Archive: April 18, 2021

2 combustion chambers type burner

Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof
and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules
in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m.Medical and Biological wastage.
3.1              Main unit
3.1.1
Application      For incineration, general and pathological
3.1.2                                            Capacity       100 – 120 kg/h burn rate
3.1.3
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4         Operating time                   Minimum 8 hours daily
3.1.5          Operating temperature        From 850 0C to 1200 0C, Automatic controlled
3.1.6          Residual Ash                       5 to 10%
3.2     Primary Chamber
3.2.1
Construction    Constructed from heavy duty mild or aluminized  steel
Or equal and approved equivalent
3.2.2
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
3.2.3
Internal Construction           Fixed hearth type complete with gratings, concave bottom and charging door, lined with refractory material
3.2.4
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
3.2.5          Door Lock                             Automatic, Electric type
3.2.6
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
3.2.7                                    Gratings       Provided
3.2.8                                            Loading    Manual loading of waste
3.2.9           Primary Burner                           Fully automatic, with fuel, temperature and speed  controls with ignition system  flame detector                                                         Air fan Complete with safety features, flame failure                                                                    Diesel fired fuel injector type
Flange mounted
3.2.10    Blower      Provided.  3 phase for supplying excess combustion air through the distribution system with speed control system
3.2.11    Temperature    Minimum exit 850 0C
3.2.12                               Observation port    To be provided with protective glass type
3.3    Secondary chamber
3.3.1
Construction    Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2                                            Insulation    Refractory material lining
3.3.3             Combustion Temperatures      Above 850 0C, controlled electronically
3.3.4             Gas residue or retention time                                              > 2 second at minimum 850 0C
3.3.5    Secondary Burner    Provided,
Diesel fired,
Fully automatic, with fuel, temperature and speed controls
With ignition system
Flame detector
Air fan
Complete with safety features, flame failure
Diesel fired fuel injector type
Flange mounted
3.3.6    Ejector    Provided, Venturi type, for cooling the flue gases
3.3.7
Combustion Air Fan                      Provided for supplying combustion and creating a
negative drift and turbulences with variable speed control
3.3.8                                         Temperature    Maximum  1600 0C
3.4       Chimney
3.4.1
Construction    Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent
Refractory material lining
3.4.2                                                    Length    10 m above ground
3.4.3                                                        Bore    about 350mm diameter
3.4.4            Discharge temperatures             About 850 0C
3.4.5                                            Emissions    To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
3.5.1    Control unit                                           Fully automatic with microprocessor based control
unit (PLC) automating all operations of the incinerator
Capable of monitoring all incinerator parameters
With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and second chambers , turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
3.5.2    Isolator switch                                  Supply and install isolator switch 100A, 3 phase, 415V, 50Hz, for the incinerator unit , including all necessary cables 10m
3.5.3
Distribution Board           Supply and install distribution board 100 A, 3 phase 415V, 50Hz, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
3.5.4
Wiring       Make provisions for wiring the isolator switch,
Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.
Working length 20m.
Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6    Fuel System
3.6.1          Fuel Tank                                            Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Tank capacity, 500 liters, constructed from preferable
suitable metallic material or high temperature
resistance material
Fuel type    Diesel
3.6.2
Fuel Lines                                       Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.  Working length , 20m
Fuel pipe material    Special copper pipes or similar and approved materials
4. Physical characteristics
4.1              Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions    About 2.5 x 2.8m (WxD)
5.  Operating environment
5.1              Power Requirements                      415V, A/C 50Hz, Three phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6             Accessories
6.1             Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
7. Spare parts
7.1                                                      Burner        1 set
7.2              Fuel Filters                                         6 sets
7.3
All other spare parts                 required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
8.2
Manufacturing standards               Environmental Management and Coordination Act, 1999
Legal Notice No.121 of 29th September 1999 on                                                                         waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
9.1                                                         Available    Should be available locally
9.2           Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
10.1                                                        KEMSA    For inspection and verification
10.2
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
11    Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12    Installation and testing    Complete installation and setup of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
13            Training
13.1
User training                                           On site user training on operation and daily up keep
13.2
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14    Technical Documentations
14.1         User manuals                                          2 sets
14.2         Service manuals                                     2 sets
14.3                                                     Drawings    2 sets
15        Commissioning
15.1    Testing and Commissioning of the machine to the satisfaction of the user
16    Warranty
16.1                                                  Equipment      Minimum of one year after commissioning on all parts.
16.2       Equipment system                                     Nil
17.    Maintenance contract
17.2         Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

Capacity per day around 8-10 kg wastage/day.·         Which product do you offer, only incinerator or also compactor, shredder machine, any other equipment related to waste treatment ?

