Archive: April 22, 2022

HICLOVER Medical Waste Burner in Supply( Finished and Brand-new and semi-finished Production).

Model Capacity/Burnning Rate For Hospital SickBed No. Fuel Type Qty. Ready for Shipping New Production  Shipping Volume Shipping Weight Delivery Location
TS30 average 30kgs per hour Average 150 SickBed Diesel Oil 1 set 5 days 20sets/2 weeks 5 m3 3000 kgs Shanghai Port
TS50 average 50kgs per hour Average 250 SickBed Diesel Oil 1 set 7 days 20sets/2 weeks 7m3 4500 kgs Shanghai Port
TS100 average 100kgs per hour Average 500 SickBed Diesel Oil 1 set 7 days 15sets/2 weeks 10m3 6000 kgs Shanghai Port
TS150 average 150kgs per hour Average 750 SickBed Diesel Oil 5 sets 7 days 15sets/2 weeks 13m3 7500 kgs Shanghai Port
YD10 average 10kgs per hour Average 50 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 3m3 1200 kgs Shanghai Port
YD20C average 20kgs per hour Average 100 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 6m3 2000 kgs Shanghai Port
YD50C average 50kgs per hour Average 250 SickBed Diesel Oil 2sets 7 days 20sets/2 weeks 7m3 2300 kgs Shanghai Port
YD30 average 30kgs per hour Average 150 SickBed Diesel Oil 1 set 5 days 20sets/2 weeks 5m3 2300 kgs Shanghai Port
YD30 Small average 30kgs per hour Average 150 SickBed Diesel Oil 2sets 5 days 20sets/2 weeks 3m3 1500 kgs Shanghai Port
YD50 average 50kgs per hour Average 250 SickBed Diesel Oil 2 sets 5 days 20sets/2 weeks 8m3 4500 kgs Shanghai Port
YD100 average 100kgs per hour Average 500 SickBed Diesel Oil 1 set 10 days 15sets/2 weeks 13m3 6000 kgs Shanghai Port
YD150 average 150kgs per hour Average 750 SickBed Diesel Oil 1 set 10 days 15sets/2 weeks 17m3 7500 kgs Shanghai Port
YD300 average 300kgs per hour Average 1500 SickBed Diesel Oil     10sets/2 weeks 20m3 9000 kgs Shanghai Port
YD500 average 500kgs per hour Average 2500 SickBed Diesel Oil     5sets/2 weeks 27m3 13000 kgs Shanghai Port
CA 50 Mobile Containerized average 50kgs per hour Average 250 SickBed Diesel Oil 2 sets 15 days 10sets/2 weeks 28m3 7000 kgs Shanghai Port
                   
1. Information High frequency change, for reference only.                  
2. Price as formal quotation and technical details and business term                  

HICLOVER – Medical Environmental 


 
Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: [email protected]
Email: [email protected]  
Nanjing Clover Medical Technology Co.,Ltd.

 

laboratory incinerator china manufacturer

Solid waste to be incinerated

 

 

Cartons,  rags,  cotton  and  other  wastes  associated  with  generation  of  electricity loaded in the incinerator in

bags.

Loading capacity: At least 100 Kg / h

 

 

Start up fuel

 

 

Diesel Oil

 

 

 

2.3  Incinerator Supply

 

 

The incinerator shall be equipped with sludge pumps that allow homogenous flow of sludge to its burner. These pumps

shall deliver waste oil from the incinerator sludge mixing tank to the incinerator. Operation and control of these

pumps shall be fully automatic. A linear negative feedback control algorithm shall be used to adjust the feed rate of

the sludge pumps and hence vary the quantity of sludge being incinerated. The sludge line shall also be equipped with

appropriate self cleaning filter that will keep impurities away from the burner.

A  sludge  mixing  tank  equipped  with  a  superheated  water  heater  shall  also  be

provided. A Superheated water heater shall be provided to heat the waste oil to the inlet temperature required by the

incinerator. In case a superheated water heater

 

cannot be provided, an electric heater shall be provided for the tank. The tank shall also be equipped with a magnetic

level indicator, level switches and appropriate drain valves, separate overflow and vent pipes.

