| Model | YD-30 | |||
| Burning Rate | average 30 kgs/hour | |||
| Feed Capacity | average 40 kgs | |||
| Paimary Combustion Chamber | 200 Liters | |||
| Secondary Combustion Chamber | 100 Liters | |||
| Mix Combustion Chamber | Yes | |||
| Feed Mode | Manual | |||
| Voltage | 220V | |||
| Power | 0.59Kw | |||
| Fuel Type | Diesel Oil | |||
| Burner | Italy Original | |||
| Oil Consumption (Diesel Oil) | average 13.3 kg/hour | |||
| Gas Consumption (Natural Gas) | *** | |||
| Internal Dimensions | 80 x 50 x 50cm (paimary chamber) | |||
| External Dimensions | 125 x 90 x 180cm (without chimney) | |||
| Temperature Monitor | Yes | |||
| Oil Tank Capacity(if oil fuel) | 60 Liters | |||
| Door Opening | 40 x 40cm | |||
| Chimney Length | 1.0 Meters | |||
| Chimney Type | Stainless Steel | |||
| Equipment Gross Weight | 1000 kgs | |||
Контейнерный мусоросжигательный завод с контейнером ISO | Мобильный мусоросжигательный завод | Отгрузка всего здания | Производительность до 100 кг в час




El incinerador YD es el último diseño para el tratamiento de desechos, incluye desechos médicos, cremación de animales y otros desechos sólidos. Este equipo de calidad estructural para tipos de sitios, como hospitales, departamentos ambientales, agencias de cremación de animales, etc. El incinerador CLOVER suministra modelos actualizados con cámara de combustión doble, cámara de combustión mixta y cámara de filtro de humo con líneas refractarias, y la temperatura de la cámara de combustión hasta 1200 grados C.
Nanjing Clover Medical Technology Co., Ltd. es un fabricante líder de incineradores de desechos en China. Somos fabricantes locales y uno de los mayores exportadores de China. Planta incineradora de residuos pirolítica, proyecto de incinerador de residuos en vietnam 2012, refractor de incinerador de residuos, ventas de incineradores de residuos, proveedores de incineradores de residuos, incineradores de residuos, equipo técnico es el principal tratamiento de residuos en todo el mundo, para residuos médicos, incineración de animales, cremación de mascotas y otros Wste sólido. La capacidad de 10kgs / Hr. Hasta 500kgs / Hr., Hasta 6ton por día. Actualmente, suministramos diferentes series para los requisitos de los clientes locales y diseñamos un incinerador actualizado con nuestra tecnología líder. La característica de diseño actualizado de nuestra gama de incineradores los convierte en uno de los más rentables del mundo.
| Artículos / Modelo | YD-30 | YD-50 | YD-100 | YD-150 |
| Tasa de combustión (kg / hora) | 30 kg / hora | 50 kgs / Hr. | 100 kgs / Hr. | 150 kgs / Hr. |
| Capacidad de alimentación (kgs) | 60 kilogramos | 150 kilogramos | 200 kilogramos | 300 kilogramos |
| Peso del equipo | 2300 kilogramos | 4000 kilogramos | 4300 kilogramos | 7000 kilogramos |
| Cámara primaria (litros) | 360 | 900 | 1200 | 1500 |
| Cámara secundaria (litros) | 200 | 200 | 500 | 500 |
| Dimensiones externas (cm) | 145x90x175 | 200 x 160 x 230 | 220x180x360 | 240x170x380 |
| Dimensiones internas (cm) | 100 x 60 x 60 | 120 x 90 x 85 | 130x100x90 | 150x100x96 |
| Tanque de aceite (litros) | 200 | 300 | 300 | 500 |
| Apertura de la puerta (cm) | 48 x 60 | 62 x 80 | 55 x 80 | 59 x 81 |
| Chimenea (M) | 5 | 5 | 10 | 10 |
| Tipo de chimenea | Acero inoxidable | Acero inoxidable | Acero inoxidable | Acero inoxidable |
| Cámara secundaria | SÍ | SÍ | SÍ | SÍ |
| Cámara de mezcla de combustión | SÍ | SÍ | SÍ | SÍ |
| Cámara de filtro de humo | SÍ | SÍ | SÍ | SÍ |
| Combustible de combustión | Gas de petróleo | Gas de petróleo | Gas de petróleo | Gas de petróleo |
| Tiempo de residencia | 2,0 seg. | 2,0 seg. | 2,0 seg. | 2,0 seg. |
| Monitoreo de temperatura | SÍ | SÍ | SÍ | SÍ |
2019-05-20 Достижения и кейсы389 просмотров
Антистатический материал Nayu
Название проекта: Антистатический материал Nayu, чистый сарай, воздушная душевая
Внедрение проекта : Проектирование, изготовление и установка 7 чистых навесов.
