Archive: August 26, 2022

Biological Waste Incinerators

Basic Info.

Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Incinarator (50 kg capacity), incinarator (syc-10 oil), incinarator (syc-10 oil) specifications, incinarator 20 kgs per hour capacity, inciner8 china, Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

Chauffe-déchets médicaux 30kgs Design TS30 PLC.

Incinérateur de déchets médicaux de 30 kg par heure (en moyenne), conception double
chambres de combustion (chambre primaire et chambre secondaire),
chambre de filtre à fumée, PLC auto. système de contrôle, 0,33 m3 (330 litres)
chambre de combustion primaire , brûleur à mazout ou à gaz en italie. pour petit
traitement des déchets médicaux hospitaliers.
Acheter un incinérateur de déchets, trouver hiclover

Articles / modèle

Automate TS30

Idée

Incinération des déchets

Taux de brûlure

Critère 30kgs / heure

Type de gaz

Gazole / gaz naturel

Réglage de contrôle

Panneau de contrôleur de pensée programmable (PLC)

Chambre de combustion clé

0,33 m3

Mesures intérieures (primaires)

750x750x600 millimètre

Chambre de combustion secondaire

0,18 m3

Dimensions internes (secondaires)

400 x 750 x 600 mm

Chambre de filtre à fumée

Oui

Établissement d’alimentation

Guide

Tension

220V

Pouvoir

0,5 Kw

Prise d’huile

10,2– – 20,0 kg / heure

Consommation de gaz

9,8– – 20,0 m3 / heure

Affichage de la température

Programme numérique

Protection du niveau de température

Contrôle PLC

Réglage de l’heure

Contrôle PLC, 0-120 minutes

Conteneur d’huile

100 litres

Porte d’alimentation des déchets

550x500mm

Smokeshaft

5,0 mètres

Type d’arbre à fumée

Acier inoxydable

Degré de température de la chambre clé

800 ℃ –– – – 1000 ℃

Degré de température de chambre supplémentaire

1000 ℃ -1200 ℃

Temps de résidence

2,0 sec.

Poids brut

3000 kg

Mesures externes

1750x1200x1400 millimètre


Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur
Environnement médical

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.

heaters that can take care of Bio-Medical waste red bag

heaters that can handle Bio-Medical waste (red bag) from lab with level 2 in addition to 3, pet research study, and health centers. There are additionally a percentage of Pharmaceutical waste to be damaged. I would definitely like your referrals on what heaters would certainly handle the these demand based upon the sticking to regular monthly kgs of material.

Site 1– – 4,650 Kgs regular monthly (I have suggest that I set up 2 burners at this location given that it is a medical research center in addition to the use is very high)

Web Site 2– – 1000Kgs each month (this center deals extra with animal research study nonetheless also has red bag waste from their research study side, they currently have a massive animal carouse heater)

Website 3– – 1000Kgs each month (this facility is an area medical care facility with bio-waste from dealing with people)

SMOKELESS INCINERATOR

THE SMOKELESS INCINERATOR FOR INDUSTRIAL PURPOSE, IN LAGOS NIGERIA
WE WANT TO KNOW THE CAPACITY OF THE EQUIPMENT, HOW MUCH LOAD OF WASTE CAN IT BURN AT A PARTICULAR TIME AND FOR HOW LONG, AND THE TYPE OF ENERGY REQUIRED FOR THE OPERATION. PRICE INCLUDING SHIPMENT
for the destruction of the followings:
Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic plastics,
natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
– particles that can be easily sorted
– Items that easily degenerate such as paper, wood, leather and garbage
– Chemical waste solids and liquids, waste oil and other difficult-to-handle items

Medical waste incineration system

Medical waste incineration system of 300 kg/hr shed price with dual fuel (gas as well as diesel) Form, daily 8-16 hrs Process and a Heap elevation of 15 meter.Primary burning

