Archive: July 27, 2020

Google快讯 – incinerator

Google
incinerator

实时更新 2020年7月27日
新闻

… del rapporto di ricerche di mercato Attrezzatura per inceneritore : https://marketresearch.biz/report/incinerator-equipment-market/request-sample.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2020年7月27日
新闻

The Occupational Safety and Health Administration (OSHA) has established a detailed procedure for dealing with medical and biomedical waste …

Facebook Twitter 标记为不相关

Bainbridge Health is using data to identify trends in critical care medication use for COVID-19 patients and prevent drug shortages during the pandemic.

Facebook Twitter 标记为不相关

The “Impact of COVID-19 on the Medical Waste Treatment Service market Report Research Industry, 2020″ report has been added to market.biz …

Facebook Twitter 标记为不相关

medical waste; explosives, radioactive and unidentified waste; large gas cylinders; tires; smoke detectors. If you have water-based latex paint or alkaline …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2020年7月27日
新闻

The Incinerator is required to both obtain and operate in compliance with a Title V permit because it is a major source of hazardous air pollutants and …

Facebook Twitter 标记为不相关

With just one incinerator in Guntur, bodies are piling up at GGH morgue. The city is counting its dead and as the bodies of COVID-19 victims pile up at …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

U.S. EPA settles with Pacific Seafood for wastewater violations in Eureka, California

 

 

 

https://us.vocuspr.com/Publish/518041/vcsPRAsset_518041_117252_ac72e661-9a5c-47d7-888c-32b1eb83fb34_0.jpg

For Immediate Release:   July 27, 2020
Media Contact:   Soledad Calvino, 415-972-3512, [email protected]

 

U.S. EPA settles with Pacific Seafood for wastewater violations in Eureka, California

EUREKA, Calif. – The U.S. Environmental Protection Agency (EPA) has announced an agreement with Pacific Seafood-Eureka, LLC over violations of the federal Clean Water Act. The settlement requires the company to pay a $74,500 penalty after an EPA inspection found the company was discharging wastewater in violation of local and federal standards into the City of Eureka’s sewer system and Humboldt Bay’s Eureka Slough.

“Humboldt Bay is an important waterway enjoyed by many Californians,” said EPA Pacific Southwest Regional Administrator John Busterud. “Unpermitted and untreated discharges of pollutants to the bay can harm aquatic life and water quality. Industrial facilities must also treat their wastewater before it enters local sewer systems to avoid harm to the collection system and potentially impacting discharges from the treatment plant.”

Pacific Seafood-Eureka, part of the Pacific Seafood Group headquartered in Portland, Oregon, operates a seafood processing facility at its Eureka location. During a 2018 inspection with the North Coast Regional Water Quality Control Board and Eureka’s Public Works Department, EPA found the company discharged wastewater directly to the Eureka Slough waterway without the appropriate permit. EPA conducted its inspection after the City of Eureka issued several notices of violations to the facility. The facility also discharged wastewater to the city of Eureka’s sanitary sewer in violation of pretreatment standards.

Violations associated with operation and maintenance of the facility’s pretreatment system were identified, including: wastewater from the indoor shrimp processing area was bypassing the facility’s pretreatment system; the facility lacked adequate secondary containment in the indoor bulk chemical storage area and outdoor chemical storage area; wastewater from the de-shelling process was observed entering a storm drain; and the company was discharging the water used to rinse off oysters and crabs directly into the Eureka Slough. The company addressed all of these compliance issues.  

Under the Clean Water Act, certain types of industrial facilities are required to treat wastewater before it is discharged into the municipal sewer system. Failure to treat industrial wastewater can cause costly damage to municipal sewer treatment plants not designed to treat industrial pollutants and poses health risks to treatment plant and collection system staff who are exposed to these pollutants. Finally, untreated industrial waste can result in pollutants bypassing treatment, enter surface waters, and harming aquatic life and water quality.

The proposed consent agreement is subject to a 30-day comment period and final agency approval. A copy of the consent agreement can be found at: https://www.epa.gov/publicnotices/pacific-seafood-eureka-llc-eureka-ca-proposed-settlement-clean-water-act-class-ii

For more information on National Pollutant Discharge Elimination System permits, please visit: https://www.epa.gov/npdes-permits/npdes-permits-epas-pacific-southwest

For more information on EPA’s Clean Water Act Pretreatment Program, please visit:
https://www.epa.gov/npdes/national-pretreatment-program

Learn more about EPA’s Pacific Southwest Region. Connect with us on Facebook and on Twitter.
 

https://us.vocuspr.com/Publish/518041/vcsPRAsset_518041_117254_727713ef-c63c-47f0-824c-233b048793ba_0.jpg