·         For the incinerator, can you propose (and of so please send us specs and price) incinerator for 25 kg/hr, 50 Kg / hr, 100 kg / hr, 200 kg / hr ? what is your minimum and maximum size available ?

·         As we are not so experience in incineration process, can you tell us which type of waste can go into the incinerator and still respecting international environmental regulation ?

·         Do you equipped your incinerator with filters ? if so which one and they are following which standard ?

·         Can you supply exhaust pipe from incinerator to the roof, and then whirly bird to avoid the rain water to go into the pipe ?

·         When we install an incinerator within a building, what are the distance to observe between equipment and wall and roof (as we need to supply also the building to house the incinerator )

For incineration, basic and also pathological incinerators

Main unit
Application    For incineration, general and pathological
Capacity      50 – 60 kg/h burn rate
Type    Two  combustion chambers type; primary  and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
Operating time                   Minimum 8 hours daily
Operating temperature        From 850 0C to 1200 0C, Automatic controlled
Residual Ash                       5 to 10%
3.2     Primary Chamber
Construction    Constructed from heavy duty mild or aluminized  steel Or
equal and approved equivalent
Insulation material               Refractory material lining similar or equal to calcium
Silicate and hot face combination of heavy duty brickwork
Internal Construction           Fixed hearth type complete with gratings, concave bottom
and charging door, lined with refractory material
Charging Door                      Suitable for manual loading of wastes and with smooth
Dear seal equivalent of Ceramic seals with hinges.
Door Lock                             Automatic, Electric type
Ash removal door       Provided, for removing resultant bottom ash leftovers                              from the Primary chamber
Gratings      Provided
Loading    Manual loading of waste
Primary Burner                           Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure,  Diesel fired fuel injector type and Flange mounted
Blower    Provided. For supplying excess combustion air through the distribution system with speed control system
Temperature    Minimum exit 850 0C
Observation port    To be provided with protective glass type
3.3       Secondary chamber
Construction      Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
Insulation    Refractory material lining
Combustion Temperatures           Above 850 0C, controlled electronically
Gas residue or retention Time          > 2 second at minimum 850 0C
Secondary Burner                       Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                  Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                  Flange mounted
Ejector    Provided, Venturi type, for cooling the flue gases
Combustion Air Fan    Provided for supplying combustion and creating a negative drift and turbulences
Temperature    Maximum  1600 0C
3.4       Chimney
Construction      Constructed from heavy duty mild or aluminized steel  or equal and approved equivalent                                                                 Refractory material lining
Length    10 m above ground
Bore    about 350mm diameter
Discharge temperatures             About 850 0C
Emissions      To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
3.5       Electrical System
Control unit                                    Fully automatic with microprocessor based control                                                                      unit (PLC) automating all operations of the                                                                      incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress
Parameters  i.e. temperature of primary and secondary chambers, turbulence and time
With status lamp
With user of defined and differed programmed operating cycles for different type of loads/conditions
With safety interlocks, display of errors and visible and audio alarms.
System for continuous  emission monitoring
Isolator switch                                  Supply and install isolator switch 240V, 100A for the                                                                    incinerator unit, including all necessary cables 10m
Distribution Board    Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment.  Wiring   to be done according IEE regulations.
Wiring    Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                       Working length 20m.  Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
Fuel System                                       Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
Fuel Tank                                            Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type    Diesel
Fuel Lines                                           Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.
Working length , 20m
Fuel pipe material; Special copper pipes or similar                                                                        and approved materials
4             Physical characteristics
Main unit                                           Floor mounted, stand alone, fixed hearth type
Dimensions      About 1.2 x 2.2m (WxD)
5  Operating environment
Power Requirements                       240V,A/C 50Hz, single phase, with PE
Ambient temperature                     10 0C to 40 0C
Relatively humidity                          40% to 90%
6. Accessories
Rack, 2 m long                               1 piece
Waste cart, stainless steel               1 piece
Spare parts
Burner    1 set
Fuel Filters                                         6 sets
All other spare parts                   required for replacement during and after 12 months of operations.    2 pieces of each
8              Quality Standards
Manufacturing standards               NEMA Kenya Act, 1999
Legal Notice No.121 of 29th September 1999 on waste Management Regulations
EU waste incinerator Directive- EC 76/2000
BS 3316
WHO Emission Standards
World Bank Emission Standards
or any other internationally recognized standards
Conformity to standards                      CE marked or any other internationally recognized documents
9          Local back up service
Available    Should be available locally
Capacity to service equipment                                                                         Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance  service and spare parts sales for the lifespan of the incinerator
10       Delivery point
KEMSA    For inspection and verification
Moi Voi, Makindu
Maragua, Eldama Ravine and Isiolo Hospitals      For installation, testing, NEMA Certification and commissioning
Pre installation works
Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
Installation and testing    Complete installation and set up of the incinerator at designated as per manufacturer’s instructions
Provide fuel and test run the incinerator for 3 hours daily for 7 days
Training
User training                                           On site user training on operation and daily up keep
Maintenance training                            On-site maintenance training on Preventive Maintenance, repair and trouble shooting
Technical Documentations
User manuals                                          2 sets
Service manuals                                     2 sets
Drawings    2 sets
15        Commissioning
Testing and Commissioning of the machine to the satisfaction of the user
Warranty
Equipment      Minimum of one year after commissioning on all parts.
Equipment system                                     Nil
17.    Maintenance contract
Comprehensive preventive & repair         service      Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning

