a burner for food waste as well as also polythene waste administration



an incinerator for food waste and polythene waste administration. based on our needs we would such as the YD 15C tiny incinerator.Mixed Biomedical waste Incinerator.Contract period: To be chosen by the provider
Negotiation terms:100% prepayment via banks TT after signing of contract.

Please validate your resolution to perform this contract job by sending handout and also your rate quotation for the listed below specification to allow us submit it to the firm incharge of the agreement for their study and additionally authorization.

Sort Of Waste: Mixed Biomedical waste.THE BURNER AS REQUESTED BY OUR CUSTOMER SHALL BE SEMI AUTOMATIC WITH:
WASTE BUCKET/TANK – – – – CONCERNING 2000KG CAPACITY OF FEEDING: REGARDING 600-800Kg Each Time.
THAWING AT ABOUT 150/165 -200 IN 60MINS THE HEATER SHALL USE DIESEL/OIL WITH SMOKESHAFT, ELECTRIC PANNELS, ELECTRIC MOTORS, And So On.
PRODUCTS FOR DISPOSAL: SHARP MEDICAL WASTES.

1. Waste burning ability of device: 100-125 kgs/ personnels.
3. 5.
6. Connected electric great deals: Approximate. 7-8 KW (A/C 3 stage,220 V, 50 Hz).
7. Total area need: 9 m (L) X 8 m (W) X 6 m (H) Each unit without stack

Heaters temperature degree regulated (TIC– – Thermocouple) as well as likewise handle ON––. OFF basis. The consistency on ON– – OFF will certainly depend upon the nature of.
waste, dampness web material, calorific worth, and more along with will certainly vary from waste to.
waste. The gas usage similarly depends upon the frequency of the door.
opening along with strategy of operation of the incinerator. We have in fact mentioned.
approx. expected fuel usage figures.

The Incineration System includes:

I. Key Incinerator with.
A. Main & & & & Additional Chamber Modules appropriately refractory lined, piped & & & & wired.
B. Container lift + DFDV gadget for autoloading and also Deashing.
tool.
II i. 1 No. totally automated Gas Oil burner for main chamber.
ii. 1 No. totally automated Gas Oil heating system for extra chamber.
III. Centrifugal forced draft follower establishing total with electric motor drive, duct as well as also.
dampers, and so forth set up on the regular skid of the gadget to offer:.
Burning air.

Eductor air.
IV. Eductor Establishing for:.
A/c of exhaust gases from 900– – 1000 0 C to around 350 0 C. Keeping the entire system under negative anxiety to stay clear of hot gases/ dirt.
bits hurrying out of billing door.
V. Electric Control Panel along with safety and security as well as protections, as well as likewise Audio/ Visual.
signs as well as.
/ or alarm systems for effective and likewise risk-free treatment of the system.
VI. Electric electric wiring of the device.
VII. Oil tank of 1000 ltrs capability placed on the skid.
VIII. Operating tools and also takes on consisting of– – rake, hoe, shovel (I No. each).
IX. Smokeshaft of 2.5 Mtr elevation.



PROGRESSED MEDICALWASTE HEATER



Incinerator design A.
Burn Rate 65kg/h minimum.
Weight (kg), please recommend:.
Second Chamber.
Gas Retention Time – – – – 2 Secs. Power Supply – for – Control Box – 220V-240V 50Hz solitary stage.
10m Pipe Pipeline, show size. I000 Litre Gas Container+ Pipeline System, show quantity.
Included chimney expansion, suggest elevation. Guarantee, indicate no of years. The minimum combustion temperature degree of the main chamber will certainly not be less than 800 degrees C;

Second combustion.
The residence time in the second chamber will not be much less than 2 seconds;.
The gas temperature degree as determined versus the within wall surface area in the second chamber, not in the fire location, will not be a lot less than as received Lots 1-7;.
Both the major as well as the 2nd temperature degrees will certainly be maintained till all the waste has been entirely ignited;

Smokeshaft.
The smokeshaft will have a marginal elevation of 4 meters over ground degree;.
The minimal leave rate of the discharges shall not be less than 10 metres/second;