 

 

Characteristics of superheated water available at the power station are as follows; Pressure and temperature of

superheated water at supply manifold; P = 10 Bars, T = 150 Deg

Pressure and temperature of superheated water at return manifold; P = 8.5 Bars, T = 140 Deg

déchets cytotoxiques

Notre intérêt est d’éliminer principalement les déchets cytotoxiques, en particulier les médicaments cytotoxiques périmés ou hors spécifications. De nombreux autres déchets pour lesquels nous voulons nous débarrasser des déchets cytotoxiques comprennent des produits pharmaceutiques psychotropes obsolètes ou hors spécifications (mais pas constamment des stupéfiants), des objets tranchants (aiguilles) et ainsi de suite.

Il est en outre très important pour nous de reconnaître si l’appareil est certifié pour traiter les déchets cytotoxiques ainsi que les caractéristiques ainsi que l’élimination des dépôts thérapeutiques.

La quantité d’élimination est au minimum d’environ 100 kg par jour. De plus grandes capacités d’environ 500 à 600 kg / j sont également d’un grand intérêt pour nous. Par conséquent, veuillez nous envoyer votre proposition pour les deux capacités quotidiennes susmentionnées.

TECHNICAL INCINERATORS REQUIREMENTS FOR 2 health centers in Kenya


TECHNICAL INCINERATORS SPECS FOR 2 medical facilities

INTRO

  • All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rdschedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
  • The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
  • The incinerator shall be run on a 3-phase power supply (mains)
  • For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
  • The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power Supply, Climate, Temperature, Humidity, etc.
  • The Bidder must provide a warranty for one year.
  • All text, parameter etc. on all control operating interfaces as well as on information displays and on print-outs shall be in English language.
  • The Bidder is responsible for all permits and approvals for importation. The Bidder shall provide all the necessary documentation in order to facilitate the legal requirements for the installation and putting into use of the equipment.
  • Period of Execution is 90 days from contract signature for delivery to site and completion of all verification operations required for the issuance of provisional acceptance.
  • Representatives of the Contracting Authority and the Beneficiary, together with the Bidder’s representative, shall carry out the controls, testing and initial approval for provisional and final acceptance as.  The provisional and final acceptance shall take place at the final destination.
  • After-Sales Service: The Bidder is required to ensure that a maintenance, service and repair centre, which is authorised by the Manufacturer, and which is able to rapidly supply genuine spare parts and consumables recommended by the Manufacturer is available throughout the one year warranty period. In fulfillment of this requirement with their offer Bidders must submit a statement signed by a representative of the manufacturer:
    • Providing the name and address of its authorised maintenance, service and repair centre,
    • Confirming that this authorised maintenance, service and repair centre is able to rapidly supply genuine spare parts and the consumables recommended by the Manufacturer; and
  • The Bidder will be responsible to deliver and install all to be supplied equipment at to be set up waste handling areas in the Republic of Kenya. The Bidder shall deliver a time schedule over the complete construction and assembling period. The delivery and installation time must be agreed between bidders, target Hospital and the Contracting Authority. The treatment plant must arrive pre-assembled. The Bidder shall ensure that all parts of the plant transported by sea shall not be shipped as “deck cargo”.
  • It is expected that the Bidder cooperates closely with the contractor for the new waste handling building/area and will make available all needed technical information, drawing, etc. to the contractor.
  • The Bidder shall supply and install the incinerator with the following attached specifications
           
TECHNICAL INCINERATORS SPECIFICATIONS FOR EAPHLNP
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerators to Nema standards        
  The following are the incinerator specifications :-        
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste        
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
  Carried Forward To Collection Page.        
  NOTE: WE REQUIRE TWO INCINERATORS. ONE        
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

The tank requirement to be attached to the burner at a better level to make it possible for free-flow of diesel from the storage space tank to the burner.

Item 1    
C Installation & commissioning works        
D Positioning of Incinerator: –

EVALUATION STANDARD

Item 1    
E Connect burners to fuel supply. No. 2    
F Chimney Installation:        
 G Composition of the chimney: –

Analysis will certainly be performed in 4 phases particularly initial assessment of documents for uniformity with obligatory demands, technical assessment, website check out and additionally commercial exam.