50 to 60kg/hr as well as 100 to 120kg/hr diesel powered incinerator

50 to 60kg/hr and 100 to 120kg/hr diesel powered burner.1. Ability to Incinerate the Complying With Types of Waste:
Family waste, glass, steel, light weight aluminum containers and also window extrudes, steel canisters (smashed), hardwood, tires, white goods, plastic containers, pressure packs, medical waste as well as quarantine waste.
2. Needed Blazing Capacity:
Around 4,500 loads annually. The incinerator has to efficient in blazing sort of waste mentioned or any mixes thereof at a price of 3 heaps per hour. The system will be created to compete at least five consecutive days non-stop if needed.
3. Incinerator Layout Needs:
The system ought to be simple in design and procedure, with marginal digital components.
The incinerator and connected air pollution control modern technology will certainly be:
a.Low being used of supporting fuel;
b.Low in electric power usage;
c.Require very little pre-processing of Local strong waste;
d.The air contamination system shall adhere to EU Waste Incineration Regulation 2000/76 and also creates component of the entire incinerator arrangement.
3.1 Particular Data that must be Given with the Style
3.1.1 Incinerator Information:
a.Batch Lots Capability;
b.Primary chamber style (density, diameter, length, insulation, cellular lining, quantity hearth location, weight); c. Second chamber design (thickness, diameter, length, insulation, lining, volume hearth location, weight);.
c.Exhaust stack style (density, diameter, lining number of sections, overall stack size, height above base, weight);.
d.Type and variety of supporting gas heaters;.
e.Fuel demands– type, quantities;.
f.Electrical power usage;.
g.Electrical services called for;.
h.Water requirements– amounts;.
i.Any various other input demands and also consumables;.
j.Temperatures to be achieved to ensure appropriate destruction of waste and adhere to called for air pollution control requirements (EU Waste Incineration Regulation 2000/76);.
k.Residence time to guarantee ideal devastation of waste as well as comply with needed air pollution control criteria;.
l.Potential weight reduction (percent) of waste;.
m.Options to instantly and also continually display and document information such as days, time of day, batch sequential number;.
n.A temperature or aesthetic sign to show warmth status of equipment; and also.
o.Details on visuals screens as well as/ or computer system recording gadgets.

