Archive: August 27, 2022

Waste Burning and Incineration Combustion Process

The combustion, or burning, of solid waste proceeds through a series of stages. Water is first driven from the unburned waste by heat produced from material burning nearby or from an auxiliary burner. As the waste heats up, carbon and other substances are released and converted into burnable gases. This is referred to as gasification. These gases are then able to mix with oxygen. If the temperature inside the burn chamber is high enough and maintained for a long enough period of time, the hot gases are completely converted into water vapour and carbon dioxide, which is then released into the air. If the temperature inside the burn chamber is not high enough and the burn time is too short, complete conversion of the burnable gases does not occur and visible smoke is released into the air.  Another result of burning at low temperatures is the creation of pollutants that were not originally present in the waste. This process is known as de novo synthesis. Dioxins, furans and other complex chemical pollutants can be formed through this process.

Ash produced from combustion takes the form of either fly ash or bottom ash.  Fly ash is the fine particles carried away in the form of smoke while bottom ash is the course non-combustible and unburned material that remains after the burn is complete. The type and amount of pollutants in the fly and bottom ash depend upon what waste is burned and completeness of the combustion process.

The completeness of combustion is determined by all of the following factors:

Temperature

The temperature generated is a function of the heating value of the waste and auxiliary fuel, incinerator or burn unit design, air supply and combustion control.  Complete combustion requires high temperatures. Generally, temperatures that exceed 650oC with a holding time of 1-2 seconds will cause complete combustion of most food and other common household waste.  Segregation of waste is required when using methods that don’t routinely achieve these temperatures. Dual chamber incinerators, which are designed to burn complex mixtures of waste, hazardous waste and biomedical waste, must provide a temperature higher than 1000oC and a holding time of at least one second to ensure complete combustion and minimize dioxin and furan emissions.  When these high temperatures and holding times are achieved, waste will be completely burned and ash, smoke and pollutant concentrations will be minimized.

Because exhaust gas temperatures vary from ambient to greater than 1000°C each time a batch waste incinerator is used, optional air pollution control systems with evaporative cooling towers and scrubbers are seldom recommended. However, it may be necessary to employ these systems with large continuous feed incinerators if additional cleaning of exhaust gas is required by regulatory authorities.

Holding Time

Complete combustion takes time.  Holding time, otherwise known as retention or residence time, is the length of time available to ensure the complete mixing of air and fuel, and thus the complete burning of waste. Low temperatures, low heating values of the waste and reduced turbulence require that the holding time be increased to complete the combustion process.

Turbulence

The turbulent mixing of burnable gases with sufficient oxygen is needed to promote good contact between the burning waste and incoming air. This will help in achieving the high temperatures at which waste can be completely burned. The amount of mixing is influenced by the shape and size of the burn chamber and how the air is injected. Passive under-fire ventilation achieved during open burning does not result in sufficient turbulence for the burning of a wide variety of waste.  Also, it is important not to overfill the burn chamber as airflow may be blocked and the amount of turbulence further reduced.  The more advanced incineration designs provide effective turbulence through the forced introduction of air directly into hot zones.

Composition of the Waste

The heating value, wetness and chemical properties of the waste affect the combustion process and the pollutants that are contained in the resulting smoke and ash. The higher the burn temperature, holding time and turbulence that are achieved, the less effect the composition of the waste has on completeness of the burn.

Burner tiny to tool waste dispossal

Carburant Diesel

The waste most include vary products plastics, rubber, paper, turf, leaves, woods, fruits, product packaging container, and also several others

Minimum température d’opération 950.
Hauteur( mm) 800. Opération. Incinerator little to instrument waste dispossal for about 150-200 metropolitan waste from mall, office in addition to domestic.

The waste most contain vary materials plastics, rubber, paper, turf, leaves, woods, fruits, packaging carton, and also plenty of others

Heater capability of destruction of 350 kg/hour

common daily massacre involves 120 pigs. The Condemned item as well as also byproducts from the abattoir for disposal is around 1000 kgs.daily
one line incinerator for the destruction of harmful clinical waste.

– – – – Heater ability of damage of 350 kg/hour, calorific well worth of waste will definitely be 13-25 MJ/kg

[3,500 kcal/kg] and also ideal cozy ability 1,225,000 kcal/hr.

– – – – Burner damages ability will definitely be 8.4 tons/day and additionally procedure time will definitely be 24 human resources./ day.

– – – – Waste will be with automatic feeding system right into the burner.