100

Pass mark for technical analysis is 70/100 marks

Item. 1    
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1    
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3    

Stage 3: Internet Site Browse With

The assessment committee will certainly check out the properties of the prospective purchasers who are receptive to technical evaluation stage to validate the credibility of legal documents sent out; establish the accuracy of the information offered in the tender documents, analyze firm’s capacity, area, to call a couple of.
LOCATION V– – TIMETABLE OF STANDARD

NO

NO

1

NO

1

ITEM DESCRIPTION UNIT QTY MARKS ALLOCATED   MARKS RECEIVED  
           
  Incinerator        
  To supply and install the following    2NO.    
  Hospital Incinerator to Nema standards        
  The following are the incinerator specifications :-        
           
A Ø      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste     35  
  Ø      Waste density:   125 to 350Kg/M³        
  Ø      Waste CV:        4000 KCAL/Kg        
  Ø      Moisture content:   10-25%        
  Ø      Estimated ash residue: 5-10%        
  Ø      Nominal capacity:   100Kg/hour batch load        
  Ø      Secondary chamber:  2 second @ 1100ºC        
  Ø      Environmental:    NEMA ACT           (EMCA) 1999        
                Clean Air Act 1999        
  BS3316 1987        
  Equipment Set      
  The Incinerator must comprise of: –        
  Ø      Manual Loading door (heavy duty steel door with appropriate refractory lining)        
  Ø      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long        
  Ø      Full sized bulk load/ash removal door        
  Ø      1 off diesel-fired ignition burner – temperature controlled        
  Ø      1 off combustion air supply fan and distribution system, automatic control        
  Ø      High capacity secondary combustion chamber 2 second @ 1100ºC with        
  Ø      1 off diesel-fired afterburner – temperature controlled        
  Ø      Control Panel – automatic operation        
  Ø      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super duty 100mm thick firebrick with 25mm thick calcium silicate insulation)        
  Ø      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the incinerator        
           
ITEM DESCRIPTION UNIT QTY RATE KSHS.
B Diesel Tank:        
  To provide for diesel service tank (Capacity 400 litres) including level indicator

Hallmark of tenderer

Item 1 20  
C Installation & commissioning works        
D Positioning of Incinerator: –

Note: In situation of variance in between system price as well as total quantity, the device price will control.

Item 1 10  
E Connect burners to fuel supply. No. 2 5  
F Chimney Installation:        
 G Composition of the chimney: –

AREA VI – – – – CONVENTIONAL FORMS

TECHNICAL INCINERATORS SPECS FOR 2 clinical centers

INTRODUCTORY

Item. 1 10  
H Commissioning & Training:        
  Testing set operating parameters, training of operators and technical staff. Item 1 10  
I Commissioning Maintenance Contract        
  Before the expiry of the warranty/signing off, the suppler shall provide a one-year replacement service parts (e.g. filters, air filters), the Quarterly routine maintenance price per quarter for three (3) quarters. Maintenance contract proposal).  The maintenance contract price includes labour, transport and accommodation for the attending technicians. Item 3 10  
  TOTAL      

The container need to be affixed to the incinerator at a greater level to make it possible for free-flow of diesel from the storage tank to the burner.

 

EXAM CRITERIA

Analysis will be executed in 4 stages specifically preliminary examination of files for uniformity with required demands, technical assessment, site check out as well as likewise industrial exam.

100

Pass mark for technological evaluation is 70/100 marks

Phase 3: Web Site Browse Through

The assessment board will inspect out the properties of the potential buyers that are responsive to technical analysis phase to confirm the credibility of lawful data sent out; develop the accuracy of the details provided in the tender documents, analyze company’s ability, location, to call a few.

Phase 4 Company Analysis

ITEM

Quotes that pass the above 3 (3) phases will be contrasted on the basis of prices/ cost approximated and the most affordable valued will definitely be taken into factor to consider the cheapest analyzed proposal as well as additionally consequently suggested for honor.

ITEM DESCRIPTION UNIT QTY. REQUIRED UNIT PRICE (KHS) REMARKS
1. Supply, Delivery, installation and commissioning of Incinerator in  

NO

 

1

   
2. Supply, Delivery, installation and commissioning of Incinerator  

NO

 

1

   

Trademark of tenderer

Note: In case of inconsistency in between system cost and total amount, the unit rate will dominate.

