Incinerator A360
Basic Info.
Additional Info.
Product Description
Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator s/p incinerator, sample business proposals for small incinerators and combutors, sample format of medical waste incinerator document model, saudi arabia, animal cremation, technical is main waste treatment all of the world, for Medical waste, Pet animal cremation and other Solid waste. The capacity from 10kgs/Hr. To 600kgs/Hr., up to 10ton per day.
Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:
Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators
Incinerator fuel: Gas incinerator, oil incinerator
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour
| Items | Specification | |||
| Model | A360 / A600 / A900 / A1200 / A1500 / A2400 / A4000 / A5500 | |||
| Main Product List | Primary Combustion Chamber | |||
| Secondary Combustion Chamber | ||||
| Mix Combustion Chamber | ||||
| Smoke Filter Chamber | ||||
| Incinerator Common Control Case | ||||
| Stainless Steel Chimney | ||||
| Italy oil/gas burner: 02 units | ||||
| Oil Tank (if oil fuel) | ||||
Coût d'incinération pour les animaux de compagnie Coût de fonctionnement 100 kg
Informations de base.
Description du produit
Nanjing Clover Medical Technology Co., Ltd., local dans la ville de Nanjing, Chine. CLOVER est fabricant de produits médicaux, d’incinérateur de déchets et d’autres fours de crémation pour animaux de ferme, d’incinérateur de crémation de crémation pour animaux de ferme, d’incinérateur pour animaux de ferme, d’incinérateur à filtre, d’équipement de protection de l’environnement. Le réseau de marché à travers le territoire de la Chine et plus de 30 pays à travers le monde.
Principales caractéristiques:
* Tous les modèles avec double chambre de combustion.
* Cheminée / cheminée en acier inoxydable, longue durée de vie. * selon commande
* Haute température, longue durée de vie de l’incinérateur.
* Installation gratuite ou minimale sur site.
* Taux de combustion élevé, de 10 kg à 500 kg par heure, jusqu’à 6 tonnes par jour.
* Plan de contrôle PLC. * selon commande
* Nouveau design pour les entreprises de crémation d’animaux de compagnie.
* Garantie d’un an sur l’incinérateur et les pièces en stock.
Champ d’application:
1. Hôpital et clinique: Déchets Iatriques, Déchets infectieux, pansements, biodéchets, médicaments.
2. Abattoir et hôpital pour animaux de compagnie et ferme: animaux morts, biodéchets.
3. Port et gare communautaires et maritimes: déchets solides municipaux, etc.
4. Laboratoires, sites éloignés, opérations de secours en cas de catastrophe, crémation d’animaux
| Articles / modèle | YD-200 | YD-300 | YD-500 | YD-600 |
| Taux de combustion (kg / heure) | 200 kg / heure | 300 kg / heure. | 500 kg / heure | 600 kg / heure |
| Capacité d’alimentation (kg) | 400 kilogrammes | 500 kilogrammes | 800 kilogrammes | 1100 kilogrammes |
| Poids de l’équipement | 7600 kilogrammes | 8300 kilogrammes | 13000 kilogrammes | 16500 kilogrammes |
| Chambre primaire (litres) | 2000 | 2400 | 4000 | 5500 |
| Chambre secondaire (litres) | 500 | 1200 | 1500 | 1500 |
| Dimensions extérieures (cm) | 270 x 185 x 380 | 260 x 220 x 420 | 320 x 220 x 460 | 360 x 220 x 475 |
| Dimensions internes (cm) | 180 x 115 x 96 | 220 x 110 x 100 | 257 x 147 x 108 | 300 x 147 x 125 |
| Réservoir d’huile (litres) | 300 | 500 | 500 | 500 |
| Ouverture de porte (cm) | 59 x 81 | 90 x 110 | 108 x 128 | 108 x 128 |
| Cheminée (M) | dix | dix | 14 | 14 |
| Type de cheminée | Acier inoxydable | Acier inoxydable | Acier inoxydable | Acier inoxydable |
| Chambre secondaire | OUI | OUI | OUI | OUI |
| Chambre de mélange-combustion | OUI | OUI | OUI | OUI |
| Chambre de filtre à fumée | OUI | OUI | OUI | OUI |
| Combustible de combustion | Gaz de pétrole | Gaz de pétrole | Gaz de pétrole | Gaz de pétrole |
| Temps de résidence | 2,0 sec. | 2,0 sec. | 2,0 sec. | 2,0 sec. |
| Surveillance de la température | OUI | OUI | OUI | OUI |
New Courtice incinerator Strikes further delays
CLARINGTON — Clarington’s brand new energy-from-waste facility is going to be delayed a second time because the boilers aren’t operating correctly and the continuing startup period may cost Durham Region an extra $1 million.