Temperature Level Warnings.
When the secondary temperature drops to detailed below the required temperature level;

General, a noticeable and/or distinct alarm system to encourage the driver.
Control box can be gotten rid of in addition to placed on different stand at least 1.5 meters from incinerator at around 1.6 meter elevation;

Great Deal 2.
Point 5 Burner design B.
Burn Price 150kg/h minimum.
Weight (kg), please suggest:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Diesel/LPG/LNG, please suggest.
One year Spare Parts Package for complete maintainability.
Thing 6 10m Tube pipe Pipeline, indicate dimension.
Item 7 I000 Litre Gas Tank + Pipeline System, suggest quantity.
Item 8 Included smokeshaft extension, show altitude.
Warranty, show no of years.
Large amount 3.
Point 9 Incinerator layout C.
Burn Rate 250kg/h minimum.
Weight (kg) please indicate:.
2nd Chamber.
Gas Retention Time 2 Secs.
Gas Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz single stage.
Minimum operating temperature level 920 ° C, please indicate.
One year Spare Components Bundle for complete maintainability.
Product 10 10m Tube pipeline Pipeline, show length.
Thing 11 I000 Litre Gas Container + Pipeline System, indicate volume.
Thing 12 Extra chimney extension, reveal height.
Guarantee, indicate no of years.
Lot 4– – Warm Waste Burner.
Point 13 HTW Burner style D.
Burn Price – – – – 150kg/hour minimum. Weight( kg), please show:.
Additional Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please suggest.
Power Supply for Control Box 220V-240V, solitary phase 50-60Hz.
Minimum running temperature level 1200 ° C, please show.
One year Spare Components Package for complete maintainability.
Thing 14 10m Hose pipeline Pipe, suggest size.
Item 15 1000 Litre Gas Tank + Pipeline System, reveal amount.
Product 16 Added smokeshaft development, reveal elevation.
Solution guarantee, reveal no of years.
Good deal 5– – Mobile Burner. 2. Incinerator gives 2 chamber incineration in addition to holds gasses for a minimum of 2 seconds.
3. Each incinerator needs to have appropriate labelling for parts/areas of high job health and wellness threat on the incinerator.
& & Country Issues, or European Union regulations and guidelines.

Item 17 Mobile Burner version E.
Burn Rate Price minimum.
Weight (kg), please show:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Gas – Diesel/LPG/LNG, please program. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature level 850 ° C, please program. One year Spare Parts Bundle for complete maintainability. Product 18 10m Hose pipe Pipeline, reveal
dimension. Item 19 1000 Litre Gas Storage Tank + Pipeline System, show volume.
Item 20 Extra chimney expansion, suggest height.
Great deal 6– – Mobile Burner.
Item 21 Mobile Burner design F.
Burn Price 100kg/h minimum.
Weight (kg), please suggest:.
Additional Chamber.
Gas Retention Time – – – – 2 Secs. Gas – Diesel/LPG/LNG, please suggest –. Power Supply – for – Control Box – 220V-240V 50Hz solitary phase. Minimum running temperature level 850 ° C, please recommend. One year Spare Components Plan for full maintainability.
Item 22 10m Hose pipe Pipe, show size.
Point 23 1000 Litre Gas Tank + Pipeline System, recommend quantity.
HTW Mobile Burner style G.
Burn Price 100kg/h minimum.
Weight (kg), please indicate:.
Extra Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please show.
Power Supply for Control Box – – – – 220V-240V 50Hz singular phase.
Minimum running temperature level 1200 ° C, please suggest.
One year Spare Parts Package for total maintainability.
10m Pipeline Pipeline, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest volume



Needs for Twin Chamber Heater



BURNER DESCRIPTION
The Version is for as much as 300kgs capability per batch bunches in addition to will absolutely lose at around 55kgs per hour.
The system has leading packing style and has a strong refractory concrete lining for optimal heat retention. Gadget have huge leading cover for extremely easy loading, along with especially made front ash door, for ash elimination.
This system performs at over 1100 ° C in the vital chamber to guarantee total combustion. This design likewise benefits
from a strong second chamber as well as burner that makes particular a complete re-burn of any smoke along with exhausts along with a 0.5 second gas retention time.
Thaw rate 150kg/h minimum
Second Chamber Yes.
Gas Retention Time 2 secs.
Gas Diesel/LPG/LNG.
Power Supply for Control Box 220V-240V 50Hz singular phase.
Minimum Operating Temperature Level 920 ˚C