SECTION VI – – STANDARD FORMS

  1. Form of tender
  2. Contract form
  3. Confidential Questionnaire form
  4. Tender security form
  5. Performance security form
  6. Bank guarantee for advance payment
  7. Declaration form


Incinerator Light Delivery Weight Small-Scale Healthcare Facility Medical, Containerized Mobile Incinerator Optional

Light Weight Small-Scale Medical, Mobile Optional Type

Two Chamber Medical Waste Incinerator

Basic Info.

Model NO.:tempreture of the stoker moving grate incinerator
Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs big medical incinerators, big scale medical waste incinerator, bio medical incenarator manufacturer in china, bio medical waste incinerators manufacturers china, per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock. 

Application Scope: 
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste. 
3. Community & Sea Port & Station: Municipal Solid Waste, etc. 
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Top Feeding Door Solid Waste Incinerators HICLOVER

HICLOVER Top Feeding Door Waste Incinerators

▲Large Feeding Door
▲Better for Animal Waste Cremation
▲HICLOVER Brand Section


***Primary Combustion Chamber
***Secondary Combustion Chamber
***Smoke Filter Chamber
***Optional Wet Scrubber System(1 section or  3 sections)

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items Side Loading Door Top Loading Door
Cost Cheap High cost
Manufacture Tech. Easy A litter difficult
Safty safe safer
Incinerator Shape L/ I
Loading manual big door can be by Forklift
Land occupation small big
Ash door same with feeding door or alone alone
market share Most-CHINA/USA/INDIA Few- UK/USA
Dooring open type Manual Pry bar/Hydraulic pressure
Dooring Open size small big
Better for medical bag waste animal waste
open when burning safer, can feed waste, few smoke not safe, cannot feed waste, most smoke



parts of an incinerator
physical method of disposing hazardous chemical waste
portable incinerators types
proper ways of waste disposal in the community
questionnaire to ask about incinerators for collection of data

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

 

2020-08-07

SK Hynix Semiconductor (China) Co., Ltd.

2019-05-20 ความสำเร็จและ คดี311 views

SK Hynix Semiconductor (China) Co., Ltd.

ชื่อโครงการ: SK Hynix Semiconductor (China) Co., Ltd. Automatic Roller Blind Air Filter

แนะนำโครงการ: ตัวกรองหลักส่วนหน้าของหน่วยอากาศบริสุทธิ์

ระยะเวลาดำเนินการ: 2015.9, 2016.8

SK Hynix เดิมชื่อ Hyundai Electronics Industry Co., Ltd. ก่อตั้งขึ้นในปี 1983 จดทะเบียนอย่างเป็นทางการในเกาหลีในปี 1996 เข้าซื้อกิจการ LG Semiconductor ในปี 1999 แยกจาก Hyundai Group ในปี 2544 และเปลี่ยนชื่อเป็น Hynix Semiconductor

ในเดือนตุลาคม 2547 ธุรกิจระบบ IC ถูกขายให้กับ Citigroup และกลายเป็นผู้ผลิตหน่วยความจำระดับมืออาชีพ
SK Hynix มุ่งมั่นที่จะผลิตผลิตภัณฑ์เซมิคอนดักเตอร์ที่ไม่ใช่หน่วยความจำโดยใช้ DRAM, NAND Flash & CIS
ปัจจุบัน มีสายการผลิตแผ่นเวเฟอร์ขนาด 8 นิ้วหนึ่งสายและสายการผลิตขนาด 12 นิ้วสองสายในเกาหลีใต้ และสายการผลิตขนาด 12 นิ้วหนึ่งสายในอู๋ซี ประเทศจีน
SK Hynix เป็นผู้ผลิต DRAM รายใหญ่เป็นอันดับสองของโลก และในปี 2550 บริษัทได้เติบโตเป็นบริษัทเซมิคอนดักเตอร์ที่ใหญ่เป็นอันดับหกของโลก
ปัจจุบันมีบริษัทขายและสำนักงานอยู่ทั่วโลก
SK hynix นั้นมีฐานที่มั่นคงในด้านหน่วยความจำเซมิคอนดักเตอร์ ซึ่งส่วนใหญ่เป็น DRAM และหน่วยความจำแฟลช และค่อยๆ เติบโตจนกลายเป็นซัพพลายเออร์อุปกรณ์เซมิคอนดักเตอร์ที่ครอบคลุมผ่านการกระจายหมวดหมู่ผลิตภัณฑ์ รวมถึงกลยุทธ์ในการก้าวเข้าสู่ธุรกิจ CIS