3.1.2 Air Pollution Control System Information.
a.The sort of air pollution control devices selected will follow EU WID Waste Incineration.
b.Directive 2000/76;.
c.Details on the gas cleansing systems to improve the elimination of great bits, acid gases and also hefty.
d.metals;.
e.Details on elements, such as:.
quencher;.
condenser/ absorber;.
venturi scrubber;.
entrainment separator and.
emissions pile( s).
Electrical power usage;.
f.Any various other input demands as well as consumables (e.g. lime);.
g.Details on graphic displays as well as/ or computer recording devices;.
h.Environmental needs – – The system would certainly have the ability/ ability to abide by pertinent air quality standards; i.e.EU Waste Incineration Regulation 2000/76. (or similar standards as well as requirements acceptable to the Australian Commonwealth Federal Government Department of the Setting);.
i.Specify air contamination parameters that are kept an eye on.
3.1.3 Site Demands for the Incinerator.
a.Total land area dimentions;.
b.Infrastructure needed (supply of water, power supply water drainage); and.
c.Any particular ecological or climatic/meteorological aspects that requires consideration.
3.1.4 Housing Needs and also Style.
a.Details on needs for a protected unit for the burner and connected air contamination control system. The room will certainly be designed to attain job-related health and safety needs such as: a. Free space is readily available on all sides as well as warm radiation is kept at a minimum giving the operators an:.
b.easy workable environment and also ventilation;.
c.There are safe storage space centers for waste;.
d.There are measures to stay clear of vermin as well as pests;.
e.The materials will be of adequate architectural thickness for security and to hold up against sea corrosion.
4. Training, Upkeep And Direction Manuals.
4.1 Upkeep Handbooks.
Supply information on maintenance demands, such as:.
a.General cleaning as well as upkeep– regularity, skills/ technological experience required;.
b.Expected life span of components as well as the system as a whole;.
c.Expected regularity of the requirement for substitute of components;.
d.Availability of parts as well as location of vendors;.
e.Frequency of requirement for significant overhauls; and also.
f.Estimated down time needed for general upkeep as well as significant overhauls.an incinerator for our dead pets in the ranch particularly poultry.

install a diesel fired burner

blaze mostly pharmaceuticals (all kinds of dosage kinds … … syrups, tablets, injectables) medical consummabables, as well as likewise biological fluids …….
Capacity around 10 kg/ hour. install a diesel discharged incinerator that can accommodate a set tons of approximately 100 kg with a day-to-day burning need of up to 500kg per 8 hour day. Industrial Incinerator to damage.
the pharmaceuticals waste like Alu, PVC, PVDC etc.Installation for burning of pet waste price, existence, payment terms where it is possible to purchase in Russia? I am aiming to for capacity in between 200 -400 kg.
1.2 FIELD PAINT.
Perform painting required for surface areas not otherwise specified, and also surface paint of items only keyed at the factory

1.3 AREA TRAINING.
a. Submit [6] full duplicates of operating instructions laying out the detailed procedures needed for system startup, operation and also shutdown. Consist of in instructions the supplier’s name, version number, service manual, components listing, as well as quick summary of all devices as well as their standard operating features. And also [Six] total copies of maintenance instructions providing regular upkeep treatments, possible breakdowns and also repair services, repairing guides, as well as streamlined schematic representations for the system as set up.

3.6. Efficiency.
Preheat the incinerator for 4 hrs to reach the firing temperature of 982degrees C [1800] levels F. Weigh and tape the overall fee weight. Charge the burner at the ranked burning capability in kg pounds per hour for a duration of [4] hrs as well as run according to the maker’s written guidelines. Consist of in efficiency testing the procedure of the mechanical billing centers, the incinerator, the air contamination control tools, the ash.
handling devices, and the procedure surveillance facilities. Execute testing complete scale for a full- operation cycle, and also monitor performance to verify compliance with the agreement needs submit a record on surveillance results. Decrease the waste to a great ash deposit. Comply with typical burnout treatment. After the incinerator has actually cooled down, consider the residue. The weight of the residue will not go beyond 5.0 percent combustible material of the overall fee weight.
After clean-out, the incinerator will disappoint any type of evidence of wear and tear, such as shagged or spilling refractory, warping of parts, as well as stained exterior paint.

– Control.
Test the incinerator under real firing problems. Validate with screening that all controls operate within the optimum as well as minimum limitations for temperature or timing. Simulate real risky problems such as heats and also fire failure by lowering the setups for the activation of limitation and security controls.