PRIMARY CHAMBER.
Resilient steel case.
Outstanding quality refractory lining as well as insulation.
Substantial full dimension leading lots door and also fluid retention sill.
1 x diesel oil terminated ignition heating systems operated on/off.
EXTRA CHAMBER.
Sturdy steel housing.
High quality refractory lining along with insulation.
1 x diesel oil fired ignition heating units ran on/off.
Requirements for Dual Chamber Incinerator:.
Key Burning.
The primary burning chamber will be approved as the crucial burning area.
The minimum burning temperature of the vital chamber shall not be much less than 800 degrees c.
Additional Burning.
The house time in the second chamber will certainly not be a lot less than 2 secs.
The gas temperature degree as gauged versus the within wall surface in the additional chamber, not in the fire zone will certainly not be less than as suggested in Lot 1-7.
Both the additionally additional as well as primary temperature levels will be maintained till all the waste has actually been completely ignited.
Chimney.
The chimney shall have a very little height of 4 metres over ground level.
The minimal departure rate of the discharges will not be less than 10metres/second.
Temperature Cautions.
When the second temperature level drops to listed below the required temperature level, a distinct and/or recognizable alarm to alert the operator.
General.
Control box can be divided and also installed on different stand of atleast 1.5 metres from the burner at about 1.6 metre altitude.
CE certified or equal for burners of this measurement and additionally design.
Drawings along with images for the provided whole lots.
1 year extra parts, gas containers as well as 10metre pipe ahead typical with every heater.
Specs for Mobile Heater Units.
Trailer mounted mobile burner tools excellent for the following applications.
Clinical waste.
Residential waste.
Industrial waste.
Pet cadavers.
SMOKESHAFT.
Resilient stainless-steel situation.
1.5 m dimension.
0.6 m refractory lined stack.
CONTROL PANEL.
Control of 1 heating unit.
Timer control 0- 12 hrs.
Vital fan timer control.
Temperature level Monitoring.
Thermostatic Control.
Automatic Control.
Cycle time developed.
ANCILLARIES.
Running along with maintenance handbooks.
Saves listing.
CONTAINERISATION.
incinerator absolutely mounted within 10 ft ISO accredited container.
3,5 kwA electrical power generator, 1000 litres fuel storage tank.
Burner placed on the silenblock padding.



Diesel/LPG/LNG burning vital burning chamber/primary combustion burner



Key burning
Diesel/LPG/LNG burning vital burning chamber/primary burning area
Second burning
Residence time in the second chamber not less than 2 secs
Both essential along with the second temperature levels maintained up until all the waste has in fact been entirely stired up
Chimney
Chimney with a very little height of 4 meters over ground level
Minimum leave velocity of the discharges very little less than 10 metres/second
Temperature level Cautions
Visible and/or distinctive alarm to warn the vehicle driver when the second temperature level drops to listed below the needed temperature level
General
Control box that can be separated as well as mounted on different stand a minimum of 1.5 meters from burner at around 1.6 meter

heightItem 1
Burner style A

Melt Rate 65kg/h minimum

Weight (kg), please show:

Secondary Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please show

Power Supply for Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please recommend

One year Spare Components Prepare for total maintainability

10m Tube Pipe, recommend size

I000 Litre Gas Tank + Pipeline System, show quantity

Added smokeshaft expansion, show elevation

Solution guarantee, suggest no of years

Thing 2
Incinerator version C.
Burn Rate 250kg/h minimum

Weight (kg) please showProgram.
2nd Chamber.
Gas Retention Time 2 Secs.
Fuel Diesel/LPG/LNG, please show.
Power Supply for Control Box 220V-240V 50Hz solitary stage
. Minimum running temperature level 920 ° C, please recommend.
One year Spare Elements Bundle for full maintainability.
10m Hose pipe Pipe, indicate size.
I000 Litre Gas Tank + Pipe System, indicate quantity.
Bonus smokeshaft expansion, suggest elevation.
Guarantee, indicate no of years

Warmth Waste Incinerator

Capability at least (4000) kg/day (( Day= 16 Working Humans Resources))

Capability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the following qualities:

* Automatic feeder as initial part of the unit.

