Archive: November 1, 2021

HIGH TECH PYROLYTIC MEDICAL WASTE HEATER

NB.; Civil tasks in addition to any kind of various other pertinent options for the installation together with training of drivers require to be included in the heater’s rate.

Needs for the shelter of the burner:

Home of the incinerator comprehensive in offer (your residence have to have toilet in addition to hand cleaning facilities in addition to likewise firefighting). The dimension of the shelter will judge 4 meter by 6 meter and will be provided with appropriate air ventilation.

This material together with equipment should include in the shed of the heater: structure in debris stone, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), proceeding lintel (linteau) in reinforced concrete; steel framework (charpente en steel); roof covering in sheet B.C.A. 28 BG

23. Release Requirement Compliance: BS 3316 or similar standard

23. Ability to treat Plastic: Not a lot less than 40% by weight

15.
* Heating unit with gasoline, mono-bloc distributing directing kind with straight fire, lighting in addition to likewise security of.
14. Heating system procedure have to be Automatic On/Off.
5. PYROLYTIC” burning, by handling the gasification of waste.
* A sheath of emptying of these gases charred.
* Plate of burning in Carborundum, avoiding the dealing with of glass together with slags. A room of write-up burning of gases.
* A heating system of illumination which the use is limited to the ignition of waste.
2. It needs to have the capability to run very little less than 10 hours/day
> > Thickness: > > 100 mm”.
13.
Accomplished by valves together with adhering to the control of the automated cycle.

21.
Gateway of regulation in addition to separating valve.
Having a high material of aluminium and also guards obstructs so as to make sure a minimum.
Tons.
Control box watertight into dirt, including:.
– Safeguard in primitive panels:.
* The insulation of the burning chamber has to be composed of refractory bricks,.
Packing protecting out of refractor. -.
– > > Nature: 42 percent of A1203.
* Flawlessly tight doorway for the hand-operated loading of waste. The filling should certainly be Manual, Establish.
Flame, illumination in addition to likewise safety and safety and security of electronic ignition, irreversible air flow, electro-magnetic sluice.
> > Thickness: > > 150 mm.
Temperature level outside sheet steel.
8. It needs to be able to hold exhaust in the 2nd shed with gasoline residence of not much less than 2 secs.

20.
The provider will surely perforn an onsite installment of this heater.

25.
– The Temperature degrees of combustion: Minimum will certainly be 850 ° C in addition to likewise max 1400 ° C. – – Message combustion: > > 1100 ° C.
12. The number of the combustion chamber: 1.200 L.
9. The incineration should be completely lacking visible smoke together with annoying odours.

* Heating system of illumination of waste, with gasoline, conventional mono-bloc dispersing leading plunging.
loadings.
– – Refractory concrete:.
shutoff.
– – Shield in fibrous panel:.
6. The burner needs to avoid the launching of black smoke along with fine dust, (Electric) throughout the.
* Framework of the refractory;.
* A heater of burning of gases,.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
* Electric box.

21. The de- ashing has to be done in lowest level of the burning chamber or the deashing.
Improve Filtering system: Scruber to be mentionned as discretionary

23. Release Criteria Conformity: BS 3316 or similar standard

23. Ability to deal with Plastic: Not a lot less than 40% by weight

24.
* Framework of the refractory;
16. The supplier needs to offer needed details for the absolute best of this installment This incinerator.
Personal facilities, lab, institutes, etc……… ….
* Electro-ventilator spreading the extra atmosphere, the standard of the air flow being.
* Frontage of filling door seals increased on hinges, wheel of screw plug, adaptable joint, in addition to also.
* Carcass in solid sheet steel with help of connection.
3. This burner needs to have the capability to destroy all flammable wastes generated by health facilities,
11. The Inner size of this Smokeshaft: Ø 400 and its elevation: 8 m.

23. The setup burner has to birth a 1 year guarantee.
* A gadget of shot of air allowing a entire recombustion of gases,.|* Framework of the refractory;.
Having a high material of aluminium and also guards obstructs so as to make sure a minimum.
* Heating system of illumination of waste, with gasoline, conventional mono-bloc dispersing leading plunging.

– Safeguard in primitive panels:.
– > > Nature: 42 percent of A1203.
* A sheath of emptying of these gases charred.
(adsbygoogle = window.adsbygoogle || []).push({});
3. This burner needs to have the capability to destroy all flammable wastes generated by health facilities,{
(adsbygoogle = window.adsbygoogle || []).push({});|}
* A regulator with watch for the temperature degree of combustion,.
* A heater of burning of gases,.
Temperature level outside sheet steel.