If you would rather not receive future communications from Environmental Protection Agency, let us know by clicking here.
Environmental Protection Agency, 75 Hawthorne Street, San Francisco, CA 94105 United States

Google快讯 – medical waste

Google
medical waste

实时更新 2020年7月27日
新闻

While the incineration system typically disposes pathological waste and pharmaceutical waste excluding plastics; the non-incineration systems include …

Facebook Twitter 标记为不相关

Tracking GPS systems have also been installed in vehicles which carries the waste to the Common Bio-medical Waste Treatment and Disposal …

Facebook Twitter 标记为不相关

Even garbage and bio-medical waste is disposed of scientifically. Deputy Commissioner Abhiram G Sankar said, “The efforts of Nodal Officer Dr Ashok …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – medical waste

Google
medical waste

实时更新 2020年7月27日
新闻

medical waste. explosives, radioactive and unidentified waste. large gas cylinders. tires. smoke detectors. If you have …

Facebook Twitter 标记为不相关

WASTE TO ENERGY: A proposed Rhode Island medical waste incinerator remains mired in a permitting battle between two neighboring …

Facebook Twitter 标记为不相关

India needs to revisit the past, think twice about healthcare conditions and fill … including segregation of bio-medical waste and general solid waste.

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Google快讯 – incinerator

Google
incinerator

实时更新 2020年7月27日
新闻

A man's body was found floating near the Baltimore incinerator Monday morning, Baltimore Police said. Police said they were called around 7 a.m. to …

Facebook Twitter 标记为不相关

A PUBLIC consultation is being held over the environmental impact of a planned waste incinerator in Carlisle. Fortum Carlisle Ltd has applied to for an …

Facebook Twitter 标记为不相关

查看更多结果 | 修改此快讯
您收到此电子邮件是因为您订阅了Google快讯

RSS 以RSS Feed的形式接收此快讯

发送反馈

Medical Waste Incineration Model TS20(PLC) Wet Scrubber (Water Spary tower)

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model

TS20(PLC)

Picture

 

Principle

Medical Waste Incineration 

Burn Rate

Average 20 kg/hour

Feed Capacity

Average 40kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

210L

Internal Dimensions

65x65x50cm

Secondary Chamber

110L

Smoke Filter

Wet Scrubber (Water Spary tower)

Feed Mode

Manual

Voltage

380V

Power

5Kw

Oil Consumption (kg/hour)

7.8–16.3

Gas Consumption (m3/hour)

8–15.7

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

100L

Feed Door

45x40cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

4000kg

External Dimensions

160x110x130cm(Incinerator)





HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

 

2020-07-28

Medical Waste Incineration Model TS20(PLC) Wet Scrubber (Water Spary tower)

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model

TS20(PLC)

Picture

 

Principle

Medical Waste Incineration 

Burn Rate

Average 20 kg/hour

Feed Capacity

Average 40kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

210L

Internal Dimensions

65x65x50cm

Secondary Chamber

110L

Smoke Filter

Wet Scrubber (Water Spary tower)

Feed Mode

Manual

Voltage

380V

Power

5Kw

Oil Consumption (kg/hour)

7.8–16.3

Gas Consumption (m3/hour)

8–15.7

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

100L

Feed Door

45x40cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st. Chamber Temperature

800–1000

2nd. Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Gross Weight

4000kg

External Dimensions

160x110x130cm(Incinerator)





HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

 

2020-07-28

Integrated Solid Waste Management System medical waste incinerator

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Capacity: Average 300 kgs per hour


Model

YD300

Picture

 

Burning Rate

Average 300 kgs/hour

Feed Capacity

Average 500 kgs/feeding

Primary Combustion Chamber

2400 Liters

Secondary Combustion Chamber

1200 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Wet Scrubber System(3 Section Type)

Feed Mode

Manual

Voltage

380V

Power

12.0 Kw

Fuel Type

Diesel Oil/ Natural Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

Average 33kg/hour

Gas Consumption (Natural Gas)

***

Internal Dimensions

220 x 110 x 100cm (primary chamber)

External Dimensions

260 x 220 x 420cm (without chimney/wet scrubber)

Temperature Monitor

Yes

Oil Tank Capacity(if oil fuel)

500 Liters

Door Opening

90 x 110cm

Chimney Length

10.0 Meters

Chimney Type

Stainless Steel

Equipment Gross Weight

14000 kgs

Operation Technical Specifications

Primary Chamber Temperature

800–1000

Secondary Chamber Temperature

1000-1200

Residency Time

2.0 Sec.

Burning Efficiency

98%

Waste Lower Calorific Power

3000Kcal



Pathological waste: organs, tissues, surgical specimens, bodily fluids removed during surgery or autopsy. 

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

 

2020-07-27