ainsi que des scories.

18. Une chambre d’article brûlant des gaz.
* Un appareil de chauffage de combustion de gaz ,.
* Un gadget de tir d’air permettant une recombinaison totale des gaz ,.
* Un dispositif d’entrée d’air de climatisation des gaz résiduaires ,.
* Une gaine d’évacuation des gaz carbonisés.
* Carcasse en tôle d’acier solide avec assistance de connexion.
* Structure du réfractaire;.
– Béton réfractaire:.
>> Épaisseur:>> 150 mm.
>> Nature: 65% de A1203.
– Isoler en panneau fibreux:.
>> Épaisseur:>> 85 mm.
>> Nature: Calcium.
* Réchauffeur à combustible, type de guidage d’épandage mono-bloc avec feu droit, éclairage et sécurité de.
allumage électronique, ventilation à long terme, entrée électromagnétique de la ligne directrice et séparant également.
soupape.
* Un coup d’air supplémentaire pour assurer un excellent contenu Web d’oxygène.

19. Un boîtier de commande assurant le cycle complet de combustion.

20. Ventilateur:.
* Electro-ventilateur dispersant l’air secondaire, la consigne du débit d’air étant.
effectuée par des vannes ainsi que le suivi du contrôle du cycle automatique.

21. Contrôles et directives :.
Boîtier de commande étanche à la saleté, y compris:.
* Un bouton disjoncteur pour chaque moteur (ventilateurs et chauffages).
* Une minuterie avec temporisation réglable pour la politique de chaque appareil de chauffage.
* Un régulateur avec montre pour le niveau de température de combustion ,.
* Une autorité de régulation avec surveillance de la température de postcombustion.
* Boîte électrique.

21. Le décendrage doit être effectué dans le bas absolu de la chambre de combustion ou de la décendrage.
doit être un décendrage automatique ou manuel.

22. Affiner le système de filtrage: Scruber à mentionner comme optionnel

23. Conformité aux normes de décharge: BS 3316 ou conventionnel comparable

23. Capacité à traiter le plastique: pas beaucoup moins de 40% en poids

24. Conformité de production CE: BS EN 746-2-1997

22. Le fournisseur doit fournir des ensembles de pièces supplémentaires de toute première nécessité ainsi que des consommables du.
incinérateur.

23. Le brûleur installé doit donner naissance à une garantie d’un an.
24. Le fournisseur effectuera une installation sur place du brûleur.

25. La formation technique des conducteurs devra être assurée et également assurée par un professionnel de la.
usine de fabrication; il s’agira certainement d’un entretien médicinal ainsi que d’un entretien préventif, de l’utilisation de matériel, etc.

NB .; Les travaux de génie civil ainsi que toutes les autres solutions pertinentes pour l’installation ainsi que la formation des chauffeurs doivent être inclus dans le tarif du brûleur.

Exigences pour l’abri du brûleur:

Maison de l’incinérateur complet en vue (votre maison doit avoir des toilettes ainsi que des centres de lavage des mains et également de lutte contre les incendies). La dimension de l’abri doit mesurer 4 mètres sur six mètres et doit être offert avec une ventilation appropriée.

Ce matériel ainsi que l’équipement doivent inclure dans la remise du brûleur: les fondations en débris de roche, l’isolation du toit par rapport à l’humudité; élévation avec bloc de 20 centimètres (bloc béton), linteau continu (linteau) en béton armé; charpente en acier (charpente en métal); couverture de toit en tôle BCA 28 BG

Компоненты тела животных , различные другие биомедицинские отходы , навоз органов тела

51. Нет функций $ _
1 (инсинератор)
Тип отходов, подлежащих утилизации Части тела животных , другие биомедицинские отходы , навоз органов , материалы для подстилки , растительные отходы и продукты питания
Инсинераторы для преобразования отходов в мелкие , белые стерильные
зола без видимого дыма или запаха
2. Грузоподъемность 300 – 4 ° C (максимальная)
3. Емкость бампера 100 кг / ч (минимум)
4 Топливо Дизель (LDOjHSD)
5. Тип работы Bumer Автоматический дизельный двигатель.
6. Первичная камера с твердым подом.
Футеровка из плотного огнеупорного бетона
Рабочая температура: 850 土 50 ° C или более.
7. Вторичная камера Скользящая пустошь
Футеровка из плотного огнеупорного бетона
Opera 恤 19 температура 1 ° C или более
8. Контроль температуры Цифровой контроль и отображение температуры.
Контроль температуры и термостатический контроль
9. Электропитание 220В для блока управления.
10 Размер Предпочтительна компактная конструкция
11. Открывающаяся крышка Большая открытая верхняя g крышка (прибл. 700 мм x 500 мм) для
легкая загрузка
12. Топливный бак 100-150 л.

13. Строительные работы , монтаж и
comnuss! Включение общестроительных работ (кирпичный дом мусоросжигательного завода
с жалюзи , листовая кровля CGI) по 由 e
модель инсинератора.
Установка и ввод в эксплуатацию мусоросжигательных заводов, включая аренду тяжелого оборудования, необходимого во время установки.
Линия электропитания к световому цеху мусоросжигательного завода, а также к шкафу управления мусоросжигательного завода
Демонстрация производительности на месте и соответствующее обучение персонала использованию инсинераторов.
Гарантия один год со дня ввода в эксплуатацию. Отдельный контракт на годовое обслуживание будет заключен с поставщиком на более позднем этапе.
14. Каталог Каталог, содержащий подробные изображения и спецификации.
указанного мусоросжигательного завода должны быть включены в
тендерный документ