* Automatic ash/ leftovers removal as preliminary part of the device.

* Water Injection System to manage the temperature > >

* Flue gas filtering system abiding by EU.
HTW Incinerator design D.
Burn Rate – – – – 150kg/hour minimum. Weight( kg), please indicate:.
Secondary Chamber.
Gas Retention Time 2 Seconds.
Gas Diesel/LPG/LNG, please program.
Power Supply for Control Box 220V-240V, solitary stage 50-60Hz.
Minimum running temperature level 1200 ° C, please program

One year Spare Components Prepare for full maintainability

10m Tube Pipe, show size.
1000 Litre Gas Storage Tank + Pipeline System, suggest quantity.
Bonus chimney extension, suggest height.
Mobile Burner

Item 5.
Mobile Heater version E

Melt Cost 50kg/h minimum

Weight (kg), please program:

Second Chamber

Gas Retention Time – – – – 2 Seconds –

– Gas – Diesel/LPG/LNG, please suggest

Power Supply for Control Box – 220V-240V 50Hz solitary stage

Minimum running temperature degree 850 ° C, please suggest

One year Spare Elements Package for complete maintainability.
Mobile Incinerator

Point 6.
Mobile Incinerator variation F

Melt Rate 100kg/h minimum

Weight (kg), please indicate:

Second Chamber

Gas Retention Time – – – – 2 Secs

– Fuel – Diesel/LPG/LNG, please suggest

Power Supply for – Control Box – 220V-240V 50Hz solitary phase

Minimum running temperature level 850 ° C, please suggest

One year Spare Components Bundle for full maintainability

10m Pipeline Pipe, suggest size

1000 Litre Gas Container + Pipe System, show amount

Additional smokeshaft expansion, show elevation

Service warranty, indicate no of years.
Warmth Waste Mobile Incinerator.
Product 7.
HTW Mobile Heater version G.
Burn Cost 100kg/h minimum.
Weight (kg), please suggest:.
Second Chamber.
Gas Retention Time – – – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate

Power Supply for Control Box – – – – 220V-240V 50Hz solitary stage

Minimum running temperature level 1200 ° C, please suggest.
Key burning.
Diesel/LPG/LNG burning primary burning chamber/primary combustion area.
2nd burning.
Residence time in the second chamber not much less than 2 seconds.
Both primary and the additional temperature levels protected up until all the waste has been totally ignited.
Smokeshaft.
Smokeshaft with a marginal altitude of 4 meters over ground level.
Minimum leave rate of the emissions not less than 10 metres/second.
Temperature level Cautions.
Audible and/or noticeable alarm to encourage the driver when the additional temperature goes down to listed below the called for temperature level.
General.
Control box that can be separated as well as mounted on separate stand at least 1.5 meters from burner at about 1.6 meter

altitude.
Assurance, show no of years

Weight (kg) please show:.
Service warranty, indicate no of years

Warmth Waste Burner

Ability at the very least (4000) kg/day (( Day= 16 Functioning Hrs))

Ability at the very least (4000) kg/day (( Day= 24 Working Hrs))

With the complying with qualities:

* Automatic feeder as original component of the device.

* Automatic ash/ leftovers elimination as preliminary element of the system.

* Water Injection System to control the temperature level > >

* Flue gas filtering system following by EU.