20.
Flame, illumination in addition to likewise safety and safety and security of electronic ignition, irreversible air flow, electro-magnetic sluice.
* A regulatory authority with look for the temperature of postcombustion.
shutoff.
11. The Inner size of this Smokeshaft: Ø 400 and its elevation: 8 m.
Personal facilities, lab, institutes, etc……… ….
Gateway of regulation in addition to separating valve.
Accomplished by valves together with adhering to the control of the automated cycle.

21.
16. The supplier needs to offer needed details for the absolute best of this installment This incinerator.
– – Refractory concrete:.
>> Nature: 65% of A1203.
7. It ought to have the ability to decrease the number of wastes by 98%.
13.
loadings.
* Carcass in solid sheet steel with help of connection.
17.
* The insulation of the burning chamber has to be composed of refractory bricks,.
* Plate of burning in Carborundum, avoiding the dealing with of glass together with slags. A room of write-up burning of gases.
* Flawlessly tight doorway for the hand-operated loading of waste. The filling should certainly be Manual, Establish.
Digital ignition, long-term venting, electromagnetic sluice entryway of guideline and likewise dividing.

23. Release Criteria Conformity: BS 3316 or similar standard

Medical Incinerator Specification

Capacity Not less than 500Kg/hr.
Operation 24hr-7days/week continuous operation.
Combustion chamber 2 combustion chamber.
Temp. First combustion chamber 800-1000 C.
Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C.
Combustion Efficiency 99.99%
Retention time Of the flow gases not less than 2 Sec in the hot portion.
Excess Oxygen concentration Of primary combustion chamber 3-6% max.

Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. 
resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the 
same time prevent the Temp. of the outside body of the chamber not higher than 70 C.
Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and 
the doors should be kept under negative pressure during the operation.
Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA.
Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti 
corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled 
circuit many times before treating/ discharging into the sewage system in compliance with KEPARS.
Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system 
including sensors.
Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy 
opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any 
flow disturbancies.
Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable 
stairs from ground to the port with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be dual system, such as diesel and natural gas.
Feeding System Should be auto feeding system into primary chamber.
Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the 
primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, 
auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc.
Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be 
heigher than 1100 C.
Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the 
combustion Temp. less than 500 C.
Flue treatment and cleaning To consist a combined system (wet/dry), using water, lime, active carbon and ceramic filters.
Quenching system/Heat exchanger Should be made and manufactured from anti corrosion and acid attack materials such as stainless steel 316 or 
equivalent.
Noise Level Not more than 85 dBA during normal operation.
Inaddition The desigh should insure that responsive fail-safe control systems are used.
The incinerator should be installed inside closed suitable building with good aeration and ventilation system. The building has 
facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and waste containers, and cool storage 
area…etc.
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, starting up and training of the operators and ministry of health engineers inside/outside 
Kuwait.
Detailed drawings, catalogs should be included.

Incinérateur de déchets municipaux à grande échelle

Informations de base.

Type: Incinérateur
Marchés d’exportation: mondiaux

Description du produit

Principales caractéristiques:
* Tous les modèles avec double chambre de combustion.
* Cheminée / cheminée en acier inoxydable, longue durée de vie. * selon commande
* Haute température, longue durée de vie de l’incinérateur.
* Installation gratuite ou minimale sur site.
* Taux de combustion élevé, du brûleur de déchets de déchets de biologie 2b, incinérateur biomédical à vendre, Chine de déchets biomédicaux, fabricants d’incinérateurs de déchets biomédicaux en Chine, systèmes d’ondes cérébrales du Moyen-Orient, 10 kg à 500 kg par heure, jusqu’à 6 tonnes par jour.
* Plan de contrôle PLC. * selon commande
* Nouveau design pour les entreprises de crémation d’animaux de compagnie.
* Garantie d’un an sur l’incinérateur et les pièces en stock.
Champ d’application:
1. Hôpital et clinique: Déchets Iatriques, Déchets infectieux, pansements, biodéchets, médicaments.
2. Abattoir et hôpital pour animaux de compagnie et ferme: animaux morts, biodéchets.
3. Port et gare communautaires et maritimes: déchets solides municipaux, etc.
4. Laboratoires, sites éloignés, opérations de secours en cas de catastrophe, crémation d’animaux