“I would rather see it delayed and performed right than hurried,” said Clarington Mayor Adrian Foster.
The Durham York Energy Centre centre, situated in Courtice, has been scheduled to be fully operational on Dec. 14, 2014. Currently the Durham York Energy Centre is not expected to be in full working order before the past quarter of 2015.
The significant systems of the EFW facility are analyzed. The boiler temperature is large enough to the combustion process however the steam temperature is not high enough, and officials aren’t certain what the issue is, says Durham’s works commissioner, Cliff Curtis.
The steam temperature needs to be large enough to drive the turbine-generator. If the steam is too trendy it may damage the turbine.
“It is like running a car with oil,” said Mr. Curtis.
Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for alterations, based on Mr. Curtis. It is expected to take three weeks to the repairs and alterations. Afterward there’ll be a four-week presentation period, followed with a 30-day approval test.
“We’re not getting the temperature we expected out of this boiler. “It is Covanta’s difficulty to deliver us the product that plays the way they said, so they’re going to select the time they require.”
The delay means additional consultant costs for building management, legal advice and baseline ambient air monitoring. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be provided from a temporary draw the solid waste management reserve fund.
“What’s the last price going to look like?” “There are definitely issues with getting it started out”
Since Jan. 16, Durham has been charging Covanta a $10,000-a-day overdue fee for each and every day that the EFW facility is not fully operational. The bill has been delivered to Covanta, however, it hasn’t been paid yet, according to Mr. Curtis. It was a part of a testing phase before the centre opens fully.
Durham cancelled landfill contracts and started sending garbage into the Courtice centre. Some garbage was burnt in the EFW plant during the evaluation phase, without generating power to the grid. Covanta has also been sending the trash to its incinerator in New York state, or landfills in the Niagara area.
Until the EFW facility is ready to go, the Region only pays Covanta half price of the agreed upon per-tonne fee. But, Durham is not earning any money before the plant is fully operational and promoting power back on the grid.
“We’re still on funding.
The plant building is arriving in slightly under budget, according to the works commissioner.
There are a few loose ends that might end up costing Durham Region more money. There’s still disagreement with former property owners on the value of this property expropriated for the facility, and a ruling is not expected until fall of next year. The final price for the utility building and connection costs is expected in coming months. The baseline ambient air monitoring runs till the EFW facility is operational, so the delay in launching means a continuing monitoring price.
“There’s some small cost over-runs on a few of the smaller things but normally we are financially on track to bring this in on funding and we look forward to having it online at the end of the calendar year,” said Mr. Curtis. A vital part of the financial situation for your energy-from-waste facility depends on it generating electrical energy revenue.
HOW THIS IMPACTS YOU
The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.
from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/
New Courtice incinerator hits further Flaws
CLARINGTON — Clarington’s brand new energy-from-waste facility will probably be delayed a second time because the boilers are not functioning properly and the ongoing startup period could cost Durham Region an extra $1 million.
“I’d rather see it delayed and performed right than hurried,” explained Clarington Mayor Adrian Foster.
The Durham York Energy Centre facility, located in Courtice, was scheduled to be completely operational on Dec. 14, 2014. Now the Durham York Energy Centre is not predicted to be in full working order until the past quarter of 2015.
The significant systems of the EFW facility are analyzed. The boiler temperature is high enough for the combustion process however the steam temperature isn’t high enough, and officials are not certain what the problem is, states Durham’s works commissioner, Cliff Curtis.
The steam temperature needs to be high enough to drive the turbine-generator. If the steam is too cool it can harm the turbine.
“It is like running a car with oil,” said Mr. Curtis.
Covanta, the company building and operating the facility for Durham and York regions, has taken the boilers down for alterations, based on Mr. Curtis. It is likely to take three weeks for the repairs and alterations. Then there’ll be a four-week presentation period, followed by a 30-day approval test.
“We’re not getting the temperature we expected from the boiler. Once we get up the temperature, I believe everything will fall into place,” said Mr. Curtis. “It is Covanta’s difficulty to provide us the product that performs the way they said, so they’re going to take the time they need.”