* Consistent discharge monitoring and also recording system.

elevation.
Guarantee, show no of years



Containerized diesel fueled burners



Heater Kind: Containerized, gasoline
Burning Price:100–– – – 120kg/hour. Minimum Operating Temperature:850 o C( key combustion).
Optimum Operating Temperature:1450 oC( Afterburner chamber).
Extra Burning Ability: Compulsory.
Density Insulation:20 mm High.
Refractory Dispersing: Minimum 65mm.
Strong refracting lining to hold up against:1500 oC.
Common stress out time: optimum:3 personnels.
Fuel kind: Diesel.
Gas Intake in L/hr:7.5 to 9.
Residence time in secondary chamber:2 sec.
Residue ash pot 100kg: Max 3.8 kg.
Heater kind: Pet waste burner.
Lots Capacity minimum: 1500 kg.
Heating unit gas kind: Diesel.
Heater fuel price max.: 20-25 Litre diesel/ per hr.
Heaters minimum: 3.
Burning rate minimum: 200-300kg/ per hr.
Heating system bar place minimum: 2 м3.
Gas container capacity minimum: 300L.
Key chamber melting temperature level min. 1100 0C.
Afterburner chamber burning temperature minutes. 1300 0C.
Power supply 220V.
Burner products and also electrical tools should be weather condition proof as well as also moisture immune within the collection of 30-90 %.
Burner requires to be certified to the ecological monitoring policies in accordance to national legislation.
Maximum dimensions– – Dimension – 5m, size – 3.5 m, altitude – 5m



Gasified incineration for melting medical wastes burner



Gasified incineration for shedding medical wastes.

Gas kind: Gas
Developed to melt disposables that can as well as should certainly be destroyed on-site. Theses wastes include also contaminated and infectious “red bag.” Surgical dressings, plastic assessment tools as well as different other wastes.
Quick, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature level indications and also cost recorder. Modulating control for gas along with air lowers gas consumption.
Minimum installation as well as also launch time.
Aluminized steel coat lined with refractory and firebrick. Screens recorders as well as likewise various other accessory equipment should be available.
Payment system:.
– – Upright price door on crucial chamber.
– – Pneumatically-driven or hydraulic ram charging system.
– – Car folded of the door after billing.
– – Main as well as additional chamber temperature offered and videotaped (optional).
Charging cost:.
– – As long as 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Gas:- Gas.
Capacity (Cubic Mtr): 1.65 M3 and even a lot more.
Ave Capability: 100kg per hr.
Added Chamber Capability (CubicMtr):3.88 or even more.
Size (mm): 1880 or much better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or much better.
Ash Door Opening (mm): 475×× × × 900 or much better.
Minutes. Running temperature level: 90 level centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Secondly Chamber: 2 sec.
Temperature Tracking: Both for additional and main chambers.
Filling SystemManual/semi-automatic.
Waste devastation effectiveness: > > 90% by weight.
Filter: Different or ceramic other equivalent filters in order to decrease the induction of unsafe air pollutants, particulates, carbon monoxide gas, dioxin/furane right into the setting.
De ashing system: Manual/semi-automatic.
– Civil features. – Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg

Burner size: max 2000x1200x3200 mm
Burning room volume:
–– Gasification space max 0.7 m3,
–– Additional burning area max 0.5 m3 ,

Dimension of the filling up entry: max 650×× 850 mm Air blower: max 0,5 kW Combustion-support burning devices: – Power max 0,2 kW INCINERATOR (WASTE BURNER).
Created to burn disposables that can as well as ought to be ruined on-site. Theses wastes consist of transmittable and also infected “red bag.” Surgical dressings, plastic examination tools as well as various other wastes.
Rapid, total, efficient garbage disposal.
Twin chamber combustion, Chambers insulated and also lined with high temperature refractory. Programmable digital temperature controls, temperature signs and also cost recorder. Modulating control for gas as well as air decreases gas consumption.
Minimum installment and also launch time.
Aluminized steel jacket lined with refractory and firebrick. Screens recorders and also other accessory equipment must be available.
Billing system:.
– Vertical cost door on key chamber.
– Pneumatic or hydraulic ram charging system.
– Auto closed down of the door after billing.
– Main as well as secondary chamber temperature presented and recorded (optional).
Charging price:.
– As much as 100kgs per hour of waste or red bag waste ranked at 2200 BTU’s per kg.
Fuel:- Natural Gas.
Capacity (Cubic Mtr): 1.65 M3 or even more.
Ave Ability: 100kg per hr.
Additional Chamber Capacity (CubicMtr):3.88 or more.
Size (mm): 1880 or far better.
Width (mm): 1280 or better.
Height Incl. Flue (mm): 7700 or far better.
Ash Door Opening (mm): 475×× 900 or much better.
Min. Running temperature level: 90 degree centigrade.
Max, Operating Temperature: 1350 level centigrade.
Residency time in Second Chamber: 2 sec.
Temperature Monitoring: Both for main and secondary chambers.
Filling SystemManual/semi-automatic.
Waste destruction efficiency:> > 90% by weight.
Filter: Ceramic or various other equal filters in order to lower the induction of unsafe air contaminants, particulates, carbon monoxide, dioxin/furane into the environment.
De ashing system: Manual/semi-automatic.
The System needs to be priced estimate total with:-.
– Pipes.
– Electric panels.
– Civil functions.
– Waste collection Trolleys.
Re-burning machine: Power max 0,2 kW Voltage: 220V/ 380V.
Weight: max 5000 kg