* A button breaker for every engine (ventilators in addition to burners).
* A regulator with electronic viewing for the temperature of combustion.
* A sheath of all the gases charred.
15.
The gas temperature as measured versus the inside wall in the second room, not in the flame zone, Won’t be as indicated in Lots 1-7;
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
2. It must have the ability to operate less than 10 hours/day
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg
19. A control box making certain the full cycle of burning. Fan:.
– Character: Calcium silicate.
* A second shot of air to ensure best oxygen net content.
4.
The minimum departure rate of the exhausts won’t be less than 10 metres/second; 1. Capability of destruction in weight: 60 Kg/h.
* A gadget of air inlet of cooling of waste gases,.
* A regulatory authority with watch for the temperature level of postcombustion.
– Refractory concrete:.
– Shield in coarse panels:
* A burner of lights that the use is limited to the ignition of waste.
* Electro-ventilator dispersing the secondary air, the principle of the air flow being carried out by valves and also adhering to the control of the automatic cycle.
12. The loudness of the combustion chamber: 1.200 L.
i. The primary combustion chamber will be accepted as the key burning zone;
11. The Interior diameter of this Smokeshaft: Ø 400 and its height: 8 m.
* The insulation of the combustion chamber have to be composed of refractory blocks, having a high web content of aluminium and insulates bricks in order to guarantee a minimum temperature on the outside sheet steel.
7. It must be able to reduce the number of wastes by 98%.
The smokeshaft shall have a minimum elevation of 4 meters over ground level;
* Carcass in solid sheet steel with assistance of link.
. Nature: 42% of Al203.
13.
The home time in the next room shall not be less than 2 secs;
* Heater of lights of waste, with fuel, common mono-bloc casting directing stirring fire, lights and also safety and security of electronic ignition, long-term air flow, electromagnetic sluice entry of regulation and also separating valve.
24. The supplier will perforn an onsite setup of this burner.
* Burner with fuel, mono-bloc dispersing leading kind with straight flame, illumination and safety and security of electronic ignition, irreversible ventilation, electro-magnetic sluice gateway of regulation and separating shutoff.
22. Refine Filtering system: Scruber to be mentionned as discretionary.
22. The supplier should provide sets of spare pieces of very first urgency and consumable of the incinerator.
6. The burner has to stay clear of the release of black smoke in addition to good dust, (Electric) during the loadings.
16. The seller has to provide necessary details for the top of this setup.
8. It must be able to hold emission in the 2nd melt with gasoline home of not less than 2 seconds.

21. The de- ashing must be carried out in all-time low of the burning chamber or the deashing ought to be Automatic or hands on batch p ashing.
– The Temperature levels of burning: Minimum will certainly be 850oC in Addition to max 1400oC
* Composition of the refractory;.

. Thickness: ≥ 75 mm.
* A timer with flexible temporization for the law of each burner.
25. The technical training of operators will need to be provided as well as provided by a professional.
Both the primary and the additional temperature levels shall be preserved till all the waste has actually been completely combusted;

Smokeshaft
23. Capability to deal with Plastic: Not less than 40 percent by weight.
9. The incineration ought to be totally devoid of noticeable smoke as well as offensive odours.
23. The set up incinerator should birth a 1 year guarantee.
* Frontage of packaging with door seals gone up on hinges, wheel of screw plug, flexible joint, and packaging protecting out of refractory.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
14. Heater procedure must be Automatic On/Off.
21. Controls and guidelines:.
– Shield in fibrous panel:.
.
Nature: 65 percent of Al203.
3. This burner has to be able to ruin all combustible wastes produced by health care facilities, private clinics, research labs, institutes, and so on.
17. A burning chamber of waste:.
* A heater of combustion of gases.
* Plate of combustion in Carborundum, preventing the repairing of glass and slags. A chamber of post combustion of gases.
* Completely limited door for the hand-operated loading of waste. The loading ought to be Guidebook, Batch Tons.
ii. The minimum burning of the main room Won’t be less than 800 degrees C;

Second combustion

21. The de- ashing must be performed in all-time low of the burning chamber or the deashing ought to be Automatic or hands-on batch de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional.
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
23. Capability to deal with Plastic: Not much less than 40% by weight.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
22. The provider should provide sets of spare parts of very first urgency and consumable of the incinerator.
23. The set up incinerator should birth a one year guarantee.
24. The provider will perforn an onsite setup of the burner.
25. The technological training of operators will have to be provided as well as provided by a professional.
from the factory; it will consist of alleviative and preventative upkeep, as well as using device, etc

Biomedical Waste Burner, 10-15 KG.