Articles / modèle YD-200 YD-300 YD-500 YD-600
Taux de combustion (kg / heure) 200 kg / heure 300 kg / heure. 500 kg / heure 600 kg / heure
Capacité d’alimentation (kg) 400 kilogrammes 500 kilogrammes 800 kilogrammes 1100 kilogrammes
Poids de l’équipement 7600 kilogrammes 8300 kilogrammes 13000 kilogrammes 16500 kilogrammes
Chambre primaire (litres) 2000 2400 4000 5500
Chambre secondaire (litres) 500 1200 1500 1500
Dimensions extérieures (cm) 270 x 185 x 380 260 x 220 x 420 320 x 220 x 460 360 x 220 x 475
Dimensions internes (cm) 180 x 115 x 96 220 x 110 x 100 257 x 147 x 108 300 x 147 x 125
Réservoir d’huile (litres) 300 500 500 500
Ouverture de porte (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Cheminée (M) dix dix 14 14
Type de cheminée Acier inoxydable Acier inoxydable Acier inoxydable Acier inoxydable
Chambre secondaire OUI OUI OUI OUI
Chambre de mélange-combustion OUI OUI OUI OUI
Chambre de filtre à fumée OUI OUI OUI OUI
Combustible de combustion Gaz de pétrole Gaz de pétrole Gaz de pétrole Gaz de pétrole
Temps de résidence 2,0 sec. 2,0 sec. 2,0 sec. 2,0 sec.
Surveillance de la température OUI OUI OUI OUI

空氣浴塵室操作過程要注意什麼事項

2019年05月22日 行業動態 199 views

在許多車間內,為保證車間的潔凈度,所以一些車間會在車間的門口附近安裝一個空氣浴塵室或風淋室,以此來保證每個進入到車間內的工人,都不會帶着灰塵進入的。可是在操作空氣浴塵室的過程中,又需要注意什麼問題?下面將跟大家做一下介紹:

   進入口的門是不能同時來打開的,如有空氣給吹出來,還沒停止的時候,預防把浴塵室側邊的門給打開。當進入到浴塵室的時候,一定需要依照空氣浴塵室的最大容納人規定來進入的,出來的時候,會限制不能超過10個人的。

   在空氣浴塵室當中,需要依據所規定的位置來站立的,而空氣沐浴的時候,還需要來轉動自己的身體、拍打身上的無沉服,才便於灰塵更好的被吹凈。雙腳是需要多次來踩踏腳踏黏墊的,對清除鞋底的灰塵、異物也都是非常有利的。每個工人在進入車間來工作的時候,都需要在空氣浴塵室中來清潔身上的灰塵,免得把外界的灰塵帶入到車間中,污染到車間內的環境,不利於在車間內,更好來工作。

   工人在進入車間之前,這無塵服是不能夠接觸牆壁、地板等一些地方的。更不可以來觸動出風口的,在安裝時,是需要定期來做出確認,並且還需要來記錄出風口的位置是不是正確的。而迴風口的過濾網,最好的更換頻率要控制在1季/次。一旦有破損或臟污的時候,是需要馬上來更換掉的。同時,更換的時候,還需要通知廠務來處理,也要記錄浴塵室的點檢表當中。

  看來,在操作空氣浴塵室時,這個操作過程也確實有不少地方是需要注意的,如沒有很好來注意的話,那就有可能會在使用過程中,出現一些問題的。對浴塵室的正  確使用,會帶來很不利的影響的。

更多內容 網址: www.ecolead.cn 電話: 025-57138032

محرقة 300 كجم

وصف المنتج

نانجينغ البرسيم التكنولوجيا الطبية المحدودة ، المحلية في مدينة نانجينغ ، الصين. CLOVER هي الشركة المصنعة للمنتجات الطبية ، ومحرقة النفايات وغيرها من الموقد الغازي البيئي ، ومحرقة حرق الغاز ، وحيوانات غرفة الغاز ، وغرفة احتراق الغاز ، ومحرقة الحديقة التي تعمل بالغاز ، ومعدات الحماية. شبكة السوق عبر أراضي الصين وأكثر من 30 دولة في جميع أنحاء العالم.
دلائل الميزات:
* جميع الموديلات بغرفة احتراق مزدوجة.
* مدخنة / كومة من الفولاذ المقاوم للصدأ ، عمر طويل. * حسب الطلب
* ارتفاع درجة الحرارة ، وعمر طويل من المحرقة.
* تثبيت مجاني أو بحد أدنى في الموقع.
* معدل حرق مرتفع ، من 10 كجم إلى 500 كجم في الساعة ، حتى 6 طن في اليوم.
* طائرة التحكم PLC. * حسب الطلب
* تصميم جديد لأعمال حرق جثث الحيوانات الأليفة.
* ضمان لمدة سنة على المحرقة والأجزاء الموجودة في المخازن.