SK Hynix เป็นบริษัทผู้ผลิตหน่วยความจำระดับโลกที่ก่อตั้งโดยบริษัทร่วมทุนในเขตผูกมัดที่ครอบคลุมของเขต Wuxi New District มณฑลเจียงซู

ผลิตภัณฑ์หลักของบริษัทคือเวเฟอร์วงจรรวมขนาด 12 นิ้ว ซึ่งใช้ในหน่วยความจำโซลิดสเตต เช่น PC, Server, Graphic, Mobile และ Graphic

โครงการนี้เป็นโครงการอุตสาหกรรมเพียงโครงการเดียวที่ได้รับอนุมัติจากสภาแห่งรัฐสำหรับการก่อสร้างในอู๋ซี ระยะแรกมีมูลค่า 2 พันล้านดอลลาร์สหรัฐ ระยะที่สอง 1.5 พันล้านดอลลาร์สหรัฐ ระยะที่สาม 2.555 พันล้านดอลลาร์สหรัฐ และระยะที่สี่คือ มูลค่า 2 พันล้านดอลลาร์สหรัฐ โครงการ SK Hynix เป็นโครงการที่มีการลงทุนด้านเซมิคอนดักเตอร์ในประเทศที่ใหญ่ที่สุดและเทคโนโลยีที่ล้ำหน้าที่สุดยังเป็นโครงการเดียวที่ลงทุนโดยต่างชาติที่ใหญ่ที่สุดในมณฑลเจียงซู
บริษัทใช้เทคโนโลยีชั้นนำของโลกในการผลิตผลิตภัณฑ์ DRAM
SK Hynix Semiconductor (China) Co., Ltd. มุ่งมั่นที่จะสร้างฐานการผลิตเซมิคอนดักเตอร์อันดับหนึ่งของโลก ในขณะเดียวกัน ก็ปฏิบัติตามความรับผิดชอบต่อสังคมอย่างจริงจัง มีส่วนร่วมอย่างแข็งขันในการดำเนินการด้านสวัสดิการสาธารณะ และแสวงหาสวัสดิการสำหรับสังคม

URL เนื้อหาเพิ่มเติม: www.ecolead.cn โทร: 025-57138032

Bagaimana memilih antara gudang bersih dan bengkel bebas habuk?

22 Mei 2019 Berita Industri 413 tontonan

Bagaimana memilih antara gudang bersih dan bengkel bebas debu?

Secara umum, kebanyakan pelanggan akan membina gudang bersih di bilik yang bersih, tetapi sebilangan pelanggan tidak mahu membina bilik bersih yang terpisah. Di gudang bersih, sistem penyaman udara, pancuran udara, tingkap pemindahan dan peralatan pemurnian lain tidak dipertimbangkan. Kos gudang bersih adalah sekitar 40% hingga 60% dari kos bilik bersih , yang bergantung pada pilihan bahan gudang bersih dan ukuran ruang bersih pelanggan. Semakin besar kawasan yang perlu dibersihkan , semakin kecil perbezaan kos antara ruang bersih dan bilik bersih.

  1. Bangsal bersih
Gudang bersih, juga dikenal sebagai gudang bersih bebas debu / gudang pembersih bersih / gudang bersih 100-gred / gudang bersih beribu-ribu / gudang bersih 10,000-gred, tertutup di ruang bengkel bebas debu bergolak dengan plastik lutsinar anti-statik kain. Ruang kecil, menggunakan unit bebas HEPA atau ULPA dan penyaman udara untuk menjadi ruang bersih yang lebih tinggi, parasnya 100 ~ 10000 , ketinggian ruang dalaman kira-kira 2.0 meter, kawasan liputan kurang dari 50m2 , empat tiang dapat dipasang roda kegiatan, untuk fleksibilitas penggunaan, dapat dilengkapi dengan penggunaan pancuran udara.