2 combustion chambers type heater



Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof
and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules
in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage.
3.1              Main unit
3.1.1
Application      For incineration, general and pathological
3.1.2                                            Capacity       100 – 120 kg/h burn rate
3.1.3
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4         Operating time                   Minimum 8 hours daily
3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled
3.1.6          Residual Ash                       5 to 10%
3.2     Primary Chamber
3.2.1
Construction    Constructed from heavy duty mild or aluminized  steel
Or equal and approved equivalent
3.2.2
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5          Door Lock                             Automatic, Electric type
3.2.6
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
3.2.7                                    Gratings       Provided
3.2.8                                            Loading    Manual loading of waste
3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type
Flange mounted
3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11    Temperature    Minimum exit 850 0C
3.2.12                               Observation port    To be provided with protective glass type
3.3    Secondary chamber
3.3.1
Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2                                            Insulation    Refractory material lining
3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically
3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C
3.3.5    Secondary Burner    Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases
3.3.7
Combustion Air Fan                      Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8                                         Temperature    Maximum  1600 0C
3.4       Chimney
3.4.1
Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent
Refractory material lining
3.4.2                                                    Length    10 m above ground
3.4.3                                                        Bore    about 350mm diameter
3.4.4            Discharge temperatures             About 850 0C
3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
3.5.1    Control unit                                           Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
3.5.4
Wiring       Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6    Fuel System
3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type    Diesel
3.6.2
Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m
Fuel pipe material    Special copper pipes or similar and approved materials
4. Physical characteristics
4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions    About 2.5 x 2.8m (WxD)
5.  Operating environment
5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6             Accessories
6.1             Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
7. Spare parts
7.1                                                      Burner        1 set
7.2              Fuel Filters                                         6 sets
7.3
All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
8.2
Manufacturing standards               Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
9.1                                                         Available    Should be available locally
9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
10.1                                                        KEMSA    For inspection and verification
10.2
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
11    Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13            Training
13.1
User training                                           On site user training on operation and daily up keep
13.2
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14    Technical Documentations
14.1         User manuals                                          2 sets
14.2         Service manuals                                     2 sets
14.3                                                     Drawings    2 sets
15        Commissioning
15.1    Testing and Commissioning of the machine to the satisfaction of the user
16    Warranty
16.1                                                  Equipment      Minimum of one year after commissioning on all parts.
16.2       Equipment system                                     Nil
17.    Maintenance contract
17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?

·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?

·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?

·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?

·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?

·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )



For incineration, fundamental and likewise pathological burners



Main unit
Application    For incineration, general and pathological
Capacity      50 – 60 kg/h burn rate
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                   Minimum 8 hours daily
Operating temperature        From 850 0C to 1200 0C, Automatic controlled
Residual Ash                       5 to 10%
3.2     Primary Chamber
Construction    Constructed from heavy duty mild or aluminized  steel Or
equal and approved equivalent
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction           Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                             Automatic, Electric type
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
Gratings      Provided
Loading    Manual loading of waste
Primary Burner                           Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted
Blower    Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature    Minimum exit 850 0C
Observation port    To be provided with protective glass type
3.3       Secondary chamber
Construction      Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation    Refractory material lining
Combustion Temperatures           Above 850 0C, controlled electronically
Gas residue or retention Time          > 2 second at minimum 850 0C
Secondary Burner                       Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                  Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                  Flange mounted
Ejector    Provided, Venturi type, for cooling the flue gases
Combustion Air Fan    Provided for supplying combustion and creating a negative drift and turbulences
Temperature    Maximum  1600 0C
3.4       Chimney
Construction      Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material lining
Length    10 m above ground
Bore    about 350mm diameter
Discharge temperatures             About 850 0C
Emissions      To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
Control unit                                    Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
Isolator switch                                  Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10m
Distribution Board    Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
Wiring    Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                       Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                            Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type    Diesel
Fuel Lines                                           Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                        and approved materials
4             Physical characteristics
Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions      About 1.2 x 2.2m (WxD)
5  Operating environment
Power Requirements                       240V,A/C 50Hz, single phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6. Accessories
Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
Spare parts
Burner    1 set
Fuel Filters                                         6 sets
All other spare parts                   required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
Manufacturing standards               NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
Available    Should be available locally
Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
KEMSA    For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing    Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                           On site user training on operation and daily up keep
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                          2 sets
Service manuals                                     2 sets
Drawings    2 sets
15        Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment      Minimum of one year after commissioning on all parts.
Equipment system                                     Nil
17.    Maintenance contract
Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning



50 to 60kg/hr as well as 100 to 120kg/hr diesel powered incinerator



50 to 60kg/hr and 100 to 120kg/hr diesel powered heater.1. Capability to Blaze the Adhering To Types of Waste:
Family members waste, glass, steel, lightweight light weight aluminum containers as well as additionally window extrudes, steel containers (shattered), wood, tires, soft goods, plastic containers, stress packs, medical waste along with quarantine waste.
2. Required Blazing Capacity:
Around 4,500 loads every year. The incinerator has to effective in blazing sort of waste discussed or any type of blends thereof at a cost of 3 heaps per hour. If needed, the system will certainly be produced to complete at least five successive days non-stop.
3. Burner Layout Requirements:
The system ought to be straightforward in design and treatment, with marginal digital elements.
The burner as well as linked air pollution control modern-day technology will certainly be:
a.Low being use supporting fuel;
b.Low in electrical power use;
c.Require extremely little pre-processing of Neighborhood strong waste;
d.The air contamination system shall abide by EU Waste Incineration Guideline 2000/76 as well as additionally creates part of the entire incinerator arrangement.
3.1 Particular Information that must be Supplied the Design
3.1.1 Burner Details:
a.Batch Lots Capability;
b.Primary chamber style (thickness, diameter, size, insulation, cellular lining, quantity fireplace area, weight); c. Second chamber design (density, size, size, insulation, cellular lining, volume fireplace location, weight);.
c.Exhaust pile style (thickness, diameter, lining variety of areas, total stack size, elevation over base, weight);.
d.Type as well as variety of supporting gas heating systems;.
e.Fuel demands– – type, quantities;.
f.Electrical power use;.
g.Electrical solutions called for;.
h.Water demands– – quantities;.
i.Any various other input needs and also consumables;.
j.Temperatures to be achieved to make certain suitable destruction of waste and also follow called for air contamination control needs (EU Waste Incineration Guideline 2000/76);.
k.Residence time to assure optimal destruction of waste as well as follow needed air pollution control criteria;.
l.Potential weight decrease (percent) of waste;.
m.Options to immediately and also constantly display as well as document info such as days, time of day, set sequential number;.
n.A temperature or aesthetic sign to reveal heat status of equipment; as well as likewise.
o.Details on visuals screens in addition to/ or computer system taping gizmos.