– Covering Temperature.
Operate the incinerator under normal lots problems for not less than 6 hours. After 6 hrs, temperature readings of the external covering, taken at not much less than 5 arbitrary places, will not exceed the temperature level constraint of paragraph furnace building.
– – capability: 300-400 kg/hour.
– – Fuel syetem: Double gas( both oil and also gas)

BIOHAZARD DISPOSAL INCINERATOR CONTAINERISED IN A 20 FEET CONTAINER

BIOHAZARD DISPOSAL: CONTAINER

GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, TOTALLY CONTAINERISED IN A 20 FT CONTAINER, TO CONSIST OF BUILT-IN FUEL CONTAINER As Well As GENERATOR.

TECHNOLOGICAL SPECS: BURNING CHAMBER QUANTITY (M3); 0.54 m3. SUGGESTED SET SIZE: 60 KG, BURN PRICE: 69 KG PER HOUR, AVERAGE GAS CONSUMPTION 13 KG PER HOUR, OPERATIONAL TEMPERATURE: 950-1320 CELSIUS, GAS RETENTION IN SECONDARY CHAMBER 0.5 SECS, WITH TEMPERATURE. TRACKING, AVERAGE ASH DEPOSIT: 3%, THERMOSTATIC TOOL: YES,
MEASUREMENTS: OUTSIDE LENGTH (mm): 1520MM, EXTERNAL SIZE (mm): 920MM, EXTERNAL HEIGHT (mm): 4020 MM
1. Burner for Bio-Medical Waste incineration needed
2. 50 kg/hr
3. 2 chambers have to exist
4. temperature level of primary chamber ought to be 850 degrees Celsius
temperature level of additional chamber should be 1200 degrees Celsius

a pet cremator

an animal cremator for our organization in malaysia.currently we are doing specific personal cremation as well as mass cremation for animals in addition to clinical waste.a burner which can shedding between 3 to 5 tonnes daily of mixed waste items, plastics, rubber, combustible putrescible waste, clinical waste, rubber tyres, paper as well as cardboard, fabrics, eco-friendly timber waste etc. As a few of the waste products will contain non-flammable solids, the burner should be capable of removing those materials possibly using a rotating kiln procedure.

It is not intended to utilize any kind of gas, such as oil or diesel, to advertise the burning of the waste, as the waste products are needed to be incinerated making use of a free burning procedure. Warm air nevertheless from a downstream procedure will be offered to enhance the burner temperature level and burning rate as needed. Very heats in the incinerator are not needed and are not called for.

The burning of the waste products is expected to create hazardous discharges which will be cleaned up by means of other existing downstream procedures and also an Article Burning process in the burner is as a result not required.

The burner must be capable of suiting an automated waste feed process.Incinerator Requirements

S. No.
Summary

1
Feeding Ability
100 Kg.

2
Burning Capacity
50 Kg./ Hour

3
Feed Setting
Hands-on

4
Gas
Diesel Oil

5
Incinerator Kind
Double Burning Chamber with Integrated In Smoke Filter (Dry Scrubber)

6
Smokeshaft Product
Non Corrosive/ Rust Resistant Ideally Stainless for longer Life (Height 5-7 Meter)

7
Burners
Premium Quality European CE Qualified Oil Burner

8
Control board
Standard PLC Control Panel

9
Power Supply
220/380 Volt A/c 50 Hz.

10
Oil Tank Capability
200 ~ ~ 300 Litre

11
Burning Chamber
Fire Brick, Refractoy Block, Concrete

blaze biohazard waste

a burner which can melting in between 3 to 5 tonnes per day of mixed waste items, plastics, rubber, flammable putrescible waste, medical waste, rubber tires, paper and also cardboard, textiles, eco-friendly hardwood waste etc. As several of the waste products will have non-flammable solids, the incinerator should be capable of drawing out those products possibly by means of a rotary kiln process. We are however open up to pointers on the problem of the rotary kiln service as you may have various other services available.

It is not meant to use any type of fuel, such as oil or diesel, to promote the burning of the waste, as the waste items are called for to be blazed making use of a totally free burning process. Hot air nevertheless from a downstream process will be available to boost the incinerator temperature as well as burning rate as needed. Very heats in the burner are not essential and also are not required.