العناصر / النموذج YD-200 YD-300 YD-500 YD-600
معدل الحرق (كلغ / ساعة) 200 كجم / ساعة. 300 كجم / ساعة. 500 كجم / ساعة. 600 كجم / ساعة.
سعة العلف (كلغ) 400 كجم 500 كجم 800 كجم 1100 كجم
وزن المعدات 7600 كجم 8300 كجم 13000 كجم 16500 كجم
الغرفة الأساسية (لتر) 2000 2400 4000 5500
الحجرة الثانوية (لتر) 500 1200 1500 1500
الأبعاد الخارجية (سم) 270 × 185 × 380 260 × 220 × 420 320 × 220 × 460 360 × 220 × 475
الأبعاد الداخلية (سم) 180 × 115 × 96 220 × 110 × 100 257x147x108 300 × 147 × 125
خزان الزيت (لتر) 300 500 500 500
فتح الباب (سم) 59 × 81 90 × 110 108 × 128 108 × 128
مدخنة (م) 10 10 14 14
نوع المدخنة ستانلس ستيل ستانلس ستيل ستانلس ستيل ستانلس ستيل
الغرفة الثانوية نعم نعم نعم نعم
غرفة الاحتراق المختلط نعم نعم نعم نعم
غرفة مرشح الدخان نعم نعم نعم نعم
وقود الاحتراق النفط / الغاز النفط / الغاز النفط / الغاز النفط / الغاز
وقت الإقامة 2.0 ثانية. 2.0 ثانية. 2.0 ثانية. 2.0 ثانية.
مراقبة درجة الحرارة نعم نعم نعم نعم

اتصل الآن هاتف: + 86-25-8461 0201

LG Chem, LG Tongchuang

2019-05-19 Pencapaian dan kes 241 pandangan

LG Chem, LG Tongchuang

Aliran udara yang bersih, kecekapan tinggi, BFU

Nama projek: Nanjing LG Chem, gudang bersih Tongchuang LG, BFU, saluran udara kecekapan tinggi

Pengenalan projek: Reka bentuk, pengeluaran dan pemasangan gudang bersih di kawasan kilang LG Chem, pengeluaran peralatan pemurnian oleh LG Tongchuang

Menjalankan masa: 2015.9-2016.3

LG Group Korea Selatan ditubuhkan di Seoul, Korea Selatan pada tahun 1947, dan terletak di No. 20, Yeouido-dong, Yeongdeungpo District, Seoul. Ini adalah kumpulan perusahaan antarabangsa yang memimpin pengembangan industri dunia. LG Group kini mempunyai lebih dari 300 pejabat di luar negeri di 171 negara dan wilayah. Kawasan perniagaan merangkumi tenaga kimia, peralatan elektronik, komunikasi dan perkhidmatan dan bidang lain.

Sejak penubuhannya pada tahun 1947, LG Chem telah mempertahankan pertumbuhan yang stabil setiap tahun, dan terus menyumbang kepada pembangunan ekonomi nasional dan peningkatan kualiti hidup negara melalui pengembangan teknologi, pelancaran produk baru dan inovasi yang berkualiti. wakil Korea.kimia syarikat.

LG Tongchuang Color Display System Co., Ltd. adalah usaha sama berskala besar yang ditubuhkan oleh LG Electronics Co., Ltd. Korea Selatan, “Nanjing Gaoke” dan Tongchuang Information Industry Group.

Lebih banyak URL kandungan: www.ecolead.cn Tel: 025-57138032

Hospital Diesel Fuel Fired Incinerators

Basic Info.

Model NO.:gas fired incinerator for crematorium
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, incinerator manufacturer’s, incinerator manufacturers in middle east, incinerator manufacturers in sweden, incinerator manufacturers price, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

A Model animal crematory burning rate from 20-400kgs per hour. Heavy duty combustion chamber and suit for large animal cremation. 

Secondary Chamber & Mix-Combustion Chamber. Residency time 2.0 sec. In post combustion chamber. Virtually smoke and smell free. 

Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burning. 

Italy original oil or gas burner, quality reliable. It suit for diesel oil, natural gas, LPG gas. 

User guider, full installation and operation document for customer.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Picture  
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Google快讯 – medical waste

Google
medical waste

实时更新 2021年11月1日
新闻

The Pakistan Environmental Protection Agency (Pak-EPA) has served strict notices to 66 public and private hospitals for flouting Hospital Waste …

Facebook Twitter 标记为不相关

(Nasdaq: SRCL), a leading provider of regulated medical waste management, secure information destruction and patient engagement solutions today …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2021年11月1日
新闻

Clear an area two metres around the incinerator down to mineral soil. Use a metal barrel in good condition. A heavy metal mesh must be put on top of …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2021年11月1日
新闻

… Protection Act (PEPA), 1997 and Hospital Waste Management Rules, 2005. … Medicsi, Lodhi Medical Store, Samar Clinic, Asia Diagnostic Centre, …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