2. Bahan bangsal yang bersih:
Secara amnya terdapat tiga jenis bingkai gudang bersih: keluli tahan karat keluli tahan karat, lorong persegi besi, dan profil aluminium.
Secara amnya terdapat tiga jenis bahan untuk bahagian atas gudang bersih: plat keluli tahan karat, plat keluli tergulung sejuk yang disembur, tirai grid anti-statik, ( plat anti-statik ) akrilik. Untuk bahagian bekalan udara bersih, biasanya pilih tudung aliran laminar FFU ( unit bekalan udara laminar FFU)

Bahan kandang untuk gudang bersih umumnya merangkumi: langsir anti-statik, ( anti-statik ) panel akrilik.


3. Pemilihan tahap penyucian gudang bersih:
Lebih banyak pelanggan akan memilih gudang bersih gred seribu, atau gudang bersih gred sepuluh ribu, dan sebilangan kecil pelanggan akan memilih gudang bersih gred seratus atau sepuluh ribu. Ringkasnya , pilihan tingkat gudang bersih bergantung pada kebutuhan kebersihan pelanggan, tetapi kerana gudang bersih relatif kedap udara, jika tingkat gudang bersih relatif rendah, maka akan sering membawa beberapa kesan sampingan. tidak mencukupi, dan pekerja akan merasa berada di gudang bersih. Sedap
dan panas, jadi anda perlu memperhatikan hal ini dalam proses komunikasi yang sebenarnya dengan pelanggan.


4. Perbandingan kos antara bengkel bersih dan bebas habuk:
Secara umum, kebanyakan pelanggan akan membina gudang bersih di bilik yang bersih, tetapi sebilangan pelanggan tidak mahu membina bilik bersih yang berasingan. Apabila gudang bersih tidak mempertimbangkan sistem penyaman udara, bilik mandi udara, tingkap pemindahan dan peralatan pembersih lain , Kos gudang bersih adalah sekitar 40% hingga 60% dari kos bilik bersih , yang bergantung pada pilihan bahan gudang bersih dan ukuran ruang bersih pelanggan. Semakin besar kawasan yang perlu dibersihkan , semakin kecil perbezaan kos antara ruang bersih dan bilik bersih.


5.
Kelebihan gudang bersih:
A.
Kelajuan pembinaan yang cepat dan pemasangan yang mudah
B.
Kos rendah dan penyelenggaraan yang mudah
C.
Mudah dikendalikan, setiap FFU mempunyai kipasnya sendiri

Lebih banyak URL kandungan: www.ecolead.cn Tel: 025-57138032

CHAUFFE-EAU PYROLYTIQUE HAUTE TECHNOLOGIE

BRÛLEUR DE DÉCHETS MÉDICAUX PYROLYTIQUE AVANCÉ

1. Capacité de dommages en poids: 60 Kg / h.
2. Il doit avoir la capacité de fonctionner très peu moins de 10 heures / jour
3. Ce brûleur doit avoir la capacité de détruire tous les déchets inflammables générés par les centres de santé,
installations personnelles, laboratoire, instituts, etc ………….
4. Spécifications de mise en page: Types A, B, C, D, ainsi que E de déchets médicaux.
5. Brûlage PYROLYTIQUE, en gérant la gazéification des déchets.
6. Le brûleur doit empêcher le lancement de fumée noire en plus de la poussière fine, (électrique) pendant le.
chargements.
7. Il devrait avoir la capacité de réduire la quantité de déchets de 98%.
8. Il devrait être en mesure de retenir l’échappement dans le 2e hangar avec une résidence de gaz d’au moins 2 secondes.
9. L’incinération doit être totalement dépourvue de fumée visible et d’odeurs gênantes.
– Les degrés de température de combustion: Le minimum sera certainement de 850 ° C ainsi que le maximum de 1400 ° C – – Message de combustion:>> 1100 ° C.
11. La taille intérieure de l’arbre à fumée: Ø 400 ainsi que son altitude: 8 m.
12. La quantité de la chambre de combustion: 1.200 L.
13.
14. La procédure du système de chauffage doit être Marche / Arrêt automatique.
15. Carburant: diesel.
16. Le fournisseur doit fournir les détails nécessaires pour le meilleur absolu de la tranche Cet incinérateur.
avec une combustion «PYROLYTIQUE» doit avoir:.
17. Une chambre de combustion des déchets :.
* Porte parfaitement étanche pour le chargement manuel des déchets. Le remplissage doit certainement être manuel, établi.
Des tonnes.
* Une unité de chauffage d’éclairage dont l’utilisation est limitée à l’inflammation des déchets.
* Façade de remplissage avec joints de porte augmentée sur charnières, roue de bouchon à vis, joint adaptable, ainsi que aussi.
emballage protégeant en réfracteur.-.
* L’isolation de la chambre de combustion doit être constituée de briques réfractaires.
ayant un haut matériau en aluminium et protège également les obstructions afin de garantir un minimum.
niveau de température extérieur en tôle d’acier.
* Cadre du réfractaire;
– – Béton réfractaire:.
>> Épaisseur:>> 100 mm ”.
->> Nature: 42% de A1203.
– Sauvegarde dans les panneaux grossiers:.
>> Épaisseur:>> 75 mm.
>> Nature: silicate de calcium. * Système de chauffage d’illumination des déchets, à gaz, épandage mono-bloc conventionnel menant à la plongée.
flamme, éclairage ainsi que sécurité et sûreté et sécurité de l’allumage électronique, flux d’air irréversible, écluse électromagnétique.
passerelle de régulation ainsi que vanne de séparation.
* Plaque de brûlage au Carborundum, évitant le traitement du verre avec les scories.