The delay means added consultant costs for construction management, legal advice and baseline ambient air observation. A Durham Region works report said Durham’s share of the extra costs is $1 million, which can be offered by a temporary draw on the good waste management reserve fund.
“What’s the last cost going to look like?” “There are definitely issues with getting it started out”
Since Jan. 16, Durham has been charging Covanta a $10,000-a-day late fee for every day the EFW facility is not fully operational. The invoice has been sent to Covanta, however, it has not been paid yet, according to Mr. Curtis. It was part of a testing stage before the facility opens completely.
Durham cancelled landfill contracts and began sending crap into the Courtice facility. Some garbage was burned at the EFW plant throughout the evaluation phase, without producing power to the grid.
Until the EFW facility is up and running, the Region only pays Covanta half cost of the agreed upon per-tonne charge. However, Durham isn’t making any money until the plant is fully operational and promoting electricity back onto the grid.
“We’re still on budget. I’d rather be getting power sales on the grid,” said Mr. Curtis.
There are a few loose ends that could end up costing Durham Region more money. There is still disagreement with former property owners on the value of the property expropriated for the facility, and a ruling is not expected until fall of next year. The final cost for the utility construction and link prices is anticipated in coming months. The baseline ambient air observation runs till the EFW facility is operational, so the delay in opening means an ongoing monitoring cost.
“There is some minor cost over-runs on a few of the smaller items but normally we are financially on course to bring this on budget and we look forward to having it online by the end of the calendar year,” said Mr. Curtis.
HOW THIS IMPACTS YOU
The Durham York Energy Centre is designed to process around 140,000 tonnes of waste every year, and generate 17.5 gross megawatts of renewable energy — sufficient to electricity between 10,000 and 12,000 houses. A key part of the economic case for your energy-from-waste facility depends on it creating electric power revenue.
The Durham York Energy Centre is designed to process up to 140,000 tonnes of waste each year, and generate 17.5 gross megawatts of renewable energy — enough to power between 10,000 and 12,000 homes. A key part of the economic case for the energy-from-waste facility depends on it generating electrical power revenue.
from: http://www.durhamregion.com/news-story/5682601-new-courtice-incinerator-hits-further-delays/
Signed a contract for roller shutter air filter of the sewage treatment plant in the northwest part of the railway in Xinxiang City, Henan Province
May 18, 2019 company news 289 views
Xinxiang City Drainage Engineering Co., Ltd.’s Xinxiang City Railway Northwest Sewage Treatment Plant is a sewage treatment plant with a capacity of 50,000 tons/day. It is located in the northwest of Xinxiang City, on the south bank of the Communist Canal, on the north side of the North Ring and beyond the West Ring. At 700m east, the equipment materials used are:
1. Coarse grid pool, lifting pump pool, fine grid pool, swirl grit tank
2. Oxidation ditch, secondary sedimentation tank, disinfection equipment, clean water tank and pump station, water distribution well and sludge pump tank
3. Blower room, Nanjing Yixiou Ecolead automatic rolling curtain filter, sludge dewatering machine room, transformer, low-voltage power distribution, high-voltage power distribution
4. Metering wells, septic tanks, biological deodorization, valve wells
5. Cables and wires, electrical switches, lighting fixtures,
6. Building materials, wall tiles, floor tiles, interior and exterior wall materials, coatings
7. Automatic control system, instrumentation.
Due to the wide variety of equipment and materials required for the project, it is not possible to list them one by one, and the actual conditions of the project shall prevail


More content URL: www.ecolead.cn Tel: 025-57138032
محارق صغيرة الحجم
معلومات أساسية.
معلومات إضافية.
وصف المنتج
نانجينغ البرسيم الطبية والتكنولوجيا المحدودة هي شركة رائدة في تصنيع محارق النفايات في الصين. ورشة المصنع المحلية في منطقة التنمية الاقتصادية liuhe ، ضاحية نانجينغ ومكتب الأعمال المحلي في منطقة وسط المدينة. في الوقت الحاضر ، يغطي سوق منتجات خط المحرقة منطقة الاتحاد السوفيتي السابق ، وبلدان إفريقيا ، ودول آسيا ومنطقة الشرق الأوسط.