The first is a small
20kg/per hr incinerator for a small-medium sized hospital, and the
second is a 500kg per/hr incinerator for a company planning to start a
incineration service in Lahore.Burn Rate : >200 kg per hour
Average fuel consumption : ~29 kg per hour ( Or lesser)
Gas Retention in Secondary Chamber : 2 secs
Temperature Monitoring : Yes
Average Ash Residue : 3%Medical waste management practises here are sub-standard. I have come across your small scale medical waste management units.Biomedical Waste Incinerator, 10-15 kg
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters                   Concentration in mg/Nm3 (12% CO2 correction
Max total dust              30mg/m3
Max Sulphur Dioxide      200mg/m3
Max Nitrogen dioxide    400mg/m3
Max Carbon                     100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser’s country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of “Pollution Control Board” of purchaser’s country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.

00 BEDS HOSPITAL INCENERATOR INFORMATIONS TECHNIQUES

1) Politique

– La gestion de l’élimination des déchets doit faire l’objet d’une attention particulière pour éviter les infections hospitalières.

– Les déchets infectieux doivent être gérés, stockés de manière stricte et brûlés par un incinérateur situé sur le site de l’hôpital.

2) Plan d’élimination des déchets

  1. a) Classification

– Les déchets médicaux hospitalisés sont classés comme suit;

Infections Déchets Déchets spécialement contrôlés Orgue, aiguille, etc.
Déchets industriels Gants en caoutchouc, etc.
Déchets généraux Gaze, etc.
Déchets généraux Plastique, caoutchouc Flacon à perfusion, etc.
Papier, bois, vinyle Bon, etc.
Métal, Verre Can, bouteille en verre
  1. b) Élimination des déchets d’infections

– Ségrégation: L’élimination des déchets infectés doit être séparée de manière appropriée et emballée dans des conteneurs particuliers et livrée à un stockage particulier. La ségrégation, l’emballage et la livraison doivent être opérés de manière appropriée dans chaque pièce telle que la salle de consultation externe, la salle d’opération, la salle de collecte de sang et la salle de dialyse.

– Précaution: les déchets infectés ne doivent pas être placés dans d’autres conteneurs sur le chemin du tri, de l’emballage et de la livraison.

– Stockage: les déchets infectieux doivent être stockés temporairement sur le site de stockage de l’hôpital jusqu’à ce que les déchets infectés soient incinérés.

– Incinérateur:

Il est conçu pour stériliser les déchets médicaux, réduire leur volume et rendre ses composants méconnaissables, le tout dans un système entièrement fermé et automatisé.

Il combine la vapeur chauffée directe, la haute pression et le déchiquetage pour traiter les matières infectieuses.

Les déchets contaminés sont chargés dans la chambre supérieure en acier inoxydable où un broyeur robuste réduit les déchets en petits morceaux. En utilisant la gravité, le matériau traité tombe dans la chambre de traitement où chaque pièce est chauffée à la vapeur à 134 et pressurisée à 3 à bar pendant 20 minutes. Les conditions de fonctionnement sont surveillées et validées en permanence pour obtenir une stérilisation complète.

Le cycle de processus d’une durée moyenne de 60 minutes est totalement automatisé. Un système informatisé surveille le processus et imprime automatiquement un rapport avec les paramètres de stérilisation essentiels à la fin du cycle pour une tenue de registres précise.

La capacité est comprise entre 500 et 600 kg / cy.h ou plus.