18. Une chambre de combustion des gaz.
* Un appareil de chauffage de combustion de gaz ,.
* Un gadget de tir d’air permettant une recombinaison totale des gaz ,.
* Un gadget d’entrée d’air de refroidissement des gaz résiduaires.
* Une gaine de vidange des gaz carbonisés.
* Carcasse en tôle d’acier solide avec l’aide de la connexion.
* Cadre du réfractaire;.
– – Béton réfractaire:.
>> Épaisseur:>> 150 mm.
>> Nature: 65% de A1203.
– – Bouclier en panneau fibreux:.
>> Épaisseur:>> 85 mm.
>> Nature: Calcium.
* Unité de chauffage au gaz, type de guidage dispersant mono-bloc avec feu droit, éclairage ainsi que sécurité de.
allumage numérique, ventilation à long terme, entrée électromagnétique de la ligne de guidage et diviseur de même.
éteindre.

19.

20.
* Electro-ventilateur diffusant l’air supplémentaire, le standard de la circulation d’air étant.
accomplie par des valves avec l’adhérence à la commande du cycle automatisé.

21. Contrôles et directives :.
Boîtier de commande étanche à la saleté, y compris:.
* Un interrupteur à bouton pour chaque moteur (chauffages et ventilateurs).
* Une minuterie avec temporisation réglable pour la politique de chaque unité de chauffage.
* Un régulateur avec montre pour le degré de température de combustion.
* Une autorité de régulation à la recherche de la température de postcombustion.
* Boîte électrique.

21. Le décendrage doit être effectué au niveau le plus bas de la chambre de combustion ou de la décendrage.
Améliorer le système de filtrage: l’épurateur doit être mentionné comme facultatif

23. Conformité aux critères de publication: BS 3316 ou norme similaire

23. Capacité à traiter le plastique: pas beaucoup moins de 40% en poids

24.
brûleur.

23. Le brûleur installé doit donner naissance à une garantie d’un an.
Le fournisseur effectuera certainement une installation sur place du chauffage.

25.
usine de fabrication; il comprendra absolument un entretien médical et préventif, ainsi que l’utilisation d’outils, etc.

NB .; Les travaux civils ainsi que tout type de diverses autres options pertinentes pour l’installation ainsi que la formation des conducteurs doivent être inclus dans le tarif du chauffe-eau.

Besoins pour l’abri du brûleur:

Résidence de l’incinérateur complète dans l’offre (votre résidence doit avoir des toilettes ainsi que des installations de nettoyage des mains ainsi que la lutte contre les incendies). L’abri mesurera 4 mètres sur 6 mètres et sera pourvu d’une ventilation appropriée.

Ce matériel ainsi que l’équipement devraient inclure dans le hangar de l’appareil de chauffage: la structure en débris de roche, l’isolation de la couverture de toiture par rapport à l’humudité; élévation avec bloc de 20 centimètres (bloc béton), linteau continu (linteau) en béton armé; charpente en acier (charpente en acier); couverture de toiture en tôle BCA 28 BG

23. Conformité aux exigences de sortie: BS 3316 ou norme similaire

23. Capacité à traiter le plastique: pas beaucoup moins de 40% en poids