من عام 2010 ، تفاوضنا مع التكنولوجيا المحدثة من الشركات المصنعة في أوروبا وأمريكا وأقمنا علاقة تعاون في إقليم السوق الصيني. للأسف ، محرقة غاز الميثان ، محارق نفايات طبية متوسطة الحجم ، متنقلة 300 ياردة. محرقة قمامة متنقلة 500 ياردة محرقة القمامة ، محرقة جثث الحيوانات المتنقلة ، المنافسة في سوق البلدان الأخرى ، التمييز بين البلدان والمخاوف المتعلقة بحقوق الملكية الفكرية تسبب الفشل في النهاية. في الوقت الحاضر ، نستثمر المزيد من الجهود والأموال وتطوير التكنولوجيا في علامتنا التجارية الخاصة ، وسنكون أحد أكبر معدات الحرق في العالم.
incinerator smoke filter
All particles of this waste should achieve a high degree of sterilization instead of just “disinfection” because of the
continuous agitations
Description of the Treatment Cycle of the chip
- i) Loading
* The waste has to be loaded by falling bagged and or boxed waste into the open loading door on the vessel.
* The loading door ought to be mounted at an angle on time top side, of this vessel with appropriately sized to accommodate the
infectious wastes for which it is intended
* Over-loading or loading too closely should not be a problem with this process, and thus no need of the special
operator skill.
- ii) Heat-up and fragmentation
* After loading, the vessel door is to be closed, and the outer jacket of the vessel is to be automatically full of
high temperature steam, which should act as the main heating medium for heating the waste.
* During this heating cycle, the shall and mixing arms should rotate constantly, causing the waste to be fragmented
and always tumbled against the hot vessel walls.
* At this point, the waste is broken up into small fragments, and all material heats up quickly, being equally and
thoroughly subjected to the hot inner surfaces. The moisture content of the Waste will turn in to steam, and the vessel
will begin to pressurize.
* Originally, no steam will be injected into the waste. When there is insufficient moisture in the waste to pressurize
the vessel, a small amount of steam is to be automatically added until the desired pressure is reached.
* At the conclusion of the period, the correct sterilization temperature and pressure ought to be reached, and the
sterilization period should begin.
iii) Sterilization interval
* The amount of steam fed into the outer jacket is to be controlled to keep the desired temperature & pressure of this
inner vessel,
* The mixing arms (grinder) MUST continue to rotate throughout this cycle to make sure even sterilization pressure and
temperature for all wastes.
* The treatment time ought to be either15 minutes at 132° C OR 30 minutes at 121° C to achieve level 6log10
sterilization.
* The extreme subjugation of the waste to high temperature and pressure moisture in a dynamic environment also needs to
cause the waste to hydrolyze that’s a quick decomposition of organic material.
- iv) De-pressurization:
* Following the treatment time, the steam into the jacket should remain on, and the internal vessel is to be vented through a
condenser, and de-pressurized. Therefore, the waste loses its water content through a combination of heat input in the
jacket and flashing of water due to depressurization.
- v) Dc-hydration
* Further dehydration is to be achieved by keeping heat input and mixing – almost total dryness ought to be achieved.
- vi) Unloading
* Ultimately, steam to the jacket should shut off, the unloading door is to be opened
* Then the shaft and mixing arms are reversed to behave as unloading mechanism and should scoop the waste fragments out of
the unloading door, onto a conveyor belt or directly into a waste container.
* The vessel should now be ready for another treatment cycle, having retained most of its heat for the treatment of the
next batch.
Incinerator A360
Basic Info.
Additional Info.
Product Description
Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator s/p incinerator, sample business proposals for small incinerators and combutors, sample format of medical waste incinerator document model, saudi arabia, animal cremation, technical is main waste treatment all of the world, for Medical waste, Pet animal cremation and other Solid waste. The capacity from 10kgs/Hr. To 600kgs/Hr., up to 10ton per day.
Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:
Treatment capacity: Small scale incinerator, large scale incinerator and incineration pant.
Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators
Incinerator fuel: Gas incinerator, oil incinerator
Waste to Energy (WTE): WTE incinerator, non-WTE incinerator
Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.
Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)
Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour
| Items | Specification | |||
| Model | A360 / A600 / A900 / A1200 / A1500 / A2400 / A4000 / A5500 | |||
| Main Product List | Primary Combustion Chamber | |||
| Secondary Combustion Chamber | ||||
| Mix Combustion Chamber | ||||
| Smoke Filter Chamber | ||||
| Incinerator Common Control Case | ||||
| Stainless Steel Chimney | ||||
| Italy oil/gas burner: 02 units | ||||
| Oil Tank (if oil fuel) | ||||