Срок исполнения: 2013,5

Nayu Anti-static Material (Tianjin) Co., Ltd. – корейское предприятие, зарегистрированное в Управлении промышленности и торговли Тяньцзиня. Его офис расположен в международном промышленном городе Сайда, Зоне экономического и технологического развития Сицин, экономическом центре Бохай-Рим. . У нас есть лучшие продукты и опыт. С нашей командой продаж и технической поддержки мы обеспечиваем клиентов лучшими продуктами, хорошей технической поддержкой и надежным послепродажным обслуживанием по мере роста компании.
| Items/Model | YD-30 | YD-50 | YD-100 | YD-150 |
| Burning Rate (kgs/Hour) | 30 kgs/Hr. | 50 kgs/Hr. | 100 kgs/Hr. | 150 kgs/Hr. |
| Feed Capacity (kgs) | 60 kgs | 150 kgs | 200 kgs | 300 kgs |
| Equipment Weight | 2300 kgs | 4000 kgs | 4300 kgs | 7000 kgs |
| Primary Chamber (Liters) | 360 | 900 | 1200 | 1500 |
| Secondary Chamber (Liters) | 200 | 200 | 500 | 500 |
| External Dimensions (cm) | 145x90x175 | 200x160x230 | 220x180x360 | 240x170x380 |
| Internal Dimensions (cm) | 100x60x60 | 120x90x85 | 130x100x90 | 150x100x96 |
| Oil Tank(Liters) | 200 | 300 | 300 | 500 |
| Door Opening (cm) | 48 x 60 | 62 x 80 | 55 x 80 | 59 x 81 |
| Chimney (M) | 5 | 5 | 10 | 10 |
| Chimney Type | Stainless Steel | Stainless Steel | Stainless Steel | Stainless Steel |
| Secondary Chamber | YES | YES | YES | YES |
| Mix-Combustion Chamber | YES | YES | YES | YES |
| Smoke Filter Chamber | YES | YES | YES | YES |
| Combustion Fuel | Oil/Gas | Oil/Gas | Oil/Gas | Oil/Gas |
| Residency Time | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. | 2.0 Sec. |
| Temperature Monitoring | YES | YES | YES | YES |
| 1st. Chmaber Temperature | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree | 800degree–1000degree |
| 2nd. Chmaber Temperature | 1000degree-1200degree | 1000degree-1200degree | 1000degree-1200degree | 1000degree-1200degree |
Incinerator 20 Kg
Incinerator electrically operated
including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine allowing supply air.
Combustion temperature: 1800 ° C.
Comes with all accessories. ▪ The incinerator should be a modern waste disposal unit, designed
to bum medical waste in a clean and environmentally efficient
manner. It should employ a temperature based logic control system
to provide optimum control of the operating conditions and
incorporate a high capacity thermal oxidizing secondary chamber.
It should be designed to retain the exhaust gases, for at least 2
seconds to ensure the unit’s effective destruction of the combustion
products.
▪ All the incinerators to be supplied and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and in particular 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
procedure for installing and operating incinerators.
▪ The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪ The incinerator shall be run on a three-phase power supply
(mains).
▪ For the technical evaluation, not only the treatment plant but
the entire system will be considered. It will be the responsibility
of the Bidder to supply a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪ The system offered shall be designed to operate normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪ The Bidder must provide a warranty for one year.
▪ All text, parameter etc. on all control operating interfaces as
well as on information displays and on print-outs shall be in
English language.