-The temperature degree will definitely regulated in varying flow and also portion in oxygen, burning gas is re-burned

in the re-combustion [additional] chamber at a temperature level of minimum 1,100 C throughout 2 secs.

– – – – Control board will certainly be fitted with an useful synoptic sight revealing the operating circumstance of the whole

heater and also handled by DCS/PLC system.

– – – – Gas therapy system will absolutely appreciate the EE standard [Directive 2000/76/EC -4/ 12/2000.

– – – – TOC of slag as well as bottom ashes will certainly be much less 3% of the dry weight.

– – – – Arrangement will certainly be completely free from visible smoke.

– – – – Heater will certainly be created as a Packaged system, having electric link pre-wired and last pipelines

in position.

– – – – Incinerator will have automated de-ashing system with upward direction.

– – – – Burner will certainly have flue gas therapy system comprehensive [emergency situation by-pass pile, gas cooling system,

two activators as well as also particulates filtering system] as well as assurance of discharges out of burner.

– – – – Training of AKU workers at website.

– – – – Web site could be reviewed as well as likewise take a look at existing ATI manufacturer, capability 150 kg/hr. in 1 day treatment.

– – – – Existing facilities space is conveniently available in basement, 100′ ′ Size x 30 ′ large x 20 ′ Altitude for 2nd Incinerator.

– – – – Existing smokeshaft size is 12 meter, and also size is 24″ ″ dia.

déchets médicaux

———————————–

  • À défaut d’établir l’authenticité du certificat, le soumissionnaire est susceptible de rendre l’offre non recevable et

soumissionnaire ouvert à une action conforme à la réglementation applicable et à agir.

  • Le catalogue original doit être soumis
  • La feuille de données originale doit être soumise

Lot-B

  1. Solidifiant (produit d’élimination des déchets liquides)

Solidifiant des déchets liquides à base d’eau.

Caractéristiques spéciales de Solidifier

Bouteille 21b

  • Solidifie efficacement et rapidement les déchets infectieux potentiellement graves
  • Pénètre rapidement pour solidifier le sang et les fluides corporels pour convertir les gels en quelques secondes
  • Aucune secousse requise
  • Conserve la solidité pour éviter les déversements et les fuites pour un ensachage sûr et facile et un transport facile vers l’élimination
  • Formule concentrée: une once solidifie 1000 cc de liquide
  • Sachets solubles gel 500 cc et 1000 cc, éliminant les déchets de bouteilles en plastique Sans chlore pour une incinération non toxique

Caractéristiques physiques / chimiques:

Point d’ébullition (F): N / A Apparence et odeur: Blanc cassé,

inodore

Pression de vapeur (mm Hg): N / A Volatils (‘% en poids):

N / A

Densité de vapeur (Air = 1): N / A Taux d’évaporation (n-

butylacétate = 1): N / A

Classification HMIS:

Santé: 1: Inflammabilité: 1

Données de réactivité:

Stabilité: stable

Conditions à éviter: aucune connue

Incompatibilité (matières à éviter): Oxydants forts

Décomposition dangereuse: Décomposition thermique: hydrocarbures CO, Co2 et NOx

Polymérisation dangereuse: ne se produira pas

Précautions de manipulation et de stockage:

Conservez dans un endroit frais et sec. Évitez de respirer la poudre. Évitez le contact avec les yeux et la peau. Conserver dans un contenant hermétiquement fermé. 80% des

la durée de conservation doit être présente au moment de la fourniture.

南京伊希歐風淋室專業廠家簡要介紹

2019年05月22日 行業動態 442 views

最專業的南京風淋室供應商-伊希歐是凈化設備製造業的領先企業。多年的發展磨練,積累了豐富的行業經驗和技術,也培養了一批具有專業服務意識的凈化行業工作人員。通過多年的口碑積累,Ecolead的風淋室、潔凈棚、捲簾過濾器、空氣過濾器相關產品得到廣大客戶的信任和喜愛。

選購風淋室產品是一件比較嚴肅和專業的工作,售前我們會提供專業的購前指導意見和選型建議。針對一些潔凈室改造項目,我們會有專門技術人員上門測量繪圖,根據圖紙制定方案和報價。會提供現場安裝(指導)、調試、培訓等服務,提供風淋室設備保養及規範操作培訓。售後我們會有專員定期回訪客戶,一年質保期內非人員損壞免費維修,質保期過後提供優惠配件,終身提供技術指導和諮詢。