Cycle de traitement:

1- Chargement; les déchets contaminés sont automatiquement chargés dans la chambre de l’unité

2-déchiquetage; le déchiqueteur robuste coupe le matériau en petits morceaux et dispose d’un système d’inversion unique pour éviter les bourrages

3-chaleur; la vapeur saturée sous pression élève la température à 134 C et la pression à 3 bar

4-stérilisation; la stérilisation entre en contact direct avec le matériel de broyage (134 c, 3 bar) pendant 20 minutes

5-refroidissement; la température est abaissée à 80 C en pulvérisant de l’eau froide sur la double enveloppe de la cuve de traitement, simultanément, l’unité revient à la pression ambiante

6-Vidange; la vapeur est condensée en eau et évacuée avec l’eau de refroidissement vers le système d’égout sanitaire

7-vide; la vapeur résiduelle restante est évacuée par une pompe à vide

8-Déchargement; un signal numérique informe l’opérateur que toutes les conditions de fonctionnement sûres sont remplies

La condition déverrouille l’unité et permet le déchargement par gravité des déchets traités dans un conteneur

Spécification d’enseignement

Caractéristiques générales

Temp opérationnel. max 160 C
Poids maximum lorsqu’il est rempli de déchets Pour un test hydraulique spécial. Kg 10500
Stress. Kg / cm 3 3,5
La pression de la vapeur. Bar 8
Débit de vapeur max Kg / h 500
Barre à air comprimé 6
Électricité 380 V / 3 – système de protection contre les surtensions 35KW
Les caractéristiques de fonctionnement
Temps de cycle moyen. minutes 60
Capacité de traitement Wight. Kg 500 – 600
Densité. Kg / m3 100
Capacité moyenne du procédé Kg / cycle d’inactivation microbienne 200-300

8log 10

Réductine du volume des déchets 80%
Consommation / cycle
Vapeur. Kg 40
Électricité. KW / h 9
Litres d’eau 500

Производительность установки для сжигания отходов от 10 до 30 тонн в день

Базовая информация.

Номер модели: средняя стоимость установки для сжигания отходов в медицинских целях.
Экспортные рынки: глобальный

описание продукта

Ключевая особенность:
* Все модели с двойной камерой сгорания.
* Дымоход / дымоход из нержавеющей стали, долгий срок службы. * по заказу
* Высокая температура, длительный срок службы инсинератора.
* Бесплатная или минимальная установка на месте.
* Высокая скорость сжигания, от 10 кг до 500 кг в час, до 6 тонн в день.
* Плоскость управления ПЛК. * по заказу
* Новый дизайн для кремации домашних животных.
* Один год гарантии на инсинератор и запасные части.

Область применения:
1. Больница и клиника: медицинские отходы, инфекционные отходы, перевязочные материалы, биологические отходы, медицина.
2. Бойня, больница для домашних животных и ферма: трупы животных, биоотходы.
3. Сообщество, морской порт и вокзал: твердые бытовые отходы и т. Д.
4. Лаборатории, удаленные районы, операции по оказанию помощи при стихийных бедствиях, кремация животных

Компания Nanjing Clover Medical Technology Co., Ltd. является ведущим производителем мусоросжигательных установок в Китае. Мы – местный производитель и один из крупнейших экспортеров Китая. Техническое оборудование пиролитических инсинераторов – это основная обработка отходов во всем мире, включая медицинские отходы, сжигание животных, кремацию домашних животных и другие твердые отходы. Емкость от 10кг / час. До 500 кг / час, до 6 тонн в день. В настоящее время, как фильтровать дым из домашней мусоросжигательной печи, как сделать большую мусоросжигательную печь, как использовать сельскохозяйственные отходы, модель сжигателя для человека, извлечение водорода из зольного остатка в мусоросжигательных заводах, мы поставляем различные серии для местных требований клиентов и проектируем обновленную мусоросжигательную печь с наша ведущая технология. Обновленные конструктивные особенности нашего ассортимента мусоросжигательных печей делают их одними из самых экономичных в мире.