▪ The Bidder is responsible for all permits and approvals for
importation. The Bidder shall provide all the necessary
documentation in order to facilitate the legal requirements for the
installation and putting into use of the equipment.
▪ Period of Execution is 90 days from contract signature for
delivery to site and completion of all verification operations
required for the issuance of provisional acceptance.
▪ Representatives of the Contracting Authority and the
Beneficiary, together with the Bidder’s representative, shall
carry out the controls, testing and initial approval for provisional
and final acceptance. The provisional and final acceptance shall
take place at the final destination.
▪ After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is authorized by
the Manufacturer, and which is able to rapidly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year warranty period. In
fulfillment of this requirement with their offer, bidders must
submit a statement signed by the manufacturer or representative
of the manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair centre is able to rapidly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪ The Bidder will be responsible to deliver and install all
equipment supplied to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time schedule over
the complete construction and assembling period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall ensure that all parts of
the plant transported by sea shall not be shipped as “deck
cargo”.
▪ It is expected that the Bidder cooperates closely with the
contractor for the new waste handling building/ housing and will
make available all needed technical information, drawing, etc. to
the contractor.
▪ The Bidder shall supply and install the incinerator with the
following attached specifications
For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below:
i. Waste type Health care waste
ii. Waste density 125 to 350Kg/M3
iii.. Waste Calorific Value 4000 KCAL/Kg
iv. Moisture content 10-25%
v. Estimated ash residue 5-10%
vi. Nominal capacity 100Kg/hour batch load
vii. Secondary chamber 2 seconds @ 1100°C
viii. Environmental Environmental Management Coordination Act, 1999 and in particular, Waste management regulations, 2006
2 Equipment
2.1 Primary Combustion Chamber
▪ The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
rolled steel sections. It is carried from the floor level on a
substantial steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face combination of super
duty brickwork or high strength castable.
▪ The primary combustion chamber must ensure minimum exit
temperature is not less than 850°C.
One Manual Load Incinerator comprising:
▪ Manual Loading door (heavy duty steel door with appropriate
refractory lining)
▪ Horizontal solid hearth, refractory lined primary combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪ Full sized bulk load/ash removal door
▪ 1 off diesel-fired ignition burner — temperature controlled
▪ 1 off combustion air supply fan and distribution system, automatic
control
▪ High capacity secondary combustion chamber with residence time
not less than 2 seconds @ >1100°C
▪ 1 off diesel-fired afterburner — temperature controlled
▪ Control panel — automatic operation
▪ Temperature indication primary and secondary chambers 0-
1200°C. Both chambers must be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.
2.2 Throughput
100kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.
2.3 Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4 Quality/Environmental Standards
▪ Environment Management and Coordination Act, 1999
▪ BS3316
2.5 Operating Period
▪ Anticipated daily operating period 8 hours
▪ Maximum operating period 12 hours
2.6 Chamber
▪ Should be refractory lined to the following standard; Hearth and
lower section of chamber walls
2.7 Hot face material
▪ Super duty firebrick
▪ Limiting continuous service limit 1500°C
▪ Thickness 100mm
▪ Thermal conductivity 1.3 W/mk
2.8 Insulation
▪ Calcium silicate
▪ Limiting continuous service limit 1000°C
▪ Thickness 25mm
▪ Thermal conductivity 0.095 W/mk
2.9 Chimney / Stack
▪ Should be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪ Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪ Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as necessary. Allow for cutting of tree
branches to facilitate the exercise.
▪ The chimney shall be painted with approved heat resistant
paint after installation.
2.10 Ignition Burners
Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
· Maximum rating: at least 450kW/hour
· Burner: arranged for on/off operation
· Maximum consumption: at least 6 litres/hour
· Average consumption: at least 3 litres/hour
2.11 Afterburner
Fully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hour
Burner: arranged for on/off operation
Maximum consumption: at least 9 litres/hour
Average consumption: at least 4.5 litres/hour
2.12 Flue gas treatment
▪ Should have particulate remover (scrubbers). A mechanical
particulate collector must be incorporated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13 Diesel Tank
▪ To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪ The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank to the incinerator.