南京伊伊希歐就是以始終保持盡善盡美的售前售後服務與產品質量來開拓市場的。您的一次性消費,獲得的是長期的服務與技術支持。

下面簡單介紹下風淋室的構造

1,風淋室的箱體材質採用的是優質冷軋鋼板烤漆處理和不鏽鋼底板。

2,配備大風量雙速高壓風機。

3,採用優質無隔板高效過濾器,過濾效果高達99.99%@0.3um。

4,不鏽鋼噴嘴,出風口的風速>22/s,噴嘴方向可以360度任意調節。

5,配備了紅外線感應器多組,程序預設防逃功能,配合客戶規範風淋室的使用,達到最大化凈化效果

6,不鏽鋼單開門,德國品牌閉門器,可承受長時間高頻率使用。

7,PLC控制系統,進口電器元件,感應自動吹淋,LED顯示吹淋時間(0~99s可調)。

更多內容 網址: www.ecolead.cn 電話: 025-57138032

Medical Incinerator Yd-50

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Medical incinerators instalation in trinidad, medical incinerators manufacturers, medical incinerators small, medical incinerators supplier, medical incinerators suppliers, Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below: 

Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant. 

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators 

Incinerator fuel: Gas incinerator, oil incinerator 

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer. 

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree
2nd. Chmaber Temperature 800degree–1000degree 800degree–1000degree 800degree–1000degree 800degree–1000degree

little array incinerator of shedding capacity

Chicken Burner – – – – 400 kgs feed per day.a tiny scale incinerator of shedding capability 30kg/hr= 1No. Note that it needs to be mobile as this is meant for oil areas service tented camps. It has to be diesel operated as our location is remote. 150! kg per human resources LPG electric burner to be utilized at the international airport. This is a requirement bu the biography safety and security and also security that all global flights need all rubbish sweltered within a recognized time.Required lots ability is 150Kg
Chamber – – – – Primar 900 liters Additional: 300Litres
Smokeshaft 8M
Burning Cost: 50kgs/hr Yes.
Feed Capability: 150kgs Yes.
Key Burning Chamber: 900 litres Yes.
Second Combustion Chamber: 300 litres Yes.
Mix Combustion Chamber: Yes Yes.
Smoke Filter Chamber: Yes Yes.
Feed Setting: Manual Yes.
Power: 0.7 Kw Yes.
Gas Kind: Diesel Oil/ Natural Gas/LPG Yes. Various Price if oil or gas fuel.
Internal Dimensions: 120 x 90 x 85cm (trick chamber) Yes.
Outdoors Dimensions: 200 x 160 x 310cm (without smokeshaft) Yes.
Burning Performance: >> 98% Yes

Medical Waste Burner of 20 kg/hr capability with dual burner

3 Medical Waste Incinerator of 20 kg/hr capability with twin burner.Medical Waste Incineration Systems. I’m interested to destroy about 200 kg proceeds to be. A Medical Burner job for Tehran district. Our purpose for this job is to establish a plant so as to combat Medical waste with 50 ton/day capability. A burner with 100 kg/ hr burning capacity. Also as it ought to work with gasoline, 2 room. Waste management
Equipé de: 1 brûleur de combustion + 1 brûleur de re-combustion + 1 laveur de fumées. Capacité de destruction horaire.
Cheminée:.
* Density of wall surface in base 18cm.
Measurement de la porte de chargement: environ 50X50 cm

Material Required.
* Outside size at top 4 1/2 feet 1.35 m.
* 2 empty kerosene tins for making air vent holes.

Medical Waste Incinerator Ts50 PLC

Basic Info.

Model NO.:china medical waste incinerators manufacturer
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that's mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. China animal cremation, china incinerator supplier, cloverincinerator, garden incinerator, hog incinerator, infectious waste pyrolysis machine china, The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm

eco pleasurable burner

50 bed medical care center as well as additionally would enjoy to have your recommendation for burner that can effectively handle the tons of 50 bed hospital.Incinerator for burnable garbage (paper & & & & natural) device ability (100/150 lts). Bio Medical Waste Incinerators,

Ability: 50kgs per hr Medical Waste Burner Design TS50 (PLC) with both choice on Fuel (Gas as well as additionally/ or Diesel2 Burners
2 Temperature degree Thermocouple
5 meters for thermal gasket
1 heater control instance
1 Blower ecologically friendly incinerator for shedding polyproplylene bags we have 10 lots weekly