Предметы / Модель TS10 (ПЛК) TS20 (ПЛК) TS30 (ПЛК) TS50 (ПЛК) TS100 (ПЛК)
Скорость сжигания 10 кг / час 20 кг / час 30 кг / час 50 кг / час 100 кг / час
Емкость подачи 20кг 40кг 60кг 100кг 200 кг
Режим управления ПЛК ПЛК ПЛК ПЛК ПЛК
Камера сгорания 100л 210л 330 л 560 л 1200L
Внутренние размеры 50x50x40 см 65x65x50 см 75x75x60 см 100x80x70 см 120x100x100 см
Вторичная камера 50 л 110л 180л 280L 600 л
Камера дымового фильтра да да да да да
Режим подачи Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации Руководство по эксплуатации
Напряжение 220В 220В 220В 220В 220В
Мощность 0,5 кВт 0,5 кВт 0,5 кВт 0,7 кВт 0,7 кВт
Расход масла (кг / час) 5,4–12,6 7,8–16,3 10,2–20 12.1–24 14–28
Расход газа (м3 / час) 6,2–11,4 8–15,7 9,8–20 9,9–26,1 10–32,2
Монитор температуры да да да да да
Температурная защита да да да да да
Масляный бак 100л 100л 100л 100л 200л
Дверца подачи 30×30 см 45×40см 55×50см 70×55см 80×60 см
Камин 3 метра 3 метра 5 метров 5 метров 10 метров
Тип дымохода Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь Нержавеющая сталь
Время проживания 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек. 2.0 сек.
Вес брутто 1500 кг 2200кг 3000кг 4500кг 6000кг
Внешние размеры 140x90x120 см 160x110x130 см 175x120x140 см 230x130x155 см 260x150x180 см

Medical Incinerator

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

YDC incinerator is latest design for waste treatment, include medical waste, animal cremation and other solid waste. This equipment quality structural for kinds of site, like medical waste heat value, medical waste incenerator, medical waste incinerater, medical waste incineration china, medical waste incinerator (yd-300), 
Medical waste incinerator manufacturers u. S. A, hospital, environmental department, animal cremation agencies, etc. CLOVER Incinerator supply updated models with dual combustion chamber, mix combustion chamber and smoke filter chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C.

Product List
Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

潔凈室潔凈度的相關概念以及相關標準

2019年05月22日 行業動態 500 views

潔凈度指潔凈空氣中空氣含塵(包括微生物)量多少的程度

潔凈室空氣潔凈度,一般需進行以下測試方能得出結論:

l  空閑、靜態測試

為潔凈室已安裝完畢,凈化空氣調節系統已處於正常運行狀態,室內生產設備和操作人員尚未到位的情況下進行的測試。

或者潔凈室凈化空氣調節系統已處於正常運行狀態,工藝設備已安裝,室內沒有生產人員的情況下進行測試。

l  運行、動態測

潔凈室已處於正常生產狀態下進行測試。潔凈室的風量、風速、正壓、溫度、濕度、噪聲的檢測,可按一般通用、空氣調節的有關規定執行。

潔凈度-塵埃粒子數對照表 

空閑狀態

運行狀態

等級

允許的單位立方面積內最大粒子數量

0.5μm

5μm

0.5μm

5μm

A

3,500

20

3,500

1*

B

3,500

29

350,000

2,000

C

350,000

2,000

3,500,000

20,000

D

3,500,000

20,000

無具體要求

無具體要求

潔凈度-歐盟同ISO標準對照

等級

空閑狀態

運轉狀態

備註

 A

ISO 5

ISO 5

用於高風險操作的局部區域

B

ISO 5

ISO 7

無菌製劑和罐裝

  C

ISO 7

ISO 8

非關鍵流程的區域

D

ISO 8

無具體要求

 非關鍵流程的區域

更多內容 網址: www.ecolead.cn 電話: 025-57138032