The connecting pipe must be a black pipe of approved gauge
and diameter. Include other accompanying accessories and
fittings
▪ Connect burners to fuel supply.
2.14 Electrical Supply
▪ Three phase 415 V a.c., 50/60 Hz.
3 Documentation:
Operation manual 2 sets
Service/maintenance manual 2 sets
4 Certification
▪ National Environment Management Authority (NEMA)
certification
5 Capacity to service equipment
▪ The agent/supplier shall have adequate facilities, spare parts,
consumables and qualified and skilled technical staff.
Installation works
▪ Provide lifting gears as forklift, gantry, rollers, and lifting
jacks and position incinerator.
6 Commissioning and Training
▪ The Agent will test all set operating parameters
▪ The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7 Commissioning Maintenance Contract
▪ Before the expiry of the warranty/ signing off, the supplier shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly routine maintenance price per quarter
for three (3) quarters.
Maintenance control proposal.
▪ The maintenance contract price includes labour, transport and
accommodation for the attending technicians.
|
|
Items/Model |
TS100(PLC) |
TS150(PLC) |
TS300(PLC) |
|
TS500(PLC) |
Burn Rate (Typical ) |
100 kg/hour |
150 kg/hour |
300 kg/hour |
|
500 kg/hour |
Control Mode |
PLC Auto. |
PLC Auto. |
PLC Auto. |
|
PLC Auto. |
Combustion Chamber |
1200L |
1500L |
2000L |
|
3000L |
Internal Dimensions |
120x100x100cm |
150x100x100cm |
170x120x100cm |
|
210x120x120cm |
Secondary Chamber |
600L |
750L |
1000L |
|
1500L |
Smoke Filter Chamber |
Dry Scrubber |
Dry Scrubber |
Dry Scrubber |
|
Dry Scrubber |
Feed Mode |
Manual |
Manual |
Manual |
|
Manual |
Voltage |
220V |
220V |
220V |
|
220V |
Power |
1.38Kw |
1.69Kw |
2.57Kw |
|
4.88Kw |
Diesel Oil Consumption (kg/hour) |
Ave.20.4 |
Ave.24.2 |
Ave.33 |
|
Ave.44 |
Natural Gas Consumption (m3n/hour) |
Ave.24.5 |
Ave.29 |
Ave.39.6 |
|
Ave.52.8 |
Temperature Monitor |
Yes |
Yes |
Yes |
|
Yes |
Temperature Protection |
Yes |
Yes |
Yes |
|
Yes |
Oil Tank |
200L |
300L |
500L |
|
500L |
Optional | Optional | Optional | Optional |
|
Smoke Wet Scrubbers |
Chimney |
10Meter |
10Meter |
14Meter |
|
14Meter |
Chimney Type |
Stainless Steel |
Stainless Steel |
Stainless Steel |
|
Stainless Steel |
1st. Chamber Temperature |
800℃–1000℃ |
800℃–1000℃ |
800℃–1000℃ |
|
800℃–1000℃ |
2nd. Chamber Temperature |
1000℃-1200℃ |
1000℃-1200℃ |
1000℃-1200℃ |
|
1000℃-1200℃ |
Residency Time |
2.0 Sec. |
2.0 Sec. |
2.0 Sec. |
|
2.0 Sec. |
Gross Weight |
6000kg |
8500kg |
11000kg |
|
16000kg |
External Dimensions |
260x150x180cm |
300x160x190cm |
400x210x300cm |
450x210x300cm
Our interest is for disposing mainly cytotoxic waste, particularly out of date or out of specs cytotoxic medicines. Numerous other wastes for which we want to obtain rid of in enhancement to the cytotoxic waste includes obsolete or out of specs psychotropic pharmaceuticals (however not constantly narcotics), sharps (needles) and also so on.
It is in addition really important for us to recognize if the device is certified to deal with cytotoxic waste as well as also the characteristics as well as disposal of therapy deposits.
The quantity of disposal is about 100 kg per day as minimum. Bigger capabilities approximately 500-600 kg/d are likewise of terrific interest to us. Hence, please send us your proposition for both aforementioned day-to-day abilities.