The burning of the waste products is expected to create toxic exhausts which will certainly be cleansed using various other existing downstream processes and an Article Combustion procedure in the incinerator is consequently not needed.

The burner should be capable of fitting an automated waste feed process.We are seeking incinerator to incinerate biohazard waste of our microbiology lab. Our day-to-day waste production is upto 20 Kg maximum and incinerator will certainly be called for on regular basis that is 1 or 2 times a week so you are as a result asked for to kindly suggest the suitable incinerator for our lab which shall be affordable for us concerning investing in as well as upkeep cost.

an industrial sized incinerator for cigarette as well as cigarette waste

inciner8ter version TS50 OR TS100 With delevery in Europe look Croatia.Please can you send me the offer for animal crematory equipment.details of Chemical waste incinerator.
For pets to 90 kg. cremation devices for pets (Max. Size pet dogs till 80 kg )1. technical specification is for burner only
2what is the capability of burner in one hour?
3. 35 for burners, 8 for control instance, 1 for HD is that the weight of each product?
4. are these currently configured to ensure that the constructing becomes easy in between control situation and also burners with HD?oil heater, 2sets (larger capacity).
Temperature Thermocouple, 2 collections.
Oil Tank 100Liters, 1 set.
Thermal Gasket, 10 Meters.
Incinerator control Case, 1 set.
Blower, 1 set.an industrial sized incinerator for cigarette and tobacco waste. Information

Brand = Any

Version = Any

400v/50hz

· Sorts of waste – – timbers, tree branches, tree leaves, wood powder and card boards

· Daily Hrs of operation = 7 hrs

· Daily create waste capability = 10000kg.
THEE SETS OF CATALOGUE ORIGINAL SHOULD BE RECIVED BY DHL + CD VEDIO.
THREE YEARS ASSURE TOTALLY FREE FREOM DELIVARY DAY As Well As FREE SPAR COMPONENT ALSO, GARANTEE LATTER SPAR PART OUGHT TO STAND FOR ONE DECADE FROM THE DATE OF DELIVEARY.
ELECTRIC SYSTEM NEED TO BE DELIVERD WITH SERVIC HANDBOOK IN ENGLISH EACH.
ELECTRIC NEEDS TO BE 380-220 V HZ 60 FOR ALL TOOLS.
PROVIDE TIME ASB.
DEAL VALIDITY SHOULD BE 6 MONTHS.
IN SITUATION OF ORDER I NEED.
2 SETS OF CERTIFICATE OF ORGINE NEED TO BE STAMPED IT FROM SAUDIA CONSULAR OFFICE IN YOUR NATION.
COMMERCAL BILLING( LEGALIZED FRO CHAMPER OF BUSINESS).
2 ORGINAL BILL OF LADIN.
must BE SEND SOME ONE FOR FIXE As Well As TRANING FOR 5 INDIVIDUAL IN EACH PLACE.
NEED TO BE SEND OUT YOUR DIZIN FOR INSTALATION UNITS.
AWITING YOUR GREAT REPLY

A PYROLYTIC MEDICAL WASTE BURNER FOR LARGE RANGE

REQUIREMENTS OF A PYROLYTIC MEDICAL WASTE BURNER FOR LARGE RANGE
1. Capacity of damage in weight: 500 kg/h.
2. It must have the ability to run not much less than 8 hours/day
3. This burner must be able to destruct all flammable wastes created by hospitals, private centers, laboratories, institutes, etc.
4. Design Spec: Kinds A, B, C, D, and also E of medical waste.
5. PYROLYTIC combustion, by controlling the gasification of waste.
6. The incinerator needs to prevent the release of black smoke and also fine dust, (Smokeless) during the loadings.
7. It must be able to reduce the volume of wastes by 98%.
8. It needs to have the ability to hold discharge in the 2nd melt with gas house of not much less than 2.
secs.
9. The incineration must be completely devoid of noticeable smoke as well as offensive smells.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
The Temperature levels of combustion: Minimum will certainly be 850oC and also max 1400oC.
Article combustion: >> 1100oC.
11. The Internal diameter of the Smokeshaft: Ø 400 and also its height: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13. The Measurement of the door for loading in cm: 120×× 120.
14. Burner procedure ought to be Automatic On/Off.
15. Fuel: diesel/Gas.
16. The supplier has to supply necessary details for the best of the installment This burner with PYROLYTIC burning need to have:.
17. A combustion chamber of waste:.
* Completely tight door for the hands-on loading of waste. The loading should be Handbook, Set.
Load.
* A heater of illumination which the use is limited to the ignition of waste.
* Frontage of packing with door seals risen on hinges, wheel of screw plug, versatile joint, as well as packing insulating out of refractory.
* The insulation of the combustion chamber should be made up of refractory blocks, having a high material of aluminium as well as protects bricks in order to assure a minimum temperature on.
the outside sheet metal.
* Make-up of the refractory;.
Refractory concrete:
. Density: 100 mm
. Nature: 42% of Al203.
Shield in coarse panels:

. Thickness: 75 mm.
Nature: Calcium silicate.
* Burner of illumination of waste, with fuel, conventional mono-bloc casting leading diving flame, lighting and safety and security of electronic ignition, long-term air flow, electro-magnetic sluice entrance of guideline and also isolating valve.
* Plate of combustion in Carborundum, avoiding the fixing of glass as well as slags.

18. A chamber of article burning of gases.
* A heater of combustion of gases,.
* A tool of injection of air enabling a total recombustion of gases,.
* A tool of air inlet of air conditioning of waste gases,.
* A sheath of evacuation of the gases burned.
* Carcass in strong sheet steel with support of connection.
* Make-up of the refractory;.
Refractory concrete:.
Density: 150 mm.
Nature: 65% of Al203.
Protect in fibrous panel:.
Density: 85 mm.
Nature: Calcium.
* Heater with fuel, mono-bloc casting assisting kind with straight flame, lights and safety of electronic ignition, long-term ventilation, electro-magnetic sluice entrance of regulation and isolating shutoff.
* A second injection of air to ensure best oxygen material.
19. A control box making certain the total cycle of combustion.
20. An Air pollution control tool attached to the flue chimney must be attached to stop.
unneeded retreat of contaminants

21. Fan:.
* Electro-ventilator distributing the second air, the policy of the air flow being executed by valves as well as following the control of the automated cycle.
22. Controls and also laws:.
Control box watertight to dust, including:

* A button circuit breaker for every engine (ventilators as well as heaters).
* A timer with flexible temporization for the guideline of each burner.
* A regulatory authority with watch for the temperature level of burning.
* A regulatory authority with digital watching for the temperature of post combustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing must be Automatic or hand-operated set de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional.
23. Discharge Requirements Conformity: BS 3316 or équivalent criterion.
23. Capability to treat Plastic: Not much less than 40% by weight.
24. CE Production Compliance: BS EN 746-2-1997

23. The provider should give batches of extra components of very first urgency as well as consumable of the incinerator.
24. The installed incinerator should bear a one year guarantee.
25. The vendor will execute an onsite installation of the burner.
25. The technical training of drivers will certainly need to be supplied and also given by a service technician from the manufacturing facility; it will certainly consist of medicinal and also preventive maintenance, and also making use of maker, etc

NB.: Civil jobs and also any kind of other associated services for the setup and also training of operators must be included in the burner s cost.

containerised Healthcare facility waste incinerator

One 40′ ′ Requirement – – containerised Burner, and also comprehend you can aid us with the purchase of the same.Waste kind or application: General as well as Medicine

Ability kgs/ hr: 75 to 350
Medical facility and also Lab tools.

One of our valued consumer is interested to acquire a Hospital Waste burner according to following specifications:

Healthcare facility waste burner
Capability: 50 Kg/ Hr
Brand-new total working unit
Burners: Double fired (Gas and diesel).
20ft container with an incinerator plant for melting solid waste including the complying with main things:

1. INCINERATOR.
2. SPARK ARRESTER.
3. FLUE GAS HEAP/ EXHAUST PIPE.
4. DIESEL OIL DAYTANK 400 L WEB.
5. INCORPORATED FIRE DEALING WITH SYSTEM.
6. USER’S MANUAL.
7. EXTRA PARTS FOR 1 YEARS OPERATION.
medical waste incinerator is from 2.5 to 3 cubic meters and also it’s capability is from 60 t0 100kg per hour.