3.1.2 Air Contamination Control System Information.
a.The type of air contamination control devices selected will certainly comply with EU WID Waste Incineration.
b.Directive 2000/76;.
c.Details on the gas cleansing systems to enhance the removal of excellent little bits, acid gases and likewise substantial.
d.metals;.
e.Details on aspects, such as:.
quencher;.
condenser/ absorber;.
venturi scrubber;.
entrainment separator and also.
discharges stack( s).
Electric power usage;.
f.Any different other input needs in addition to consumables (e.g. lime);.
g.Details on graphic display screens along with/ or computer system recording devices;.
h.Environmental requirements – – – – The system would absolutely have the capacity/ capability to follow essential air top quality standards; i.e.EU Waste Incineration Policy 2000/76. (or comparable standards as well as requirements acceptable to the Australian Commonwealth Federal Government Division of the Setup);.
i.Specify air contamination criteria that are kept an eye on.
3.1.3 Site Demands for the Burner.
a.Total land area dimentions;.
b.Infrastructure required (supply of water, power supply water drainage); and also.
c.Any particular eco-friendly or climatic/meteorological aspects that calls for consideration.
3.1.4 Housing Needs as well as also Style.
a.Details on demands for a safeguarded unit for the burner and also connected air contamination control system. The space will absolutely be made to obtain job-related health and safety demands such as: a. Free space is conveniently offered on all sides as well as warm radiation is maintained a minimal offering the operators an:.
b.easy convenient environment as well as also air flow;.
c.There are secure storage area facilities for waste;.
d.There are measures to remain clear of vermin along with bugs;.
e.The products will be of sufficient architectural thickness for safety and to stand up versus sea rust.
4. Training, Upkeep As Well As Instructions Manuals.
4.1 Upkeep Handbooks.
Supply information on maintenance demands, such as:.
a.General cleaning in addition to upkeep– – consistency, abilities/ technological experience needed;.
b.Expected lifetime of elements as well as the system as a whole;.
c.Expected consistency of the demand for replacement of components;.
d.Availability of parts as well as place of suppliers;.
e.Frequency of need for substantial overhauls; and additionally.
f.Estimated down time needed for general maintenance as well as significant overhauls.a burner for our dead pets in the cattle ranch particularly fowl.



install a diesel discharged heater



blaze primarily drugs (all type of dosage kinds … … … … syrups, tablet computers, injectables) clinical consummabables, in addition to also biological liquids ……… ….
Capacity around 10 kg/ hr. set up a diesel discharged burner that can fit a collection tons of about 100 kg with an everyday burning requirement of approximately 500kg per 8 hour day. Industrial Burner to harm.
the drugs waste like Alu, PVC, PVDC etc.Installation for burning of pet dog waste cost, existence, settlement terms where it is feasible to acquire in Russia? I am aiming to for ability in between 200 -400 kg.
1.2 AREA PAINT.
Perform painting needed for area not or else specified, and also surface paint of things just keyed at the factory

1.3 LOCATION TRAINING.
a. Submit [6] complete duplicates of operating guidelines laying out the detailed procedures needed for system start-up, operation and also closure. Consist of in guidelines the supplier’s name, version number, service guidebook, parts noting, as well as quick recap of all tools in addition to their typical operating attributes. As well as additionally [Six] complete duplicates of maintenance instructions giving regular maintenance therapies, feasible break downs and additionally fix solutions, repairing guides, in addition to streamlined schematic representations for the system as set up.

3.6. Effectiveness.
Preheat the incinerator for 4 hrs to get to the shooting temperature of 982degrees C [1800] degrees F. Weigh and also tape the general fee weight. Charge the burner at the rated burning capability in kg extra pounds per hour for a period of [4] hrs in addition to run according to the manufacturer’s written guidelines. Contain in performance testing the treatment of the mechanical billing facilities, the burner, the air contamination control tools, the ash.
Carry out testing complete scale for a full- procedure cycle, and likewise keep an eye on performance to validate compliance with the arrangement requires send a record on security outcomes. After the burner has really cooled down, think about the residue. The weight of the deposit will not go past 5.0 percent combustible product of the total charge weight.
After clean-out, the burner will let down any kind of type of evidence of wear and tear, such as shagged or spilling refractory, bending of components, along with stained outside paint.

– – Control.
Test the incinerator under genuine shooting troubles. Validate with testing that all controls run within the optimum as well as minimum restrictions for temperature or timing. Mimic genuine high-risk issues such as warms as well as likewise fire failure by reducing the configurations for the activation of limitation as well as security controls.

– – Treatment Temperature.
Operate the burner under typical lots troubles for not much less than 6 hours. – – Gas syetem: Double gas( both oil as well as likewise gas)